SOLICITATION

View the file

Other files for this federal contract opportunity

Other files attached to CONVERTER, SIGAL DA, newest first.
File Type Posted
SPRRA118R0180_Redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

SPRRA1-18-R-0180

X

2018MAY24

2018JUN25

DOA1

2018MAY24 SEE SCHEDULE

SPRRA1

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

HENRY LAMOTHE

(256)924-7904

DLA-AVN-AHA

HENRY.LAMOTHE@DLA.MIL

X 1 25

1 38

X 1

X 4

X 6 X 7

X 9

X 11

X 15

X 20

X 30

X 38

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: HENRY LAMOTHE

Buyer Office Symbol/Telephone Number: DLA-AVN-AHA/(256)924-7904

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

A-1. THIS REQUIREMENT IS RESTRICTED TO CHELTON, INC. d/b/a COBHAM ANTENNA SYSTEMS, CAGE 63563, IAW 10 U.S.C. 2304 (c)(1) FAR 6.302-1.

ONLY ONE RESPONSIBLE SOURCE AND NO OTHER SUPPLIES OR SERVICES WILL SATISFY AGENCY REQUIREMENTS.

A-2. THIS REQUIREMENT IS IN SUPPORT OF THE (BE) BLACKHAWK WEAPON SYSTEM.

A-3. FLIGHT SAFETY/CRITICAL SAFETY ITEM (CSI) IS NOT REQUIRED.

A-4. PRODUCTION LOT TESTING (PLT) IS NOT REQUIRED.

A-5. FIRST ARTICLE TEST (FAT) IS NOT REQUIRED.

A-6. SNRR MARKINGS ARE NOT REQUIRED.

A-7. TAMMS-A ARE NOT REQUIRED.

A-8. IUID MARKING ARE NOT REQUIRED.

A-9. BAR CODE MARKINGS ARE REQUIRED.

A-10. THIS IS A ONE TIME BUY FIRM FIXED PRICE EFFORT.

A-11. W-A-R-N-I-N-G: THIS IS A PART NUMBER BUY. PART NUMBER: 7-163PIN160HT.

A-12. CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: _______________________________

TELEPHONE NUMBER: ___________________

E-MAIL ADDRESS: _____________________

A-13. THE DCMA ACO POC IS:

NAME: _______________________________

TELEPHONE NUMBER: ___________________

E-MAIL ADDRESS: _____________________

A-14. CONTRACT SPECIALIST POINT OF CONTACT INFORMATION:

NAME: HENRY JOSEPH LAMOTHE ____________________

OFFICE SYMBOL: DLA-AVN-AHAA _____________

TELEPHONE NUMBER: 256-924-7904 ____________

E-MAIL ADDRESS: HENRY.LAMOTHE@DLA.MIL _________________________

A-15. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.

A-16. NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403-3, RELATIVE TO THE REQUIREMENTS FOR OBTAINING

OTHER THAN CERTIFIED COST OR PRICING DATA. THIS IS CONSIDERED TO BE A SOLE SOURCE REQUIREMENT; YOU ARE REQUIRED TO SUBMIT OTHER THAN

COST AND PRICING DATA. OFFEROR MAY USE THEIR OWN FORMAT TO PROVIDE, AT A MINIMUM, A BREAKDOWN OF ALL THE COST ELEMENTS TO INCLUDE

PROFIT/FEE WHICH COMPRISE THE TOTAL PROPOSED PRICE OR SALES HISTORY. FAILURE TO PROVIDE OTHER THAN COST AND PRICING DATA IF REQUESTED

WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE.

A-17. FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED

FOR PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, 2 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE

THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION

AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN

PART, AS APPROPRIATE.

*** END OF NARRATIVE A0001 ***

3 38

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 CONVERTER,SIGNAL DA

NSN: 5895-01-534-8070

Mfr CAGE: 63563

Mfr Part Number: 7-163PIN160HT

0001AA PRODUCTION QUANTITY 281 EA $ $ ____________________ ______________ __________________

COMMODITY NAME: CONVERTER,SIGNAL DA

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 7-163PIN160HT

Packaging and Marking _____________________

MIL-STD-129 MARKINGS SHALL APPLY.

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [3.7] LB

LN [12.0] IN

WD [9.0] IN

DP [9.0] IN

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE

ISPM-15 COMPLIANT

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [41] JII/CD [1] JIII/PM [00] JIV/WM [K3]

JV/CD [LT] JVI/CT [H] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [39] JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W25G1W) XR W1A8 DLA DIST-TOBYANNA

4 38

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

11 HAP ARNOLD BLVD

BLDG 11

TOBYHANNA,PA,18466-5059

DELIVERIES SHALL COMMENCE 350 DAYS AFTER RECEIPT OF

ORDER.

DELIVERIES WILL BE AT A RATE OF 12 EA PER MONTH,

UNTIL ORDER IS COMPLETE.

(End of narrative F001)

5 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/ or https://www.acquisition.gov/

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

HIGHER - - LEVEL CONTRACT QUALITY REQUIREMENT : ANSI/ISO/ASQ 9001:2008, AS 9100 OR EQUIVALENT, TAILORING: ALL PARAGRAPHS UNDER 7.3

(DESIGN AND DEVELOPMENT) DO NOT APPLY

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

6 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/ or https://www.acquisition.gov/

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989

F-2 52.242-15 STOP-WORK ORDER AUG/1989

F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

F-4 52.247-34 F.O.B. DESTINATION NOV/1991

F-5 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

F-6 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984

F-7 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

0001AA 281 365 DACA

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFERORS PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

0001AA 281 ____ DACA

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

Contractors date of receipt of the contract or notice of award by adding

(1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of Clause)

7 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

8 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION G - CONTRACT ADMINISTRATION DATA

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS MAY/2013

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov ; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this

Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/ .

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

COMBO

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

ORIGIN/ORIGIN

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC HQ0339

Issue By DoDAAC SPRRA1

Admin DoDAAC S4402A

Inspect By DoDAAC S4402A

Ship To Code W25G1W

Ship From Code 63563

Mark For Code NOT APPLICABLE

Service Approver (DoDAAC) NOT APPLICABLE

Service Acceptor (DoDAAC) NOT APPLICABLE

Accept at Other DoDAAC NOT APPLICABLE

LPO DoDAAC NOT APPLICABLE

DCAA Auditor DoDAAC NOT APPLICABLE

Other DoDAAC(s) NOT APPLICABLE

9 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email

Notifications" field of WAWF once a document is submitted in the system.

ACO: NATASHA BRISCOE; NATASHA.BRISCOE@DCMA.MIL; (214) 599-2745

CA: JONATHAN ASKEW; JONATHAN.ASKEW@DCMA.MIL; (214) 599-2755

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

ACO: NATASHA BRISCOE; NATASHA.BRISCOE@DCMA.MIL; (214) 599-2745

CA: JONATHAN ASKEW; JONATHAN.ASKEW@DCMA.MIL; (214) 599-2755

(2) For technical WAWF help, contact the WAWF helpdesk at 866-

618-5988.

(End of clause)

10 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

52.208-4700 WOOD PACKING MATERIALS REQUIREMENTS_______________________________________________

A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).

B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures

(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United

States must meet ISPM 15 whenever WPM is used to ship DOD cargo.

(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement

Regulations (see http://www.alsc.org/ ).

(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.

D. Replacement Preservative for Pentachlorophenol

If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or

1.8 percent copper 8 quinolinolate.

(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention

Standard. The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

52-209-4005 SOURCES ELIGIBLE FOR AWARD CONSIDERATION____________________________________________________

(a) Competition under this solicitation is restricted to the following sources:

(1) Approved Sources listed in Section B -- sources that have been approved by the prime manufacturer or the Government for supply of item(s) listed in this solicitation, to assure the requisite safe, dependable, effective operation and support of military equipment;

(2) Sources that have been approved prior to award -- other than approved sources listed in Section B;

(3) Non-manufacturers--offers from non-manufacturers (distributors) will only be considered for award if the required item(s) is new material and has been or will be obtained from a source of supply which has been approved prior to award. The source and part number of the item the offeror intends to supply must be stated in the offer.

(4) Surplus Dealers--offerors of Government surplus in accordance with Section I clause entitled "Material Requirements, FAR

52.211-5, will only be considered for award if the former Government surplus or residual inventory resulting from terminated contracts was originally manufactured by an approved source of supply.

(b) Only offers submitted by the above sources will be considered for award under this solicitation.

(c) Offerors (prospective manufacturers or non-manufacturers [distributors]) who wish to become an approved source of supply for an item listed in this solicitation should proceed per the instructions set forth in paragraph (d) below. It is noted that offeror requests for source approval in conjunction with this procurement will not be a cause for delay in this solicitation action. However, if it is determined that additional sources will clearly benefit the Government and that any delay incident to their approval would not impact readiness, a reasonable delay may be entertained. Whether or not such delay will occur will be solely at the discretion of the

Government, and the time set for opening of the Invitation for Bids or the closing date of the Request for Proposals may or may not be extended. An extension will be witnessed by issuance of an amendment to this solicitation.

(d) Offerors (prospective manufacturers or non-manufacturers [distributors]) seeking to obtain source approval, must submit a Source

Approval Request (SAR) package, for review and approval, to the Engineering Directorate (ED), Quality Engineering Division. Source approval must be obtained prior to being considered for contract award. Approvals are made on an individual part number basis for a specific manufacturing location (CAGE). Firms are encouraged to seek source approval in order to compete for future solicitations by following the SAR submission guidance provided on the website http://amcomdmz.redstone.army.mil/casl_cmo/casldba.casl_cmo_samsar .

Questions concerning SAR submissions can be directed to the ED SAR Team at EDSAR@amrdec.army.mil or call the SAR Team at 256-313-8978, 256-313-0341, or 256-313-8994.

(e) The Aviation and Missile Lifecycle Management Command (AMCOM) may require additional data, testing, or plant visits before it is able to completely evaluate a SAR. This may require the offeror (at no expense to the Government) to supply parts for testing, engine run up, or flight tests. In that event, the requestor will be so advised. AMCOM reserves the right to approve a contractor for award prior to completion of physical testing of the offered item. In such cases, the contractor shall perform any outstanding tests and

11 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

provide all required documentation at no cost to the Government prior to entering upon full production. Lack of successful performance within the specified timeframe shall be grounds for a no cost termination.

(f) When a SAR is received, it will be processed for evaluation. If the evaluation and approval (including preparation or update of the requisite technical data package (TDP)) occurs before award, the requestor will be considered for award if a proposal was submitted per

(d) above. If the evaluation/TDP preparation has not been completed prior to award, AMCOM will continue the process until complete. If the requestors SAR becomes approved, the requestor will be eligible for consideration on all future solicitations for the item.

(g) All approval or disapproval notices shall be officially provided to the contractor by the appropriate technical official.

(h) Non-manufacturers (distributors) seeking to supply an item from a non-approved source must first ensure that the source becomes approved in accordance with (d) above prior to contract award.

52.211-4008 REVISIONS TO DRAWINGS/PART NUMBERS______________________________________________

(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the

Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.

If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document. The minimum acceptable data includes the next higher assembly and the item of Supply Detail Drawings which will allow provisioning, National Stock Number assignment and updating of AMCOM's data records.

(b) The contractor hereby verifies previous contractual submission of technical data:

Contract No.: _____________________________________________________

Contractor: _______________________________________________________

Explanation of Data Rights: __________________________________________

(c) The Government is not by this request soliciting, nor is the Government liable for cost incurred by the offeror in preparing or developing modifications, deviations, waivers, or other changes to drawings or part number(s). Furthermore, this request does not authorize changes to the drawing(s) or part number(s) for this acquisition, another contract, or for any other purpose. Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.

(d) All proposed part number changes shall be submitted pursuant to the requirements of the clause entitled, "Engineering Change

Proposal (ECP), Value Engineering Change Proposal (VECP), Request for Deviation (RFD), and Request for Waiver (RFW) (USAAMCOM).

52.243-4000 ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR DEVIATION, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF__________________________________________________________________________________________________________________________________

REVISION, & SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS____________________________________________________________________________

1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for Deviations (RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 except as specified in paragraph 5 below.

2. Format.

a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government

Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II

ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.

b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523, pages 1 through 7 (as applicable), be prepared.

Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.

c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using RDMR Form 523

(page 1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification Codes", and Block 7 "Priority."

d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFD. RFDs shall be prepared using RDMR Form 527 or RDMR Form 530 (Type I, see block 5 of the form.)

e. The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV. RFVs shall be prepared using RDMR Form 528.

f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract

Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFD/RFV proposal.

g. Classification of RFDs/RFVs.

(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health;

performance; interchangeability; reliability; survivability; maintainability; effective use or operation; weight;

12 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.

(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.

(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs g(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.

h. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.

i. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.

j. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.

k. Times allowed for technical decisions for ECP and RFD/RFV proposals will be worked out via mutual agreement between the

Contractor and the Government.

l. The Contractor shall submit, concurrent with the ECP, a separate AMSAM-RD Form 525, "Specification Change Notice" (SCN), for each specification that would require revision if the ECP were approved.

m. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.

n. The Contractor shall utilize RDMR Form 526, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.

o. The Contractor shall utilize RDMR Form 524, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub- sections entitled "WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.

3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO).

One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, RFVs or RFDs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.

4. Distribution.

a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft

Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Army Contracting Command - Redstone Website https://www.amrdec.army.mil/amrdec/rdmr-se/tdmd/ConfigMgt.htm by clicking on "Forms/Checksheets." The forms are in both "Adobe Acrobat" and "Form Flow" formats. In order to access and use the forms, the user must have the "Adobe Acrobat" or "Form Flow" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO. Contractors who do not have access to the Army Contracting Command -

Redstone website will need to contact the PCO, the appropriate Project Office Configuration Management Office, or the Technical

Data Management Division (RDMR-SET) to have the forms sent to their facility.

b. Hard Copy Distribution of Class I or II ECPs and RFD/RFVs, For each Class I or II ECP, or each RFD/RFV that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit

DCMA's written evaluation pertaining to the proposed engineering change action to the PCO. Assistance in preparing any of these proposals may be obtained from the ACO or AMCOM Change Control Point at:

Aviation and Missile Research, Development, and Engineering Center

ATTN: RDMR-SET

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-1335

c. Hard Copy Distribution of VECPs. For each VECP that the ACO determines to be in compliance with this provision, the

Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any VECP that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation to the PCO. The Contractor shall also submit one copy of the VECP to the Value Engineering Program Manager (VEPM) whose address is below. Assistance in preparing VECPs may be obtained from the VEPM.

Aviation and Missile Research, Development, and Engineering Center

ATTN: RDMR-SEI

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-8163

5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach

13 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.

6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The

Government will notify the Contractor in writing if a proposal is determined to be unacceptable.

52.246-4003 CALIBRATION_______________________

The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National

Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test

Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International

Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.

52.247-4001 POINT OF PRESERVATION, PACKAGING, PACKING AND MARKING OF SUPPLIES_____________________________________________________________________________

Preservation, packaging, packing and marking of supplies will be performed at the following location: (If other than the location set forth in block 9, page 1 of this purchase order):

To be determined at award.

52.247-4700 BAR CODE MARKINGS_____________________________

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

*** END OF NARRATIVE H0001 ***

14 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION I - CONTRACT CLAUSES

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/ or https://www.acquisition.gov/

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

I-1 52.202-1 DEFINITIONS NOV/2013

I-2 52.203-3 GRATUITIES APR/1984

I-3 52.203-5 COVENANT AGAINST CONTINGENT FEES MAY/2014

I-4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT SEP/2006

I-5 52.203-7 ANTI-KICKBACK PROCEDURES MAY/2014

I-6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR MAY/2014

IMPROPER ACTIVITY

I-7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY MAY/2014

I-8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS OCT/2010

I-9 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER MAY/2011

I-10 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS OCT/2016

I-11 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE JUL/2016

I-12 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH OCT/2015

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

I-13 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY JUL/2013

MATTERS

I-14 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS NOV/2015

I-15 52.211-5 MATERIAL REQUIREMENTS AUG/2000

I-16 52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS APR/2008

I-17 52.215-2 AUDIT AND RECORDS--NEGOTIATIONS OCT/2010

I-18 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT OCT/1997

I-19 52.215-14 INTEGRITY OF UNIT PRICES OCT/2010

I-20 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN OCT/2010

CERTIFIED COST OR PRICING DATA --MODIFICATIONS

I-21 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES FEB/1997

I-22 52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES JAN/2018

I-23 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT EXCEEDING MAY/2014

$15,000

I-24 52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR/2015

I-25 52.222-26 EQUAL OPPORTUNITY SEP/2016

I-26 52.222-37 EMPLOYMENT REPORTS ON VETERANS FEB/2016

I-27 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS DEC/2010

ACT

I-28 52.222-50 COMBATING TRAFFICKING IN PERSONS MAR/2015

I-29 52.223-6 DRUG-FREE WORKPLACE MAY/2001

I-30 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING AUG/2011

I-31 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES JUN/2008

I-32 52.227-1 AUTHORIZATION AND CONSENT DEC/2007

I-33 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT DEC/2007

I-34 52.229-3 FEDERAL, STATE, AND LOCAL TAXES FEB/2013

I-35 52.229-6 TAXES--FOREIGN FIXED-PRICE CONTRACTS FEB/2013

I-36 52.232-1 PAYMENTS APR/1984

I-37 52.232-11 EXTRAS APR/1984

I-38 52.232-17 INTEREST MAY/2014

I-39 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984) APR/1984

I-40 52.232-23 ASSIGNMENT OF CLAIMS MAY/2014

I-41 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT JUL/2013

I-42 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN/2013

I-43 52.233-1 DISPUTES MAY/2014

I-44 52.233-3 PROTEST AFTER AWARD AUG/1996

I-45 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT/2004

I-46 52.242-13 BANKRUPTCY JUL/1995

15 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

I-47 52.243-1 CHANGES--FIXED PRICE AUG/1987

I-48 52.247-63 PREFERENCE FOR U.S.-FLAG AIR CARRIERS JUN/2003

I-49 52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (SHORT APR/1984

FORM) (APR 1984) -- ALTERNATE I (APR 1984)

I-50 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) APR/2012

I-51 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) APR/1984

I-52 52.253-1 COMPUTER GENERATED FORMS JAN/1991

I-53 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS SEP/2011

I-54 252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT- DEC/2008

RELATED FELONIES

I-55 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS SEP/2013

I-56 252.204-7000 DISCLOSURE OF INFORMATION OCT/2016

I-57 252.204-7002 PAYMENT FOR SUBLINE ITEMS NOT SEPARATELY PRICED DEC/1991

I-58 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT APR/1992

I-59 252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT FEB/2014

I-60 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING OCT/2016

I-61 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT MAY/2016

I-62 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE OCT/2015

GOVERNMENT OF A TERRORIST COUNTRY

I-63 252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC DEC/2017

I-64 252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS DEC/2017

I-65 252.225-7013 DUTY-FREE ENTRY MAY/2016

I-66 252.227-7013 RIGHTS IN TECHNICAL DATA--NONCOMMERCIAL ITEMS FEB/2014

I-67 252.227-7025 LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED MAY/2013

INFORMATION MARKED WITH RESTRICTIVE LEGENDS

I-68 252.227-7030 TECHNICAL DATA--WITHHOLDING OF PAYMENT MAR/2000

I-69 252.229-7000 INVOICES EXCLUSIVE OF TAXES OR DUTIES JUN/1997

I-70 252.229-7006 VALUE ADDED TAX EXCLUSION (UNITED KINGDOM) DEC/2011

I-71 252.229-7007 VERIFICATION OF UNITED STATES RECEIPT OF GOODS JUN/1997

I-72 252.231-7000 SUPPLEMENTAL COST PRINCIPLES DEC/1991

I-73 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS JUN/2012

I-74 252.232-7010 LEVIES ON CONTRACT PAYMENTS DEC/2006

I-75 252.243-7001 PRICING OF CONTRACT MODIFICATIONS DEC/1991

I-76 252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT DEC/2012

I-77 252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT MAR/2008

I-78 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA--BASIC APR/2014

I-79 252.247-7024 NOTIFICATION OF TRANSPORTATION OF SUPPLIES BY SEA MAR/2000

I-80 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS DEC/2014

The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of clause)

I-81 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES OCT/1997

(a) The Contractor shall make the following notifications in writing:

(1) When the Contractor becomes aware that a change in its ownership has occurred, or is certain to occur, that could result in changes in the valuation of its capitalized assets in the accounting records, the Contractor shall notify the Administrative Contracting

Officer (ACO) within 30 days.

(2) The Contractor shall also notify the ACO within 30 days whenever changes to asset valuations or any other cost changes have occurred or are certain to occur as a result of a change in ownership.

(b) The Contractor shall --

(1) Maintain current, accurate, and complete inventory records of assets and their costs;

(2) Provide the ACO or designated representative ready access to the records upon request;

16 38

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(3) Ensure that all individual and grouped assets, their capitalized values, accumulated depreciation or amortization, and remaining useful lives are identified accurately before and after each of the Contractors ownership changes; and

(4) