SPRTA125R0191.pdf

PDF 193 KB Posted

Attached to
Synchronizing Ring Federal contract opportunity
Solicitation number
SPRTA1-25-R-0191
Issued by
Defense Logistics Agency Aviation

About this file

This is a federal solicitation (SPRTA1-25-R-0191) issued by the Defense Logistics Agency Aviation for a synchronizing ring, a critical aircraft engine component used to control convergent nozzle segments. The solicitation is set aside for small businesses with a size standard of 1,500 employees and a NAICS code of 336412. The requirement includes first article testing for a titanium alloy synchronizing ring with multiple manufacturer part numbers, with two bid options: Bid A requires first article testing and Bid B does not. The quantity is 14 units, with a best estimated quantity of 10 units, and the delivery date is targeted for 31 January 2027. The evaluation will use a best value source selection process, with technical acceptability as a prerequisite, and will consider factors including price, past performance, and small business participation.

The solicitation includes detailed requirements for first article testing, with three first article units to be produced - one for destructive testing and two for non-destructive testing and potential production use. The government will evaluate proposals based on compliance with technical specifications, pricing, past performance (primarily through the Supplier Performance Risk System), and a Small Business Participation Plan. Offerors must meet cybersecurity, telecommunications equipment, and other regulatory requirements. The procurement is rated as a Defense Priorities and Allocations System order, indicating potential national defense significance, and includes provisions for Foreign Military Sales with multiple potential destination countries.

View the file

Other files for this federal contract opportunity

Other files attached to Synchronizing Ring, newest first.
File Type Posted
QR_ATTACH.pdf PDF
SPI_ATTACH.pdf PDF
LPF_ATTACH.pdf PDF
4048281_TRNSPDATA_REPORT.pdf PDF
4048280_PKGRQMT_REPORT.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

SPRTA1-25-R-0191

X

6.SOLICITATION ISSUE DATE

14 MAR 2025

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 336412

8(A) SIZE STANDARD: 1,500

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

FMS REQUIREMENT

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

New Manufactured Materials / Critical Safety Item

Cert Cost Pricing Data It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors would not be required to provide additional information necessary to determine price reasonableness. However, if after receipt of proposals it is determined that adequate price competition doesnot exist; cost or pricing data shall be required IAW 52.215-20 in Section L of this solicitation. The offeror shall provide “cost or pricing data” within 14 calendar days after receipt of the Government’s request.

To be eligible for contract award, offerors must be approved sources, in accordance with the Qualification Requirements clause. Note that the Government is not required to delay contract award to review pending Source Approval Requests (SARs). Therefore, offerors are encouraged to submit the SAR as soon as possible. Due to export control restrictions, the Engineering Data List (EDL) and drawings can only be obtained through www.sam.gov via secure link to the solicitation notice for view only by vendors authorized to view export-controlled data.

First Article (FAT) Testing is required for this requirement. See Section “M” for evaluation of offers.

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

SPRTA1

2. CONTRACT NUMBER

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Aircraft Engine and Engine Parts Manufacturing

9. (Agency Use)

LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE.

SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE UNTIL

14-APR-2025 3:00PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

DLA AVIATION AT OKLAHOMA CITY, OK

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

BUYER: James Headington/DLA/AOAA james.headington.1@us.af.mil Phone: (405) 855- 3535

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE

OF ITEMS INVOLVED

DATE AND LOCAL TIME 14 APR 2025 3:00 PM

SOLICITATION NUMBER SPRTA125R0191

FROM: AFFIX

STAMP

HERE

TO:

ATTN: James Headington/DLA/AOAA

DLA AVIATION AT OKLAHOMA CITY, OK

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

SPRTA1-25-R-0191

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

PRICING NOTE 1: In order to maintain unit price integrity, contractors must individually price Line Items individually or clearly state that there is a “ZERO DOLLAR CHARGE” for these items.

