JOFOC.pdf

PDF 2 MB Posted

Attached to
Lodging/Hotel Room Services Federal contract opportunity
Solicitation number
SSA70016R0008
Issued by
Department of State US Embassy Riyadh

About this file

Justification and Approval for Other than Full and Open Competition (JOFOC)

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION AND APPROVAL

FOR OTHER THAN FULL AND OPEN COMPETITION (JOFOC)

ACQUISITION OF HOTEL ACCOMMODATIONS IN SUPPORT OF SENIOR

HIGH LEVEL USG VIP VISIT

Senior High Level USG Principal traveling with a delegation inclusive of support elements in: Security, Communications, Logistics and Operations.

1. I recommend that the Department of State use other than full and open competition for the acquisition of hotel rooms for this VIP visit. The estimated cost is not to exceed

$200,000 USD.

2. Nature and/or description of the action being approved.

3. A description of the supplies or services required to meet the agency's needs.

Four Seasons Hotel Riyadh at Kingdom Tower P.O. Box 231000 Kingdom Center Riyadh 11321 Kingdom of Saudi Arabia

The Embassy ofthe United States of America in Riyadh, Saudi Arabia will issue a fixed price indefinite quantity/indefinite delivery contract for lodging services. The contract period will be from April 6, 2016 to April 30, 2016.

4. An identification of the statutory authority permitting other than full and open competition.

[X] 41 U.S.C. 253 (c) (2), FAR 6.302-2; Unusual and Compelling Urgency;

(Based on the available time and urgency of the requirement as detailed below)

Security concerns prohibit sufficient advanced notification of VIP travel to allow for sufficient time to conduct full and open competition. The Department of State can only communicate with the staff at Posts abroad when authorization is given due to security concerns. They have an extremely short turnaround time when authorization has been granted for negotiations to commence and site selections to be finalized with both the local vendors and Posts before the actual Senior High Level USG VIP visit occurs. Security and logistical teams make determinations during the site survey as to which hotels are most suitable for the Senior High Level USG VIP and his traveling staff to remain overnight. Consideration of the Senior High Level USG Principal and the location are taken into consideration as a determining factor.

The types of events, meetings, locations and availability of venues to support the Senior High Level USG VIP and the delegation are often times designated by the host countries.

Unique requirements for communications support are under severe time limitations and always a determining factor in the selection process as its capacity to be augmented to the unique requirements necessary to support certain Senior High Level USG Principals.

Many of the arrangements for hotel and transportation are often not confirmed until just before the actual visit. In addition to supporting a large delegation within a short time frame, last minute and frequent changes of itineraries for supporting personnel often result in significant changes in how Posts work with the vendors.

With the exception of a few trips, contracts are not permitted to be signed until the Department of State (Post) has written confirmation from all supporting agencies, which enables collection of funds from said agencies in the event of cancellation.

This results in an unusual and compelling urgency in accordance with 41 U.S.C.

253 (c) (2), FAR 6.302-2.

These unique Senior High Level USG VIP travel requirements result in only a very limited number of responsible sources with no other supplies or services capable of satisfying agency requirement in accordance with 41 U.S.C. 253 (c) (2), Far 6.302-2. The following hotel operators will also provide services for this visit:

-- Burj Rafal Hotel Kempinski Riyadh -- Courtyard Marriot Diplomatic Quarter -- Movenpick Hotel Riyadh -- Ritz Carlton Hotel -- Riyadh Marriott Hotel

5. A demonstration that the proposed contractor's unique qualifications or the nature of the acquisition requires use of the authority cited.

Security and logistics are the Department of State's primary considerations when procuring hotel rooms. The Department of State must be able to provide a safe and secure environment for VIP visitors. Frequently VIP visits are not announced or confirmed in sufficient time to conduct a competition, creating an urgent and compelling need. At other times, the security requirements and/or requirements of the host country government limit the acquisition to one or a small number of predetermined hotels.

[] The VIP visit information was not available in sufficient time thereby creating an urgent and compelling need.

[] The host country government requires the use ofthis/these hotel(s).

[X] The proposed contractor has the following unique qualifications which meet the Department of State's security and logistical requirements.

[X] Set-back (hotel is safe distance from the street) [X] Location (able to secure building, travel route; distance to and from event) [X] Size and number of rooms (able to house everyone in one hotel) [] Conference facilities (adequate space for meetings, press conferences) [] Communications (able to install equipment/lines, command center) [] Accommodating to security needs

6. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable.

Due to urgency and exception in FAR 2S.401(a)(S) this solicitation cannot be posted but the JOFOC will be published in FedBizOpps after the event

The following other hotels were reviewed but were not adequate because of the following:

Intercontinental: Riyadh is in the process of building a subway system. At the moment, there is much construction occurring next to the Intercontinental that would be disruptive to guests and would prove problematic for our motorcade. There are unexpected detours in the area of the hotel and from a security standpoint -- it would be difficult to develop alternative routes for the motorcade.

7. A determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

The Contracting Officer has determined that the rates provided by the vendor are fair and reasonable.

8. Any other facts supporting the use of other than full and open competition.

None

9. A listing of sources, if any, that expressed, in writing, an interest in the acquisition.

None

10. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required.

None

CERTIFICATIO ~S

I certify that the information in this justification is accurate and contains complete data necessary to support the recommendation for other tt an full and open competition to the best of my knowledge and belief.

G? .::?

~haelDobbs

•04/0112016

Director, Office of Presidential Travel Support

I certify that this justification is accurate and complete to the best of my knowledge and belief. Based on my assessment, I conclude that other than full and open competition is justified and the proposed price is fair and reasonable.

04/0112016 ~7h~ Kevin M. Phillips Contracting Officer

File details come from the government source that posted it. Updated .