SPRTA1-21-R-0158 (With Attachments).pdf

PDF 1 MB Posted

Attached to
Spacer, Compressor R Federal contract opportunity
Solicitation number
SPRTA1-21-R-0158
Issued by
Defense Logistics Agency Aviation

About this file

This is a solicitation for new manufacture of PN 413918P20 Spacer, Compressor R. The Defense Logistics Agency Aviation seeks offers for 180 each of this part through a 100% small business set-aside. The National Stock Number is 2840-01-305-5307 RV. Early or partial delivery is acceptable and Unique Item Identifiers are required, as this part is a critical safety item. Fiscal year 2022 funds apply and are subject to availability. Offers are due by September 27, 2021. Award is expected by October 2022. Pricing shall remain firm for 120 days.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

SPRTA1-21-R-0158

X

X

6.SOLICITATION ISSUE DATE

26 AUG 2021

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 336412

8(A) SIZE STANDARD: 1,500

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

New Manufacture Early or Partial Delivery Acceptable IUID Required Critical Safety Item

FY22 funds apply to this acquisition. Availability of funds clause (FAR 52.232-18) applies. No obligation may be incurred by the Government until FY22 funds availability has been certified.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR

INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE CONTRACTOR AGREES TO HOLD

ITS OFFERED PRICES FIRM FOR THE ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO

THE TERMS AND CONDITIONS STATED HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

SPRTA1

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH OR OTHERWISE

IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Aircraft Engine and Engine Parts Manufacturing

9. (Agency Use) LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE. SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE

UNTIL

27-SEP-2021 4:00PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

DLA AVIATION AT OKLAHOMA CITY, OK

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

BUYER: Scott Rountree/DLA-AOAA scott.rountree@us.af.mil Phone: (405) 739- 9079

X

1. THIS CONTRACT IS A RATED ORDER UNDER DPAS

(15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE OF ITEMS

INVOLVED

DATE AND LOCAL TIME 27 SEP 2021 4:00 PM

SOLICITATION NUMBER SPRTA121R0158

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Scott Rountree/DLA-AOAA

DLA AVIATION AT OKLAHOMA CITY, OK

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

SPRTA1-21-R-0158

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

PRICING NOTE: In order to maintain unit price integrity, contractor must individually price Line Items or clearly state that there is a “ZERO DOLLAR CHARGE” for these items.

First Article Waiver: First article waiver will be considered for offerors who have previously furnished production quantities in the last 36 months of the same articles for Government, DOD or Air Force provided articles thus furnished have exhibited satisfactory performance in service, in the opinion of the Air Force.

First Article Note: First Article Offeror will be accepted under Bid A (CLINs 0001AA, 0001AB, and 0001AC). If your company meets the condition for First Article Waiver, please propose under Bid B (CLIN 0002).

INFORMATIONAL- NEW MANUFACTURE, BASIC ITEM - CRITICAL SAFETY ITEM (CSI)

Bid A - First Article Required Item No.

Firm Fixed Price

NSN: 2840-01-305-5307 RV

SPACER, COMPRESSOR R

Provides proper spacing between the 15th and 16th stage disks and seals airflow in the N2 Compressor.

AMS 5660 NICKEL ALLOY

Manufacturer Part Number 2T575 413918P20 2V116 413918P20 51992 413918P20 Associated Document(s) Line Item(s)

FD20302200059ADV 0001

Priority: R Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE N/A N/A

First Article Unit (Expended)

Bid A - First Article Required Item No.

0001AA

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001AA AA

Note: This first article will be consumed or destroyed during Government testing. This first article must still be approved by the Government and inspected and accepted by the Government.

NSN: 2840-01-305-5307 RV

FIRST ARTICLE

FIRST ARTICLE - SAME AS BASIC ITEM ABOVE

Associated Document(s) Line Item(s)

FD20302200059ADV 0002

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Buy American Act/Balance of Payments Program IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FY2303 DESTINATION

Class I ODS Substance Application/Use Quantity

NONE N/A N/A

Type / Ship To PACRN Mark For

A FY2303 PAA FIRST ARTICLE MONITOR

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

A FY2303 1 EA *180 Calendar Days Non-MilStrip

Proposed Delivery

A FY2303 1 EA

NOTE 1: The First Article offered must be manufactured at the facilities in which the item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered.

NOTE 2: Please clearly label said part as "For material/destructive testing".

NOTE 3: Ensure the words "FIRST ARTICLE" are marked on the outside of the box in large red conspicuous letters.

Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF).

First Article Units (Non-Expended)

Bid A - First Article Required Item No.

0001AB

Firm Fixed Price Quantity U/I Unit Price Amount

2 EA

CLIN ACRN ACRN Total

0001AB AA

NOTE: The quantity of the first article for this item number will be considered part of the contract quantity if the first articles are approved by Government and are inspected/accepted by the Government as required by FAR clauses 52.209-4.

NSN: 2840-01-305-5307 RV

FIRST ARTICLE

FIRST ARTICLE - SAME AS BASIC ITEM ABOVE

Associated Document(s) Line Item(s)

FD20302200059ADV 0003

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FY2303 DESTINATION

Class I ODS Substance Application/Use Quantity

NONE N/A N/A

Type / Ship To PACRN Mark For

A FY2303 PAA FIRST ARTICLE MONITOR

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

A FY2303 2 EA *180 Calendar Days Non-MilStrip

Proposed Delivery

A FY2303 2 EA

NOTE 1: The First Article offered must be manufactured at the facilities in which the item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered.

NOTE 2: The contractor SHALL NOT take any action on Line Item 0001AC until approval/disapproval is received for the First Article units required in the above line items.

NOTE 3: Ensure the words "FIRST ARTICLES" are marked on the outside of the box in large red conspicuous letters.

NEW MANUFACTURED MATERIAL - PRODUCTION UNITS

Bid A - First Article Required Item No.

0001AC

Firm Fixed Price Quantity U/I Unit Price Amount

178 EA

CLIN ACRN ACRN Total

0001AC AA

For Line 0001AC, the 2 each non-expended First Articles (upon Engineering approval) will be added to the 178 each Best Estimated Production Quantity, which would account for the current required quantity of 180 each.

NSN: 2840-01-305-5307 RV

PRODUCTION ARTICLE

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Associated Document(s) Line Item(s)

FD20302200059ADV 0001

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3211 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE N/A N/A

Type / Ship To PACRN Mark For

A SW3211 PAA ACCT 09

Type / Ship To Quantity (U/I) On or Before Req No / Pri

Required Delivery

A SW3211 178 EA 1 MAY 2024 Non-MilStrip

Proposed Delivery

A SW3211 178 EA

NEW MANUFACTURED MATERIAL - CRITICAL SAFETY ITEM (CSI)

Bid B - First Article NOT Required Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

181 EA

CLIN ACRN ACRN Total

0002 AA

NSN: 2840-01-305-5307 RV

SPACER, COMPRESSOR R

Provides proper spacing between the 15th and 16th stage disks and seals airflow in the N2 Compressor.

AMS 5660 NICKEL ALLOY

Manufacturer Part Number 2T575 413918P20 2V116 413918P20 51992 413918P20 Associated Document(s) Line Item(s)

FD20302200059ADV 0001

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3211 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE N/A N/A

Type / Ship To PACRN Mark For

A SW3211 PAA ACCT 09

Type / Ship To Quantity (U/I) On or Before _ Req No / Pri

Required Delivery

A SW3211 181 EA 1 MAY 2024 Non-MilStrip

NEW MANUFACTURED MATERIAL - CRITICAL SAFETY ITEM (CSI)

Bid B - First Article NOT Required Proposed Delivery

A SW3211 181 EA

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: A FY2303

FY2303 DDOO SOP 1ST ARTICLE

CP 405 739 8596

8080 PERIMETER RD BLDG 18 DR 16

TINKER AFB OK 73145

TINKER AFB OK 73145 OK

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A SW3211

DLA DISTRIBUTION DEPOT OKLAHOMA

3301 F AVE CEN REC BLDG 506 DR 22

TINKER AFB OK 73145-8000

TINKER AFB OK 73145-8000 73145-8000

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)

(IAW FAR 9.308-2)

Test criteria are as follows:

Item No(s) Test Criteria/Technical Requirements

0001AA

0001AB

See Below See Below

Performance or other characteristics which the First Articles must meet are:

All drawing and specification requirements.

The detailed technical requirements for First Article approval tests are contained in:

All drawing and specification requirements.

Disposition of the First Article shall be as follows:

Item No(s) Approved 0001AA First Article will be expended in testing.

0001AB First Articles will be installed on aircraft/equipment to determine proper fit/function.

Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

Item No(s) Disapproved 0001AA Residual components of disapproved First Article will be returned to the contractor.

0001AB Disapproved First Articles will be returned to the contractor.

(The above Clause/Provision has been modified.)

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)

(IAW FAR 46.302)

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(IAW FAR 46.311, DFARS 246.202-4(1))

(a) The Contractor shall comply with the higher-level quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*

*See Individual Line Item Schedule

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503) Government Contract Quality Assurance Inspection and Acceptance will be at (Final):

[CONTRACTOR FILL-IN]

Item No(s): See schedule for items with the following code(s) listed below :

Inspection Code and Address:

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b))

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c))

52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)

(IAW FAR 47.303-2(c))

52.247-34 F.O.B. DESTINATION (NOV 1991)

(IAW FAR 47.303-6(c))

52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT (FEB 1999)

(IAW FAR 47.305-4(c)) Applicable Item No(s)

0001AA 0001AB

52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)

(IAW FAR 47.303-17(f))

F.O.B. ORIGIN (OCT 1993)

(IAW FAR 47.305(b)) Any supply item applicable to this document shall be delivered F.O.B. at:

F.O.B. Address:

[CONTRACTOR FILL-IN]

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall use the following document type(s).

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

SEE DFARS CLAUSE 252.232-7003 (b)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

N/A

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(f) [Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC SEE FRONT PAGE OF SOLICITATION Issue By DoDAAC SEE FRONT PAGE OF SOLICITATION Admin DoDAAC SEE FRONT PAGE OF SOLICITATION Inspect By DoDAAC SEE SCHEDULE SECTION B Ship To Code SEE SCHEDULE SECTION B Ship From Code SEE SCHEDULE SECTION B Mark For Code SEE SCHEDULE SECTION B Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) N/A Accept at Other DoDAAC SEE SCHEDULE SECTION E LPO DoDAAC N/A DCAA Auditor DoDAAC CONTACT LOCAL DCMA OFFICE Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

CONTACT LOCAL DCMA OFFICE

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 97 X4930 .FC04 64 1 47 GT 15101P 01N000 00000 000000 503000 F03000 $0.00

PSR: K25626 FSR: 013352

ACRN TOTAL $ 0.00

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

5352.201-9101 OMBUDSMAN (OCT 2019)

(IAW AFFARS 5301.9103)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern.

The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) The Competition Advocate (CA) at each contracting activity/office (as defined in DLAD 2.101) shall act as the ombudsman and attempt to resolve contractor complaints. DLA AVIATION/AOCA’s CA/ombudsman can be reached at (405) 734-8241, facsimile (405) 734-8129. Complaints which cannot be so resolved shall be forwarded to the HQ through J-72 for resolution by the DLA competition advocate. Each activity is responsible for developing procedures for executing the duties and responsibilities of its local ombudsman.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements.

Such inquiries shall be directed to the contracting officer.

52.202-1 DEFINITIONS (JUN 2020)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

(IAW FAR 3.808(b))

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(SEP 2013)

(IAW DFARS 203.970)

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)

(IAW FAR 4.303)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

(IAW FAR 4.1403(a))

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(JUN 2016)

(IAW FAR 4.1903)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED

ENTITIES (JUL 2018)

(IAW FAR 4.2004)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)

(IAW 4.2105(b))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING (DEC 2019)

(IAW DFARS 204.7304(c))

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (MAY 2016)

(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2021)

(IAW DFARS 204.2105(c))

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2020)

(IAW DFARS 204.7304(e))

252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)

(IAW DFARS 204.804-70)

(a) At the conclusion of all applicable closeout requirements of Federal Acquisition Regulation 4.804, the Government and Contractor shall mutually agree on the residual dollar amount remaining on the contract. Both the Government and Contractor agree to waive payment of any residual dollar amount of $1,000 or less to which either party may be entitled at the time of contract closeout.

(b) A residual dollar amount includes all money owed to either party at the end of the contract and as a result of the contract, excluding amounts connected in any way with taxation or a violation of law or regulation.

(c) For purposes of determining residual dollar amounts, offsets (e.g., across multiple contracts or orders) may be considered only to the extent permitted by law.

252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS

(DEC 1991)

(IAW DFARS 205.470, DFARS 212.301(f)(x))

52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)

(IAW FAR 9.206-2)

(a) Definition: "Qualification Requirement," as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.

(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.

Item No Agency Name/Address

(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.

Offeror's Name ______________________________

Manufacturer's Name _________________________

Source's Name ______________________________

Item Name _________________________________

Service Identification _________________________

Test Number _______________________________ (to the extent known)

(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.

(e) If an offeror, manufacturer, source, product, or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.

(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)

(IAW FAR 9.308-2(a)(1), FAR 9.308-2(b)(1))

(a) The Contractor shall deliver ** units(s) of Lot/Item * within *** calendar days from the date of this contract to the Government at **** for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

First Article Item **Quantity ***Calendar Days ****Type/Location

0001AA

0001AB

DDOO-SOP/FIRST ARTICLES

BLDG 18, DR16

8080 PERIMETER ROAD

TINKER AFB, OK

73145-8000

DODAAC: FY2303

MARK FOR: FIRST ARTICLES

ATTN: DDOO-SOP

DO NOT POST, NOT ACCOUNTABLE:

DO NOT PUT INTO SUPPLY.

(b) Within ** calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor.

A notice of disapproval shall cite reasons for the disapproval.

*Lot/Item **Approval Days ELIN No.

0001AA

0001AB

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. A resubmission fee of $16,300.00 will be assessed to the contractor if First Article tests fail.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor—

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(JUN 2020)

(IAW FAR 9.409)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

(IAW FAR 9.104-7(c))

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(NOV 2015)

(IAW FAR 9.108-5(b))

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(MAY 2019)

(IAW DFARS 209.409)

252.209-7010 CRITICAL SAFETY ITEMS (AUG 2011)

(IAW DFARS 209.270-5)

(b) Identification of critical safety items. One or more of the items being procured under this contract is an aviation or ship critical safety item. The following items have been designated aviation critical safety items or ship critical safety items by the designated design control activity:

Line Item Description

0001AA

0001AB

0001AC

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

(IAW FAR 11.304)

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b)) This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)

(IAW DFARS 211.274-6(a)(1), DFARS 212.301(f)(xii))

(a) Definitions. As used in this clause—

“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid/equivalents.html .

“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at http://www.acq.osd.mil/dpap/pdi/uid/uii_types.html .

(c) Unique item identifier.

(1) The Contractor shall provide a unique item identifier for the following:

(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

See Schedule as Applicable

(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

*Items less than $5000, which require UID, will be specifically identified in the schedule.

See Schedule as Applicable

(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).

(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).

(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.

(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:

(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .

(2) Embedded items shall be reported by one of the following methods—

(i) Use of the embedded items capability in WAWF;

(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or

(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.

52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)

(IAW FAR 15.209(b)(1))

52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(IAW FAR 15.209(h), AFFARS 53.15.209(h))

52.215-14 INTEGRITY OF UNIT PRICES (JUN 2020)

(IAW FAR 15.408(f)(1))

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEVIATION 2020-O0008)

(OCT 2020)

(IAW Deviation 2020-O0008 Rev. 2)

(a) Definition. “Small business concern,” as used in this clause, means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.

(b) Applicability. This clause applies only to—

(1) Contracts that have been totally set aside for small business concerns; and

(2) Orders set aside for small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).

(c) General.

(1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.

(2) Any award resulting from this solicitation will be made to a small business concern.

(d) Agreement.

(1) For a contract or an order at or below the simplified acquisition threshold, a small business concern may provide the end item of any firm. For a contract or an order exceeding the simplified acquisition threshold, unless the Small Business Administration has waived the requirements of paragraphs (d)(1)(i) through (iii) of this clause in accordance with 13 CFR 121.1204, a small business concern that provides an end item it did not manufacture, process, or produce, shall—

(i) Provide an end item that a small business has manufactured, processed, or produced in the United States or its outlying areas;

(ii) Be primarily engaged in the retail or wholesale trade and normally sell the type of item being supplied;

and

(iii) Take ownership or possession of the item(s) with its personnel, equipment, or facilities in a manner consistent with industry practice; for example, providing storage, transportation, or delivery.

(2) For contracts or orders for multiple end items, at least 50 percent of the total value of the contract or order shall be manufactured, processed, or produced in the United States or its outlying areas by small business concerns.

(3) Paragraphs (d)(1) through (2) of this clause do not apply to construction or service contracts.

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)

(IAW FAR 19.708(a))

52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION 2020-O0008) (MAR 2020)

(IAW Deviation 2020-O0008 Rev. 2)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Definition. “Similarly situated entity,” as used in this clause, means a first-tier subcontractor, including an independent contractor, that—

(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.

(c) Applicability. This clause applies only to—

(1) Contracts that have been set aside for small business concerns or 8(a) participants;

(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) participants;

(3) Contracts that have been awarded on a sole-source basis in accordance with subpart 19.8;

(4) Orders set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F), if the order amount is expected to exceed the simplified acquisition threshold;

(5) Orders competed among 8(a) participants in accordance with subpart 19.8 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F), regardless of dollar value;

(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference; and

(7) Orders issued directly to small business concerns or 8(a) participants under multiple-award contracts as described in 19.504(c)(1)(ii).

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a NAICS code for—

(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. Other direct costs are excluded to the extent they are not the principal purpose of the contract and cannot be obtained from small business concerns;

(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 85 percent subcontract amount that cannot be exceeded; or

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 75 percent subcontract amount that cannot be exceeded.

(f) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.

(g) The Contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraphs (c)(1) and (2) of this clause—

[Contracting Officer check as appropriate.] [ ] By the end of the base term of the contract and then by the end of each subsequent option period; or [ ] By the end of the performance period for each order issued under the contract.

(2) For orders, in accordance with paragraphs (c)(3) and (4) of this clause, by the end of the performance period for the order.

(End of clause)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020)

(IAW FAR 19.309(c))

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) concern eligible under the WOSB Program.

[Complete only if the Contractor represented itself as a women-owned small business concern in paragraph (h)(3) of this clause.] The Contractor represents that—

(i) It [ ] is, [ ] is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ] is, [ ] is not is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(4)(i) of this clause is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture.

[The Contractor shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: _______________________________.] Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.

(5) Economically disadvantaged women-owned small business (EDWOSB) concern.

[Complete only if the Contractor represented itself as a women-owned small business concern eligible under the WOSB Program in (h)(4) of this clause.] The Contractor represents that—

(i) It [ ] is, [ ] is not an EDWOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(5)(i) of this clause is accurate for each EDWOSB concern participating in the joint venture.

[The Contractor shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: ___________________________________.] Each EDWOSB concern participating in the joint venture shall submit a separate signed copy of the EDWOSB representation.

(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.

(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.

(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that—

(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture.

[The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: _________________________________________.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[Contractor to sign and date and insert authorized signer’s name and title.]

52.222-19 CHILD LABOR COOPERATION WITH AUTHORITIES AND REMEDIES (DEVIATION

2020-O0019) (JUL 2020)

(IAW Deviation 2020-O0019 Revision 1)

52.222-20 CONTRACTS FOR MATERIALS, ARTICLES, AND EQUIPMENT (JUN 2020)

(IAW FAR 22.610)

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

(IAW FAR 22.810(a)(1))

52.222-26 EQUAL OPPORTUNITY (SEP 2016)

(IAW FAR 22.810(e))

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))

(a) Definitions. As used in this clause-- “Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,’ and “recently separated veteran” have the meanings given at Federal Acquisition Regulation (FAR) 22.1301.

(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .