SPRRA2-23-C-0010 AWARD -- 31 MAR 2023.pdf

PDF 829 KB Posted

Attached to
Advanced Technology Integration – Detroit (ATI-D) Federal contract opportunity
Solicitation number
SPRRA2-23-C-0010
Issued by
Defense Logistics Agency Aviation

About this file

This is an award notice for contract SPRRA2-23-C-0010 issued by the Defense Logistics Agency Aviation to Intuitive Research and Technology Corporation. The contract is for $56,928,794.43 to support the Advanced Technology Integration – Detroit program. Key work under the contract includes material, design reviews, sensor suites, prototypes, long range initial production involving installation of sensor suites on mast/gimbaled/turret systems, and contract data requirement deliverables. The period of performance spans March 2023 through November 2023. The federal agencies involved are the Defense Logistics Agency Aviation as the issuing agency and the Army Redstone Test Center as the customer.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Harold R. Brewer, Chairman

3/31/2023

AWARD/CONTRACT 1. This Contract Is A Rated Order Under DPAS (15 CFR 700)

Rating Page Of Pages

2. Contract (Proc. Inst. Ident.) No. 3. Effective Date 4. Requisition/Purchase Request/Project No.

5. Issued By Code 6. Administered By (If Other Than Item 5) Code e-mail address:

7. Name And Address Of Contractor (No., Street, City, County, State and Zip Code) 8. Delivery

FOB Origin Other (See Below)

9. Discount For Prompt Payment

10. Submit Invoices Item (4 Copies Unless Otherwise Specified)

Code Facility Code To The Address Shown In:

11. Ship To/Mark For Code 12. Payment Will Be Made By Code

13. Authority For Using Other Than Full And Open Competition: 14. Accounting And Appropriation Data

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

15A. Item No. 15B. Supplies/Services 15C. Quantity 15D. Unit 15E. Unit Price 15F. Amount

15G. Total Amount Of Contract

16. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attachments

C Description/Specs./Work Statement J List of Attachments

D Packaging and Marking Part IV - Representations And Instructions

E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors

H Special Contract Requirements M Evaluation Factors for Award Contracting Officer Will Complete Item 17 (Sealed-Bid or Negotiated Procurement) Or 18 (Sealed-Bid Procurement) As Applicable

17. Contractor’s Negotiated Agreement (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all the services set forth or otherwise identified above and on any continuation sheets for the consideration stated herein. The rights and obligations of the parties to this contract shall be subject to and governed by the following documents: (a) this award/contract, (b) the solicitation, if any, and (c) such provisions, representations, certifications, and specifications, as are attached or incorporated by reference herein. (Attachments are listed herein.)

18. Sealed-Bid Award (Contractor is not required to sign this document.) Your bid on Solicitation Number , including the additions or changes made by you which additions or changes are set forth in full above, is hereby accepted as to the items listed above and on any continuation sheets. This award consummates the contract which consists of the following documents: (a) the Government’s solicitation and your bid, and (b) this award/contract. No further contractual document is necessary. (Block 18 should be checked only when awarding a sealed-bid contract.)

19A. Name And Title Of Signer (Type Or Print) 20A. Name Of Contracting Officer

19B. Name of Contractor 19c. Date Signed 20B. United States Of America 20C. Date Signed

By By

(Signature of person authorized to sign) (Signature of Contracting Officer)

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 26 (Rev. 5/2011) Previous edition is NOT usable Prescribed By GSA - FAR (48 CFR) 53.214(a)

DOA2

SPRRA2-23-C-0010 2023MAR31 SEE SCHEDULE

SPRRA2

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

MICHAEL L. ELLISON

MICHAEL.ELLISON@DLA.MIL

S0107A

DCMA HUNTSVILLE

1040 RESEARCH BLVD, SUITE 100

MADISON AL 35758-2040

1MQC1

INTUITIVE RESEARCH AND TECHNOLOGY CORPORATION

5030 BRADFORD DR NW STE 205

HUNTSVILLE, AL 35805-1935

X

SEE SCHEDULE

HQ0338

DFAS-COLUMBUS CENTER

SOUTH ENTITLEMENT OPERATIONS

P O BOX 182317

COLUMBUS OH 43218-2317

X 1 SEE SECTION G

SEE SCHEDULE

$56,928,794.43

X

2 signed

JUSTINE KIRK

JUSTINE.KIRK@DLA.MIL (256)690-5424

/SIGNED/ 2023MAR31

1 38

X 1

X 4

X 10

X 11

X 12

X 15

X 20

X 38

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MICHAEL L. ELLISON

Buyer Office Symbol/Telephone Number: DLA-AVN-AHCA/(256)690-5751

Type of Contract 1: Firm Fixed Price

Kind of Contract: Research and Development Contracts

Type of Business: Other Small Business Performing in U.S.

Surveillance Criticality Designator: B

Weapon System: Hellfire

*** End of Narrative A0000 ***

*** WARNING EXPORT CONTROL***

THIS ACQUISITION CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, USC., SEC 2751 ET SEQ) OR

THE EXPORT ADMINISTRATION ACT (TITLE 50, USC., APP 2401-2402) EXECUTIVE ORDER 12470. THIS INFORMATION CANNOT BE RELEASED OUTSIDE THE

UNITED STATES WITHOUT PRIOR APPROVAL OF THE GOVERNMENT.

A-1. THIS AWARD IS FOR THE PRE-PRODUCTION, RESEARCH AND DEVELOPMENT, REQUIREMENT TO MEET THE NEEDS OF THE CUSTOMER, TACTICAL AVAIATION

AND GROUND MUNITIONS (TAGM) ADVANCED TECHNOLOGY INTERGRATION (ATI) PROGRAM OFFICE. THIS REQUIREMENT IS RESTRICTED TO INTUITIVE RESEARCH

AND TECHNOLOGY CORPORATION, CAGE CODE 1MQC1, IAW 10 U.S.C. 3204 (a)(2) AND FAR 6.302-2,THIS ACQUSITION IS UNUSAL AND COMPELLING URGENCY.

A-2. THIS REQUIREMENT IS IN SUPPORT OF THE HELLFIRE DEPLOYMENT ENGAGEMENT SYSTEM (HADES) PROGRAM.

A-3. THIS A ONE TIME BUY (OTB), FIRM FIXED PRICE EFFORT.

A-4. CONTRACTOR POINT OF CONTACT:

NAME: Cortney Hardiman ________________

TELEPHONE NUMBER: 256-348-8879 ____________

E-MAIL ADDRESS: cortney.hardiman@irtc-hq.com ____________________________

A-5. DCMA ACO POINT OF CONTACT:

NAME: Randall W. Way _______________

TELEPHONE NUMBER: 256-850-7332 ____________

E-MAIL ADDRESS: randall.w.way.civ@mail.mil __________________________

A-6. CONTRACT SPECIALIST POINT OF CONTACT INFORMATION:

NAME: Michael Ellison _______________

OFFICE SYMBOL: DLA-AHCA ________

TELEPHONE NUMBER: 256-280-6424 ____________

E-MAIL ADDRESS: michael.ellison@dla.mil _______________________

A-7. CONTRACTING OFFICER REPRESENTATIVE POINT OF CONTACT:

NAME: Franklin Niles ______________

TELEPHONE NUMBER: 256-955-1358 ____________

E-MAIL ADDRESS: franklin.y.niles.civ@army.mil _____________________________

A-8. FUNDS WILL BE OBLIGATED/CITED UPON ISSUANCE OF CONTRACT.

2 38

SPRRA2-23-C-0010

INTUITIVE RESEARCH AND TECHNOLOGY CORPORATION

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A-9. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.

A-10. FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED

FOR PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE

THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIRMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION

AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR

PART, AS APPROPRIATE.

A-11. AS SPECIFIED IN THE H NARRATIVE, THE GOVERNMENT SHALL RETAIN ALL RIGHTS TO TECHNICAL DATA PROVIDED FOR THIS EFFORT.

A-12. GFE WILL BE PROVIDED WITHIN 30 DAYS OF CONTRACT AWARD (NO LATER THAN JUNE 2023, AND ALL WILL BE DELIVERED BY THE END OF JULY

2023), FOR IRTC TO BEGING INTERGRATION. REFERENCE ATTACHMENT 0003 IN SECTION J.

*** END OF NARRATIVE A0001 ***

3 38

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 MATERIAL ________

A100 MATERIAL 1 LO $ ** N/A ** $ 12,411,693.21 ________ ______________ __________________

COMMODITY NAME: ATI-D LONG LEAD

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 5340

PRON: Y03INS04Y0 PRON AMD: 01 ACRN: AA

AMS CD: 371359.H87

CUSTOMER ORDER NO: MIPR3EINS06002

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W80E6J308902AT W81MTJ L 1

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 03-APR-2023

FOB POINT: Destination

SHIP TO:

(W81MTJ) PR US ARMY REDSTONE TEST CENTER

BLDG 4500

MARTIN ROAD

REDSTONE ARSENAL,AL,35898-0000

0002 ATI-D DESIGN REVIEW

NSN: 9999-99-999-9999

0002AA NRE 1 LO $ ** N/A ** $ 3,461,355.71 ____________________ ______________ __________________

COMMODITY NAME: ATI-D DESIGN REVIEW

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: Y03TTF03Y0 PRON AMD: 01 ACRN: AB

AMS CD: 411359.00

PSC: 5342

4 38

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

CUSTOMER ORDER NO: MIPR3DTTF14002

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W80E6J308906AT W81MTJ L 1

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 01-MAY-2023

FOB POINT: Destination

SHIP TO:

(W81MTJ) PR US ARMY REDSTONE TEST CENTER

BLDG 4500

MARTIN ROAD

REDSTONE ARSENAL,AL,35898-0000

0002AB NRE 1 LO $ ** N/A ** $ 7,592,247.95 ___ ______________ __________________

COMMODITY NAME: ATI-D SENSOR SUITE S

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: Y03INS05Y0 PRON AMD: 01 ACRN: AA

AMS CD: 371359.H87

PSC: 5342

CUSTOMER ORDER NO: MIPR3EINS06002

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W80E6J308903AT W81MTJ L 1

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 01-JUN-2023

FOB POINT: Destination

SHIP TO:

(W81MTJ) PR US ARMY REDSTONE TEST CENTER

BLDG 4500

MARTIN ROAD

REDSTONE ARSENAL,AL,35898-0000

5 38

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0002AC NRE 1 LO $ ** N/A ** $ 545,242.57 ___ ______________ __________________

COMMODITY NAME: ATI-D PROTOTYPE

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: Y03INS06Y0 PRON AMD: 01 ACRN: AA

AMS CD: 371359.H87

PSC: 5342

CUSTOMER ORDER NO: MIPR3EINS06002

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W80E6J308904AT W81MTJ L 1

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 01-JUN-2023

FOB POINT: Destination

SHIP TO:

(W81MTJ) PR US ARMY REDSTONE TEST CENTER

BLDG 4500

MARTIN ROAD

REDSTONE ARSENAL,AL,35898-0000

0002AD NRE 1 LO $ ** N/A ** $ 4,961,355.71 ___ ______________ __________________

COMMODITY NAME: ATI-D DESIGN REVIEW

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: Y03PUR02Y0 PRON AMD: 01 ACRN: AA

AMS CD: 371359.H87

PSC: 5342

CUSTOMER ORDER NO: MIPR3DPUR14002

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

6 38

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W80E6J308907AT W81MTJ L 1

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 01-JUN-2023

FOB POINT: Destination

SHIP TO:

(W81MTJ) PR US ARMY REDSTONE TEST CENTER

BLDG 4500

MARTIN ROAD

REDSTONE ARSENAL,AL,35898-0000

0003 ATI-D LRIP

NSN: 9999-99-999-9999

0003AA INSTALL OF FLIR/RADAR DENSOR SUITES & MOUNT OF ______________________________________________

MAST/NG/LN25 25 EA $ 1,118,275.971 $ 27,956,899.28 ____________ ______________ __________________

COMMODITY NAME: ATI-D LRIP

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: Y03INS03Y0 PRON AMD: 01 ACRN: AA

AMS CD: 371359.H87

PSC: 1095

CUSTOMER ORDER NO: MIPR3EINS06002

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W80E6J308901AT W81MTJ L 1

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 5 01-JUL-2023

002 5 01-AUG-2023

003 5 01-SEP-2023

004 5 01-OCT-2023

005 5 01-NOV-2023

FOB POINT: Destination

SHIP TO:

(W81MTJ) PR US ARMY REDSTONE TEST CENTER

7 38

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

BLDG 4500

MARTIN ROAD

REDSTONE ARSENAL,AL,35898-0000

0004 CONTRACT DATA REQUIREMENTS LIST _______________________________

A400 BUILD TO AND LAYOUT OF DRAWINGS 1 EA $ ** NSP ** $ ** NSP ** _______________________________ ______________ __________________

COMMODITY NAME: CDRL - SEE EXHIBIT A

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 1095

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 3

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 30-NOV-2023

FOB POINT: Destination

SHIP TO:

(W81MTJ) PR US ARMY REDSTONE TEST CENTER

BLDG 8022

COTTONWOOD ROAD

REDSTONE ARSENAL,AL,35898-0000

A401 TRAINING MATERIALS 1 EA $ ** NSP ** $ ** NSP ** __________________ ______________ __________________

COMMODITY NAME: CDRL - SEE EXHIBIT B

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 1095

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

8 38

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 3

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 30-NOV-2023

FOB POINT: Destination

SHIP TO:

(W81MTJ) PR US ARMY REDSTONE TEST CENTER

BLDG 8022

COTTONWOOD ROAD

REDSTONE ARSENAL,AL,35898-0000

9 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996

E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ANSI/ISO/ASQ 9001: 2015

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

10 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989

F-2 52.242-15 STOP-WORK ORDER AUG/1989

F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

F-4 52.247-34 F.O.B. DESTINATION NOV/1991

F-5 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

F-6 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984

F-7 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY MAR/2022

11 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION G - CONTRACT ADMINISTRATION DATA

PRON/ PRON/

AMS CD/ AMS CD/

LINE MIPR/ OBLG JO NO/ OBLIGATEDLINE MIPR/ OBLG JO NO/ OBLIGATED

ITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNTITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNT_____ _________ _____ ___________ ____ _______________ _________ _____ ___________ ____ __________

0002AA Y03TTF03Y0 2 AB $ 3,461,355.71

411359.00

MIPR3DTTF14002

0002AB Y03INS05Y0 2 AA $ 7,592,247.95

371359.H87

MIPR3EINS06002

0002AC Y03INS06Y0 2 AA $ 545,242.57

371359.H87

MIPR3EINS06002

0002AD Y03PUR02Y0 2 AA $ 4,961,355.71

371359.H87

MIPR3DPUR14002

0003AA Y03INS03Y0 2 AA $ 27,956,899.28

371359.H87

MIPR3EINS06002

A100 Y03INS04Y0 2 AA $ 12,411,693.21

371359.H87

MIPR3EINS06002

TOTAL $ 56,928,794.43

OBLIGATED OBLIGATED

ACRN ACCOUNTING CLASSIFICATION AMOUNTACRN ACCOUNTING CLASSIFICATION AMOUNT____ _________________________ ______________ _________________________ __________

AA 21 3204000003222010371359.252G S23185 $ 53,467,438.72

AB 21 3202000003222010411359.252G S23185 $ 3,461,355.71 __________________

TOTAL $ 56,928,794.43

LINELINE

ITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATIONITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATION_____ ____ _______________________________________ ____ __________________________________

0002AA AB 21 232320200000 S23185 3222010411359.00 252GMIPR3DTTF14002ZD12RAS23185

0002AB AA 21 232420400000 S23185 3222010371359.H87 252GMIPR3EINS06002ZF17RAS23185

0002AC AA 21 232420400000 S23185 3222010371359.H87 252GMIPR3EINS06002ZF17RAS23185

0002AD AA 21 232420400000 S23185 3222010371359.H87 252GMIPR3DPUR14002ZF14RAS23185

0003AA AA 21 232420400000 S23185 3222010371359.H87 252GMIPR3EINS06002ZF17RAS23185

A100 AA 21 232420400000 S23185 3222010371359.H87 252GMIPR3EINS06002ZF17RAS23185

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) JAN/2023

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

12 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/ .

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items--

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

THE CONTRACTOR IS ENCOURAGED TO USE THE COMBINATION INVOICE AND RECEIVING REPORT (COMBO) FOR SUBMITTING INVOICES FOR SUPPLIES. THIS

ELIMINATES THE NEED TO SEPARATELY PROCESS A RECEIVING REPORT AND INVOICE.

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

INSPECTION: ORIGIN ACCEPTANCE: ORIGIN

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some Combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC HQ0338

Issue By DoDAAC SPRRA2

Admin DoDAAC S0107A

Inspect By DoDAAC S0107A

13 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Ship To Code W81MTJ

Ship From Code 1MQC1

Mark For Code N/A

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) N/A

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and

Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

RANDALL W. WAY

DCMA ACO

256-850-7332

RANDALL.W.WAY.CIV@MAIL.MIL

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

14 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

DATA RIGHTS___________

THE GOVERNMENT HAS UMLIMITED RIGHTS TO ALL DOCUMENTS/MATERIAL PRODUCED UNDER THIS CONTRACT. ALL DOCUMENTS AND MATERIALS, TO INCLUDE

THE SOURCE CODES OF ANY SOFTWARE, PRODUCED UNDER THIS CONTRACT, SHALL BE GOVERNMENT OWNED AND ARE THE PROPERTY OF THE GOVERNMENT WITH

ALL RIGHTS AND PRIVILEGES OF OWNERSHIP/COPYRIGHT BELONGING EXCLUSIVELY TO THE GOVERNMENT. THESE DOCUMENTS AND MATERIALS MAY NOT BE

USED OR SOLD BY THE CONTRACTOR WITHOUT WRITTEN PERMISSION FROM THE CONTRACTING OFFICER. ALL MATERIALS SUPPLIED TO THE GOVERNMENT SHALL

BE THE SOLE PROPERTY OF THE GOVERNMENT AND MAY NOT BE USED FOR ANY OTHER PURPOSE. THIS RIGHT DOES NOT ABROGATE ANY OTHER GOVERNMENT

RIGHTS.

Disputes Agreement to Use Alternative Dispute Resolution (ADR)________________________________________________________________

(a) The parties agree to negotiate with each other to try to resolve any disputes that may arise. If unassisted negotiations are unsuccessful, the parties will use alternative dispute resolution (ADR) techniques to try to resolve the dispute. Litigation will only be considered as a last resort when ADR is unsuccessful or has been documented by the party rejecting ADR to be inappropriate for resolving the dispute.

(b) Before either party determines ADR inappropriate, that party must discuss the use of ADR with the other party. The documentation rejecting ADR must be signed by an official authorized to bind the contractor (see FAR 52.233-1), or, for the Agency, by the contracting officer, and approved at a level above the contracting officer after consultation with the ADR Specialist and legal counsel. Contractor personnel are also encouraged to include the ADR Specialist in their discussions with the contracting officer before determining ADR to be inappropriate.

(c) If you wish to opt out of this clause, check here [ ]. Alternate wording may be negotiated with the contracting officer.

(End of Provision)

WOOD PACKING MATERIALS REQUIREMENTS___________________________________

A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).

B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures

(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United

States must meet ISPM 15 whenever WPM is used to ship DOD cargo.

(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement

Regulations (see http://www.alsc.org/ ).

(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.

D. Replacement Preservative for Pentachlorophenol

If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or 1.8 percent copper 8 quinolinolate.

(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated.

All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention

Standard. The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

15 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

REVISIONS TO DRAWINGS/PART NUMBERS__________________________________

(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting

Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.

If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document. The minimum acceptable data includes the next higher assembly and the item of Supply Detail Drawings which will allow provisioning, National Stock Number assignment and updating of

AMCOM's data records.

(b) The contractor hereby verifies previous contractual submission of technical data:

Contract No.: _____________________________________________________

Contractor: _______________________________________________________

Explanation of Data Rights: __________________________________________

(c) The Government is not by this request soliciting, nor is the Government liable for cost incurred by the offeror in preparing or developing modifications, deviations, waivers, or other changes to drawings or part number(s). Furthermore, this request does not authorize changes to the drawing(s) or part number(s) for this acquisition, another contract, or for any other purpose. Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.

(d) All proposed part number changes shall be submitted pursuant to the requirements of the clause entitled, "Engineering Change

Proposal (ECP), Value Engineering Change Proposal (VECP), Request for Deviation (RFD), and Request for Waiver (RFW) (USAAMCOM).

ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR DEVIATION, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, &__________________________________________________________________________________________________________________________________

SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS________________________________________________________________

1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for Deviations

(RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.

2. Format.

a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.

b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.

c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using RDMR Form 523 (page

1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification Codes", and Block 7 "Priority."

d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFD. RFDs shall be prepared using RDMR Form 527 or RDMR Form 530 (Type I, see block 5 of the form.)

e. The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV. RFVs shall be prepared using RDMR Form 528.

f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract

Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFD/RFV proposal.

16 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

g. Classification of RFDs/RFVs.

(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance; interchangeability; reliability;

survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.

(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.

(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs g(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.

h. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.

i. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.

j. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.

k. Times allowed for technical decisions for ECP and RFD/RFV proposals will be worked out via mutual agreement between the Contractor and the Government.

l. The Contractor shall submit, concurrent with the ECP, a separate AMSAM-RD Form 525, "Specification Change Notice" (SCN), for each specification that would require revision if the ECP were approved.

m. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.

n. The Contractor shall utilize RDMR Form 526, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.

o. The Contractor shall utilize RDMR Form 524, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub- sections entitled

"WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.

3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer

(ACO). One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, RFVs or RFDs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.

4. Distribution.

a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Army Contracting Command - Redstone Website https://www.amrdec.army.mil/amrdec/rdmr-se/tdmd/ConfigMgt.htm by clicking on "Forms/Checksheets." The forms are in both "Adobe Acrobat" and "Form Flow" formats. In order to access and use the forms, the user must have the "Adobe Acrobat" or "Form Flow" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO. Contractors who do not have access to the Army Contracting Command - Redstone website will need to contact the PCO, the appropriate Project Office Configuration Management Office, or the Technical Data Management

Division (RDMR-SET) to have the forms sent to their facility.

b. Hard Copy Distribution of Class I or II ECPs and RFD/RFVs, For each Class I or II ECP, or each RFD/RFV that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO.

Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation pertaining to the proposed engineering change action to the PCO. Assistance in preparing any of these proposals may be obtained from the ACO or AMCOM Change Control Point at:

Aviation and Missile Research, Development, and Engineering Center

17 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

ATTN: RDMR-SET

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-1335

c. Hard Copy Distribution of VECPs. For each VECP that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any VECP that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation to the PCO. The Contractor shall also submit one copy of the VECP to the

Value Engineering Program Manager (VEPM) whose address is below. Assistance in preparing VECPs may be obtained from the VEPM.

Aviation and Missile Research, Development, and Engineering Center

ATTN: RDMR-SEI

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-8163

5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCOauthorizes the alternate format, submittal, or distribution process.

6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The

Government will notify the Contractor in writing if a proposal is determined to be unacceptable.

POINT OF PRESERVATION, PACKAGING, PACKING AND MARKING OF SUPPLIES_________________________________________________________________

Preservation, packaging, packing and marking of supplies will be performed at the following location:

Intuitive Research and Technology Coporation

5030 Bradford DR NW STE 205

Huntsville, AL 35805-1935

BAR CODE MARKINGS_________________

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

ELECTRONIC FABRICATION: REQUIREMENTS FOR ELECTRICAL AND ELECTRONIC ASSEMBLIES

1. Notwithstanding any other provision contained in any part of this contract to the contrary, the minimum requirements/standards for soldering electrical and electronic assemblies shall be the non-military joint industry standard, ANSI/J-STD-001, Class 3. The revision of ANSI/J-STD-001 in effect on the effective date of the contract shall govern the hardware produced hereunder. A copy of ANSI/J-STD-001 may be obtained from the Institute for Interconnecting and Packaging Electronic Circuits (IPC), 2215 Sanders Road, Northbrook, IL, 60062-

6135, telephone number (847) 509-9700, fax number (847) 509-9798.

2. The contractor shall establish and maintain an electronic/electrical parts control program and shall maintain and make available to the Government records and data which will provide visibility and traceability of all parts used in the production of the equipment under this contract. This selection of parts shall not be construed to relieve the contractor of meeting specified performance of the end item in which the part is used.

3. The Technical Data Package (TDP) shall serve as the baseline Program Parts Selection List (PPSL) and the parts and sources listed therein are the standard parts and sources. A Non Standard Part is defined as a part or source other than that cited in the PPSL. When the contractor desires to use a part or source other than those cited in the PPSL, the change must be approved by the Government via a

Request for Deviation (RFD) as defined elsewhere in this contract. Failure on the part of the contractor to submit such RFDs may result in the replacement of the nonstandard part with the standard part by the Government at the contractors expense for all affected items.

4. The contractor shall provide objective evidence such as form, fit, function, and interchangeability data that shows the proposed part complies with the requirements of applicable parts documentation. The RFD shall detail the technical justification for the use of the part and advantages of the nonstandard part, if any. Compare the nonstandard part to the standard part whose characteristics are nearest to those required for the application. Include, when applicable:

a. Part Number and Source

b. Size and weight data.

c. Electrical and mechanical characteristics

d. Reliability (with data if requested)

e. Availability of the standard part (delivery schedules, still available etc.)

18 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

f. Supplemental data such as existing control drawings, specifications, vendor data sheets, and other pertinent data. Data need not be furnished for nonstandard parts covered by documents listed in the Department of Defense Index of Specifications and

Standards (DoDISS) or Standardized Military Drawings (SMD).

5. The Contractor shall maintain a Lead Free Control Plan (LFCP) and make available to the Government upon request. The requirement for a Lead Free Control Plan shall be flowed down to suppliers of equipment that may include lead-free materials. The LFCP shall follow the guidelines set forth in GEIA-STD-0005-1, "Performance Standard for Aerospace and High Performance Electronic Systems Containing Lead-

Free Solder" or its equivalent. In addition, the LFCP shall also include tin whisker mitigation plans in accordance with GEIA-STD-0005-

2, "Standard for Mitigating the Effects of Tin Whiskers in Aerospace and High Performance Electronic Systems" or its equivalent, at control level 2C or equivalent. The Contractor should include in the LFCP any special design considerations, manufacturing process controls, test and qualification requirements, quality inspection and screening, marking and identification, maintenance and repair processes, and other steps taken to mitigate risk.

6. The Contractor shall prepare, or update existing, Counterfeit Risk Management Plan and make available to the Government upon request.

The Plan shall meet the requirements of SAE AS5553 for electronic items. The Contractor shall procure parts from original manufacturers or the original manufacturers franchised distributors. Contractors shall report counterfeits and suspected counterfeits to the

Government and in the Government Industry Data Exchange Program (GIDEP), in accordance with the GIDEP Operations Manual, SO300-BT-PRO-

010.

*** END OF NARRATIVE H0001 ***

19 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION I - CONTRACT CLAUSES

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

I-1 52.202-1 DEFINITIONS JUN/2020

I-2 52.203-3 GRATUITIES APR/1984

I-3 52.203-5 COVENANT AGAINST CONTINGENT FEES MAY/2014

I-4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT JUN/2020

I-5 52.203-7 ANTI-KICKBACK PROCEDURES JUN/2020

I-6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR MAY/2014

IMPROPER ACTIVITY

I-7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY MAY/2014

I-8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS JUN/2020

I-9 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS JAN/2017

OR STATEMENTS

I-10 52.204-2 SECURITY REQUIREMENTS MAR/2021

I-11 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER MAY/2011

I-12 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS JUN/2020

I-13 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT/2018

I-14 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE AUG/2020

I-15 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES NOV/2021

DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES

I-16 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH NOV/2021

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

I-17 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY OCT/2018

MATTERS

I-18 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS NOV/2015

I-19 52.210-1 MARKET RESEARCH NOV/2021

I-20 52.211-5 MATERIAL REQUIREMENTS AUG/2000

I-21 52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .