FA_Test_Plan_and_Report_CDRLs.pdf
PDF 32 KB Posted
- Attached to
- Engines, Turbines, and Components Federal contract opportunity
- Solicitation number
- SPRTA1-15-R-0112
About this file
FA Test Plan and Report CDRLs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| LPF-QAR-003.pdf | ||
| Qualification_Requirements.pdf | ||
| SPRTA115R0112.pdf | ||
| Engineering_Instructions.pdf | ||
| FA_Test_Report_DID.pdf | ||
| FA_Test_Plan_DID.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of11 2
E. Contract/Pr No.:
15-00382/15-00508/15-00551F100/220/229 / P/N 4078304
0001AB
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Test/Inspection Report NSN: 2840-01-308-44693NZ NOUN: Liner, Augmentor Com
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-NDTI-80809B/T N/A AFLCMC/LPSAA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
SD
8. APP Code:
N/A A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
N/A
1 XTIME
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Block 16
G. Prepared By: H. Date I. Approved By: J. Date:
AFLCMC/EZGED
3001 Staff Dr, Ste 1AB 85A
Tinker AFB, OK 73145-3041
Attn: FA Monitor
0 2 0
15. Total: 0 2 0
16. Remarks:
NAME: Zilar, Dale N DATE: 20 AUG 2014
The first article test report shall satisfy all requirements in the first article test plan. All drawing requirements must be satisfied including dimensions, visual inspections, non-destructive inspections (NDIs), manufacturing processes and material requirements. The test report shall indicate that any sources used to perform significant manufacturing processes are approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).
A copy of the part process sheets shall be provided also. A government representative must coordinate on the test report. Guidelines for the test reports are contained within LPF-QAR-003, attached.
The first article test reports shall be received at OC-ALC/ENRS 120 calendar days from the date of government approval of test plan.
Contractor will include any QAR findings relative to the test report with the final test report submitted to AFLCMC/EZGED.
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
24 OCT 2014 //DIGITALLY SIGNED//
COORDINATORS:
AFLCMC / LPSAAB
SHELLEY.ERIC.CLEVELAND.1249361280
405-734-8789 / 884-8789
24 OCT 2014
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of21 2
E. Contract/Pr No.:
15-00382/15-00508/15-00551F100/220/229 / P/N 4078304
0001AA
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
First Article Qualification Test Plan and Procedures NSN: 2840-01-308-4469NZ NOUN: Liner, Augmentor Com
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-NDTI-81307A N/A AFLCMC/LPSAA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
SD
8. APP Code:
N/A A
11. As of Date: 13. Date of Subsequent Submission:
See Block 16
N/A
1 XTIME
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Block 16
G. Prepared By: H. Date I. Approved By: J. Date:
AFLCMC/EZGED
3001 Staff Dr, Ste 1AB 85A
Tinker AFB, OK 73145-3041
Attn: FA Monitor
0 2 0
15. Total: 0 2 0
16. Remarks:
NAME: Zilar, Dale N DATE: 07 AUG 2014
Contractor must provide a plan to ensure that all drawing requirements are met on each first article.
The plan should include the equipment and facilities utilized to verify all drawing requirements. As a minimum, the following information is required.
a. A list of all drawing dimension, tolerances and the equipment utilized to verify each dimension.
An actual drawing should be submitted to correlate with the dimension list.
b. A plan to verify that all non-destructive inspections are met.
c. A plan to verify that all visual inspection requirements are met.
d. A plan to verify material properties to include mechanical properties, metallurgical properties and chemical compositions.
e. A plan to verify that all significant manufacturing processes are performed by sources that are currently approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).
f. A plan to verify that all forging or casting sources are currently approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA) if applicable. Guidelines for first article test plans are contained within LPF-QAR-003, attached.
A government representative must coordinate on the first article test plan. The first article test plan shall be received 30 calendar days from the date of contract.
Contractor will include any QAR findings relative to the test report with the final test report submitted to AFLCMC/EZGED.
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
24 OCT 2014 //DIGITALLY SIGNED//
COORDINATORS:
AFLCMC / LPSAAB
SHELLEY.ERIC.CLEVELAND.1249361280
405-734-8789 / 884-8789
24 OCT 2014
File details come from the government source that posted it. Updated .