SPRRA2-21-D-0018.pdf
PDF 189 KB Posted
- Attached to
- CABLE ASSEMBLY SPEC Federal contract opportunity
- Solicitation number
- SPRRA2-21-D-0018
- Issued by
- Defense Logistics Agency Aviation
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AWARD/CONTRACT 1. This Contract Is A Rated Order Under DPAS (15 CFR 700)
Rating Page Of Pages
2. Contract (Proc. Inst. Ident.) No. 3. Effective Date 4. Requisition/Purchase Request/Project No.
5. Issued By Code 6. Administered By (If Other Than Item 5) Code e-mail address:
7. Name And Address Of Contractor (No., Street, City, County, State and Zip Code) 8. Delivery
FOB Origin Other (See Below)
9. Discount For Prompt Payment
10. Submit Invoices Item (4 Copies Unless Otherwise Specified)
Code Facility Code To The Address Shown In:
11. Ship To/Mark For Code 12. Payment Will Be Made By Code
13. Authority For Using Other Than Full And Open Competition: 14. Accounting And Appropriation Data
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
15A. Item No. 15B. Supplies/Services 15C. Quantity 15D. Unit 15E. Unit Price 15F. Amount
15G. Total Amount Of Contract
16. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s) Part I - The Schedule Part II - Contract Clauses
A Solicitation/Contract Form I Contract Clauses B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attachments C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
Contracting Officer Will Complete Item 17 (Sealed-Bid or Negotiated Procurement) Or 18 (Sealed-Bid Procurement) As Applicable
17. Contractor’s Negotiated Agreement (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all the services set forth or otherwise identified above and on any continuation sheets for the consideration stated herein. The rights and obligations of the parties to this contract shall be subject to and governed by the following documents: (a) this award/contract, (b) the solicitation, if any, and (c) such provisions, representations, certifications, and specifications, as are attached or incorporated by reference herein. (Attachments are listed herein.)
18. Sealed-Bid Award (Contractor is not required to sign this document.) Your bid on Solicitation Number , including the additions or changes made by you which additions or changes are set forth in full above, is hereby accepted as to the items listed above and on any continuation sheets. This award consummates the contract which consists of the following documents: (a) the Government’s solicitation and your bid, and (b) this award/contract. No further contractual document is necessary. (Block 18 should be checked only when awarding a sealed-bid contract.)
19A. Name And Title Of Signer (Type Or Print) 20A. Name Of Contracting Officer
19B. Name of Contractor 19c. Date Signed 20B. United States Of America 20C. Date Signed
By By (Signature of person authorized to sign) (Signature of Contracting Officer) AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 26 (Rev. 5/2011) Previous edition is NOT usable Prescribed By GSA - FAR (48 CFR) 53.214(a)
DOA2
SPRRA2-21-D-0018 SEE SCHEDULE
SPRRA2
DEFENSE LOGISTICS AGENCY
5201 MARTIN ROAD/DLA-AVN-AH
REDSTONE ARSENAL AL 35898-7340
RODNEY O HAYGOOD
RODNEY.HAYGOOD@DLA.MIL
S0107A
DCMA HUNTSVILLE
1040 RESEARCH BLVD, SUITE 100
MADISON AL 35758-2040
7D457
RIDGE INSTRUMENTS COMPANY, INC.
4603 US HIGHWAY 31 S
DECATUR, AL 35603-5048
X
SEE SCHEDULE
HQ0338
DFAS-COLUMBUS CENTER
SOUTH ENTITLEMENT OPERATIONS
P O BOX 182317
COLUMBUS OH 43218-2317
SEE SCHEDULE
$66,052.00
X
2 signed
SIYEICEA S JACKSON
SIYEICEA.JACKSON@DLA.MIL (256)690-5737
1 40
X 1
X 4
X 12
X 13
X 14
X 16
X 24
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: RODNEY O HAYGOOD
Buyer Office Symbol/Telephone Number: DLA-AVN-AHD/(256)690-5733
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Type of Business: Other Small Business Performing in U.S.
Surveillance Criticality Designator: B
Contract Expiration Date: 2026MAY14
*** End of Narrative A0000 ***
A-1. THIS REQUIREMENT IS AWARDED TO RIDGE INSTRUMENTS COMPANY,INC CAGE .
7D457.
A-2. THIS REQUIREMENT IS IN SUPPORT OF THE PATRIOT SYSTEM: M-D6.
A-3. PRODUCTION LOT TESTING IS REQUIRED.
a. PRODUCTIN LOT TEST - GOVERNMENT FACILITY
b. QUANTITY: ALL
c. TEST DAYS: 50
d. GOVERNMENT REVIEW DAYS: 10
A-4. THE TEST ITEM(S) WILL NOT NOT BE DESTROYED AS PART OF THE TESTING PROGRAM.
A-5. ALL MANUFACTURING LOTS WILL BE SUBJECTED TO TESTING
A-6. THIS IS A FIVE YEAR (IDIQ), FIRM FIXED PRICE EFFORT FOR PN: 11455208.
A-7. ARMS EXPORT CONTROL IS APPLICABLE. WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT
CONTROL ACT (TITLE 22, U.S.C., SEC 2751 ET SEQ.) OR EXECUTIVE ORDER 12470. VIOLATION OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL
PENALTIES.
A-8. FIRST ARTICLE (FAT) IS NOT REQUIRED. ______
A-9. IUID MARKINGS ARE NOT REQUIRED. ________
A-10. SERIAL NUMBERING ARE NOT REQUIRED. ________
A-11. TAMMS-A MARKINGS ARE NOT REQUIRED. ________
A-12. SNRR MARKINGS ARE NOT REQUIRED. _______
A.13. RFID MARKINGS ARE NOT REQUIRED. _______
A-14. FIT CHECK IS NOT REQUIRED. ______
A-15. CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: ROGER BECK
TELEPHONE NUMBER: 256-351-6514 EXT 104
E-MAIL ADDRESS: roger@ridge-inc.com
A-16. DCMA ACO POINT OF CONTACT INFORMATION:
NAME: RANDELL WAY
TELEPHONE NUMBER: 256-850-7332
E-MAIL ADDRESS: randell.w.way.civ@mail.mil
A-17. PLEASE SUBMIT ALL INQUIRIES AND QUESTIONS AFTER CONTRACT AWARD TO THE GOVERNMENT:
NAME: DLA Post Award Team
TELEPHONE NUMBER: (256) 924-7930
E-MAIL ADDRESS: dlahsvpostawardteam@dla.mil
A-18. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.
2 40
SPRRA2-21-D-0018
RIDGE INSTRUMENTS COMPANY, INC.
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A-19. FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED
FOR PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE
THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION
AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN
DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN
PART, AS APPROPRIATE.
*** END OF NARRATIVE A0001 ***
3 40
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
THIS IS A FIVE YEAR INDEFINITE DELIVERY INDEFINITE
QUANTITY (IDIQ) CONTRACT. FUNDS WILL BE
OBLIGATED/CITED UPON THE ISSUANCE OF EACH DELIVERY
ORDER.
THE GOVERNMENT WILL ONLY BE OBLIGATED TO ORDER THE
STATED MINIMUM QUANTITY. THE GOVERNMENT IS NOT
OBLIGATED TO ISSUE ANY ADDITIONAL ORDERS AGAINST THIS
CONTRACT; HOWEVER, THE GOVERNMENT RESERVES THE RIGHT
TO ORDER UP TO THE MAXIMUM QUANTITY.
THE GOVERNMENT HAS SEGREGATED THE POTENTIAL
QUANTITIES INTO THREE ORDERING PERIODS. HOWEVER, THIS
DOES NOT PRECLUDE EXERCISING ITS RIGHTS UNDER FAR
52.216-19 BY ORDERING THE MAXIMUM QUANTITY SPECIFIED
IN FAR 52.216-19(b)(1) AT ANY TIME DURING THE
INDEFINITE QUANTITY PERIOD.
THE GOVERNMENT'S MINIMUM QUANTITY TO BE AWARDED
SIMULTANEOUSLY WITH THE AWARD OF THE BASIC CONTRACT
IS 8 EACH. THE INITIAL DELIVERY ORDER WILL MEET OR
EXCEED THE MINIMUM QUANTITY AT THE FIRST ORDERING
PERIOD PRICING. THE GOVERNMENT'S MAXIMUM QUANTITY
DURING THE INDEFINITE QUANTITY PERIOD IS 28 EACH.
AT NO TIME WILL THE CONTRACTOR BE REQUIRED TO SHIP
MORE THAN 28 UNITS UNLESS MUTUALLY AGREED TO BY BOTH
PARTIES.
ORDERING PERIOD 1 WILL BE FROM DATE OF AWARD THROUGH
DAY 365 DAYS AFTER CONTRACT AWARD (DARO).
ORDERING PERIOD 2 WILL BEGIN 366 DARO AND END 730
DACA.
ORDERING PERIOD 3 WILL BEGIN 731 DARO AND END 1,095
DACA.
ORDERING PERIOD 4 WILL BEGIN 1,096 DARO AND END 1,460
DACA.
ORDERING PERIOD 5 WILL BEGIN 1.461 DARO AND END 1,826
DACA.
(End of narrative A001)
0001 CABLE ASSEMBLY, SPEC
NSN: 6150-01-092-0612
Mfr CAGE: 18876
Mfr Part Number: 11455208
4 40
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AA PRODUCTION LOT TEST-GOVERNMENT FACILITY 8 EA $ 2,419.00000 $ 19,352.00 _______________________________________ ______________ __________________
COMMODITY NAME: CABLE ASSEMBLY, SPEC
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 6150
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES)
WT [5.5]
LN [12.5]
WD [12.5]
DP [8.5]
ALL WOOD PACKAGING MATERIAL(WPM) MUST BE ISPM-15
COMPLIANT.
THE FOLLOWING MIL-STD-2073-1 CODES, APPENDIX J SHALL
APPLY:
JI/A/MP [41]
JII/CD [1]
JIII/PM [00]
JIV/WM [00]
JV/CD [NA]
JVI/CT [A]
JVII/UC [ED]
JVII/IC [00]
JIX/A/PK [F]
JX/SM [00]
JVIIIA/OPI[M]
Supplemental Information:
COIL CABLE CAP/CUSHION CONNECTORS
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Government Approval/Disapproval Days: 60
FOB POINT: Destination
5 40
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
FIRST ORDERING PERIOD
DELIVERIES SHALL COMMENCE 158 DAYS AFTER RECEIPT OF
ORDER AT A RATE OF 2 PER MONTH UNTIL COMPLETE.
(End of narrative F001)
0002 CABLE ASSEMBLY, SPEC
NSN: 6150-01-092-0612
Mfr CAGE: 18876
Mfr Part Number: 11455208
0002AA PRODUCTION QUANTITY YEAR 2 5 EA $ 2,236.00000 $ 11,180.00 __________________________ ______________ __________________
COMMODITY NAME: CABLE ASSEMBLY, SPEC
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 6150
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES)
WT [5.5]
LN [12.5]
WD [12.5]
DP [8.5]
ALL WOOD PACKAGING MATERIAL(WPM) MUST BE ISPM-15
COMPLIANT.
THE FOLLOWING MIL-STD-2073-1 CODES, APPENDIX J SHALL
APPLY:
JI/A/MP [41]
JII/CD [1]
JIII/PM [00]
JIV/WM [00]
JV/CD [NA]
JVI/CT [A]
JVII/UC [ED]
JVII/IC [00]
6 40
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
JIX/A/PK [F]
JX/SM [00]
JVIIIA/OPI[M]
Supplemental Information:
COIL CABLE CAP/CUSHION CONNECTORS
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
FOB POINT: Destination
SECOND ORDERING PERIOD DELIVERIES
SHALL COMMENCE 158 DAYS AFTER RECEIPT OF ORDER AT A
RATE OF 5 PER MONTH UNTIL COMPLETE.
(End of narrative F001)
0003 CABLE ASSEMBLY SPEC
NSN: 6150-01-092-0612
Mfr CAGE: 18876
Mfr Part Number: 11455208
0003AA PRODUCTION QUANTITY YEAR 3 5 EA $ 2,299.00000 $ 11,495.00 __________________________ ______________ __________________
COMMODITY NAME: CABLE ASSEMBLY SPEC
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 6150
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES)
WT [5.5]
LN [12.5]
WD [12.5]
7 40
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DP [8.5]
ALL WOOD PACKAGING MATERIAL(WPM) MUST BE ISPM-15
COMPLIANT.
THE FOLLOWING MIL-STD-2073-1 CODES, APPENDIX J SHALL
APPLY:
JI/A/MP [41]
JII/CD [1]
JIII/PM [00]
JIV/WM [00]
JV/CD [NA]
JVI/CT [A]
JVII/UC [ED]
JVII/IC [00]
JIX/A/PK [F]
JX/SM [00]
JVIIIA/OPI[M]
Supplemental Information:
COIL CABLE CAP/CUSHION CONNECTORS
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
FOB POINT: Destination
THIRD ORDERING PERIOD
DELIVERIES SHALL COMMENCE 158 DAYS AFTER RECEIPT OF
ORDER AT A RATE OF 5 PER MONTH UNTIL COMPLETE.
(End of narrative F001)
0004 CABLE ASSEMBLY, SPEC
NSN: 6150-01-092-0612
Mfr CAGE: 18876
Mfr Part Number: 11455208
0004AA PRODUCTION QUANTITY YEAR 4 5 EA $ 2,365.00000 $ 11,825.00 __________________________ ______________ __________________
COMMODITY NAME: CABLE ASSEMBLY, SPEC
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 6150
8 40
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES)
WT [5.5]
LN [12.5]
WD [12.5]
DP [8.5]
ALL WOOD PACKAGING MATERIAL(WPM) MUST BE ISPM-15
COMPLIANT.
THE FOLLOWING MIL-STD-2073-1 CODES, APPENDIX J SHALL
APPLY:
JI/A/MP [41]
JII/CD [1]
JIII/PM [00]
JIV/WM [00]
JV/CD [NA]
JVI/CT [A]
JVII/UC [ED]
JVII/IC [00]
JIX/A/PK [F]
JX/SM [00]
JVIIIA/OPI[M]
Supplemental Information:
COIL CABLE CAP/CUSHION CONNECTORS
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
FOB POINT: Destination
FOURTH ORDERING PERIOD
DELIVERIES SHALL COMMENCE 158 DAYS AFTER RECEIPT OF
ORDER AT A RATE OF 5 PER MONTH UNTIL COMPLETE.
(End of narrative F001)
9 40
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0005 CABLE ASSEMBLY SPEC
NSN: 6150-01-092-0612
Mfr CAGE: 18876
Mfr Part Number: 11455208
0005AA PRODUCTION QUANTITY YEAR 5 5 EA $ 2,440.00000 $ 12,200.00 __________________________ ______________ __________________
COMMODITY NAME: CABLE ASSEMBLY SPEC
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 6150
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES)
WT [5.5]
LN [12.5]
WD [12.5]
DP [8.5]
ALL WOOD PACKAGING MATERIAL(WPM) MUST BE ISPM-15
COMPLIANT.
THE FOLLOWING MIL-STD-2073-1 CODES, APPENDIX J SHALL
APPLY:
JI/A/MP [41]
JII/CD [1]
JIII/PM [00]
JIV/WM [00]
JV/CD [NA]
JVI/CT [A]
JVII/UC [ED]
JVII/IC [00]
JIX/A/PK [F]
JX/SM [00]
JVIIIA/OPI[M]
Supplemental Information:
COIL CABLE CAP/CUSHION CONNECTORS
(End of narrative D001)
Inspection and Acceptance _________________________
10 40
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
INSPECTION: Origin ACCEPTANCE: Origin
FOB POINT: Destination
FIFTH ORDERING PERIOD
DELIVERIES SHALL COMMENCE 158 DAYS AFTER RECEIPT OF
ORDER AT A RATE OF 5 PER MONTH UNTIL COMPLETE.
(End of narrative F001)
11 40
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-1 CONTRACTOR INSPECTION REQUIREMENTS APR/1984
E-2 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-3 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
E-4 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-5 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.ANSI/ISO/ASQ 9001:2015, AS 9100 OR EQUIVALENT, TAILORING: OPERATION REQUIREMENTS ONLY (PARAGRAPH 8.1, 8.2, 8.4, 8.5, 8.6, AND 8.7)
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
12 40
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
F-2 52.242-15 STOP-WORK ORDER AUG/1989
F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-4 52.247-34 F.O.B. DESTINATION NOV/1991
F-5 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
F-6 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984
Time of Delivery Accelerated Delivery
Unless otherwise authorized in the award, accelerated delivery is acceptable only if there is no additional cost or obligation to the
Government for accelerated delivery.
*** END OF NARRATIVE F0001 ***
13 40
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION G - CONTRACT ADMINISTRATION DATA
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS DEC/2018
(a) Definitions. As used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at https://wawf.eb.mil/ .
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items--
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
INVOICE/RECEIVING REPORT COMBO
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
ORIGIN/DESTINATION: Year 1
ORIGIN/ORIGIN: Year 2 Thru 5
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some Combinations of invoice and receiving report in one step.]
14 40
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0338
Issue By DoDAAC SPRRA2
Admin DoDAAC S0107A
Inspect By DoDAAC S0107A
Ship To Code W31P0W
Ship From Code 7D457
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and
Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
DCMA ACO: randall.w.way.civ@mail.mil (256-850-7332)
DCMA CA: noeleen.g.laughlin.civ@mail.mil (256-850-7335)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
15 40
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION H - SPECIAL CONTRACT REQUIREMENTS
BAR CODE MARKINGS _________________
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
ELECTRONIC FABRICATION: REQUIREMENTS FOR ELECTRICAL AND ELECTRONIC ASSEMBLIES______________________________________________________________________________
1. Notwithstanding any other provision contained in any part of this contract to the contrary, the minimum requirements/standards for soldering electrical and electronic assemblies shall be the non-military joint industry standard, ANSI/J-STD-001, Class 3. The revision of ANSI/J-STD-001 in effect on the effective date of the contract shall govern the hardware produced hereunder. A copy of ANSI/J-STD-001 may be obtained from the Institute for Interconnecting and Packaging Electronic Circuits (IPC), 2215 Sanders Road, Northbrook, IL, 60062-
6135, telephone number (847) 509-9700, fax number (847) 509-9798.
2. The contractor shall establish and maintain an electronic/electrical parts control program and shall maintain and make available to the Government records and data which will provide visibility and traceability of all parts used in the production of the equipment under this contract. This selection of parts shall not be construed to relieve the contractor of meeting specified performance of the end item in which the part is used.
3. The Technical Data Package (TDP) shall serve as the baseline Program Parts Selection List (PPSL) and the parts and sources listed therein are the standard parts and sources. A Non Standard Part is defined as a part or source other than that cited in the PPSL. When the contractor desires to use a part or source other than those cited in the PPSL, the change must be approved by the Government via a
Request for Deviation (RFD) as defined elsewhere in this contract. Failure on the part of the contractor to submit such RFDs may result in the replacement of the nonstandard part with the standard part by the Government at the contractors expense for all affected items.
4. The contractor shall provide objective evidence such as form, fit, function, and interchangeability data that shows the proposed part complies with the requirements of applicable parts documentation. The RFD shall detail the technical justification for the use of the part and advantages of the nonstandard part, if any. Compare the nonstandard part to the standard part whose characteristics are nearest to those required for the application. Include, when applicable:
a. Part Number and Source
b. Size and weight data.
c. Electrical and mechanical characteristics
d. Reliability (with data if requested)
e. Availability of the standard part (delivery schedules, still available etc.)
f. Supplemental data such as existing control drawings, specifications, vendor data sheets, and other pertinent data. Data need not be furnished for nonstandard parts covered by documents listed in the Department of Defense Index of Specifications and Standards
(DoDISS) or Standardized Military Drawings (SMD).
5. The Contractor shall maintain a Lead Free Control Plan (LFCP) and make available to the Government upon request. The requirement for a Lead Free Control Plan shall be flowed down to suppliers of equipment that may include lead-free materials. The LFCP shall follow the guidelines set forth in GEIA-STD-0005-1, "Performance Standard for Aerospace and High Performance Electronic Systems Containing Lead-
Free Solder" or its equivalent. In addition, the LFCP shall also include tin whisker mitigation plans in accordance with GEIA-STD-0005-
2, "Standard for Mitigating the Effects of Tin Whiskers in Aerospace and High Performance Electronic Systems" or its equivalent, at control level 2C or equivalent. The Contractor should include in the LFCP any special design considerations, manufacturing process controls, test and qualification requirements, quality inspection and screening, marking and identification, maintenance and repair processes, and other steps taken to mitigate risk.
6. The Contractor shall prepare, or update existing, Counterfeit Risk Management Plan and make available to the Government upon request. The Plan shall meet the requirements of SAE AS5553 for electronic items. The Contractor shall procure parts from original manufacturers or the original manufacturers franchised distributors. Contractors shall report counterfeits and suspected counterfeits to the Government and in the Government Industry Data Exchange Program (GIDEP), in accordance with the GIDEP Operations Manual, SO300-BT-
PRO- 010.
ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG NOTICE______________________________________________________________________________________________________________________________________
PREPARATION AND SUBMISSION INSTRUCTIONS_______________________________________
1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), and Request for Variance
(RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.
2. Format. _______
a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer
16 40
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished
Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for
Class I ECPs.
b. Long Form Procedure: Class I changes to the CI require that DD Form 1692, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.
c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using DD
Form 1692 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office
(CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Priority", and Block 8 "Justification Codes."
d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFV. RFVs shall be prepared using DD Form 1694.
e. Each ECP and RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense
Contract Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFV proposal.
f. Classification of RFVs.
(1) Major RFVs. RFVs written against CIs shall be designated as major when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance; interchangeability;
reliability; survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.
(2) Critical RFVs. RFVs written against CIs shall be designated as critical when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.
(3) Minor RFVs. RFVs written against CIs shall be designated as minor when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs f(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.
g. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.
h. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.
i. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.
j. Times allowed for technical decisions for ECP and RFV proposals will be worked out via mutual agreement between the Contractor and the Government.
k. The Contractor shall submit, concurrent with the ECP, a separate DD Form 1696, "Specification Change Notice"
(SCN), for each specification that would require revision if the ECP were approved.
l. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.
m. The Contractor shall utilize DD Form 2617, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.
n. The Contractor shall utilize DD Form 1695, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled "WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.
3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO). __________
One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or
17 40
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, or RFVs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.
4. Distribution. ____________
a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft _______________________
Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Office of the Secretary of Defense Executive Services Directorate DoD Directives Division website
(://www.esd.whs.mil/DD/ ) via the DoD Forms menu. The forms are provided in fillable Adobe Acrobat Portable Document Format (PRF). In order to access and use the forms, the user must have the "Adobe Acrobat" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO.
b. Hard Copy Distribution of Class I or II ECPs and RFVs, For each Class I or II ECP, or each RFV that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation pertaining to the proposed engineering change action to the PCO. Assistance in preparing any of these proposals may be obtained from the ACO or AMCOM Change Control Point at:
Aviation and Missile Center, Systems Readiness Directorate
ATTN: FCDD-AMR-MD
Redstone Arsenal, Al 35898-5000
Telephone: 256-876-1335
c. Hard Copy Distribution of VECPs. For each VECP that the ACO determines to be in compliance with this provision, _______________________________ the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any VECP that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation to the PCO. The Contractor shall also submit one copy of the VECP to the Value Engineering Program Manager (VEPM) whose address is below. Assistance in preparing VECPs may be obtained from the VEPM.
Aviation and Missile Center, Systems Readiness Directorate
ATTN: FCDD-AMR-MI
Redstone Arsenal, Al 35898-5000
Telephone: 256-876-8163
5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different ___________________________________________________ submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.
6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or _____________________ execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The Government will notify the Contractor in writing if a proposal is determined to be unacceptable.
PRODUCTION LOT TEST - GOVERNMENT TESTED_______________________________________
(a) The Contractor shall deliver minimum:5 maximum:28 units of Lot/Item CLINs 0001AA,0002AA,0003AA,0004AA and 0005AA within 158 calendar days from the date of this contract to the Government at
US ARMY AVIATION AND MISSILE COMMANDREDSTONE TECHNICAL TEST CENTERCOTTONWOOD ROAD BLDG 8022 MF4500 REDSTONE ARSENAL, AL 35898-8052 For
Production Lot Test (PLT). If the quantity required for PLT is less than the actual production quantity, the sample(s) to be shipped shall be selected at random during manufacture by the DCMA QAR. The shipping documentation shall contain this contract number and the
Lot/Item identification. Copies of all available in-process documentation to include copies of Instruction Letters, Inspection
Sheets/records, Material Test Results, and Certificates of Compliance shall be included with the sample(s) shipment.
(b) PLT sample(s) must meet all the requirements of the Technical Data Package (TDP) and all other contractual requirements. If the entire lot is required for testing, delivery of the total quantity required herein shall be accomplished in no more than two (2) shipments. Delivery in one (1) shipment is desirable; however, when two (2) shipments are necessary, fifty percent (50%) or more of the total quantity shall be included in the first shipment, and the remaining quantity shall be included in the second shipment.
(c) The Contracting Officer will notify the Contractor, in writing, of the acceptance or rejection of the Production Lot Test sample(s). The notice of acceptance shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of rejection shall cite reasons for the rejection.
(d) If the PLT sample(s) is/are rejected, the Government may choose to have the contractor remedy the non-conformances found on the
18 40
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
product by rework when appropriate, or require the contractor to provide newly manufactured product for inspection. The Contractor, upon
Government request, shall make any necessary changes to meet the requirements of this contract. The Contractor shall furnish any reworked or newly manufactured PLT sample(s) to the Government as appropriate, under the terms and conditions and within the time specified by the Government. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule and/or for any additional costs to the Government related to these inspection retests.
(e) The Government reserves the right to reject any lot in which one or more defective units of production are found. The Government, at its discretion, may elect to perform a 100 percent screen on a lot and accept only those items that are conforming to all contract requirements. Under no circumstances shall the Government accept or be obligated to accept known defective hardware as a part of any lot.
POINT OF PRESERVATION, PACKAGING, PACKING AND MARKING OF SUPPLIES_________________________________________________________________
Preservation, packaging, packing and marking of supplies will be performed at the following location: (If other than the location set forth in block 9, page 1 of this purchase order):
SU W1A8 DLA DISTRIBUTION DDSP
NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND, PA, 17070-5002
REVISIONS TO DRAWINGS/PART NUMBERS__________________________________
(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the
Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.
If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document. The minimum acceptable data includes the next higher assembly and the item of Supply Detail Drawings which will allow provisioning, National Stock Number assignment and updating of AMCOM's data records.
(b) The contractor hereby verifies previous contractual submission of technical data:
Contract No.:_______________________________________________________ _______________________________________________________
Contractor:_________________________________________________________ _________________________________________________________
Explanation of Data Rights:_________________________________________ _________________________________________
(c) The Government is not by this request soliciting, nor is the Government liable for cost incurred by the offeror in preparing or developing modifications, deviations, waivers, or other changes to drawings or part number(s). Furthermore, this request does not authorize changes to the drawing(s) or part number(s) for this acquisition, another contract, or for any other purpose. Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.
(d) All proposed part number changes shall be submitted pursuant to the requirements of the clause entitled, "Engineering Change
Proposal (ECP), Value Engineering Change Proposal (VECP), Request for Deviation (RFD), and Request for Waiver (RFW) (USAAMCOM).
WOOD PACKING MATERIALS REQUIREMENTS___________________________________
A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures
(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United
States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD
HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement
"<"http://www.alsc.org/) ">"
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an
19 40
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.
D. Replacement Preservative for Pentachlorophenol
If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or
1.8 percent copper 8 quinolinolate.
(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated.
All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard. The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their
National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
*** END OF NARRATIVE H0001 ***
DLAD CLAUSE 52.204-9000
CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (JUL 2015)
(a) Work to be performed under this contract or task order may, in full or in part, be performed at the Defense Logistics
Agency (DLA) Headquarters (HQ), DLA field activity office(s), or other Federally-controlled facilities. Prior to beginning work on a contract, DLA requires all Contractor personnel working on the Federally-controlled facility to have, at a minimum, an initiated
National Agency Check with Written Inquiries (NACI) or NACI equivalent and favorable completion of a Federal Bureau of Investigation
(FBI) fingerprint check.
(b) Additionally, in accordance with Department of Defense (DoD) Regulation 5200.2-R, Personnel Security Programs, and DLA
Issuance 4314, Personnel Security Program, all DoD Contractor personnel who have access to Federally-controlled information systems must be assigned to positions which are designated at one of three information technology (IT) levels, each requiring a certain level of investigation and clearance, as follows:
(1) IT-I for an IT position requiring a single scope background investigation (SSBI) or SSBI equivalent;
(2) IT-II for an IT position requiring a National Agency check with Law and Credit (NACLC) or NACLC equivalent; and
(3) IT-III for an IT position requiring a NACI or equivalent.
Note: IT levels will be designated according to the criteria in DoD 5200.2-R.
(c) Previously completed security investigations may be accepted by the Government in lieu of new investigations if determined by the DLA Intelligence Personnel Security Office to be essentially equivalent in scope to the contract requirements. The length of time elapsed since the previous investigation will also be considered in determining whether a new investigation is warranted. To assist the Government in making this determination, the Contractor must provide the following information to the respective DLA Intelligence Personnel Security Office immediately upon receipt of the contract. This information must be provided for each Contractor employee who will perform work on a Federally-controlled facility and/or will require access to Federally-controlled information systems:
20 40
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) Full name, with middle name, as applicable, with social security number;
(2) Citizenship status with date and place of birth;
(3) Proof of the individual's favorably adjudicated background investigation or NACI, consisting of identification of the type of investigation performed, date of the favorable adjudication, name of the agency that made the favorable adjudication, and name of the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .