TABLE OF CONTENTS
PART I- ADDENDUM TO STANDARD FORM 1449
SECTION A- CONTINUATION TO STANDARD FORM 1449
SECTION B- PRICES/COSTS
SECTION C- DESCRIPTION OF SUPPLIES OR SERVICES
PART II- CONTRACT CLAUSES AND TERMS AND CONDITIONS
SECTION D- FAR CLAUSE 52.212-4, CONTRACT TERMS AND CONDITIONS-COMMERCIAL ITEMS
SECTION E- CONTRACT CLAUSES
SECTION F- FAR CLAUSE 52.212-5, CONTRACT TERMS AND
CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS-COMMERCIAL ITEMS
PART III- CONTRACT DOCUMENTS, EXHIBITS AND/OR ATTACHMENTS
SECTION G- CONTRACT DOCUMENTS, EXHIBITS AND/OR ATTACHMENTS
SECTION H- FAR PROVISION 52.212-3, OFFEROR REPRESENTATIONS
AND CERTIFICATIONS COMMERCIAL ITEMS
SECTION I- SUPPLEMENTAL PROVISIONS
SECTION J- FAR PROVISION 52.212-1, INSTRUCTIONS TO OFFERORS - COMMERCIAL ITEMS
SECTION K- FAR PROVISION 52.212-2, EVALUATION - COMMERCIAL ITEMS
PART I- ADDENDUM TO STANDARD FORM 1449
Pages
SECTION A- CONTINUATION TO STANDARD FORM 1449 4
SECTION B- PRICES/COSTS 5-40
SECTION C- DESCRIPTION OF SUPPLIES AND SERVICES 42-62
SECTION A- CONTINUATION TO STANDARD FORM 1449
RESERVED
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B-1 PRICES/COSTS
On a firm fixed price basis, the contractor shall furnish all management, supervision, supplies, equipment, vehicles, materials, and labor, except as otherwise specified herein, necessary for or incidental to vaulting and storage services for magnetic media, including the transportation and recall of media, for the Social Security Administration (SSA) in accordance with the requirements specified herein at the firm-fixed prices set forth below. Prices are subject to change only as a result of prevailing wage determinations set forth by the Service Contract Act.
B-2 CONTRACT LINE ITEM NUMBERS (CLINS)
All Contract Line Items Numbers (CLINS) are Firm Fixed Priced. Those line items annotated with a “*Requirements” fall under the procedures set forth at FAR 52.216-21 Requirements, 52.216-18 Ordering, 52.216-19 Order Limitations, at the clause found in paragraph E-6 titled “Ordering Procedures.” Quantities for Requirements CLINS identified in this document are only estimates.
Base Year - July1, 2010– June 30, 2011
| 0001 | *REQUIREMENTS- The contractor shall provide the services required for the phase-in/transition period as set forth in Section C-4.K (15 day period). | | | | | |
| | Unit Price | Estimated Quantity | Unit | Total Price | |
| | $_______ | 1 | | Job | $_________ |
TAPE STORAGE – The contractor shall provide storage of tapes as follows: (Reference Section C-4.A-C)
| 0002 | Baltimore, Maryland (Estimated Monthly Tape Storage volume is 29,000; number of Federal workdays is 261) Unit Price Per Tape: $______ | | | |
| Unit Price | Quantity | | Unit | Total Price |
| $_____ | | 12 | Month | $__________ |
| 0003 | Durham, North Carolina (Estimated Monthly Tape Storage volume is 4,900; number of Federal workdays is 261) Unit Price Per Tape $______ | | | | | | |
| | Unit Price | Quantity | | Unit | | Total Price |
| $_____ | | 12 | | Month | | $__________ | |
SCHEDULED PICKUP AND DELIVERY TRIPS (Reference Section C-4.D)
| 0004 | Scheduled daily pickup and delivery services @ 1 round-trip per day Monday through Saturday excluding Federal holidays) to and from the SSA Primary Location (Baltimore, Maryland) (Reference C-4-D.1). | | | | | |
| Unit Price | Quantity | Unit | | Total Price | | |
| | $__________ | 12 | | Month | $__________ |
| 0005 | Scheduled daily pickup and delivery services @ 1 round-trip per day Monday through Friday (excluding Federal Holidays) to and from SSA Secondary Location (Durham, North Carolina) (Reference C-4.D.3). | | | | | |
| Unit Price | Quantity | Unit | | Total Price | | |
| | | $__________ | 12 | Months | $__________ |
ACTUAL EMERGENCY ROUND-TRIP TO/FROM NCC PRIMARY VAULT FACILITY AND/OR DSC PRIMARY VAULT FACILITY TO SSA DISASTER RECOVERY SITE or DATA CENTER for NCC or DSC AS REQUIRED
SSA Primary Location (NCC Data Center) Disaster Recovery In the event of an actual emergency at the NCC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA NCC Prime Location in Baltimore, Maryland. (Reference C-4.F)
| 0006 | *REQUIREMENTS – In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA contracted recovery facility | | | | |
| Unit Price | Estimated Quantity | | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
| 0007 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA Secondary location Data Center in Durham, North Carolina | | | | |
| Unit Price | Estimated Quantity | | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
SSA Secondary Location (DSC Data Center) Disaster Recovery In the event of an actual emergency at the DSC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Secondary Location in Durham, North Carolina. (Reference C-4.F)
| 0008 | *REQUIREMENTS In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA contracted recovery facility | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Trip | $________ |
| 0009 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA Primary Location Data Center in Baltimore, Maryland | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Trip | $________ |