PRICING NOTE 2: The Government may accept BID A (FIRST ARTICLE REQUIRED) or BID B (FIRST ARTICLE NOT REQUIRED) depending upon which alternative is most advantageous to the Government, price and other factors considered. DO NOT QUOTE BOTH BIDS.

PRICING NOTE 3: It is anticipated that pricing of this action will be based on adequate price competition;

therefore, offerors will not be required to provide information necessary to determine price reasonableness.

However, if after receipt of proposals it is determined that adequate price competition does not exist; cost or pricing data (see FAR 15.403) shall be required within 7 calendar days after receipt of the Government's request if applicable.

Informational CLIN

Item No.

Firm Fixed Price Quantity U/I

14 EA

NSN: 2840-01-454-8470 NZ

SYNCHRONIZING RING,

Controls the movement of convergent nozzle segemtns bb a series of interconnected links. The sync ring is moved forward and rearward by actuators to increase and decrease nozzle throat area.

titanium alloy Manufacturer Part Number

0JWE8 4082995-01

1J4P3 4082995-01

1TUK8 4082995-01

52661 4082995-01 Associated Document(s) Line Item(s)

FD20302400902 0001

FD20302400902 0006

FD20302400902 0007

FD20302400902 0008

Priority: E Applicability: None ;

Foreign Military Sales :FMS Case:

Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

FIRST ARTICLE TEST PLAN

Bid A - First Article Required Item No.

0001AA

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced

CLIN ACRN ACRN Total

0001AA AB

First Article Test Plan First Article Test Plan IAW DD Form 1423

2840DTH2400F2NZ

Associated Document(s) Line Item(s)

FD20302400902 0005

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 2008

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B FA8111 ORIGIN

Type / Ship To PACRN Mark For B FA8111 PAA First Article Monitor Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

B FA8111 1 LO *30 Calendar Days

Proposed Delivery

B FA8111 1 LO

NOTE: DO NOT proceed with line items 0001AB and 0001AC until the First Article Test Plan has been reviewed by the Engineering Activity. Estimated approval/disapproval time is 45 days.

NOTE: Contractor First Article Test Plan IAW DD 1423-1, attached hereto.

FIRST ARTICLE TEST REPORT

Bid A - First Article Required Item No.

0001AB

Firm Fixed Price Quantity U/I Unit Price Amount

FIRST ARTICLE TEST REPORT

Bid A - First Article Required 1 LO Not Separately Priced

CLIN ACRN ACRN Total

0001AB AB

First Article Test Report

TEST REPORT IN ACCORDANCE WITH DD FORM 1423, ATTACHED HERETO.

2840DTH24000F1NZ

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2015 2008

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B FA8111 ORIGIN

Type / Ship To PACRN Mark For B FA8111 PAA First Article Monitor Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

B FA8111 1 LO *120 Calendar Days Non-MilStrip

Proposed Delivery

B FA8111 1 LO

BID A-FIRST ARTICLE REQUIRED (DESTRUCTIVE EXHIBIT)

Bid A - First Article Required Item No.

0001AC

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001AC AB

First Article - First Article to Be Destroyed Seal Metallic Aircraft

Note: This item will ship in place at the contractor's facility and will be held until the First Article Test Report is approved and the QAR has signed the WAWF receiving report confirming the first article has been accepted and can be invoiced for payment.

Note: This First Article is one of the requirements set forth in FAR Clause 52.209-3.

Note: The contractor may present this first article exhibit to the Government Quality Assurance Representative (QAR) for inspection and acceptance when the contractor has received the First Article Test Report Approval Modification from the Government Contracting Officer.

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

Foreign Military Sales :FMS Case:IS-D-REF

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* TBDTBD ORIGIN

Type / Ship To PACRN Mark For

* TBDTBD PAA FIRST ARTICLE MONITOR

Type / Ship To Quantity (U/I) *ARO After First

Article Test Plan Approval

Req No / Pri

Required Delivery

* TBDTBD 1 EA *120 Calendar Days DISB5N32971381 / PRI: 2

Proposed Delivery

* TBDTBD 1 EA

NOTE: The first article exhibit shall be destructively tested/evaluated IAW LPF-QAR-003 (attached hereto) and will be condemned and disposed of at the contractor’s facility.

BID-A FIRST ARTICLE REQUIRED (NON-DESTRUCTIVE EXHIBITS)

Item No.

0001AD

Firm Fixed Price Quantity U/I Unit Price Amount

2 EA

CLIN ACRN ACRN Total

0001AD AB

First Article - Exhibits for Non-Destructive Testing Seal Metallic Aircraft

NOTE: These First Article exhibits are the remaining two first articles required by FAR Clause 52.209-3. Do not ship these exhibits with the First Article Test Report. These two exhibits may be presented to the Government QAR for Inspection and Acceptance when the Contractor has received the First Article Test Report Approval Modification from the Government Contracting Officer.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* TBDTBD ORIGIN

Type / Ship To PACRN Mark For

* TBDTBD PAA DISB00

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* TBDTBD 2 EA 31 JAN 2027 DISB5N32971381 / PRI: 2

Proposed Delivery

* TBDTBD 2 EA

NOTE 1: The quantity of First Article exhibits for Line Item 0001AD may be considered part of the contract quantity if the First Articles on Line Item 0001AC are approved by the Government as required by FAR Clause 52.209-3.

NOTE 2: These items will ship in place at the contractor's facility and will be held until the First Article Test Report has been reviewed and approved and the Government Quality Assurance (QAR) has signed the WAWF receiving report confirming the First Articles have been accepted and can be invoiced for payment. This note refers to the "TYPE/SHIP TO" block of this item number and the data associated with the block.

NOTE 3: The contractor may present these First Article exhibits to the QAR for inspection and acceptance when the contractor has received the First Article Test Report Approval Modification data associated with that block.

NOTE 4: The First Articles offered must be manufactured at the facilities in which those items are to be produced under the contract ,or if the First Articles are a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered.

NOTE 5: The contractor SHALL NOT take any action on Line Item 0001AE until approval/disapproval is received for the First Article Units required in above line items.

BID-A FIRST ARTICLE REQUIRED (PRODUCTION ITEMS)

Item No.

0001AE

Firm Fixed Price

BID-A FIRST ARTICLE REQUIRED (PRODUCTION ITEMS)

Bid A - First Article Required Best Estimated Qty

U/I Unit Price Amount

8 EA

CLIN ACRN ACRN Total

0001AE AB

NOTE: If the First Article units for Line Item 0001AD are approved by the Government, then 2 each will become a part of production for Line Item 0001AE and combine to make the current required quantity of 10 each.

Production Article

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DIS002 ORIGIN

Type / Ship To PACRN Mark For

* DIS002 PAA DISB00

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* DIS002 8 EA 31 JAN 2027 DISB5N32971381 / PRI: 2

Proposed Delivery

* DIS002 8 EA

INSPECTION AND ACCEPTANCE REPORTS WILL BE SUBMITTED USING WIDE AREA WORKFLOW (WAWF) .

Item No.

0001AF

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

BID-A FIRST ARTICLE REQUIRED (PRODUCTION ITEMS)

Bid A - First Article Required

0001AF AB

NOTE: If the First Article units for Line Item 0001AD are approved by the Government, then 2 each will become a part of production for Line Item 0001AE and combine to make the current required quantity of 10 each.

Production Article

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DIS002 ORIGIN

Type / Ship To PACRN Mark For

* DIS002 PAA DISB00

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* DIS002 1 EA 31 JAN 2027 DISB5N32971381 / PRI: 2

Proposed Delivery

* DIS002 1 EA

Item No.

0001AG

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001AG AB

NOTE: If the First Article units for Line Item 0001AD are approved by the Government, then 2 each will become a part of production for Line Item 0001AE and combine to make the current required quantity of 10 each.

Production Article

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DIS002 ORIGIN

Type / Ship To PACRN Mark For

* DIS002 PAA DISB00

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* DIS002 1 EA 31 JAN 2027 DISB5N32971381 / PRI: 2

Proposed Delivery

* DIS002 1 EA

Item No.

0001AH

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

2 EA

CLIN ACRN ACRN Total

0001AH AB

NOTE: If the First Article units for Line Item 0001AD are approved by the Government, then 2 each will become a part of production for Line Item 0001AE and combine to make the current required quantity of 10 each.

Production Article

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DIS002 ORIGIN

Type / Ship To PACRN Mark For

* DIS002 PAA DISB00

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* DIS002 2 EA 31 JAN 2027 DISB5N32971381 / PRI: 2

Proposed Delivery

* DIS002 2 EA

BID-B FIRST ARTICLE NOT REQUIRED (PRODUCTION ITEMS)

Bid B - First Article Not Required Item No.

0001AJ

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

10 EA

CLIN ACRN ACRN Total

0001AJ AB

Production Article

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DIS002 ORIGIN

Type / Ship To PACRN Mark For

BID-B FIRST ARTICLE NOT REQUIRED (PRODUCTION ITEMS)

Bid B - First Article Not Required

* DIS002 PAA DISB00

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* DIS002 10 EA 31 JAN 2027 DISB5N32971381 / PRI: 2

Proposed Delivery

* DIS002 10 EA

BID B-FIRST ARTICLE NOT REQUIRED (PRODUCTION ITEMS)

Bid B- First Article Not Required Item No.

0001AK

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001AK AB

NSN: PROD

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Priority: R

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DTH003 ORIGIN

Type / Ship To PACRN Mark For

* DTH003 PAA DTH100

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* DTH003 1 EA 31 JAN 2027 DTH15430592070 / PRI: 6

Proposed Delivery

BID B-FIRST ARTICLE NOT REQUIRED (PRODUCTION ITEMS)

Bid B- First Article Not Required

* DTH003 1 EA

BID-B FIRST ARTICLE NOT REQUIRED (PRODUCTION ITEMS)

Bid B- First Article Not Required Item No.

0001AL

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001AL AB

NSN: PROD

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Priority: R

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DPT006 ORIGIN

Type / Ship To PACRN Mark For

* DPT006 PAA DPTM00

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* DPT006 1 EA 31 JAN 2027 DPTM5440595102 / PRI: 3

Proposed Delivery

* DPT006 1 EA

BID B-FIRST ARTICLE NOT REQUIRED (PRODUCTION ITEMS)

Bid B- First Article Not Required Item No.

0001AM

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

2 EA

CLIN ACRN ACRN Total

0001AM AB

NSN: PROD

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Priority: R

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DPT006 ORIGIN

Type / Ship To PACRN Mark For

* DPT006 PAA DPTM00

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* DPT006 2 EA 31 JAN 2027 DPTM5441225100 / PRI: 3

Proposed Delivery

* DPT006 2 EA

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: B FA8111

DEPARTMENT OF THE AIR FORCE

AFLCMC/LZPED SO-TINKER

3001 STAFF DR STE 1AB85A

ATTN: FIRST ARTICLE MONITOR

TINKER AFB OK 73145-3303

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

SHIP TO (FOREIGN MILITARY SALES)

TYPE/CODE: * DGR002

SUPPLEMENTAL ADDRESS CODE: DA2QCG

FMS CASE CODE/LOA: GR-D-QCG/002

MAPAC SHIP TO CODE: DGR002

MAPAC MARK FOR: DGRQ00

REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: * DIS002

SUPPLEMENTAL ADDRESS CODE: DA2REF

FMS CASE CODE/LOA: IS-D-REF/001

MAPAC SHIP TO CODE: DIS002

MAPAC MARK FOR: DISB00

REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: * DPT006

SUPPLEMENTAL ADDRESS CODE: DA6QAV

FMS CASE CODE/LOA: PT-D-QAV/009

MAPAC SHIP TO CODE: DPT006

MAPAC MARK FOR: DPTM00

REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: * DTH003

SUPPLEMENTAL ADDRESS CODE: DA3RAI

FMS CASE CODE/LOA: TH-D-RAI/004

MAPAC SHIP TO CODE: DTH003

MAPAC MARK FOR: DTH100

REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: * TBDTBD

SUPPLEMENTAL ADDRESS CODE: TBDTBD

FMS CASE CODE/LOA: IS-D-REF/001

MAPAC SHIP TO CODE: TBDTBD

MAPAC MARK FOR: FA MONT

REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)

(IAW FAR 9.308-2)

Test criteria are as follows:

Government Test/Inspection Requirements N/A

Lot/Item Contractor Test/Inspection Requirements See Below

Contractor Testing Criteria:

Identified in drawing 4082995-01, sub-tier drawings (if an assembly), and specifications identified therein.

NOTE 1: First Article testing requirements shall be per LPF-QAR-003 and the following:

A. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003.

B. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003 prior to assembly.

C. After completion of the inspections per 9.B.a above, one article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPF-QAR-003.

NOTE 2: Deliveries (FAT test plan and Reports) are preferably submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

D. 1) DD Form 1423 ELIN:

2) Deliver due 45 calendar days from date of contract

E. 1) DD Form 1423 ELIN:

2) Due 60 calendar days from date of contract

Contractor Testing Report Forwarded To:

AFLCMC/EZGED

3001 STAFF DRIVE, STE 1AB85A

TINKER AFB, OK 73145-3041

ATTN: FIRST ARTICLE MONITOR

DODAAC: FA8111

NOTE 3: First Article Quantity is 3 Parts:

- 2 Parts will be part of production quantity

- 1 Part will be expended in testing

NOTE 4: Disposition of First Articles: Destructively tested First Articles will be condemned and disposed of at vendor’s facility.

Destructively tested first article assets will be condemned and disposed of at vendor's facility. For

FMS contracts, forward approved First Articles to contractor for shipment with production quantities.

NOTE 5: The cognizant Government engineering authority shall be the final authority for determining if a contractor meets the conditions of waiver identified. First Article testing is waived if the offeror is the prime contractor OEM, Pratt & Whitney.

Note 6: This a critical part used in the F100 series turbine engine. Poor quality parts will have an adverse effect on mission capability and system safety. For this reason, First Article Testing is required to insure first time manufacturers or manufacturers that have not produced he item within three years manufacture parts in accordance with the drawing and specification requirements.

Disposition of the First Article shall be as follows:

Lot/Item Approved

0001AC

0001AD

Expended in Testing Returned to Contractor for Shipment with Production Item

Lot/Item Disapproved

0001AC

0001AD

Returned to Contractor Returned to Contractor

(The above Clause/Provision has been modified.)

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)

(IAW FAR 46.302)

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(IAW FAR 46.311, DFARS 246.202-4(1))

(a) The Contractor shall comply with the higher-level quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*

*See Individual Line Item Schedule

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503) Government Contract Quality Assurance Inspection and Acceptance will be at (Final):

[CONTRACTOR FILL-IN]

Item No(s): See schedule for items with the following code(s) listed below :

Inspection Code and Address:

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b))

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c))

52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)

(IAW FAR 47.303-2(c))

52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)

(IAW FAR 47.303-17(f))

F.O.B. ORIGIN (OCT 1993)

(IAW FAR 47.305(b)) Any supply item applicable to this document shall be delivered F.O.B. at:

F.O.B. Address:

[CONTRACTOR FILL-IN]

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and re(a) Definitions. As used in this clause— ceiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov ; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/ .

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

SEE DFARS CLAUSE 252.232-7003 (b)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

SEE SCHEDULE, SECTION B

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC SEE FRONT PAGE OF SOLICITATION Issue By DoDAAC SEE FRONT PAGE OF SOLICITATION Admin DoDAAC SEE FRONT PAGE OF SOLICITATION Inspect By DoDAAC SEE SCHEDULE SECTION B Ship To Code SEE SCHEDULE SECTION B Ship From Code SEE SCHEDULE SECTION B Mark For Code SEE SCHEDULE SECTION B Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) N/A Accept at Other DoDAAC SEE SCHEDULE SECTION E LPO DoDAAC N/A DCAA Auditor DoDAAC CONTACT LOCAL DCMA OFFICE Other DoDAAC(s) N/A

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g.

timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

SEE FRONT PAGE OF SOLICITATION

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

CONTACT LOCAL DCMA OFFICE

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AB 9711X8242 .0002 4F X 47 5W CQCGGR 000000 00000 002 503000 F03000 $0.00

PSR: F25307 FSR: 026522 DSR: 126102

ACRN TOTAL $ 0.00

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

5352.201-9101 OMBUDSMAN (JUN 2023)

(IAW DAFFARS 5301.9103)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes.

The ombudsman may refer the party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) The Competition Advocate (CA) at each contracting activity/office (as defined in DLAD 2.101) shall act as the ombudsman and attempt to resolve contractor complaints. DLA AVIATION – AOCA’s CA/ombudsman can be reached at 405-855-3552, facsimile (405) 734-8129. Complaints which cannot be so resolved shall be forwarded to the HQ through J-72 for resolution by the DLA competition advocate. Each activity is responsible for developing procedures for executing the duties and responsibilities of its local ombudsman.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

52.202-1 DEFINITIONS (JUN 2020)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

(IAW FAR 3.808(b))

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)

(IAW FAR 3.906)

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(DEC 2022)

(IAW DFARS 203.970)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

(IAW FAR 4.1403(a))

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(NOV 2021)

(IAW FAR 4.1903)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES

(DEC 2023)

(IAW FAR 4.2004)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

(IAW 4.2105(b))

52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)

(IAW FAR 4.2203)

52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS- PROHIBITION

(IAW FAR 4.2306(c))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING DEVIATION 2024-O0013, REVISION 1 (MAY 2024)

(IAW Class Deviation 2024-O0013 Rev. 1)

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (JAN 2023)

(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)

(IAW DFARS 204.2105(c))

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)

(IAW DFARS 204.7304(e))

252.204-7021 Contractor Compliance with the Cybersecurity Maturity Model Certification Level

Requirement (JAN 2023) (IAW DFARS 204.7503(a) and 204.7503(b))

(a) Scope. The Cybersecurity Maturity Model Certification (CMMC) CMMC is a framework that measures a contractor’s cybersecurity maturity to include the implementation of cybersecurity practices and institutionalization of processes (see https://www.acq.osd.mil/cmmc/index.html).

(b) Requirements. The Contractor shall have a current (i.e. not older than 3 years) CMMC certificate at the CMMC level required by this contract and maintain the CMMC certificate at the required level for the duration of the contract.

(c) Subcontracts. The Contractor shall—

(1) Insert the substance of this clause, including this paragraph (c), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services, excluding commercially available off-the-shelf items; and

(2) Prior to awarding to a subcontractor, ensure that the subcontractor has a current (i.e., not older than 3 years) CMMC certificate at the CMMC level that is appropriate for the information that is being flowed down to the subcontractor.

252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)

(IAW DFARS 204.804-70)

(a) At the conclusion of all applicable closeout requirements of Federal Acquisition Regulation 4.804, the Government and Contractor shall mutually agree on the residual dollar amount remaining on the contract. Both the Government and Contractor agree to waive payment of any residual dollar amount of $1,000 or less to which either party may be entitled at the time of contract closeout.

(b) A residual dollar amount includes all money owed to either party at the end of the contract and as a result of the contract, excluding amounts connected in any way with taxation or a violation of law or regulation.

(c) For purposes of determining residual dollar amounts, offsets (e.g., across multiple contracts or orders) may be considered only to the extent permitted by law.

252.208-7000 INTENT TO FURNISH PRECIOUS METALS AS GOVERNMENT-FURNISHED

MATERIAL (DEC 1991)

(IAW DFARS 208.7305(a))

(b) The Offeror shall cite the type (silver, gold, platinum, palladium, iridium, rhodium, and ruthenium) and quantity in whole troy ounces of precious metals required in the performance of this contract (including precious metals required for any first article or production sample), and shall specify the national stock number (NSN) and nomenclature, if known, of the deliverable item requiring precious metals.

Precious Metal* Quantity Deliverable Item (NSN and Nomenclature)

*If platinum or palladium, specify whether sponge or granules are required.

52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)

(IAW FAR 9.206-2)

(a) Definition: "Qualification Requirement," as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.

(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.

Item No Agency Name/Address AFSC Small Business Office (AFSC/SB) 3001 Staff Drive Suite 1AG85A Tinker AFB OK 73145-3009 Stacy.Cochran@Us.af.mil 312-339-7243

(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.

Offeror's Name ______________________________

Manufacturer's Name _________________________

Source's Name ______________________________

Item Name _________________________________

Service Identification _________________________

Test Number _______________________________ (to the extent known)

(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.

(e) If an offeror, manufacturer, source, product, or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.

(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)

(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))

(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

*Lot/Item ***Calendar Days Before Test **Quantity

0001AC

0001AD

10 DAYS 3 EACH

(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to ___***___ marked "FIRST ARTICLE TEST REPORT: Contract No. Lot/Item No. ___*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

*Lot/Item ****Approval Days ELIN No.

0001AB 60 DAYS

FA Test Report Item ***Type/Location **Calendar Days

0001AB FA8111 120 DAYS

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING -- ALTERNATE I (JAN 1997)

(IAW FAR 9.308-1(a)(2), FAR 9.308-1(b)(2)) As prescribed in 9.308-1(a)(2) and (b)(2), add the following paragraph (i) to the basic clause:

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(NOV 2021)

(IAW FAR 9.409)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

(IAW FAR 9.104-7(c))

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(NOV 2015)

(IAW FAR 9.108-5(b))

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(MAY 2019)

(IAW DFARS 209.409)

252.209-7010 CRITICAL SAFETY ITEMS (AUG 2011)

(IAW DFARS 209.270-5)

(b) Identification of critical safety items. One or more of the items being procured under this contract is an aviation or ship critical safety item. The following items have been designated aviation critical safety items or ship critical safety items by the designated design control activity:

Line Item Description

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

(IAW FAR 11.302)

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b)) This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)

(IAW DFARS 211.274-5(a), DFARS 212.301(f)(xii))

(a) Definitions. As used in this clause—

“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

(c) Unique item identifier.

(1) The Contractor shall provide a unique item identifier for the following:

(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

See Schedule as Applicable

(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

*Items less than $5000, which require UID, will be specifically identified in the schedule.

See Schedule as Applicable

(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).

(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).

(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.

(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:

(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .

(2) Embedded items shall be reported by one of the following methods—

(i) Use of the embedded items capability in WAWF;

(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or

(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.

52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)

(IAW FAR 15.209(b)(1))

52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(IAW FAR 15.209(h))

52.215-14 INTEGRITY OF UNIT PRICES (NOV 2021)

(IAW FAR 15.408(f)(1))

52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS

CONCERNS (OCT 2022)

(IAW FAR 19.1309(b))

(b) Waiver of evaluation preference.

__ Offeror elects to waive the evaluation preference.

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2023)

(IAW FAR 19.309(c))

(h) If the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .