SPRRA220P0104.pdf

PDF 62 KB Posted

Attached to
HOLDER, PRINTED CIRCUT Federal contract opportunity
Solicitation number
SPRRA2-20-Q-0068
Issued by
Defense Logistics Agency Aviation

View the file

Other files for this federal contract opportunity

Other files attached to HOLDER, PRINTED CIRCUT, newest first.
File Type Posted
SPRRA220P0104-P00002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF

ORDER FOR SUPPLIES OR SERVICES

1. CONTRACT PURCH ORDER/AGREEMENT NO. 2. DELIVERY ORDER/CALL NO. 3. DATE OF ORDER/CALL

(YYYYMMMDD)

4. REQUISITION/PURCH REQUEST NO. 5. PRIORITY

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than 6) CODE 8. DELIVERY FOB

DESTINATION

OTHER

(See Schedule if other)

9. CONTRACTOR CODE FACILITY 10. DELIVER TO FOB POINT BY (Date) 11. X IF BUSINESS IS

SMALL

SMALL

NAME 12. DISCOUNT TERMS DISADVANTAGED

AND

ADDRESS

WOMAN-OWNED

13. MAIL INVOICES TO THE ADDRESS IN BLOCK

14. SHIP TO CODE 15. PAYMENT WILL BE MADE BY CODE MARK ALL

PACKAGES AND

PAPERS WITH

IDENTIFICATION

NUMBERS IN

BLOCKS 1 AND 2

16. DELIVERY/

CALL THIS DELIVERY ORDER IS ISSUED ON ANOTHER GOVERNMENT AGENCY OR IN ACCORDANCE WITH AND SUBJECT TO TERMS AND CONDITIONS OF ABOVE NUMBERED CONTRACT.

TYPE

OF

ORDER

PURCHASE

Reference your Oral Written Quotation ________________________ , Dated ________________.

____________________________ furnish the following on terms specified herein.

ACCEPTANCE. THE CONTRACTOR HEREBY ACCEPTS THE OFFER REPRESENTED BY THE NUMBERED PURCHASE ORDER AS IT MAY PREVIOUSLY HAVE BEEN OR IS NOW MODIFIED, SUBJECT TO ALL OF THE TERMS AND CONDITIONS SET FORTH, AND AGREES TO PERFORM THE SAME.

NAME OF CONTRACTOR SIGNATURE TYPED NAME AND TITLE DATE SIGNED

If this box is marked, supplier must sign Acceptance and return the following number of copies:

17. ACCOUNTING AND APPROPRIATION DATA/LOCAL USE

18. ITEM NO. 19. SCHEDULE OF SUPPLIES/SERVICE 20. QUANTITY

ORDERED/

ACCEPTED*

21.

UNIT

22. UNIT PRICE 23. AMOUNT

* If quantity accepted by the Government is 24. UNITED STATES OF AMERICA 25. TOTAL same as quantity ordered, indicate by X. 26.

If different, enter actual quantity accepted below DIFFERENCES quantity ordered and encircle. BY: CONTRACTING/ORDERING OFFICER 27a. QUANTITY IN COLUMN 20 HAS BEEN

INSPECTED RECEIVED ACCEPTED, AND CONFORMS TO CONTRACT EXCEPT AS NOTED ____________________________________________________

b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE c. DATE d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

(YYYYMMMDD) REPRESENTATIVE

e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 28. SHIP. NO. 29. D.O. VOUCHER NO. 30. INITIALS

PARTIAL

32. PAID BY 33. AMOUNT VERIFIED CORRECT FOR

f. TELEPHONE NUMBER g. E-MAIL ADDRESS

FINAL

31. PAYMENT 34. CHECK NUMBER

36. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT.

COMPLETE

a. DATE b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

PARTIAL

35. BILL OF LADING NO.

FINAL

37. RECEIVED AT 38. RECEIVED BY (Print) 39. DATE RECEIVED

40. TOTAL CON-

TAINERS

41. S/R ACCOUNT NUMBER 42. S/R VOUCHER NO.

DD FORM 1155, DEC 2001 PREVIOUS EDITION IS OBSOLETE.

SPRRA2-20-P-0104 2020JUL06 SEE SCHEDULE DOA2

SPRRA2

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

LATOYA S. ORR

EMAIL: LATOYA.ORR@DLA.MIL

S2206A

DCMA BOSTON

BUILDING 1108

HANSCOM AFB, MA 01731-1610

X

9X175

COSTA PRECISION MANUFACTURING CORP.

PLAINS RD

CLAREMONT, XX 03743-0990

SEE SCHEDULE

X

See Block 15

SEE SCHEDULE

HQ0337

DFAS-COLUMBUS CENTER

NORTH ENTITLEMENT OPERATIONS

P.O. BOX 182317

COLUMBUS OH 43218-2317

X

X

X 2

QUOTE 3875 2020MAY05

SEE CONTRACT ADMINISTRATION DATA

SEE SCHEDULE

TRACY HAYWOOD

TRACY.HAYWOOD@DLA.MIL (256)690-5423

2020JUL06 /SIGNED/ 2020JUL06

$37,960.00

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: LATOYA S. ORR

Buyer Office Symbol/Telephone Number: DLA-AVN-AHC/(256)924-7926

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Type of Business: Other Small Business Performing in U.S.

Surveillance Criticality Designator: C

Weapon System: Patriot

*** End of Narrative A0000 ***

THE FOLLOWING DOCUMENTS ARE HEREBY INCORPORATED BY REFERENCE INTO THIS CONTRACT: SOLICITATION SPRRA2-20-Q-0068 AND YOUR FINAL OFFER, WHICH IS BEING ACCEPTED BY THE GOVERNMENT TO FORM THIS CONTRACT.

A-1. THIS IS A ONE TIME BUY, FIRM FIXED PRICE EFFORT, AWARDED TO COSTA PRECISION MANUFACTURING CORP. CAGE: 9X175

A-2. THIS REQUIREMENT IS IN SUPPORT OF THE PATRIOT SYSTEM: M-D6.

A-3. GOVERNMENT FIRST ARTICLE TEST IS REQUIRED.

A-4. THE TEST ITEM SHALL BE SUBJECT TO DESTRUCTIVE TESTING AS PART OF THE FIRST ARTICLE TEST.

A-5. THE TECHNICAL DATA PACKAGE PROVIDED ON CD CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE

22 U.S.C., SEC 2751 ET SEQ.) OR EXECUTIVE ORDER 12470. VIOLATION OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.

A-6. IUID MARKINGS ARE NOT REQUIRED.

A-7. SERIAL NUMBERING IS NOT REQUIRED.

A-8. DLA POST AWARD CONTACT:

DLA HSV Post Award Team

7408 Warehouse Road

Redstone Arsenal, AL 35898

DLAHSVPostAwardTeam@dla.mil

A-9. CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: __TOM BARBER________________________________ _________________

E-MAIL ADDRESS: ___tbarber@costaprecision.com_____ __________________________________

TELEPHONE NUMBER: _ 603-542-5229 EXT 16___________ ________________________________

CAGE CODE: ____9X175______________________________ _____

A-10. DCMA ACO POINT OF CONTACT INFORMATION:

NAME: ____MARIANNE DEL GRECO_____________________ ___________________________________________

E-MAIL ADDRESS: _marianne.f.delgreco.civ@mail.mil ________________________________

TELEPHONE NUMBER: _______603-621-2964____________ _______________________________

A.11. FUNDS WILL BE OBLIGATED/CITED UPON ISSUANCE OF ORDER.

A-12. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.

A-13. FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED

FOR PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE

2 25

SPRRA2-20-P-0104

COSTA PRECISION MANUFACTURING CORP.

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION

AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN

PART, AS APPROPRIATE.

*** END OF NARRATIVE A0001 ***

3 25

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 HOLDER,PRINTED CIRC

NSN: 5998-01-682-1184

Mfr CAGE: 18876

Mfr Part Number: 13660133-4

0001AA GOVERNMENT TESTED FIRST ARTICLE 1 EA $ 4,500.00000 $ 4,500.00 _______________________________ ______________ __________________

COMMODITY NAME: HOLDER,PRINTED CIRC

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: D10H0045D1 PRON AMD: 04 ACRN: AA

AMS CD: SM2B1100000

PSC: 5998

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

MIL-STD-129 MARKINGS SHALL APPLY

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

MIL-STD-2073-1 CODES, APPENDIX J:

JI/A/MP [41] JII/CD [1] JIII/PM [00] JIV/WM [EC]

JV/CD [NA] JVI/CT [A] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [10.5]

LN [26.0]

WD [10.0]

DP [6.0]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Government Approval/Disapproval Days: 90

Deliveries or Performance _________________________

DOC SUPPL

4 25

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

002 SPRRA200070900 W31P0W J 2

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 07-MAY-2021

FOB POINT: Destination

SHIP TO:

(W31P0W) SR HEADQUARTERS US ARMY AVIATION &

REDSTONE TECHNICAL TEST CENTER

COTTONWOOD RD BLDG 8022 MF 4500

REDSTONE ARSENAL,AL,35898-8052

CONTRACT/DELIVERY ORDER NUMBER ______________________________

SPRRA2-20-P-0104/0000

0001AB PRODUCTION QUANTITY 14 EA $ 2,390.00000 $ 33,460.00 ___________________ ______________ __________________

COMMODITY NAME: HOLDER,PRINTED CIRC

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: D10H0045D1 PRON AMD: 04 ACRN: AA

AMS CD: SM2B1100000

PSC: 5998

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

MIL-STD-129 MARKINGS SHALL APPLY

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

MIL-STD-2073-1 CODES, APPENDIX J:

JI/A/MP [41] JII/CD [1] JIII/PM [00] JIV/WM [EC]

JV/CD [NA] JVI/CT [A] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [10.5]

LN [26.0]

WD [10.0]

DP [6.0]

(End of narrative D001)

5 25

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W31G3H9344AF06 W90BTD J 2

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 14 19-NOV-2021

FOB POINT: Destination

SHIP TO:

(W90BTD) SR HEADQUARTERS US ARMY AVIATION &

AMCOM FLEET MGT CENTER AFMC

HOLBROOK RD BLDG 722

FORT BLISS,TX,79916-5801

CONTRACT/DELIVERY ORDER NUMBER ______________________________

SPRRA2-20-P-0104/0000

6 25

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-1 CONTRACTOR INSPECTION REQUIREMENTS APR/1984

2 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

3 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984

4 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

5 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ANSI/ISO/ASQ 9001:2015, AS 9100 OR EQUIVALENT, TAILORING: ALL PARAGRAPHS UNDER 8.3 (DESIGN AND DEVELOPMENT AND SERVICES) DO NOT APPLY

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

7 25

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DELIVERIES OR PERFORMANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.242-15 STOP-WORK ORDER AUG/1989

2 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

3 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

4 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984

5 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

CLIN 0001AA 1 465

CLIN 0001AB 14 585

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFERORS PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

CLIN 0001AA 1 301

CLIN 0001AB 14 497

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

Contractors date of receipt of the contract or notice of award by adding

(1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of Clause)

8 25

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

9 25

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CONTRACT ADMINISTRATION DATA

PRON/ PRON/

AMS CD/ AMS CD/

LINE MIPR/ OBLG JO NO/ OBLIGATEDLINE MIPR/ OBLG JO NO/ OBLIGATED

ITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNTITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNT_____ _________ _____ ___________ ____ _______________ _________ _____ ___________ ____ __________

0001AA D10H0045D1 2 AA $ 4,500.00

SM2B1100000

0001AB D10H0045D1 2 AA $ 33,460.00

SM2B1100000

TOTAL $ 37,960.00

OBLIGATED OBLIGATED

ACRN ACCOUNTING CLASSIFICATION AMOUNTACRN ACCOUNTING CLASSIFICATION AMOUNT____ _________________________ ______________ _________________________ __________

AA 97 X4930AC9F 6X 26K6 S01021 W31G3H $ 37,960.00 __________________

TOTAL $ 37,960.00

LINELINE

ITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATIONITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATION_____ ____ _______________________________________ ____ __________________________________

0001AA AA 97 0X0X4930AC9F S01021 6X0000SM2B110000026K6 S01021 W31G3H

0001AB AA 97 0X0X4930AC9F S01021 6X0000SM2B110000026K6 S01021 W31G3H

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS DEC/2018

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this

Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/ .

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

10 25

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items--

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

COMBO REPORT

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some Combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC HQ0337

Issue By DoDAAC SPRRA2

Admin DoDAAC S2206A

Inspect By DoDAAC S2206A

Ship To Code W31P0W/W90BTD

Ship From Code 9X175

Mark For Code N/A

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) N/A

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and

Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

DCMA ACO: marianne.f.delgreco.civ@mail.mil 603-621-2964

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

11 25

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SPECIAL CONTRACT REQUIREMENTS

BAR CODE MARKINGS_________________

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG NOTICE______________________________________________________________________________________________________________________________________

PREPARATION AND SUBMISSION INSTRUCTIONS_______________________________________

1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), and Requests for Variance

(RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.

2. Format. _______

a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished

Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for

Class I ECPs.

b. Long Form Procedure: Class I changes to the CI require that DD Form 1692, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.

c. Short Form Procedure: ECPs and VECPs, which meet the requirements of Class II ECPs, shall be prepared using DD Form 1692 (page

1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Priority", and Block 8 "Justification Codes."

d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFV. RFVs shall be prepared using DD Form 1694.

e. Each ECP and RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract Management

Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFV proposal.

f. Classification of RFVs.

(1) Major RFVs. RFVs written against CIs shall be designated as major when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance; interchangeability; reliability;

survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.

(2) Critical RFVs. RFVs written against CIs shall be designated as critical when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.

(3) Minor RFVs. RFVs written against CIs shall be designated as minor when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs f(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.

g. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.

h. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.

i. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.

j. Times allowed for technical decisions for ECP and RFV proposals will be worked out via mutual agreement between the Contractor and the Government.

k. The Contractor shall submit, concurrent with the ECP, a separate DD Form 1696, "Specification Change Notice" (SCN), for each

12 25

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

specification that would require revision if the ECP were approved.

l. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.

m. The Contractor shall utilize DD Form 2617, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.

n. The Contractor shall utilize DD Form 1695, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled

"WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.

3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO). __________

One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, or RFVs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.

4. Distribution. ____________

a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft Word _______________________ is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Office of the Secretary of Defense Executive Services Directorate DoD Directives Division website

(http://www.esd.whs.mil/DD/ ) via the DoD Forms menu. The forms are provided in fillable Adobe Acrobat Portable Document Format

(PDF). In order to access and use the forms, the user must have the "Adobe Acrobat" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO.

b. Hard Copy Distribution of Class I or II ECPs and RFVs, For each Class I or II ECP, or each RFV that the ACO determines to be in ______________________________________________________ compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation pertaining to the proposed engineering change action to the PCO. Assistance in preparing any of these proposals may be obtained from the ACO or AMCOM Change Control Point at:

Aviation and Missile Research, Development, and Engineering Center

ATTN: RDMR-SET

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-1335

c. Hard Copy Distribution of VECPs. For each VECP that the ACO determines to be in compliance with this provision, the Contractor _______________________________ shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any VECP that is submitted to the

PCO, the ACO shall immediately submit DCMA's written evaluation to the PCO. The Contractor shall also submit one copy of the VECP to the Value Engineering Program Manager (VEPM) whose address is below. Assistance in preparing VECPs may be obtained from the

VEPM.

Aviation and Missile Research, Development, and Engineering Center

ATTN: RDMR-SEI

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-8163

5. Alternate Format, Submittal, or Distribution Process. Proposals may be prepared in a different format, submitted using a different ____________________________________________________ submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.

6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution _____________________ of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The

Government will notify the Contractor in writing if a proposal is determined to be unacceptable.

(End of Clause)

FIRST ARTICLE INSPECTION AND TEST - GOVERNMENT TESTED - ADDITIONAL REQUIREMENTS_______________________________________________________________________________

a. The first article shall conform to the requirements of the contract and the Technical Data Package drawing(s), the Quality Assurance

Provisions (QAPs), and specification(s) referenced thereon. The first article shall be representative of items to be manufactured using

13 25

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

the same processes and procedures and at the same facility as contract production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

b. Unless otherwise specified in the contract, the contractor shall NOT retain the first article provided under this contract to serve as the manufacturing standard of acceptance.

c. Additional first article testing may be ordered by the Contracting Officer in writing whenever (i) a major change is made to the technical data, (ii) there is a lapse in production for a period in excess of 18 months, or (iii) a change occurs in place of performance, manufacturing locations or processes, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Should the Government require additional first article testing the Contractor may be entitled to an equitable adjustment.

d. Rejected first articles or portions thereof not destroyed during inspection and testing will be held at the government first article test site for a period of 3 years following the date of notification of rejection, pending receipt of instructions from the Contractor for the disposition of the rejected material. The Contractor agrees that failure to furnish such instructions within said time period shall constitute abandonment of said material by the Contractor and shall confer upon the Government the right to destroy or otherwise dispose of the rejected items at the discretion of the Government without liability to the Contractor by reason of such destruction or disposition.

NOTICE: ENVIRONMENTAL TEST__________________________

Item(s) or components thereof which are subjected to environmental tests of a destructive nature or which otherwise degrade the quality of the item(s) shall not be furnished to the Government in satisfaction of this contract.

REQUEST FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL_____________________________________________________

The requirement for FIRST ARTICLE APPROVAL may be waived, in whole or in part, by the Government, provided that sufficient information is provided to determine whether the request is to be approved. A partial waiver is defined as a waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP) and/or the solicitation/contract, i.e. vibration test, salt water spray test, or a test on a component or subassembly of the procured item. A full waiver is defined as a waiver of all

First Article testing as required by the TDP and/or the solicitation/contract.

All waiver requests require a First Article Waiver Worksheet to be completed and submitted to the Government along with all supporting documentation. The worksheet will be provided by the Buyer upon request. No requests will be considered if the worksheet and supporting documentation are not submitted to the Government. The worksheet must be completed in its entirety. For those sections of the worksheet which do not apply, annotate with N/A (not applicable). To substantiate or clarify information provided, the Government may request additional information.

Submission of the FAT waiver request (and supporting documentation) to the Government does not guarantee that the waiver will be granted.

The First Article Waiver Worksheet and additional supporting documentation must be submitted on Company letterhead and signed by an authorized agent of the Company.

Supporting documentation.

(1) The request for waiver must be accompanied by the First Article Waiver Worksheet, and documentation in support of the request. The documentation may include, but is not limited to:

(i) Copy of the Administrative Contracting Officers (ACOs) or Procuring Contracting Officers (PCOs) letter approving a First

Article Test report on a recent contract for the same or similar item;

(ii) Copy of a First Article Test report for the same or a similar item as that solicited herein;

(iii) Copy of an ACO or PCO letter approving a prior waiver request; or

(iv) If the waiver request is based on similarity, a copy of the drawing/other appropriate technical requirements of the similar item.

(2) If a copy of a First Article Test report is submitted in support of a request for waiver, the test report must have been approved and signed by an authorized representative of the United States Government.

14 25

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(3) The First Article Waiver Worksheet and all supporting documentation should be submitted by email. If the First Article Waiver

Worksheet and supporting documentation cannot be transmitted by email, the PCO should be contacted for further instruction.

Note: If a waiver is granted, an accelerated delivery schedule will apply.

Note: Cost considerations shall apply for approving a waiver or a portion thereof of a First Article Test.

WOOD PACKING MATERIALS REQUIREMENTS___________________________________

A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).

B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures

(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United

States must meet ISPM 15 whenever WPM is used to ship DOD cargo.

(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement

"http://www.alsc.org/) "

(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with

ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.

D. Replacement Preservative for Pentachlorophenol

If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or

1.8 percent copper 8 quinolinolate.

(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.

The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their

National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

*** END OF NARRATIVE H0001 ***

15 25

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CONTRACT CLAUSES

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT/2018

2 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE JUL/2016

3 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS NOV/2015

4 52.211-5 MATERIAL REQUIREMENTS AUG/2000

5 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT OCT/1997

6 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES FEB/1997

7 52.223-6 DRUG-FREE WORKPLACE MAY/2001

8 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING JUN/2020

9 52.233-1 DISPUTES (MAY 2014) -- ALTERNATE I (DEC 1991) DEC/1991

10 52.243-1 CHANGES--FIXED PRICE AUG/1987

11 52.248-1 VALUE ENGINEERING JUN/2020

12 52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (SHORT APR/1984

FORM)

13 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) APR/1984

14 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS SEP/2011

15 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS SEP/2013

16 252.204-7000 DISCLOSURE OF INFORMATION OCT/2016

17 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT APR/1992

18 252.204-7006 BILLING INSTRUCTIONS OCT/2005

19 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING DEC/2019

20 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT MAY/2016

21 252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC DEC/2017

22 252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS DEC/2017

23 252.225-7041 CORRESPONDENCE IN ENGLISH JUN/1997

24 252.225-7048 EXPORT-CONTROLLED ITEMS JUN/2013

25 252.227-7013 RIGHTS IN TECHNICAL DATA--NONCOMMERCIAL ITEMS FEB/2014

26 252.227-7016 RIGHTS IN BID OR PROPOSAL INFORMATION JAN/2011

27 252.227-7025 LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED MAY/2013

INFORMATION MARKED WITH RESTRICTIVE LEGENDS

28 252.227-7030 TECHNICAL DATA--WITHHOLDING OF PAYMENT MAR/2000

29 252.227-7037 VALIDATION OF RESTRICTIVE MARKINGS ON TECHNICAL DATA SEP/2016

30 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS DEC/2018

31 252.232-7010 LEVIES ON CONTRACT PAYMENTS DEC/2006

32 252.243-7001 PRICING OF CONTRACT MODIFICATIONS DEC/1991

33 252.246-7003 NOTIFICATION OF POTENTIAL SAFETY ISSUES JUN/2013

34 252.246-7007 CONTRACTOR COUNTERFEIT ELECTRONIC PART DETECTION AND AVOIDANCE SYSTEM AUG/2016

35 252.246-7008 SOURCES OF ELECTRONIC PARTS MAY/2018

36 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA--BASIC FEB/2019

37 52.209-4 FIRST ARTICLE APPROVAL -- GOVERNMENT TESTING (SEP 1989) -- ALTERNATE JAN/1997

I (JAN 1997)

(a) The Contractor shall deliver 1 (ONE) unit(s) of Lot/Item CLIN 0001AA within 301 calendar days from the date of this contract to the _______ ___________ ___

Government at PR W0H9 US ARMY AVN & MISSILES CMD, REDSTONE TECHNICAL TEST CENTER, COTTONWOOD RD BLDG 8022 MF 4500, REDSTONE ARSENAL, _______________________________________________________________________________________________________________________

AL_35898-8052 for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification.______________

The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

(b) Within 90 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in __ writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this

16 25

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing.

After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the

Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor --

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractors expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

(j) The Contractor shall produce both the first article and the production quantity at the same facility.

(End of Clause)

38 52.209-4 FIRST ARTICLE APPROVAL -- GOVERNMENT TESTING SEP/1989

(a) The Contractor shall deliver 1 (ONE) unit(s) of Lot/Item CLIN 0001AA within 301 calendar days from the date of this contract to the _______ ___________ ___

Government at PR W0H9 US ARMY AVN & MISSILES CMD, REDSTONE TECHNICAL TEST CENTER, COTTONWOOD RD BLDG 8022 MF 4500, REDSTONE ARSENAL, AL __________________________________________________________________________________________________________________________

35898-8052 for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The___________ characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

(b) Within 90 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in __ writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing.

After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

17 25

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the

Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .