Summary of Summer Renovations Project

This document is a comprehensive specifications and bidding package issued by Davison Community Schools in Davison, Michigan for a summer renovations project. The project encompasses the replacement of doors, frames, and masonry at Davison High School and Hahn Intermediate School. The scope of work includes selective demolition, unit masonry installation, spray polyurethane foam insulation, joint sealants, hollow metal doors, aluminum framed entrances and storefronts, door hardware, glazing, and high-performance coatings. A non-mandatory pre-bid meeting is scheduled for July 2, 2026 at 11:00 a.m. at Davison High School, with facility access available by contacting Rod Hoover at (810) 600-0306. Bids are due on July 14, 2026 at 1:00 p.m. at the Davison Administration Office, with bid opening and public reading immediately following. Post-bid interviews are scheduled for July 14, 2026 from 2:00 p.m. to 4:00 p.m., and owner review is scheduled for July 15-17, 2026. The contract start date is July 20, 2026, with substantial completion required by October 30, 2026 and final completion by November 6, 2026. Installations must occur between July 13, 2026 and October 16, 2026.

Each bid must be accompanied by a certified check, money order, or bid bond of not less than 5 percent of the total bid amount. Performance and payment bonds are required in amounts equal to 100 percent of the contract sum, with premiums included in the base bid. The contract will be executed using the AIA A101-2017 Standard Form of Agreement Between Owner and Contractor. All bids shall be submitted by a prime bidder only and must include all subcontractor costs. This project does not require prevailing wages. The successful bidder must furnish evidence of insurance including Employer's Liability ($1,000,000 minimum), Comprehensive General Liability ($1,000,000 each occurrence), and Automobile Liability ($1,000,000 per person/$2,000,000 per occurrence). Bidders must submit sworn statements disclosing any familial relationships with school board members or the superintendent and certifying that they are not Iran-linked businesses. Electronic bidding documents will be available from Kingscott Associates, Inc. via ShareFile beginning June 24, 2026, with access coordinated through Lisa Dailey at ldailey@kingscott.com.

View the file

Other files for this state and local contract opportunity

Other files attached to Summer Renovations Project, newest first.
File Type Posted
april24IranEconomicSanctionsAct (1).pdf PDF
SR-CD Set 6.24.26.pdf PDF
april24FamilialDisclosureForm (1).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONDITIONS OF THE CONTRACT AND SPECIFICATIONS

FOR

SUMMER RENOVATIONS

DAVISON COMMUNITY SCHOOLS

DAVISON, MICHIGAN

June 18, 2026

A/E NO. 2790-22.0H

OWNER

DAVISON COMMUNITY SCHOOLS

1490 N. OAK ROAD

DAVISON, MICHIGAN 48423

(810) 591-1050

ARCHITECTS/ENGINEERS

KINGSCOTT ASSOCIATES, INC

950 TRADE CENTRE WAY, SUITE 130

PORTAGE, MICHIGAN 49002

(269) 381-4880

2790-22.0H TABLE OF CONTENTS TOC-1

Kingscott Associates, Inc. Summer Renovations

Architects/Engineers Davison Community Schools

Portage, Michigan Davison, Michigan

TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

NOTICE TO BIDDERS

INSTRUCTION TO BIDDERS

BID FORM

AFFIDAVIT OF BIDDER #1

AFFIDAVIT OF BIDDER #2

GENERAL CONDITIONS

SUPPLEMENTARY GENERAL CONDITIONS

DIVISION 01 – GENERAL REQUIREMENTS

013300 ARCHITECT’S SUBMITTAL PROCEDURES

DIVISION 02 – EXISTING CONDITIONS

024119 SELECTIVE DEMOLITION

DIVISION 03 – CONCRETE (NOT USED)

DIVISION 04 – MASONRY

042000 UNIT MASONRY

DIVISION 05 – METALS (NOT USED)

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES (NOT USED)

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

072119 SPRAY POLYURETHANE FOAM INSULATION

079200 JOINT SEALANTS

DIVISION 08 – OPENINGS

081113 HOLLOW METAL DOORS

084113 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS

087100 DOOR HARDWARE

088000 GLAZING

DIVISION 09 – FINISHES

099600 HIGH-PERFORMANCE COATINGS

DIVISION 10 and 33 (NOT USED)

2790-22H NOTICE TO BIDDERS NTB-1

Sealed Bids for the Summer Renovations Project will be received by Davison Community

Schools, at the Davison Administration Office, 1490 N. Oak Road, Davison, Michigan 49423, on

July 14th, until 1:00 p.m., local time.

Bids will be opened publicly and read aloud at the Davison Administration Office.

Bids received after 1:00pm will be returned unopened. Each bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the firm submitting the bid and the Superintendent of Davison Community Schools or any member of the Board of Education.

Bids shall be executed on the Bid Form provided. Each proposal must be accompanied by a satisfactory certified check, money order, or bid bond payable to Davison Community Schools for not less than five (5%) percent of the amount of the bid and delivered in a sealed envelope bearing the bidder’s name, address, and project identification.

All bids submitted shall be from a prime bidder only and shall include all subcontractor costs for scopes identified in the contract documents. This project does not require prevailing wages.

Successful bidder(s) will be awarded by AIA A101-2017, Standard Form of Agreement Between

Owner and Contractor, issued by the Owner following direction by Davison Community Schools.

Bidding and Contract Documents will be available from Kingscott Associates, Inc. on June 24, 2026, on the Kingscott ShareFile site. For access to the Kingscott ShareFile site, please contact

Lisa Dailey ldailey@kingscott.com. No printed sets of contract documents will be issued;

however, the electronic files may be reproduced for bidding purposes by the bidder and at the bidder’s expense.

The Owner reserves the right to accept or reject any or all bids, to waive any irregularities in bidding and to refrain from accepting or rejecting any bids for a period of thirty (30) days after the bid opening.

There will be a non-mandatory pre-bid meeting on July 2, 2026, at 11:00am starting at

Davison High School. If you are not able to attend the pre-bid meeting, access to the Owner’s facilities may be arranged through contacting Rod Hoover at (810) 600-0306.

The project scope of work includes the following:

1. Replacement of doors, frames and masonry at Davison HS and Hahn Intermediates schools.

2790-22H INSTRUCTIONS TO BIDDERS ITB-1

INSTRUCTIONS TO BIDDERS

DEFINITIONS: Bidding Documents include the Advertisement or Invitation for Bids, or Notice to Bidders, Instructions to Bidders, Bid/Proposal Forms and Supplements (if any), Sample Forms and the Proposed Contract Documents, including General Conditions of the Contract for

Construction, Supplementary Conditions, Specifications, Drawings, and any Addenda issued prior to receipt of bids.

All definitions set forth in the General Conditions of the Contract for Construction or in any other

Contract Documents are applicable to the Bidding Documents.

Addenda are written or graphic instruments issued by the Architects/Engineers prior to execution of a Contract which modify or interpret the Bidding Documents by additions, clarifications or corrections.

A Bid is a complete and properly signed proposal to do the Work or designated portion thereof for the sums stipulated therein submitted in accordance with and supported by such data as required by the Bidding Documents.

A Bidder is a person or entity who submits a Bid for the Work or specified portion thereof as described in the Proposed Contract Documents.

A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment or labor for a portion of the Work.

BIDDER'S REPRESENTATIONS: Each Bidder by submitting a Bid represents that the Bidder has; read and understands the Bidding Documents and the Bid is made in accordance therewith;

read and understands the Bidding Documents to the extent that such documentation relates to the

Work for which the Bids is submitted, and to other portions of the Project (if any) that may be bid concurrently or are presently under construction; visited the site, become familiar with local conditions under which the Work is to be performed and correlated personal observations with requirements of the proposed Contract Documents; based the Bid upon materials, systems, and equipment described in the Bidding Documents without exception, unless so noted as may be provided on the Bid Form.

BIDDING DOCUMENTS: Bidding Documents may be obtained from the issuing office as stated in the Advertisement, Invitation, or Notice to Bidders. All plans and specifications remain the property of the Architects/Engineers.

Complete sets of the Bidding Documents shall be used in preparing Bids. Neither the Owner nor the Architect/Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

In making electronic copies of the Bidding Documents available, the Owner and the

Architect/Engineers do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant permission for any other use of the Bidding Documents.

2790-22H INSTRUCTIONS TO BIDDERS ITB-2

INTERPRETATION OF BIDDING DOCUMENTS: Bidders shall carefully study and compare the Bidding Documents with each other, and with other work being bid concurrently or presently under construction to the extent that it is related to the Work for which the Bid is submitted.

Bidders shall promptly notify the Architect of any ambiguity, inconsistency or errors that they may discover upon examination of the Bidding Documents or of the site and local conditions.

Bidders or Sub-bidders requiring clarification or interpretation of the Bidding Documents shall make such written request to the Architects/Engineers at least three (3) days prior to the date of receipt of bids. Any required interpretation, correction or change of the Bidding Documents will be made by addendum and will be issued by electronic transmission or posting to a File Transfer

Protocol (FTP) site. Interpretations, corrections or changes made in any other manner are not binding and Bidders shall not rely upon such.

SUBSTITUTIONS: The materials, products and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance and quality to be met by any proposed substitution. No substitution will be considered prior to receipt of Bids unless written request for approval has been received by the Architect at least three (3) days prior to the date for receipt of Bids. Such requests shall include the name of the material or equipment for which it is to be substituted and a complete description of the proposed substitution including drawings, performance and test data, and other information necessary for an evaluation. A statement setting forth changes in other materials, equipment or other portions of the Work including changes in the work of other contracts that incorporation of the proposed substitution would require shall be included. The burden of proof of the merit of the proposed substitution is upon the proposer. The

Architect decision of approval or disapproval of a proposed substitution shall be final.

If the Architect approves a proposed substitution prior to receipt of Bids, such approval will be set forth in an Addendum and will be issued by electronic transmission or posting to a File

Transfer Protocol (FTP) site. Bidders shall not rely upon approvals made in any other manner.

No substitutions will be considered after the Contract award unless specifically provided in the

Contract Documents.

ADDENDA: Addenda will be issued by electronic transmission or posting to a File Transfer

Protocol (FTP) or similar site to all who are known by the Architect to have received access to the

Bidding Documents. Copies also will be made available for inspection wherever Bidding

Documents are on file for that purpose. Each Bidder shall ascertain prior to submitting a bid that the Bidder has received all Addenda issued, and the Bidder shall acknowledge their receipt in the allotted space on the proposal form.

It shall be understood and agreed that the requirements contained in all Bidding Documents shall apply to all addenda items and the general character of the work called for in the Addenda shall be the same as originally required for similar work (unless otherwise noted) and that all incidental work necessitated shall be included, even though not specified herein.

BIDS - FORM AND STYLE: Bids shall be submitted in duplicate on forms provided by the

Architects, with all applicable blanks filled in by typewriter or manually by ink. Where so indicated by the makeup of the Bid Form, sums shall be expressed in both words and figures. In case of discrepancy between the two, the written amount shall govern. Any interlineation, alteration or erasure must be initialed by the signer of the Bid.

Each Bid shall include the legal name and address of the Bidder and a statement whether the

Bidder is a sole proprietor, partnership, corporation or any other Legal Entity. Each copy shall be signed by a person legally authorized to bind the Bidder to a Contract. Bids submitted by a corporation shall have the corporation seal affixed. Bids submitted by an agent shall be accompanied by a current power of attorney certifying the agent's authority to bind the Bidder.

2790-22H INSTRUCTIONS TO BIDDERS ITB-3

SUBMISSION OF BIDS: Bids can be submitted by mail. All Bids submitted by mail shall be enclosed in a sealed opaque envelope. The envelope shall be addressed to the Owner and shall be identified with the Bidders name and address, the Project name, and the designated portion of the

Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with a notation "BID ENCLOSED” on the face thereof.

If the bid is submitted via email, the subject line should consist of the Project Name and include the notation “BID ENCLOSED”.

Bids shall be deposited at the designated location prior to the time and date indicated in the

Advertisement, Invitation to Bid or Notice to Bidders or any extension thereof made by

Addendum. Bids received after the time and date set for receipt of Bids will be returned unopened.

Bidders shall assume full responsibility for timely delivery to the location designated for receipt of Bids. Oral, telephonic, or telegraphic bids are invalid and will not receive consideration.

BID MODIFICATION OR WITHDRAWAL: The Bidders so agrees in submitting a Bid that it may not be modified, withdrawn or canceled during the stipulated time period following the time and date designated for receipt of Bids. Modification or withdrawal of an early submitted Bid may be made only by notice to the party receiving Bids at the place and prior to the time designated for receipt. Such notice shall be in writing over the signature of the Bidder or by telegram. If by telegram, written confirmation over the signature of the Bidder must have been mailed and postmarked on or before the date and time set for receipt of Bids. Modified or withdrawn Bids may be resubmitted up to the time designated for receipt of Bids, provided that they comply fully with all Bidding Documents.

CONSIDERATION OF BIDS: The Owner shall have the right to reject any and all Bids. A bid may be rejected if not accompanied by a required bid security, or by other data required by the

Bidding Documents or which is in any way incomplete or irregular.

The Owner shall have the right to waive informalities or irregularities in a Bid received, and to accept the Bid which, in the Owner's judgment, is in the Owner's best interests.

The Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the low Bidder on the basis of the sum of the Base Bid and Alternates accepted.

SUBMISSION OF POST BID INFORMATION: Bidders to whom award of a Contract is under consideration shall, upon request of the Architect, promptly submit statements setting forth previous experience, references, physical plant and equipment possessed, description of organization, financial resources and such other evidence as may testify to the ability to carry out contracts. This requirement may be met by submitting AIA Document A-305, Contractor's

Qualification Statement.

Unless waived by the Architect, the Bidder shall as soon as practicable after notification of selection for the award of a Contract, submit the following information to the Architect:

A designation of the Work to be performed by the Bidders own forces.

The proprietary names and the suppliers of principal items or systems materials and equipment proposed for the Work.

2790-22H INSTRUCTIONS TO BIDDERS ITB-4

A list of names of the Subcontractors or other persons or organizations (including those who are furnished materials or equipment fabricated to a special design) proposed for the principal portions of the Work.

The Bidder will be required to establish to the satisfaction of the Architect and the Owner the reliability and responsibility of the proposed Subcontractors to furnish and perform the Work described in the sections of the specifications pertaining to such proposed Subcontractors respective trades.

Prior to the award of the Contract, the Architect will notify the Bidder in writing if after due investigation, the Owner or Architect has reasonable objection to any person or organization, on such list. If the Owner or Architect has a reasonable objection to any person or organization, the

Bidder may, at the Bidders option, (l) withdraw the Bid or (2) submit an acceptable substitute person or organization with an adjustment in the Bid to cover the difference in cost occasioned by such substitution. The Owner may, at his discretion, accept the adjusted Bid or may disqualify the Bidder. In the event of either withdrawal or disqualification under this paragraph, bid security will not be forfeited.

Subcontractors and other persons and organizations proposed by the Bidder and accepted by the

Owner and the Architect must be used on the Work for which they were proposed and accepted and shall not be changed except with the written approval of the Owner and Architect.

PERFORMANCE BOND AND PAYMENT BOND: The successful Bidder shall furnish a

Performance Bond in an amount of not less than one hundred (l00%) percent of the contract sum as a security for the faithful performance of this contract and also a Payment Bond in an amount of not less than one hundred (l00%) percent of the sum of contract as security for the payment of all persons performing labor on the project under the contract and/or furnishing materials in connection with the contract. Bidders shall include the premiums for bonds in their proposals, with all costs for the performance and payment bond included in the base bid amount.

The Bidder shall deliver the required bonds to the Owner not later than the date of execution of the contract, or if the Work is commenced prior thereto in response to a letter of intent, the Bidder shall, prior to commencement of the Work and if required by the Owner, submit evidence satisfactory to the Owner that such bonds will be issued.

The Bidder shall require the attorney in fact who executed the required bonds on behalf of the surety to affix thereto a certified and current copy of the power of attorney indicating the monetary limit of such power. Bonds shall be written in the form of AIA Document A-3l2, Performance Bond and Payment Bond or equivalent. Bonds shall be dated on or after the date of the Contract.

INSURANCE: Successful Bidders will be required to furnish evidence of insurance of the kind and in the amounts as required by the General Conditions of the Contract for Construction and

Supplementary General Conditions.

PAYMENTS RETAINED: Owner shall make payments on account upon issuance of Certificates of Payment by the Architect for labor and material incorporated in the work and for materials suitably stored at the site up to ninety (90%) percent of the value thereof.

When the cumulative total of payment retained is equal to ten (10%) percent of the contract sum, subsequent payments will be made in the full amount for labor and material incorporated in the work and for materials suitably stored at the site, if, in the judgment of the Architect and the

2790-22H INSTRUCTIONS TO BIDDERS ITB-5

Owner, the work is progressing satisfactorily. This amount shall be retained until final acceptance of the work.

FINAL PAYMENT: Final payment, including retained percentage, shall become due when the contractor submits satisfactory evidence to the Architect that:

All payrolls, bills for materials, equipment and other indebtedness connected with the work for which the Owner of his property might in any way be responsible have been paid or otherwise satisfied.

Consent of surety in writing to final payment.

Data establishing payment or satisfaction of all obligations, such as receipts, releases and waivers of liens from each supplier and subcontractor covering each item of work.

SPECIFICATIONS/AUTOMATED TECHNICAL SECTIONS: Portions of the specifications may have been derived from an automated master specification production system and may include minor deviations from traditional writing forms. Such deviations must be recognized as a normal result of this production technique, and no other meaning will be implied or permitted.

The editing and printing methods utilized by the automated procedures can produce some irregularities in grammatical structure such as form, structure, spelling and punctuation. Most are of common practice. Should any Bidder be in doubt as to the intended meaning, he shall so notify the Architect who in turn shall clarify the question by means of addenda to all Bidders.

MICHIGAN OCCUPATIONAL SAFETY AND HEALTH ACT (MIOSHA): The contractor is to note the MIOSHA - (ACT 154 of the Public Acts of 1974) amendments that include requirements for the communication of information regarding safe handling of hazardous chemicals present in Michigan workplaces known as “Michigan’s Right to Know Law”. The

Contractor and all subcontractors shall comply with all required provisions that may relate to any materials that contain hazardous chemicals.

VOLUNTARY ALTERNATES: When reference is made in the specifications to one or more trade names or to the names of one or more manufacturers, such references are made to designate and identify the material or equipment to be furnished. The Bidder may, at his option, in addition to the Base Bid on the specified items, provide Voluntary Alternate proposals for optional materials and/or methods that the Bidder proposes to use, together with the difference in cost from that basically specified. The Owner reserves the right to accept or reject such options.

Submission of Voluntary Alternate proposals does not require prior approval of the Architect.

However, where a proposed Voluntary Alternate requires changes or modifications, in assembly, detail or form of any other construction, for accommodation, it shall be the responsibility of the

Bidder to reconcile and include all costs necessary for incorporation of such into the work.

Voluntary Alternates, if accepted, will be incorporated into the executed contract.

ALTERNATES: Where, by make up of the Proposal Form provision is made for an "Alternate" the Bidder shall state the amount that will be added or deducted from the Base Bid if the Owner decides to accept a change in the scope of work or in products, materials, equipment, systems or installation methods that is described in the Contract Documents.

Included as part of each Alternate shall be all miscellaneous devices, appurtenances and similar items incidental to or required for a complete installation whether or not specifically mentioned as part of the Alternate.

2790-22H INSTRUCTIONS TO BIDDERS ITB-6

BIDDING SCHEDULE

Documents available: June 24, 2026

Pre-bid walkthrough: July 2, 2026, 11:00am

Bid Due Date: July 14, 2026, 1:00pm

Post Bid Interviews: July 14, 2026, 2-4pm

Owner Review: July 15-17, 2026

CONSTRUCTION TIME OF COMPLETION:

Start date: July 20, 2026

Substantial completion: October 30, 2026

Final completion: November 6, 2026

EXAMINATION OF SITE, EXISTING BUILDINGS AND CONTRACT DOCUMENTS:

Before submitting a proposal, each Bidder shall carefully examine the Contract Documents, visit the site of the Work, fully inform himself as to all existing conditions and limitations and shall include in the proposal a sum to cover the cost of all items included in the work. No additional compensation for the omission of any work, materials, and/or labor required to complete the work in accordance with the contract will be granted due to the bidder’s failure to conform to these requirements.

Arrangements to visit the site may be made by contacting: Rod Hoover (810) 600-0306

Questions regarding the bid or contract documents shall be directed to:

T.J. O’Connor

Kingscott Associates, Inc.

950 Trade Centre Way, Suite 130

Portage, MI 49002

E-mail: tjoconnor@kingscott.com

Phone: (248) 506-8561

END OF SECTION

2790-22H BID FORM 1

BID FORM

Owner:

Davison Community Schools

Davison, Michigan

The undersigned, having carefully examined the Notice to Bidders, Instruction to Bidders, the premise and conditions affecting this work, together with drawings and specifications for the

Summer Renovations Project for Davison Community Schools and other documents related thereto, does hereby propose to furnish labor, materials, services and equipment necessary to complete all work, called for by and in accordance with the drawings and specifications for same, issued for bidding and dated June 22, 2026 including addenda numbered

TIME OF COMPLETION

The undersigned agrees to start work upon receipt of the Contract and shall achieve Final

Completion by October 30, 2026. Installations are to happen between July 13, 2026 and

October 16, 2026. (Note: Contract will be issued after a meeting (regular or special) of the

Davison School Board).

EXCEPTIONS AND/OR SUBSTITUTIONS

We have submitted our proposal(s) complete as specified and in accordance with the

Construction Documents WITH/WITHOUT (circle one) exceptions or substitutions. (Explain the exceptions or substitutions below).

BASE BID for Summer Renovations Project for Davison Community Schools:

ACCEPTANCE:

The undersigned agree(s) to accept a contract for the work covered by this proposal, in accordance with the contract and bidding documents.

The Owner reserves the right to accept or reject any and all proposals or parts of the same.

2790-22H BID FORM 2

BIDDER STATUS:

(Check One)

_________Individual ___________Partnership __________Corporation

Submitted By:

Company _________________________________________________________________

Address _________________________________________________________________

Telephone/Fax _________________________________________________________________

Email _________________________________________________________________

Signature/Date _________________________________________________________________

Print Name/Title_________________________________________________________________

SCHEDULE

The proposed schedule may be a deciding factor in the selection of the successful bidder. Please indicate the proposed schedule as follows:

Proposed Material Delivery Date: _______________________________________________

Proposed Installation Start Date: _______________________________________________

Proposed Completion Date: __________________________________________________

SUBCONTRACTORS

Provide a list of subcontractors included in this bid:

2790-22H AFFIDAVIT OF BIDDER 1

AFFIDAVIT OF BIDDER #1

The undersigned, the owner or authorized officer of ___________________________

(the “Bidder”), pursuant to the familial disclosure requirement provided in advertisement for construction bids and Instructions to Bidders, hereby represent and warrant, except as provided below, that no familial relationships exist between the owner(s) or any employee of and any other member of the Board of Education or Administration of Davison Community

Schools, or the Superintendent of Davison Schools.

List any Familial Relationships:

BIDDER:_________________________

By: ______________________________

Its:_______________________________

STATE OF MICHIGAN )

)ss

COUNTY OF ______________)

This instrument was acknowledged before me on the _________ day of ___________, in the year

__________, by_____________________________.

, Notary Public

__________________County, Michigan

My Commission Expires: _______________

Acting in the County of: ________________

2790-22H AFFIDAVIT OF BIDDER 1

AFFIDAVIT OF BIDDER #2

The undersigned, the owner or authorized officer of ___________________________

(the “Bidder”), hereby certify that they are not an Iran-linked business nor on the U.S.

Government Services Administration’s Excluded Parties List.

BIDDER:_________________________

By: ______________________________

Its:_______________________________

STATE OF MICHIGAN )

)ss

COUNTY OF ______________)

This instrument was acknowledged before me on the _________ day of ___________, in the year

__________, by_____________________________.

, Notary Public

__________________County, Michigan

My Commission Expires: _______________

Acting in the County of: ________________

2790-22H GENERAL CONDITIONS 1

GENERAL CONDITIONS

GENERAL CONDITIONS A-201:

The General Conditions shall be the "General Conditions of the Contract for Construction ", AIA

Document A-201, 2017 edition, issued by the American Institute of Architects, 1735 New York

Avenue, N.W., Washington D.C. 20006.

The General Conditions are on file at the following location:

Architect:

Kingscott Associates Inc.

950 Trade Centre Way, Suite 130

Portage, MI 49002

2790-22H SUPPLEMENTARY GENERAL CONDITIONS 1

SUPPLEMENTARY GENERAL CONDITIONS

OF THE

CONTRACT FOR CONSTRUCTION

SPECIAL NOTE:

These supplementary General Conditions consist of amendments and/or additions which shall take precedence over and modify specific articles and/or paragraphs of the "General Conditions of the Contract" A-201, 2007 Edition, and shall be used in conjunction with them as part of the contract documents. Any and/or all articles and/or paragraphs of the "General Conditions of the Contract" not specifically amended in this section shall apply in their entirety.

AMENDMENTS AND ADDITIONS:

The following items relate to the General Conditions by specific article and/or paragraph number being amended or added to. These items, as amendments, shall have precedence over only such portions and said articles and/or paragraphs of the General Conditions which are specifically modified thereby.

MODIFICATIONS OF THE GENERAL CONDITIONS

ARTICLE 1 GENERAL PROVISIONS Paragraph 1.2 Correlation and Intent of the Contract Documents, add the following subparagraph:

1.2.4. In case of an inconsistency between Drawings and Specifications or within either Document not clarified by addendum, the better quality or greater quantity of Work shall be provided in accordance with the Architect's interpretation.

ARTICLE 3 CONTRACTOR Paragraph 3.2. “Review of Contract Documents and Field Conditions by Contractor”:

DELETE PARAGRAPH 3.2.2 AND REPLACE WITH THE FOLLOWING:

3.2.2 The Contractor shall carefully study and compare the Contract Documents with each other and with information furnished by the Owner pursuant to Section 2.2.3 and shall at once report to the Architect errors, inconsistencies or omissions discovered. The Contractor shall not be liable to the Owner, or Architect for damage resulting from errors, inconsistencies or omissions in the Contract Documents unless the Contractor recognized such error, inconsistency or omission and knowingly failed to report it to the Architect. If the Contractor performs any construction activity knowing it involves a recognized error, inconsistency or omission in the Contract Documents without such notice to the Architect, the Contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable costs for correction.

Prior to submitting its bid, the Contractor shall have studied and compared the Contract Documents and shall have reported to the Architect any error, inconsistency or omission in the Contract Documents. It will be presumed that the Contractor’s bid and the Contract Sum include the cost of correcting any such error, inconsistency or omission, which could have been

2790-22H SUPPLEMENTARY GENERAL CONDITIONS 2

discovered by the exercise of reasonable diligence. Unless the Contractor establishes that such error, inconsistency or omission could not have been discovered by the exercise of reasonable diligence, the contractor will make such corrections without additional compensation so that the Work is fully functional.

ARTICLE 3 CONTRACTOR Paragraph 3.4. “Labor and Materials” add the following to subparagraph 3.4.3:

Contractor shall enforce regulations regarding the use of tobacco products on school property.

ARTICLE 3 CONTRACTOR Paragraph 3.4 Labor and Materials, add the following subparagraph.

3.4.4 The Contractor shall take precautions to ensure that he or his subcontractors utilize no asbestos containing building materials (ACBM, as defined in section 763.83 of 40 CFR Part 763 amended). Upon completion of the work, and before final payment, the contractor shall submit a signed statement that "to the best of his or her knowledge no asbestos containing building materials (ACBM) was used as a building material in construction of the project."

ARTICLE 11 INSURANCE AND BONDS Paragraph 11.1 Contractor’s Liability Insurance, add the following subparagraphs:

11.5 The Contractor shall purchase and maintain insurance for the following with minimum coverage as indicated and naming Davison Community Schools and

Kingscott Associates, Inc.

COMPENSATION

Employer's Liability, Occupational Disease $1,000,000 minimum and as and Workmen's Compensation required by the laws of the State of Michigan

PUBLIC LIABILITY AND PROPERTY DAMAGE

Comprehensive General Liability Form Required

Bodily Injury and Death $1,000,000 each occurrence $1,000,000 aggregate

Property Damage $1,000,000 each occurrence $1,000,000 aggregate

AUTOMOBILE LIABILITY

Comprehensive Automobile Liability Form Required

Bodily Injury and Death $1,000,000 each person $2,000,000 each occurrence

Property Damage $2,000,000 each occurrence

2790-22H SUPPLEMENTARY GENERAL CONDITIONS 3

ADDITIONAL CONDITIONS

ADD ARTICLES 16 AND 17 AS FOLLOWS:

ARTICLE 16:

Pursuant to Michigan House Bill No. 5376, which amends Public Act 451 of 1976, each contractor/subcontractor shall provide the following:

“All bids shall be accompanied by a sworn statement disclosing any familial relationship that exists between the owner(s) or any employee of the bidder and any member of the Board of Education of the School District or the Superintendent of the School District. The Board of

Education shall not accept a bid that does not include a sworn and notarized relationship disclosure statement.”

ARTICLE 17

Pursuant to the Iran Economic Sanctions Act 517 of 2012,

(1) Beginning April 1, 2013, an Iran linked business is not eligible to submit a bid on a request for proposal with a public entity.

(2) Beginning April 1, 2013, a public entity shall require a person that submits a bid on a request for proposal with the public entity to certify that it is not an Iran linked business.

The contractor shall submit with their bid a sworn statement certifying the above.

END OF SECTION

Request for Information

RFI:

To:

Company:

Subject:

Date:

Project Name:

Response By:

Reference:

Request:

Requested By: Company:

Response:

Response By:

Date:

2790-22.0H ARCHITECT’S SUBMITTAL PROCEDURES 013300-1

SECTION 013300

ARCHITECT’S SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting RFI’s, Shop Drawings, Product Data, Samples, and other submittals.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

B. Informational Submittals: Written information that does not require Architect's responsive action.

Submittals may be rejected for not complying with requirements.

1.3 SUBMITTAL PROCEDURES

A. General: Electronic copies of CAD Drawings of the Contract Documents will be provided by Architect for Contractor’s use in preparing submittals. See 1.4 below.

B. All submittals must be in electronic form. Paper copies are not acceptable unless specifically listed. The architect will review, stamp and return an electronic document for the contractor’s use. Copies of the reviewed shop drawings shall be provided by the contractor for distribution as required by the

Construction Manager.

C. Each submittal item shall be submitted in its entirety as one complete package including all information required to fully review the item. Material sample, data, warranty and maintenance information, and drawings shall come as one package. Submittals missing required components and / or without product selections identified will be rejected without review.

D. Compliance Certificate: Refer to the attached Compliance Certificate. Compliance Certificates are to be used by contractors to indicate the products/devices intended for use in this project without the need and time for product data submittals. Contractors shall use Compliance Certificates whenever possible to expedite the work and limit paper work. Items listed on the form must be approved products listed in the specifications. No substitutions allowed. Select one (1) source for each category, sign this sheet, and submit as the contractor’s commitment to use products required by the contract documents. No further product data submittals are required for this section. Physical sample, color samples, or layout shop drawings must be submitted where required by the specification. Refer to the attached specification list for sections that are subject to this certificate. NOTE: Not all specification sections listed below will apply to the project listed above. There might not be specification sections included that are in the

2790-22.0H ARCHITECT’S SUBMITTAL PROCEDURES 013300-2

project listed above, in that case coordinate with architect at post bid interview for submittal requirements.

E. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

F. Submittals Schedule: Comply with requirements in Division 1 Section "Construction Progress

Documentation" for list of submittals and time requirements for scheduled performance of related construction activities.

G. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows.

Time for review shall commence on Architect's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. RFI’s, request for information: Allow 5 working days for initial response for each RFI. Allow additional time if coordination with subsequent RFI is required, or when additional information is need for the response.

2. Shop drawings, sample, and product data:

a. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Architect will advise Contractor when a submittal being processed must be delayed for coordination.

b. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

c. Resubmittal Review: Allow 15 days for review of each resubmittal.

d. Sequential Review: where sequential review of submittals by Architect’s consultants, Owner, or other parties is indicated, allow 21 days for initial review of each submittal.

e. Submissions that are large or of multiple submissions or requires detailed or lengthy review by the Architect or his consultant may require additional time.

f. Submissions for products or material that require a long lead time for delivery shall be noted as such and marked “Top Priority” so the architect may expedite the process. The architect will expedite reviews when the contractor legitimately can’t submit within a reasonable time due to construction schedule. Failure to submit in a timely manner or to allow sufficient time for initial review and resubmittal reviews may result in project delays, additional service charges by the architect, or other penalties for the contractor.

2790-22.0H ARCHITECT’S SUBMITTAL PROCEDURES 013300-3

H. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space approximately 6 by 8 inches on label or beside title block to record Contractor's review and approval markings and action taken by Architect.

3. Include the following information on label for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Architect.

d. Name and address of Contractor.

e. Name and address of subcontractor.

f. Name and address of supplier.

g. Name of manufacturer.

h. Submittal number or other unique identifier, including revision identifier.

1) Submittal number shall use Specification Section number followed by a decimal point and then a sequential number (e.g., 06100.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., 06100.01.A).

i. Number and title of appropriate Specification Section.

j. Drawing number and detail references, as appropriate.

k. Location(s) where product is to be installed, as appropriate.

l. Other necessary identification.

I. Deviations: Highlight, encircle, or otherwise specifically identify deviations from the Contract

Documents on submittals.

J. Additional Copies: Unless additional copies are required for final submittal, and unless Architect observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

1. Additional copies submitted for maintenance manuals will not be marked with action taken and will be returned.

K. Transmittal: Package each submittal individually and appropriately for transmittal and handling.

Transmit each submittal using a transmittal form including electronic submittals. Architect will discard submittals received from sources other than the Construction Manager. Architect will return any submittal with a transmittal, which doesn’t fully list, and properly identify the enclosed items.

L. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in label or title block and clearly indicate extent of revision.

3. Resubmit submittals until they are marked " Review or reviewed with comments."

M. Distribution: Furnish copies of reviewed submittals to the Construction Manager, manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

2790-22.0H ARCHITECT’S SUBMITTAL PROCEDURES 013300-4

1.4 CONTRACTOR'S USE OF ARCHITECT'S CAD FILES

A. General: At Contractor's written request, copies of Architect's CAD files will be provided to the

Contractor for Contractor's use in connection with Project, subject to the following conditions:

1. The Architect will provide, electronic data files, compatible with AutoCAD for contractor’s convenience and use in the preparation of shop drawings. Refer to Terms and Conditions at the end of this specification. Requests for electronic data shall be in written form through the architect.

Prior to the release of electronic files, the Architect will require a signed waiver of release.

Contractors should allow a minimum of 1-week for this process.

PART 2 - RFI’S – REQUEST FOR INFORMATION

1. All RFI’s shall be submitted to the Architect in electronic form. PDF’s and Word files are acceptable.

2. PDF RFI forms shall include an editable text area for response, date, and signature.

3. RFI’s shall be distributed by e-mail. E-mail title shall be specific to job name, and RFI number.

This is mandatory for proper tracking.

4. Faxed and Hand written RFI’s are not acceptable and will be rejected.

PART 3 - PRODUCTS

3.1 ACTION SUBMITTALS

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Submittal Types:

a. Shop Drawing

b. Product Data

c. Sample

d. Other

B. Kingscott Review Stamp Statement: “Reviewed only for the limited purpose of checking for conformance with the design concept expressed in the Contract Documents. Dimensions, quantities, accuracy, assembly methods, installation methods, coordination with other trades and field verification are the responsibility of the contractor.”

1. The following Actions will be taken:

a. Reviewed with no exceptions

b. Reviewed with Exceptions

c. Revise and resubmit

d. Rejected

C. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

2790-22.0H ARCHITECT’S SUBMITTAL PROCEDURES 013300-5

1. Use the Material Compliance form when permitted and whenever possible to save time and paper work.

2. If information must be specially prepared for submittal because standard data are not suitable for use, submit as Shop Drawings, not as Product Data.

3. Mark each copy of each submittal to show which products and options are applicable. Unmarked submittals will be rejected. Failure to mark appropriate products will result in rejection of the submittal.

4. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Printed performance curves.

g. Operational range diagrams.

h. Compliance with specified referenced standards.

i. Testing by recognized testing agency.

5. Number of Copies: Submit one electronic copy of Product Data, unless otherwise indicated.

Architect will return one electronic copy. See the Constriction Manager’s submittal requirements for final record and distribution copy requirements.

D. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop

Drawings on reproductions of the Contract Documents or standard printed data, unless submittal of

Architect's CAD Drawings is otherwise permitted.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Dimensions.

b. Identification of products.

c. Fabrication and installation drawings.

d. Roughing-in and setting diagrams.

e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

f. Shop work manufacturing instructions.

g. Templates and patterns.

h. Schedules.

i. Notation of coordination requirements.

j. Notation of dimensions established by field measurement.

k. Relationship to adjoining construction clearly indicated.

l. Seal and signature of professional engineer if specified.

m. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 30 by 40 inches.

3. Number of Copies: Submit one opaque (bond) copy, and one electronic copy of each submittal.

Architect will return one electronic copy for printing and distribution.

2790-22.0H ARCHITECT’S SUBMITTAL PROCEDURES 013300-6

E. Samples: Submit Physical Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.

2. Identification: Attach label on unexposed side of Samples that includes the following:

a. Generic description of Sample.

b. Product name and name of manufacturer.

c. Sample source.

d. Number and title of appropriate Specification Section.

3. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

4. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available. Scanned color charts, samples, etc. will be REJECTED. Send physical samples, color charts, etc. as described in each specification section.

a. Number of Samples: Submit one full set of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line.

Architect will return submittal with options selected.

5. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection. Scanned color charts, samples, etc., will be REJECTED.

Send physical samples, color charts, etc. as described in each specification section.

a. Number of Samples: Submit three sets of Samples. Architect will retain one Sample set;

remainder will be returned. Mark up and retain one returned Sample set as a Project Record

Sample.

3.2 DELEGATED DESIGN

A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated.

1. If criteria indicated are not sufficient to perform services or certification required, submit a written request for additional information to Architect.

B. Delegated-Design Submittal: In addition to Shop Drawings, Product Data, and other required submittals, submit four copies of a statement, signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional.

2790-22.0H ARCHITECT’S SUBMITTAL PROCEDURES 013300-7

1. Indicate that products and systems comply with performance and design criteria in the Contract

Documents. Include list of codes, loads, and other factors used in performing these services.

PART 4 - EXECUTION

4.1 CONTRACTOR'S REVIEW

A. Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions prior to submission for review. It is the contractor’s responsibility to review and identify major discrepancy with the contract dements, and significant missing information. Documents with discrepancies and substantially missing information shall be returned for revisions prior to submission to the Construction Manager.

B. Mark with approval stamp before submitting to the Construction Manager.

C. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

4.2 CONSTRUCTION MANAGER'S REVIEW

A. Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions prior to submission for review.