Amendment Qty Decrease for SPRTA120R0079_______0001.pdf

PDF 21 KB Posted

Attached to
MODULE KIT, SERVO Federal contract opportunity
Solicitation number
SPRTA1-20-R-0079
Issued by
Defense Logistics Agency Aviation

View the file

Other files for this federal contract opportunity

Other files attached to MODULE KIT, SERVO, newest first.
File Type Posted
IUID_REPORT.pdf PDF
TRNSPDATA_REPORT.pdf PDF
PKGRQMT_REPORT.pdf PDF
SPRTA1-20-R-0079.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NO.

SPRTA1-20-R-0079-0001

3. EFFECTIVE DATE

24 FEB 2020

4. REQUISITION/PURCHASE REQ. NO.

FD20302000649

5. PROJECT NO (If applicable)

6. ISSUED BY CODE

DLA AVIATION AT OKLAHOMA CITY, OK

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

BUYER: Louis A. Colon/DLA-AOAA louis.colon.2@us.af.mil Phone: (405) 855- 3354 Fax: (405) 734-8129 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODESPRTA1

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

SPRTA120R0079-0001

9B. DATED (SEE ITEM 11)

24-FEB-2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 9-MAR-2020 4:00 PM

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

SPRTA1-20-R-0079-0001

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to decrease the quantity:

FIRST:

From: 34 Each

To: 16 Each

SECOND: All other terms and conditions shall remain the same and in full force and effect.

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

NEW MANUFACTURED MATERIAL

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

16 EA

CLIN ACRN ACRN Total

0001 AA

NSN: 2915-01-226-1047 NZ

MODULE KIT,SERVO VA

(EHSV) valve converts an electrical signal into pressure signal used to schedule nozzle position.

Cast Aluminum Manufacturer Part Number

06848 351015-ISSA

81873 20105090-101 Priority: R

Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Applicability: None ;

Trade Agreement Act IUID Required: Yes Physical Item Markings:

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3211 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE NONE NONE

Type / Ship To PACRN Mark For A SW3211 PAA Acct 09 A SW3211 PAB Acct 09 A SW3211 PAC Acct 09 A SW3211 PAD Acct 09 Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

A SW3211 5 EA 29 MAY 2020 Non-MilStrip

NEW MANUFACTURED MATERIAL

A SW3211 5 EA 30 JUN 2020 Non-MilStrip

A SW3211 5 EA 31 JUL 2020 Non-MilStrip

A SW3211 1 EA 31 AUG 2020 Non-MilStrip

Proposed Delivery

A SW3211 5 EA

A SW3211 5 EA

A SW3211 5 EA

A SW3211 1 EA

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: A SW3211

DLA DISTRIBUTION DEPOT OKLAHOMA

3301 F AVE CEN REC BLDG 506 DR 22

3301 F AVE CEN REC BLDG 506 DR 22

TINKER AFB OK 73145-8000

TINKER AFB OK 73145-8000

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

File details come from the government source that posted it. Updated .