DISASTER RECOVERY EXERCISE ROUND-TRIP TO/FROM NCC AND/OR DSC PRIMARY VAULT FACILITY TO SSA DISASTER RECOVERY SITE/DATA CENTER OR RESPECTIVE DATA CENTER AS REQUIRED (Reference Section C-4.E)
SSA Primary Location (NCC Data Center) Disaster Recovery Exercise In the event of a disaster recovery exercise at the NCC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Prime Location in Baltimore, Maryland. (Reference Section C-4.E)
| 0010 | *REQUIREMENTS – In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA contracted recovery facility | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
| 0011 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA Secondary Location Data Center in Durham, North Carolina | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
SSA Secondary Location (DSC Data Center) Disaster Recovery Exercise In the event of disaster recovery exercise at the DSC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Secondary Location in Durham, North Carolina. (Reference Section C-4.E)
| 0012 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA contracted recovery facility | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
| 0013 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA Primary Location Data Center in Baltimore, Maryland | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
EMERGENCY RUN TO DISASTER RECOVERY SITE AS REQUIRED (Section C-4.F.2)
SSA Primary Location (NCC Data Center) Emergency Run In the event of an actual emergency at the NCC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Prime Location in Baltimore, Maryland. (Reference section C-4.F.2)
| 0014 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA contracted recovery facility | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
| 0015 | *REQUIREMENTS - - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA Secondary Location Data Center in Durham, North Carolina | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
SSA Secondary Location (DSC Data Center) Emergency Run In the event of an actual emergency at the DSC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Secondary Location in Durham, North Carolina. (Reference section C-4.F.2)
| 0016 | *REQUIREMENTS - - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA contracted recovery facility | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
| 0017 | *REQUIREMENTS - - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA Primary Location Data Center in Baltimore, Maryland | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
UNSCHEDULED TRIPS AS REQUIRED (Section C-4.G)
1. Scenario 1 – One or more magnetic tapes currently stored at the Contractor’s storage facility are needed at the NCC or DSC SSA data center for data reconstruction. (See section C.4.G)
| 0018 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from Primary Vault for Primary Location (NCC) to NCC Data Center located in Baltimore, Maryland | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
| 0019 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from Primary Vault for Secondary Location (DSC) to DSC Data Center located in Durham, North Carolina | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
2. Scenario 2 – Emergency run to Disaster Recovery site as required. A special recall of small quantities of magnetic tape cartridges may be required during the recovery period. (See section C.4.G)
| 0020 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from NCC Primary Vault to SSA contracted recovery site | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
| 0021 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from NCC Primary Vault to DSC Data Center located in Durham, North Carolina | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
| 0022 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from DSC Primary Vault to SSA contracted recovery site | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
| 0023 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from DSC Primary Vault to NCC Data Center located in Baltimore, Maryland | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
3. Scenario 3 – Transportation of Magnetic Media back and forth from the SSA Prime Location (Baltimore, Maryland) and the SSA Secondary Location (Durham, North Carolina) (See section C.4.G)
| 0024 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from NCC Data Center to DSC Data Center | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
| 0025 | *REQUIREMENTS – The contractor shall provide transportation of magnetic media back and forth from DSC Data Center to NCC Data Center | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
0026 CRISIS COPY FACILITY-TAPE STORAGE - The contractor shall provide storage of tapes as follows (Section C-4.M)
Per Tape per Month (Estimated Monthly Tape Storage Volume is approximately 9,000 total) Unit Price Per Tape: $______
| NCC Crisis Vault – 8,000 | | | | | |
| DSC Crisis Vault – 1,000 | | | | | |
| Unit Price | | Quantity | Unit | | Total Price | |
| $_____ | | 12 | | Month | | $________ |
