SPRRA119D0079_FULLY_EXECUTED.pdf

PDF 187 KB Posted

Attached to
LANDING GEAR, FIXED Federal contract opportunity
Solicitation number
SPRRA1-19-R-0113
Issued by
Defense Logistics Agency Aviation

About this file

NOTICE OF AWARD SPRRA119R0113 / SPRRA119D0079

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AWARD/CONTRACT 1. This Contract Is A Rated Order Under DPAS (15 CFR 700)

Rating Page Of Pages

2. Contract (Proc. Inst. Ident.) No. 3. Effective Date 4. Requisition/Purchase Request/Project No.

5. Issued By Code 6. Administered By (If Other Than Item 5) Code e-mail address:

7. Name And Address Of Contractor (No., Street, City, County, State and Zip Code) 8. Delivery

FOB Origin Other (See Below)

9. Discount For Prompt Payment

10. Submit Invoices Item (4 Copies Unless Otherwise Specified)

Code Facility Code To The Address Shown In:

11. Ship To/Mark For Code 12. Payment Will Be Made By Code

13. Authority For Using Other Than Full And Open Competition: 14. Accounting And Appropriation Data

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

15A. Item No. 15B. Supplies/Services 15C. Quantity 15D. Unit 15E. Unit Price 15F. Amount

15G. Total Amount Of Contract

16. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attachments

C Description/Specs./Work Statement J List of Attachments

D Packaging and Marking Part IV - Representations And Instructions

E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors

H Special Contract Requirements M Evaluation Factors for Award Contracting Officer Will Complete Item 17 (Sealed-Bid or Negotiated Procurement) Or 18 (Sealed-Bid Procurement) As Applicable

17. Contractor’s Negotiated Agreement (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all the services set forth or otherwise identified above and on any continuation sheets for the consideration stated herein. The rights and obligations of the parties to this contract shall be subject to and governed by the following documents: (a) this award/contract, (b) the solicitation, if any, and (c) such provisions, representations, certifications, and specifications, as are attached or incorporated by reference herein. (Attachments are listed herein.)

18. Sealed-Bid Award (Contractor is not required to sign this document.) Your bid on Solicitation Number , including the additions or changes made by you which additions or changes are set forth in full above, is hereby accepted as to the items listed above and on any continuation sheets. This award consummates the contract which consists of the following documents: (a) the Government’s solicitation and your bid, and (b) this award/contract. No further contractual document is necessary. (Block 18 should be checked only when awarding a sealed-bid contract.)

19A. Name And Title Of Signer (Type Or Print) 20A. Name Of Contracting Officer

19B. Name of Contractor 19c. Date Signed 20B. United States Of America 20C. Date Signed

By By

(Signature of person authorized to sign) (Signature of Contracting Officer)

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 26 (Rev. 5/2011) Previous edition is NOT usable Prescribed By GSA - FAR (48 CFR) 53.214(a)

DOA1

SPRRA1-19-D-0079 SEE SCHEDULE

SPRRA1

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

WENDELLAR JOHNSON

WENDELLAR.JOHNSON@DLA.MIL

S0512A

DCMA LOS ANGELES

6230 VAN NUYS BLVD

VAN NUYS, CA 91401

34705

CLIFFDALE MFG. INC.

20409 PRAIRIE ST

CHATSWORTH, CA 91311-6029

X

SEE SCHEDULE

HQ0339

DFAS - COLUMBUS CENTER

WEST ENTITLEMENT OPERATIONS

P O BOX 182317

COLUMBUS OH 43218-2317

SEE SCHEDULE

$0.00

X

2 signed

CARMEN L. SMITH

CARMEN.SMITH@DLA.MIL (256)690-5444

1 34

X 1

X 5

X 10

X 11

X 12

X 14

X 16

X 22

X 34

Jerry R Hill Government Contracts Manager

2019 JUN 11

AWARD/CONTRACT 1. This Contract Is A Rated Order Under DPAS (15 CFR 700)

Rating Page Of Pages

2. Contract (Proc. Inst. Ident.) No. 3. Effective Date 4. Requisition/Purchase Request/Project No.

5. Issued By Code 6. Administered By (If Other Than Item 5) Code e-mail address:

7. Name And Address Of Contractor (No., Street, City, County, State and Zip Code) 8. Delivery

FOB Origin Other (See Below)

9. Discount For Prompt Payment

10. Submit Invoices Item (4 Copies Unless Otherwise Specified)

Code Facility Code To The Address Shown In:

11. Ship To/Mark For Code 12. Payment Will Be Made By Code

13. Authority For Using Other Than Full And Open Competition: 14. Accounting And Appropriation Data

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

15A. Item No. 15B. Supplies/Services 15C. Quantity 15D. Unit 15E. Unit Price 15F. Amount

15G. Total Amount Of Contract

16. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attachments

C Description/Specs./Work Statement J List of Attachments

D Packaging and Marking Part IV - Representations And Instructions

E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors

H Special Contract Requirements M Evaluation Factors for Award Contracting Officer Will Complete Item 17 (Sealed-Bid or Negotiated Procurement) Or 18 (Sealed-Bid Procurement) As Applicable

17. Contractor’s Negotiated Agreement (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all the services set forth or otherwise identified above and on any continuation sheets for the consideration stated herein. The rights and obligations of the parties to this contract shall be subject to and governed by the following documents: (a) this award/contract, (b) the solicitation, if any, and (c) such provisions, representations, certifications, and specifications, as are attached or incorporated by reference herein. (Attachments are listed herein.)

18. Sealed-Bid Award (Contractor is not required to sign this document.) Your bid on Solicitation Number , including the additions or changes made by you which additions or changes are set forth in full above, is hereby accepted as to the items listed above and on any continuation sheets. This award consummates the contract which consists of the following documents: (a) the Government’s solicitation and your bid, and (b) this award/contract. No further contractual document is necessary. (Block 18 should be checked only when awarding a sealed-bid contract.)

19A. Name And Title Of Signer (Type Or Print) 20A. Name Of Contracting Officer

19B. Name of Contractor 19c. Date Signed 20B. United States Of America 20C. Date Signed

By By

(Signature of person authorized to sign) (Signature of Contracting Officer)

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 26 (Rev. 5/2011) Previous edition is NOT usable Prescribed By GSA - FAR (48 CFR) 53.214(a)

DOA1

SPRRA1-19-D-0079 2019JUN12 SEE SCHEDULE

SPRRA1

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

WENDELLAR JOHNSON

WENDELLAR.JOHNSON@DLA.MIL

S0512A

DCMA LOS ANGELES

6230 VAN NUYS BLVD

VAN NUYS, CA 91401

34705

CLIFFDALE MFG. INC.

20409 PRAIRIE ST

CHATSWORTH, CA 91311-6029

X

SEE SCHEDULE

HQ0339

DFAS - COLUMBUS CENTER

WEST ENTITLEMENT OPERATIONS

P O BOX 182317

COLUMBUS OH 43218-2317

SEE SCHEDULE

$0.00

X

2 signed

CARMEN L. SMITH

CARMEN.SMITH@DLA.MIL (256)690-5444

/SIGNED/ 2019JUN12

1 34

X 1

X 5

X 10

X 11

X 12

X 14

X 16

X 22

X 34

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: WENDELLAR JOHNSON

Buyer Office Symbol/Telephone Number: DLA-AVA/(256)690-5415

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Type of Business: Other Small Business Performing in U.S.

Surveillance Criticality Designator: B

Contract Expiration Date: 2024JUN12

*** End of Narrative A0000 ***

A-1. THIS CONTRACT IS AWARDED TO CLIFFDALE MFG. CAGE (34705) AS A 100% SMALL BUSINESS SET-ASIDE IN ACCORDANCE WITH FAR 19.502-2. _____________

A-2. THIS CONTRACT IS IN SUPPORT OF THE BE UH-60 BLACKHAWK WEAPON SYSTEM. ________________________________

A-3. FLIGHT SAFETY/CRITICAL SAFETY ITEM (CSI) IS NOT REQUIRED. ______

A-4. PRODUCTION LOT TESTING IS NOT REQUIRED. ______

A-5. CONTRACTOR'S FIRST ARTICLE TEST IS REQUIRED. __

A-6. FAT UNIT SHALL NOT BE RETAINED AS A MATERIAL STANDARD. TEST ITEM WILL NOT BE DESTROYED AS PART OF TESTING. FAT SHALL BE IN ENGLISH. _________ ________

A-7. ENGINEERING TEST IS NOT REQUIRED. ______

A-8. SNRR MARKINGS ARE NOT REQUIRED. _______

A-9. TAMMS-A IS NOT REQUIRED. ______

A-10. IUID MARKINGS ARE NOT REQUIRED. _______

A-11. FATIGUE TESTING IS NOT REQUIRED. ______

A-12. ARMS EXPORT CONTROL ARE APPLICABLE. THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ___

ACT TITLE 22, U.S.C., SEC 2751 ET SEQ.)OR EXECUTIVE ORDER 12470. VIOLATION OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES.

A-13. THIS IS A FIVE (5) YEAR INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ), FIRM FIXED PRICE EFFORT FOR PART NUMBER: 70250-13103-043. _______________

A-14. CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: JERRY HILL __________

TELEPHONE NUMBER: (747) 202-3445 ______________

E-MAIL ADDRESS: JHILL@CLIFFDALEMFG.COM ______________________

A-15. DCMA ACO POINT OF CONTACT INFORMATION:

NAME: STEPHANIE WASHINGTON _____________________

TELEPHONE NUMBER: (818)267-2110 _____________

E-MAIL ADDRESS: STEPHANIE.R.WASHINGTON4.CIV@MAIL.MIL ____________________________________

A-16. CONTRACT SPECIALIST POINT OF CONTACT INFORMATION:

NAME: WENDELLAR JOHNSON _________________

OFFICE SYMBOL: DLA-AVN-AHAA ____________

TELEPHONE NUMBER: 256-690-5451 ____________

E-MAIL ADDRESS: WENDELLAR.JOHNSON@DLA.MIL _________________________

A-17. FUNDS WILL BE OBLIGATED/CITED UPON ISSUANCE OF EACH DELIVERY ORDER.

A-18. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.

A.19. PLEASE SUBMIT ALL FAT REPORTS, INQUIRIES, AND QUESTIONS TO:

2 34

SPRRA1-19-D-0079

CLIFFDALE MFG. INC.

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DLA HSV POST AWARD TEAM

7408 WAREHOUSE ROAD

REDSTONE ARSENAL, AL 35898

OR

Email: DLAHSVPostAwardTeam@dla.mil

A-20. CONTRACTOR FIRST ARTICLE TEST

Number of samples to be tested = ___1______ ___________

Deliver FOB: Destination

Inspection: Origin

Acceptance: Destination (By the PCO)

BY: 528 (Delivery Date for First Article Test Report)

Ship To: ATTN: DLA Aviation Huntsville Post Award Team

5201 Martin Road

Redstone Arsenal, Alabama 35898

(With an information copy to the Administering Contracting Officer)

Or

Email To: DLAHSVPostAwardTeam@dla.mil

Delivery Schedule:

510 Days ARO: Contractor First Article completed and Report Submission

45 Days: Government Review and Notification to Contractor

255 DAFAA: Delivery of Production Units

720 DARO

FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE TESTED IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON A MUTUALLY AGREED UPON DATE BETWEEN _ _

THE GOVERNMENT AND THE CONTRACTOR. THE DATE SHALL OCCUR WITH ENOUGH TIME IN ADVANCE TO BEGIN SCHEDULED DELIVERIES 720 DACA. THE ___

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING 30 DAYS PRIOR TO THE PROPOSED DATE OF FIRST ARTICLE TESTING. THE FIRST

ARTICLE TEST REPORT IS DUE 15 DAYS AFTER FAT. THE PREFERRED METHOD OF TRANSMITTAL IS CD. THE GOVERNMENT HAS 45 DAYS TO __ __

APPROVE/DISAPPROVE THE TEST REPORT.

Long Lead Time and or Long Term Contracts_________________________________________

FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED FOR

PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE

THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION

AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN

PART, AS APPROPRIATE.

*** END OF NARRATIVE A0001 ***

3 34

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

4 34

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 LANDING GEAR, FIXED

NSN: 1620-01-623-9230

Mfr CAGE: 34705

Mfr Part Number: 70250-13103-043

THIS IS A FIVE YEAR INDEFINITE DELIVERY INDEFINITE

QUANTITY (IDIQ) CONTRACT.

FUNDS WILL BE OBLIGATED/CITED UPON THE ISSUANCE OF

EACH DELIVERY ORDER. THE GOVERNMENT WILL ONLY BE

OBLIGATED TO ORDER THE STATED MINIMUM QUANTITY. THE

GOVERNMENT IS NOT OBLIGATED TO ISSUE ANY ADDITIONAL

ORDERS AGAINST THIS CONTRACT; HOWEVER, THE GOVERNMENT

RESERVES THE RIGHT TO ORDER UP TO THE MAXIMUM

QUANTITY.

THE GOVERNMENT HAS SEGREGATED THE POTENTIAL

QUANTITIES INTO FIVE YEAR PERIODS. HOWEVER, THIS

DOES NOT PRECLUDE EXERCISING ITS RIGHTS UNDER FAR

52.216-19 BY ORDERING THE MAXIMUM QUANTITY SPECIFIED

IN FAR 52.216-19(b)(1) AT ANY TIME DURING THE

INDEFINITE QUANTITY PERIOD.

THE GOVERNMENT'S MINIMUM QUANTITY TO BE AWARDED

SIMULTANEOUSLY WITH THE AWARD OF THE BASIC CONTRACT

IS 480 EACH. THE INITIAL DELIVERY ORDER WILL MEET OR

EXCEED THE MINIMUM QUANTITY AT THE FIRST YEAR

PRICING. THE GOVERNMENT'S MAXIMUM QUANTITY DURING

THE INDEFINITE QUANTITY PERIOD IS 2400 EACH.

PRICES FOR EACH YEAR WILL BE VALID FOR ALL QUANTITIES

ORDERED DURING THAT ORDERING PERIOD.

YEAR 1 WILL BE FROM DATE OF AWARD THROUGH DAY 365

DAYS AFTER CONTRACT AWARD (DACA).

YEAR 2 WILL BEGIN 366 DACA AND END 730 DACA.

YEAR 3 WILL BEGIN 731 DACA AND END 1,095 DACA.

YEAR 4 WILL BEGIN 1,096 DACA AND END 1,460 DACA.

YEAR 5 WILL BEGIN 1,461 DACA AND END 1,826 DACA.

THE ESTIMATED (E) QUANTITY LISTED HEREIN DOES NOT

COMMIT THE GOVERNMENT TO ORDER THAT OR ANY QUANTITY

ABOVE THE MINIMUM QUANTITY.

(End of narrative B001)

5 34

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0001AA PRODUCTION QUANTITY WITH FIRST ARTICLE TEST 480 (E) EA $ 3,000.00000 $ 1,440,000.00 ___________________________________________ ______________ __________________

PROGRAM YEAR: 1

COMMODITY NAME: LANDING GEAR, FIXED

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 1620

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70250-13103-043

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Government Approval/Disapproval Days: 45

FOB POINT: Destination

0002 LANDING GEAR, FIXED

NSN: 1620-01-623-9230

Mfr CAGE: 34705

Mfr Part Number: 70250-13103-043

0002AA PRODUCTION QUANTITY 480 (E) EA $ 3,000.00000 $ 1,440,000.00 ____________________ ______________ __________________

PROGRAM YEAR: 2

COMMODITY NAME: LANDING GEAR, FIXED

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 1620

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70250-13103-043

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

6 34

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

FOB POINT: Origin

0003 LANDING GEAR, FIXED

NSN: 1620-01-623-9230

Mfr CAGE: 34705

Mfr Part Number: 70250-13103-043

0003AA PRODUCTION QUANTITY 480 (E) EA $ 3,000.00000 $ 1,440,000.00 ____________________ ______________ __________________

PROGRAM YEAR: 3

COMMODITY NAME: LANDING GEAR, FIXED

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 1620

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70250-13103-043

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

FOB POINT: Origin

0004 LANDING GEAR, FIXED

NSN: 1620-01-623-9230

Mfr CAGE: 34705

Mfr Part Number: 70250-13103-043

0004AA PRODUCTION QUANTITY 480 (E) EA $ 3,000.00000 $ 1,440,000.00 ____________________ ______________ __________________

PROGRAM YEAR: 4

COMMODITY NAME: LANDING GEAR, FIXED

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 1620

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70250-13103-043

7 34

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

FOB POINT: Origin

0005 LANDING GEAR, FIXED

NSN: 1620-01-623-9230

Mfr CAGE: 34705

Mfr Part Number: 70250-13103-043

0005AA PRODUCTION QUANTITY 480 (E) EA $ 3,000.00000 $ 1,440,000.00 ____________________ ______________ __________________

PROGRAM YEAR: 5

COMMODITY NAME: LANDING GEAR, FIXED

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 1620

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70250-13103-043

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

FOB POINT: Origin

0006 FIRST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** _________________________ ______________ __________________

COMMODITY NAME: LANDING GEAR, FIXED

PSC: 1620

CLIN CONTRACT TYPE:

Firm Fixed Price

8 34

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

FOB POINT: Destination

SHIP TO: (SPRRA1)

DLA AVIATION AT HUNTSVILLE, AL DLR PROCUREMENT

OPERATIONS (AH) 5201 MARTIN ROAD REDSTONE ARSENAL, AL

35898-7340.

FIRST ARTICLE TEST (FAT) TIME IS 3 DAYS. UNITS TO BE _

TESTED 1 EACH. FAT SHALL BEGIN ON A MUTUALLY AGREED _

UPON DATE BETWEEN THE GOVERNMENT AND THE CONTRACTOR.

THE DATE SHALL OCCUR WITH ENOUGH TIME IN ADVANCE TO

BEGIN SCHEDULED DELIVERIES 720 DARO. THE CONTRACTOR ___

SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING 30 __

DAYS PRIOR TO THE PROPOSED DATE OF FIRST ARTICLE

TESTING. THE FIRST ARTICLE TEST REPORT IS DUE 15 DAYS __

AFTER FAT. THE PREFERRED METHOD OF TRASNITTAL IS CD.

THE GOVERNMENT HAS 45 DAYS TO APRROVE/ ___

DISAPPROVE THE TEST REPORT. FAT SHALL BE IN ENGLISH.

(End of narrative F001)

9 34

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

PACKAGING AND MARKING_____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military LEVEL PACKING: B

ADDITIONAL PACKAGING REQUIREMENTS:

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [15.5]

LN [18]

WD [12]

DP [18]

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [20] JII/CD [1] JIII/PM [06] JIV/WM [GB]

JV/CD [BG] JVI/CT [H] JVII/UC [EE] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

*** END OF NARRATIVE D0001 ***

10 34

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/ or https://www.acquisition.gov/

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ANSI/ISO/ASQ 9001:2008, AS 9100 OR EQUIVALENT, TAILORING: ALL PARAGRAPHS UNDER 7.3 (DESIGN AND DEVELOPMENT) DO NOT APPLY

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

INSPECTION AND ACCEPTANCE AT ORIGIN___________________________________

The Governments Quality Assurance Representative (QAR) will inspect supplies described by manufacturer's name/code and part number at origin location(s):

The QAR may require that objective evidence be furnished establishing the name and address of the plant that manufactures the supplies to ensure that a domestic product is being supplied. Objective evidence of performance must be present for all quality assurance requirements specified in the contract. The QAR may require additional examinations and tests to determine:

Completeness of item

Material is new and unused

Absence of rust

Contamination, or deterioration

Correct identification/item marking

Correct packaging

Absence of any damage

Compliance with preparation for delivery

If the supplier is not the manufacturer of the supplies, objective evidence must be furnished to establish that the supplies were produced by the approved manufacturer.

For supplies designated as former Government surplus (whether described by manufacturers name/code and part number, or by Military or

Federal specification or drawing), the original package markings of each item shall be verified to previous Government contract number and part number. An deviation shall be cause for rejection of the item. The Procuring Activity may add additional inspection requirements based on the evaluation of the surplus offer. Such additional requirements will be identified before the award.

*** END OF NARRATIVE E0001 ***

11 34

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

***DELIVERIES SHALL COMMENCE 720 DAYS AFTER RECEIPT OF ORDER(DARO) WITH FIRST ARTICLE TEST(FAT) & 540 DARO WITHOUT FAT***

**FOR CLIN 0001AA SHIP TO: (W45H08)**

SR U S ARMY DEPOT CORPUS CHRISTI

540 FIRST ST SE BLDG 1846

CORPUS CHRISTI, TX 78419-5255

**FOR CLINS 0002AA-0005AA SHIP TO INSTRUCTIONS FOR CONSIGNEE WILL BE FURNISHED PRIOR TO SCHEDULED DELIVERY DATE FOR ITEMS REQUIRED UNDER_________________________________________________________________________________________________________________________________________

THIS CONTRACT.**________________

*** END OF NARRATIVE F0001 ***

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/ or https://www.acquisition.gov/

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989

F-2 52.242-15 STOP-WORK ORDER AUG/1989

F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

F-4 52.247-29 F.O.B. ORIGIN FEB/2006

F-5 52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY FEB/2006

F-6 52.247-34 F.O.B. DESTINATION NOV/1991

F-7 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

F-8 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984

F-9 52.247-59 F.O.B. ORIGIN--CARLOAD AND TRUCKLOAD SHIPMENTS APR/1984

F-10 52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS JAN/1991

F-11 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

0001AA 480 (E) 720 (DARO)

0002AA 480 (E) 540 (DARO)

0003AA 480 (E) 540 (DARO)

0004AA 480 (E) 540 (DARO)

0005AA 480 (E) 540 (DARO)

0006 1 (EA) 510 (DARO)

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no

12 34

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

other delivery schedule, the required delivery schedule above will apply.

OFFERORS PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

0001AA 480 (E) 720 (DARO) ___

0002AA 480 (E) 540 (DARO) ___

0003AA 480 (E) 540 (DARO) ___

0004AA 480 (E) 540 (DARO) ___

0005AA 480 (E) 540 (DARO) ___

0006 1 (EA) 510 (DARO) ___

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

Contractors date of receipt of the contract or notice of award by adding

(1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of Clause)

F-12 52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT SEP/2000

(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of TBD per calendar day of delay.

(b) If the Government terminates this contract in whole or in part under the Default -- Fixed-Price Supply and Service clause, the

Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default -- Fixed-Price Supply and Service clause in this contract.

(End of Clause)

13 34

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION G - CONTRACT ADMINISTRATION DATA

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS DEC/2018

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/ .

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items--

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

COMBO

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

N/A

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some Combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in

14 34

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC HQ0339

Issue By DoDAAC SPRRA1

Admin DoDAAC S0512A

Inspect By DoDAAC S0512A

Ship To Code TBD

Ship From Code TBD

Mark For Code N/A

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) N/A

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and

Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

ACO; STEPHANIE WASHINGTON; STEPHANIE.R.WASHINGTON4.CIV@MAIL.MIL; (818)267-2110

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

15 34

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

BAR CODE MARKINGS_________________

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

REQUEST FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL_____________________________________________________

The requirement for FIRST ARTICLE APPROVAL may be waived, in whole or in part, by the Government, provided that sufficient information is provided to determine whether the request is to be approved. A partial waiver is defined as a waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP) and/or the solicitation/contract, i.e. vibration test, salt water spray test, or a test on a component or subassembly of the procured item. A full waiver is defined as a waiver of all

First Article testing as required by the TDP and/or the solicitation/contract.

All waiver requests require a First Article Waiver Worksheet to be completed and submitted to the Government along with all supporting documentation. The worksheet will be provided by the Buyer upon request. No requests will be considered if the worksheet and supporting documentation are not submitted to the Government. The worksheet must be completed in its entirety. For those sections of the worksheet which do not apply, annotate with N/A (not applicable). To substantiate or clarify information provided, the Government may request additional information.

Submission of the FAT waiver request (and supporting documentation) to the Government does not guarantee that the waiver will be granted.

The First Article Waiver Worksheet and additional supporting documentation must be submitted on Company letterhead and signed by an authorized agent of the Company.

Supporting documentation.

(1) The request for waiver must be accompanied by the First Article Waiver Worksheet, and documentation in support of the request. The documentation may include, but is not limited to:

(i) Copy of the Administrative Contracting Officers (ACOs) or Procuring Contracting Officers (PCOs) letter approving a

First Article Test report on a recent contract for the same or similar item;

(ii) Copy of a First Article Test report for the same or a similar item as that solicited herein;

(iii) Copy of an ACO or PCO letter approving a prior waiver request; or

(iv) If the waiver request is based on similarity, a copy of the drawing/other appropriate technical requirements of the similar item.

(2) If a copy of a First Article Test report is submitted in support of a request for waiver, the test report must have been approved and signed by an authorized representative of the United States Government.

(3) The First Article Waiver Worksheet and all supporting documentation should be submitted by email. If the First Article

Waiver Worksheet and supporting documentation cannot be transmitted by email, the PCO should be contacted for further instruction.

Note: If a waiver is granted, an accelerated delivery schedule will apply.

Note: Cost considerations shall apply for approving a waiver or a portion thereof of a First Article Test.

REVISIONS TO DRAWINGS/PART NUMBERS__________________________________

(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the

Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.

If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document. The minimum acceptable data includes the next higher assembly and the item of Supply Detail Drawings which will allow provisioning, National Stock Number assignment and updating of AMCOM's data records.

16 34

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(b) The contractor hereby verifies previous contractual submission of technical data:

Contract No.: _____________________________________________________

Contractor: _______________________________________________________

Explanation of Data Rights: __________________________________________

(c) The Government is not by this request soliciting, nor is the Government liable for cost incurred by the offeror in preparing or developing modifications, deviations, waivers, or other changes to drawings or part number(s). Furthermore, this request does not authorize changes to the drawing(s) or part number(s) for this acquisition, another contract, or for any other purpose. Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.

(d) All proposed part number changes shall be submitted pursuant to the requirements of the clause entitled, "Engineering Change

Proposal (ECP), Value Engineering Change Proposal (VECP), Request for Deviation (RFD), and Request for Waiver (RFW) (USAAMCOM).

WOOD PACKING MATERIALS REQUIREMENTS___________________________________

A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).

B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures

(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United

States must meet ISPM 15 whenever WPM is used to ship DOD cargo.

(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement

Regulations (see http://www.alsc.org/ ).

(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.

D. Replacement Preservative for Pentachlorophenol

If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or

1.8 percent copper 8 quinolinolate.

(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention

Standard. The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

POINT OF PRESERVATION, PACKAGING, PACKING AND MARKING OF SUPPLIES_________________________________________________________________

Preservation, packaging, packing and marking of supplies will be performed at the following location: (If other than the location set forth in block 9, page 1 of this purchase order):

ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR DEVIATION, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, &__________________________________________________________________________________________________________________________________

SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS________________________________________________________________

17 34

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for Deviations (RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.

2. Format.

a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government

Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II

ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.

b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523, pages 1 through 7 (as applicable), be prepared.

Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.

c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using RDMR Form 523

(page 1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification Codes", and Block 7 "Priority."

d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFD. RFDs shall be prepared using RDMR Form 527 or RDMR Form 530 (Type I, see block 5 of the form.)

e. The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV. RFVs shall be prepared using RDMR Form 528.

f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract

Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFD/RFV proposal.

g. Classification of RFDs/RFVs.

(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health;

performance; interchangeability; reliability; survivability; maintainability; effective use or operation; weight;

appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.

(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.

(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs g(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.

h. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.

i. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.

j. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.

k. Times allowed for technical decisions for ECP and RFD/RFV proposals will be worked out via mutual agreement between the

Contractor and the Government.

l. The Contractor shall submit, concurrent with the ECP, a separate AMSAM-RD Form 525, "Specification Change Notice" (SCN), for

18 34

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

each specification that would require revision if the ECP were approved.

m. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.

n. The Contractor shall utilize RDMR Form 526, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.

o. The Contractor shall utilize RDMR Form 524, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub- sections entitled "WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.

3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO).

One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, RFVs or RFDs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.

4. Distribution.

a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft

Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.