2795383_FA_REPORT.pdf
PDF 97 KB Posted
- Attached to
- Support Turbine First Article Government Test Solicitation Federal contract opportunity
- Solicitation number
- SPRTA1-19-R-0423
About this file
First Articles
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRTA119R0423_______0001.pdf | ||
| 2808606_TRNSPDATA_REPORT.pdf | ||
| SPRTA119R0423.pdf | ||
| 1973758_UIIEC_REPORT.pdf | ||
| 2808604_PKGRQMT_REPORT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
25 APR 2019(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
63005 / 6870409
4. NSN
2840004118852OJ
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 3 UNIT(S) OF LOT / ITEM each
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
X REQUIRED NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
REQUIRED X NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A.
X
CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
All drawing and specifications requirements.
B. The detailed technical requirements for First Article approval tests are contained in
All drawing and specifications requirements.
(Cite Spec and Para number)
C. TEST PLAN REQUIRED
Number of days for government approval / disapproval days.
D. Contractor's notification to ACO and
(Requesting Activity) of test time and location due days prior to start of testing.
E. TEST REPORT REQUIRED
(1) Forwarded to
(2) Government written notice of approval / disapproval due days after receipt of contractor's report.
F. FIRST ARTICLE DELIVERY
(1) Due within 180 calendar days from date contract.
(2) Notify 30 calendar days prior to shipment.
(3) Delivered to government at
See block 12
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 180 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$13,000.0000
Page 1 of 3AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 23 May 2019
25 APR 2019(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
10. DISPOSITION OF FIRST ARTICLES
X Approved First Articles will be forwarded to
Supply
X 1 (insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor
X will be retained by USAF pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles
X will be returned to the contractor will be retained by pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.
b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.
c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. Provided not more than months have elapsed since completion of the contract.
e. X First Article testing will not be waived.
f. See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
12. REMARKS
Olson, Gregory TNAME: 13 MAY 2019DATE:
First Article shall include one complete unassembled item.
DDOO-SOP (FIRST ARTICLES)
Bldg 18, Door 16, Phone: (405) 739-7667 8080 Perimeter Rd.
Tinker AFB, OK 73145-8000
DODAAC: FY2303
Mark For: FIRST ARTICLES
ATTN: DDOO-SOP
DO NOT POST, NON-ACCOUNTABLE
DO NOT PUT INTO SUPPLY
DODAAC: FY2303
All requests for waiver of First Article testing shall be forwarded to the Cognizant Engineering Authority (AFLCMC/LPED2) for approval. First Article testing will be waived if the contractor is the OEM.
Page 2 of 3AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 23 May 2019
25 APR 2019(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST
(Name, Organization, Phone)
Olson, Gregory T
AFLCMC / LP E D 2
405-622-7626
892-7626
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Page 3 of 3AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 23 May 2019
File details come from the government source that posted it.