SCHEDULED PICK-UP AND DELIVERY SERVICES: 1 ROUND TRIP PER WEEK (EXCLUDING FEDERAL HOLIDAYS) FROM THE NCC Primary Vault to the NCC Crisis Copy Facility or DSC Primary Vault to the DSC Crisis Copy Facility (Section C-4.M)
| 0027 | The contractor shall provide scheduled pick-up and delivery services from the NCC Primary Vault to the NCC Crisis Copy Facility | | | | | |
| Unit Price | | Quantity | Unit | | Total Price | |
| $_____ | | 52 | | Week | | $________ |
| 0028 | The contractor shall provide scheduled pick-up and delivery services from the DSC Primary Vault to the DSC Crisis Copy Facility | | | | |
| Unit Price | | Quantity | Unit | Total Price | |
| $_____ | | 52 | | Week | $________ |
ACTUAL EMERGENCY ROUND-TRIP TO DISASTER RECOVERY SITE FROM NCC OR DSC CRISIS COPY FACILITY - AS REQUIRED (Reference Section C-4.M)
| 0029 | *REQUIREMENTS – In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from NCC Crisis Copy Facility to Disaster Recovery site: | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
| 0030 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from DSC Crisis Copy Facility to Disaster Recovery site: | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 1 | Trip | $________ |
DISASTER RECOVERY EXERCISE ROUND-TRIP FROM NCC OR DSC CRISIS COPY FACILITY TO DISASTER RECOVERY SITE (Reference Section C-4.M)
| 0031 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the NCC Crisis Copy Facility. | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 1 | Each | $________ |
| 0032 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the DSC Crisis Copy Facility. | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 1 | Each | $________ |
EMERGENCY RUN TO DISASTER RECOVERY SITE FROM NCC or DSC CRISIS COPY FACILITY - AS REQUIRED (Section C-4.M)
| 0033 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from NCC Crisis Copy Facility | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
| 0034 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the DSC Crisis Copy Facility | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
| 0035 | CONTAINER STORAGE – (Section C-4.D.1 (2)b. and C-4.D.3(2)b.) | | | | | | |
| Unit Price | | Quantity | | Unit | | Total Price | |
| $______ | | | 12 | | Month | | $_______ |
| 0036 | COMPUTER HARD DRIVE STORAGE (Section C-4.D) | | | | | | | |
| | Unit Price | Quantity | | Unit | | Total Price | |
| | $______ | | 12 | | Month | | $__________ |
Option Year 1 - July 1, 2011– June 30, 2012
OPTION YEAR 1 -TAPE STORAGE (Reference Section C-4.A-C)
| 0037 | Baltimore, Maryland(Estimated Monthly Tape Storage volume is 30,000; number of Federal workdays is 261) Unit Price Per Tape: $_____ | | | |
| Unit Price | Quantity | | Unit | Total Price |
| $_____ | | 12 | Month | $__________ |
| 0038 | Durham, North Carolina (Estimated Monthly Tape Storage volume is 5,400; number of Federal workdays is 261) Unit Price Per Tape: $_____ | | | | | | |
| | Unit Price | Quantity | | Unit | | Total Price |
| $_____ | | 12 | | Month | | $__________ | |
OPTION YEAR 1 - SCHEDULED PICKUP AND DELIVERY TRIPS
SCHEDULED PICKUP AND DELIVERY TRIPS (Reference Section C-4.D)
| 0039 | Scheduled daily pickup and delivery services @ 1 round-trip per day Monday through Saturday excluding Federal holidays) to and from the SSA Primary Location (Baltimore, Maryland) (Reference C-4.D.1). | | | | | |
| Unit Price | Quantity | Unit | | Total Price | | |
| | $__________ | 12 | | Month | $__________ |
| 0040 | Scheduled daily pickup and delivery services @ 1 round-trip per day Monday through Friday (excluding Federal Holidays) to and from SSA Secondary Location (Durham, North Carolina) (Reference C-4-D.3). | | | | | |
| Unit Price | Quantity | Unit | | Total Price | | |
| | | $__________ | 12 | Months | $__________ |
OPTION YEAR 1 - ACTUAL EMERGENCY ROUND-TRIP TO/FROM NCC PRIMARY VAULT FACILITY AND/OR DSC PRIMARY VAULT FACILITY TO SSA DISASTER RECOVERY SITE or DATA CENTER for NCC or DSC AS REQUIRED
SSA Primary Location (NCC Data Center) Disaster Recovery In the event of an actual emergency at the NCC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA NCC Prime Location in Baltimore, Maryland. (Reference C-4.F)
| 0041 | *REQUIREMENTS – In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA contracted recovery facility | | | | |
| Unit Price | Estimated Quantity | | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
| 0042 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA Secondary location Data Center in Durham, North Carolina | | | | |
| Unit Price | Estimated Quantity | | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
SSA Secondary Location (DSC Data Center) Disaster Recovery In the event of an actual emergency at the DSC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Secondary Location in Durham, North Carolina. (Reference C-4.F)
| 0043 | *REQUIREMENTS In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA contracted recovery facility | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Trip | $________ |
| 0044 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA Primary Location Data Center in Baltimore, Maryland | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Trip | $________ |
OPTION YEAR 1 - DISASTER RECOVERY EXERCISE ROUND-TRIP TO/FROM NCC AND/OR DSC PRIMARY VAULT FACILITY TO SSA DISASTER RECOVERY SITE/DATA CENTER OR RESPECTIVE DATA CENTER AS REQUIRED (Reference Section C-4.E)
SSA Primary Location (NCC Data Center) Disaster Recovery Exercise In the event of a disaster recovery exercise at the NCC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Prime Location in Baltimore, Maryland. (Reference Section C-4.E)
| 0045 | *REQUIREMENTS – In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA contracted recovery facility | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
| 0046 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA Secondary Location Data Center in Durham, North Carolina | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
SSA Secondary Location (DSC Data Center) Disaster Recovery Exercise In the event of disaster recovery exercise at the DSC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Secondary Location in Durham, North Carolina. (Reference Section C-4.E)
| 0047 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA contracted recovery facility | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
| 0048 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA Primary Location Data Center in Baltimore, Maryland | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
OPTION YEAR 1 - EMERGENCY RUN TO DISASTER RECOVERY SITE AS REQUIRED (Section C-4.F.2)
SSA Primary Location (NCC Data Center) Emergency Run In the event of an actual emergency at the NCC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Prime Location in Baltimore, Maryland. (Reference section C-4.F.2)
| 0049 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA contracted recovery facility | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
| 0050 | *REQUIREMENTS - - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA Secondary Location Data Center in Durham, North Carolina | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
SSA Secondary Location (DSC Data Center) Emergency Run In the event of an actual emergency at the DSC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Secondary Location in Durham, North Carolina. (Reference section C-4.F.2)
| 0051 | *REQUIREMENTS - - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA contracted recovery facility | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
| 0052 | *REQUIREMENTS - - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA Primary Location Data Center in Baltimore, Maryland | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
OPTION YEAR 1- UNSCHEDULED TRIPS AS REQUIRED (Section C-4.G)
1. Scenario 1 – One or more magnetic tapes currently stored at the Contractor’s storage facility are needed at the NCC or DSC SSA data center for data reconstruction. (See section C.4.G)
| 0053 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from Primary Vault for Primary Location (NCC) to NCC Data Center located in Baltimore, Maryland | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
| 0054 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from Primary Vault for Secondary Location (DSC) to DSC Data Center located in Durham, North Carolina | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
2. Scenario 2 – Emergency run to Disaster Recovery site as required. A special recall of small quantities of magnetic tape cartridges may be required during the recovery period. (See section C.4.G)
| 0055 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from NCC Primary Vault to SSA contracted recovery site | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
| 0056 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from NCC Primary Vault to DSC Data Center located in Durham, North Carolina | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
| 0057 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from DSC Primary Vault to SSA contracted recovery site | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
| 0058 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from DSC Primary Vault to NCC Data Center located in Baltimore, Maryland | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
3. Scenario 3 – Transportation of Magnetic Media back and forth from the SSA Prime Location (Baltimore, Maryland) and the SSA Secondary Location (Durham, North Carolina) (See section C.4.G)
| 0059 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from NCC Data Center to DSC Data Center | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
| 0060 | *REQUIREMENTS – The contractor shall provide transportation of magnetic media back and forth from DSC Data Center to NCC Data Center | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
0061 OPTION YEAR 1- CRISIS COPY FACILITY-TAPE STORAGE - The contractor shall provide storage of tapes as follows (Section C-4.M)
Per Tape per Month (Estimated Monthly Tape Storage Volume is 10,000) Unit Price Per Tape: $_____ NCC Crisis Vault – 8,500 DSC Crisis Vault – 1,500
| Unit Price | Quantity | Unit | | Total Price | |
| $_____ | 12 | | Month | | $________ |
OPTION YEAR 1 - SCHEDULED PICK-UP AND DELIVERY SERVICES: 1 ROUND TRIP PER WEEK (EXCLUDING FEDERAL HOLIDAYS) FROM THE NCC Primary Vault to the NCC Crisis Copy Facility or DSC Primary Vault to the DSC Crisis Copy Facility (Section C-4.M)
| 0062 | The contractor shall provide scheduled pick-up and delivery services from the NCC Primary Vault to the NCC Crisis Copy Facility | | | | | |
| Unit Price | | Quantity | Unit | | Total Price | |
| $_____ | | 52 | | Week | | $________ |
| 0063 | The contractor shall provide scheduled pick-up and delivery services from the DSC Primary Vault to the DSC Crisis Copy Facility | | | | |
| Unit Price | | Quantity | Unit | Total Price | |
| $_____ | | 52 | | Week | $________ |
OPTION YEAR 1 - ACTUAL EMERGENCY ROUND-TRIP TO DISASTER RECOVERY SITE FROM NCC OR DSC CRISIS COPY FACILITY - AS REQUIRED (Reference Section C-4.M)
| 0064 | *REQUIREMENTS – In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from NCC Crisis Copy Facility to Disaster Recovery site: | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
| 0065 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from DSC Crisis Copy Facility to Disaster Recovery site: | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 1 | Trip | $________ |
OPTION YEAR 1 - DISASTER RECOVERY EXERCISE ROUND-TRIP FROM NCC OR DSC CRISIS COPY FACILITY TO DISASTER RECOVERY SITE (Reference Section C-4.M)
| 0066 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the NCC Crisis Copy Facility. | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 1 | Each | $________ |
| 0067 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the DSC Crisis Copy Facility. | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 1 | Each | $________ |
OPTION YEAR 1 - EMERGENCY RUN TO DISASTER RECOVERY SITE FROM NCC or DSC CRISIS COPY FACILITY - AS REQUIRED (Section C-4.M)
| 0068 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from NCC Crisis Copy Facility | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
| 0069 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the DSC Crisis Copy Facility | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
| 0070 | OPTION YEAR 1- CONTAINER STORAGE – (Section C-4.D.1 (2)b. and C-4.D.3(2)b.) | | | | | | |
| Unit Price | | Quantity | | Unit | | Total Price | |
| $______ | | | 12 | | Month | | $_______ |
| 0071 | OPTION YEAR 1- COMPUTER HARD DRIVE STORAGE (Section C-4.D) | | | | | | | |
| | Unit Price | Quantity | | Unit | | Total Price | |
| | $______ | | 12 | | Month | | $__________ |
Option Year 2 - July 1, 2012– June 30, 2013
OPTION YEAR 2 -TAPE STORAGE (Reference Section C-4.A-C)
| 0072 | Baltimore, Maryland (Estimated Monthly Tape Storage volume is 31,300; number of Federal workdays is 261) Unit Price Per Tape: $_____ | | | |
| Unit Price | Quantity | | Unit | Total Price |
| $_____ | | 12 | Month | $__________ |
| 0073 | Durham, North Carolina (Estimated Monthly Tape Storage volume is 6,000; number of Federal workdays is 261) Unit Price Per Tape: $_____ | | | | | | |
| | Unit Price | Quantity | | Unit | | Total Price |
| $_____ | | 12 | | Month | | $__________ | |
OPTION YEAR 2 - SCHEDULED PICKUP AND DELIVERY TRIPS
SCHEDULED PICKUP AND DELIVERY TRIPS (Reference Section C-4-D)
| 0074 | Scheduled daily pickup and delivery services @ 1 round-trip per day Monday through Saturday excluding Federal holidays) to and from the SSA Primary Location (Baltimore, Maryland) (Reference C-4.D.1). | | | | | |
| Unit Price | Quantity | Unit | | Total Price | | |
| | $__________ | 12 | | Month | $__________ |
| 0075 | Scheduled daily pickup and delivery services @ 1 round-trip per day Monday through Friday (excluding Federal Holidays) to and from SSA Secondary Location (Durham, North Carolina) (Reference C-4.D.3). | | | | | |
| Unit Price | Quantity | Unit | | Total Price | | |
| | | $__________ | 12 | Months | $__________ |
OPTION YEAR 2 - ACTUAL EMERGENCY ROUND-TRIP TO/FROM NCC PRIMARY VAULT FACILITY AND/OR DSC PRIMARY VAULT FACILITY TO SSA DISASTER RECOVERY SITE or DATA CENTER for NCC or DSC AS REQUIRED
SSA Primary Location (NCC Data Center) Disaster Recovery In the event of an actual emergency at the NCC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA NCC Prime Location in Baltimore, Maryland. (Reference C-4.F)
| 0076 | *REQUIREMENTS – In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA contracted recovery facility | | | | |
| Unit Price | Estimated Quantity | | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
| 0077 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA Secondary location Data Center in Durham, North Carolina | | | | |
| Unit Price | Estimated Quantity | | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
SSA Secondary Location (DSC Data Center) Disaster Recovery In the event of an actual emergency at the DSC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Secondary Location in Durham, North Carolina. (Reference C-4.F)
| 0078 | *REQUIREMENTS In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA contracted recovery facility | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Trip | $________ |
| 0079 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA Primary Location Data Center in Baltimore, Maryland | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Trip | $________ |
OPTION YEAR 2 - DISASTER RECOVERY EXERCISE ROUND-TRIP TO/FROM NCC AND/OR DSC PRIMARY VAULT FACILITY TO SSA DISASTER RECOVERY SITE/DATA CENTER OR RESPECTIVE DATA CENTER AS REQUIRED (Reference Section C-4.E)
SSA Primary Location (NCC Data Center) Disaster Recovery Exercise In the event of a disaster recovery exercise at the NCC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Prime Location in Baltimore, Maryland. (Reference Section C-4.E)
| 0080 | *REQUIREMENTS – In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA contracted recovery facility | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
| 0081 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA Secondary Location Data Center in Durham, North Carolina | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
SSA Secondary Location (DSC Data Center) Disaster Recovery Exercise In the event of disaster recovery exercise at the DSC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Secondary Location in Durham, North Carolina. (Reference Section C-4.E)
| 0082 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA contracted recovery facility | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
| 0083 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA Primary Location Data Center in Baltimore, Maryland | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
OPTION YEAR 2 - EMERGENCY RUN TO DISASTER RECOVERY SITE AS REQUIRED (Section C-4.F.2)
SSA Primary Location (NCC Data Center) Emergency Run In the event of an actual emergency at the NCC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Prime Location in Baltimore, Maryland. (Reference section C-4.F.2)
| 0084 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA contracted recovery facility | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
| 0085 | *REQUIREMENTS - - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA Secondary Location Data Center in Durham, North Carolina | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
SSA Secondary Location (DSC Data Center) Emergency Run In the event of an actual emergency at the DSC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Secondary Location in Durham, North Carolina. (Reference section C-4.F.2)
| 0086 | *REQUIREMENTS - - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA contracted recovery facility | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
| 0087 | *REQUIREMENTS - - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA Primary Location Data Center in Baltimore, Maryland | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
OPTION YEAR 2- UNSCHEDULED TRIPS AS REQUIRED (Section C-4.G)
1. Scenario 1 – One or more magnetic tapes currently stored at the Contractor’s storage facility are needed at the NCC or DSC SSA data center for data reconstruction. (See section C.4.G)
| 0088 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from Primary Vault for Primary Location (NCC) to NCC Data Center located in Baltimore, Maryland | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
| 0089 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from Primary Vault for Secondary Location (DSC) to DSC Data Center located in Durham, North Carolina | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
2. Scenario 2 – Emergency run to Disaster Recovery site as required. A special recall of small quantities of magnetic tape cartridges may be required during the recovery period. (See section C.4.G)
| 0090 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from NCC Primary Vault to SSA contracted recovery site | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
| 0091 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from NCC Primary Vault to DSC Data Center located in Durham, North Carolina | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
| 0092 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from DSC Primary Vault to SSA contracted recovery site | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
| 0093 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from DSC Primary Vault to NCC Data Center located in Baltimore, Maryland | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
3. Scenario 3 – Transportation of Magnetic Media back and forth from the SSA Prime Location (Baltimore, Maryland) and the SSA Secondary Location (Durham, North Carolina) (See section C.4.G)
| 0094 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from NCC Data Center to DSC Data Center | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
| 0095 | *REQUIREMENTS – The contractor shall provide transportation of magnetic media back and forth from DSC Data Center to NCC Data Center | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
0096 OPTION YEAR 2- CRISIS COPY FACILITY-TAPE STORAGE - The contractor shall provide storage of tapes as follows (Section C-4.M)
Per Tape per Month (Estimated Monthly Tape Storage Volume is 10,500) Unit Price Per Tape: $_____
| NCC Crisis Vault – 9,000 | | | | | |
| DSC Crisis Vault – 1,500 | | | | | |
| Unit Price | | Quantity | Unit | | Total Price | |
| $_____ | | 12 | | Month | | $_______ |
OPTION YEAR 2 - SCHEDULED PICK-UP AND DELIVERY SERVICES: 1 ROUND TRIP PER WEEK (EXCLUDING FEDERAL HOLIDAYS) FROM THE NCC Primary Vault to the NCC Crisis Copy Facility or DSC Primary Vault to the DSC Crisis Copy Facility (Section C-4.M)
| 0097 | The contractor shall provide scheduled pick-up and delivery services from the NCC Primary Vault to the NCC Crisis Copy Facility | | | | | |
| Unit Price | | Quantity | Unit | | Total Price | |
| $_____ | | 52 | | Week | | $________ |
| 0098 | The contractor shall provide scheduled pick-up and delivery services from the DSC Primary Vault to the DSC Crisis Copy Facility | | | | |
| Unit Price | | Quantity | Unit | Total Price | |
| $_____ | | 52 | | Week | $________ |
OPTION YEAR 2 - ACTUAL EMERGENCY ROUND-TRIP TO DISASTER RECOVERY SITE FROM NCC OR DSC CRISIS COPY FACILITY - AS REQUIRED (Reference Section C-4.M)
| 0099 | *REQUIREMENTS – In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from NCC Crisis Copy Facility to Disaster Recovery site: | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
| 0100 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from DSC Crisis Copy Facility to Disaster Recovery site: | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 1 | Trip | $________ |
OPTION YEAR 2 - DISASTER RECOVERY EXERCISE ROUND-TRIP FROM NCC OR DSC CRISIS COPY FACILITY TO DISASTER RECOVERY SITE (Reference Section C-4.M)
| 0101 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the NCC Crisis Copy Facility. | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 1 | Each | $________ |
| 0102 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the DSC Crisis Copy Facility. | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 1 | Each | $________ |
OPTION YEAR 2 - EMERGENCY RUN TO DISASTER RECOVERY SITE FROM NCC or DSC CRISIS COPY FACILITY - AS REQUIRED (Section C-4.M)
| 0103 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from NCC Crisis Copy Facility | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
| 0104 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the DSC Crisis Copy Facility | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
| 0105 | OPTION YEAR 2- CONTAINER STORAGE – (Section C-4.D.1 (2)b. and C-4.D.3(2)b.) | | | | | | |
| Unit Price | | Quantity | | Unit | | Total Price | |
| $______ | | | 12 | | Month | | $_______ |
| 0106 | OPTION YEAR 2- COMPUTER HARD DRIVE STORAGE (Section C-4.D) | | | | | | | |
| | Unit Price | Quantity | | Unit | | Total Price | |
| | $______ | | 12 | | Month | | $__________ |
Option Year 3 - July 1, 2013– June 30, 2014
OPTION YEAR 3 -TAPE STORAGE (Reference Section C-4.A-C)
| 0107 | Baltimore, Maryland(Estimated Monthly Tape Storage volume is 33,000; number of Federal workdays is 261) Unit Price Per Tape: $_____ | | |
| Unit Price | Quantity | Unit | Total Price |
| $_____ | | 12 Month | $__________ |
| 0108 | Durham, North Carolina (Estimated Monthly Tape Storage volume is 6,600; number of Federal workdays is 261) Unit Price Per Tape: $_____ | | | | | |
| | Unit Price | Quantity | Unit | | Total Price |
| $_____ | | 12 | Month | | $__________ | |
OPTION YEAR 3 - SCHEDULED PICKUP AND DELIVERY TRIPS
SCHEDULED PICKUP AND DELIVERY TRIPS (Reference Section C-4-D)
| 0109 | Scheduled daily pickup and delivery services @ 1 round-trip per day Monday through Saturday excluding Federal holidays) to and from the SSA Primary Location (Baltimore, Maryland) (Reference C-4.D.1). | | | | | |
| Unit Price | Quantity | Unit | | Total Price | | |
| | $__________ | 12 | | Month | $__________ |
| 0110 | Scheduled daily pickup and delivery services @ 1 round-trip per day Monday through Friday (excluding Federal Holidays) to and from SSA Secondary Location (Durham, North Carolina) (Reference C-4.D.3). | | | | | |
| Unit Price | Quantity | Unit | | Total Price | | |
| | | $__________ | 12 | Months | $__________ |
OPTION YEAR 3- ACTUAL EMERGENCY ROUND-TRIP TO/FROM NCC PRIMARY VAULT FACILITY AND/OR DSC PRIMARY VAULT FACILITY TO SSA DISASTER RECOVERY SITE or DATA CENTER for NCC or DSC AS REQUIRED
SSA Primary Location (NCC Data Center) Disaster Recovery In the event of an actual emergency at the NCC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA NCC Prime Location in Baltimore, Maryland. (Reference C-4.F)
| 0111 | *REQUIREMENTS – In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA contracted recovery facility | | | | |
| Unit Price | Estimated Quantity | | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
| 0112 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA Secondary location Data Center in Durham, North Carolina | | | | |
| Unit Price | Estimated Quantity | | Unit | Total Price | |
| $______ | | 1 | | Trip | $________ |
SSA Secondary Location (DSC Data Center) Disaster Recovery In the event of an actual emergency at the DSC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Secondary Location in Durham, North Carolina. (Reference C-4.F)
| 0113 | *REQUIREMENTS In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA contracted recovery facility | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Trip | $________ |
| 0114 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA Primary Location Data Center in Baltimore, Maryland | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Trip | $________ |
OPTION YEAR 3 - DISASTER RECOVERY EXERCISE ROUND-TRIP TO/FROM NCC AND/OR DSC PRIMARY VAULT FACILITY TO SSA DISASTER RECOVERY SITE/DATA CENTER OR RESPECTIVE DATA CENTER AS REQUIRED (Reference Section C-4.E)
SSA Primary Location (NCC Data Center) Disaster Recovery Exercise In the event of a disaster recovery exercise at the NCC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Prime Location in Baltimore, Maryland. (Reference Section C-4.E)
| 0115 | *REQUIREMENTS – In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA contracted recovery facility | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
| 0116 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA Secondary Location Data Center in Durham, North Carolina | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
SSA Secondary Location (DSC Data Center) Disaster Recovery Exercise In the event of disaster recovery exercise at the DSC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Secondary Location in Durham, North Carolina. (Reference Section C-4.E)
| 0117 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA contracted recovery facility | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
| 0118 | *REQUIREMENTS - In the event of a disaster recovery exercise, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA Primary Location Data Center in Baltimore, Maryland | | | |
| Unit Price | Estimated Quantity | Unit | Total Price | |
| $______ | | 1 | Each | $________ |
OPTION YEAR 3 - EMERGENCY RUN TO DISASTER RECOVERY SITE AS REQUIRED (Section C-4.F.2)
SSA Primary Location (NCC Data Center) Emergency Run In the event of an actual emergency at the NCC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Prime Location in Baltimore, Maryland. (Reference section C-4.F.2)
| 0119 | *REQUIREMENTS - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA contracted recovery facility | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
| 0120 | *REQUIREMENTS - - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for NCC Primary Vault to SSA Secondary Location Data Center in Durham, North Carolina | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
SSA Secondary Location (DSC Data Center) Emergency Run In the event of an actual emergency at the DSC, the pick list for shipment of media would include tapes from the Contractor’s offsite facility for the SSA Secondary Location in Durham, North Carolina. (Reference section C-4.F.2)
| 0121 | *REQUIREMENTS - - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA contracted recovery facility | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
| 0122 | *REQUIREMENTS - - In the event of an actual emergency, the contractor shall provide media retrieval and delivery services from the contractor’s storage facility for DSC Primary Vault to SSA Primary Location Data Center in Baltimore, Maryland | | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | | |
| $______ | | | 1 | | Trip | $________ |
OPTION YEAR 3- UNSCHEDULED TRIPS AS REQUIRED (Section C-4.G)
1. Scenario 1 – One or more magnetic tapes currently stored at the Contractor’s storage facility are needed at the NCC or DSC SSA data center for data reconstruction. (See section C.4.G)
| 0123 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from Primary Vault for Primary Location (NCC) to NCC Data Center located in Baltimore, Maryland | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
| 0124 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from Primary Vault for Secondary Location (DSC) to DSC Data Center located in Durham, North Carolina | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 6 | Trip | $________ |
2. Scenario 2 – Emergency run to Disaster Recovery site as required. A special recall of small quantities of magnetic tape cartridges may be required during the recovery period. (See section C.4.G)
| 0125 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from NCC Primary Vault to SSA contracted recovery site | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
| 126 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from NCC Primary Vault to DSC Data Center located in Durham, North Carolina | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
| 0127 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from DSC Primary Vault to SSA contracted recovery site | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
| 0128 | *REQUIREMENTS - The contractor shall provide transportation of magnetic media back and forth from DSC Primary Vault to NCC Data Center located in Baltimore, Maryland | | | | |
| Unit Price | | Estimated Quantity | Unit | Total Price | |
| $______ | | | 3 | Trip | $________ |
3. Scenario 3 – Transportation of Magnetic Media back and…