SRC27420._JCWA_Coon_Gulf_aggregate_specs.pdf
PDF 114 KB Posted
- Attached to
- Conservation/FW/WL - Aggregate -Coon Gulf Tract State and local contract opportunity
- Solicitation number
- SRC0000027420
- Issued by
- Jefferson County, Alabama
About this file
This is an aggregate specifications document for stone delivery to the Coon Gulf Forever Wild Tract, likely administered by the Alabama Department of Conservation and Natural Resources (DCNR). The project requires delivery of 250 tons of DOT #57 Stone to two specific locations within the tract: 100 tons to coordinates (34.76402, -85.82895) and 150 tons to coordinates (34.83115, -85.79871). Delivery is needed by March 31, 2025, with deliveries permitted Monday through Friday between 0700-1600 hours. The delivery location is at 5302 CR 491 in Stevenson, AL, with specific directions provided from Highway 117.
The delivery specifications require 72 hours notice prior to delivery, tailgating services, and coordination with the onsite DCNR employee Austin LeCroy. All drop locations will be at dirt WMA (Wildlife Management Area) roads without street addresses. There are no road or bridge restrictions, and gates will be open at all sites. A DCNR employee will be present to provide drop location guidance and tailgating instructions for drivers. The document appears to be a standard form used to specify aggregate delivery requirements for state land management projects.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Quick_Quote_Standard_Boilerplate_updated_12.18.2024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Aggregate Specs Type of aggregate:
Amount needed:
No
M T W T F
DOT #57 Stone
250 Tons
Coon Gulf Forever Wild Tract
5302 CR 491
Stevenson, AL 35772
Coming from Stevenson North on Hwy 117, take a right onto CR 491, 3/31/2025
72 hrs
Austin LeCroy (256)-563-1204
0700-1600
100 tons delivered to (34.76402, -85.82895), 150 tons delivered to
(34.83115, - 85.79871)
All drop locations will be at dirt WMA roads with no street address. Gates will be open at all sites and a DCNR employee will be onsite for drop location questions or tailgating instructions for drivers.
and travel for 5.3 miles. The entrance road will be on the left with a sign.
File details come from the government source that posted it. Updated .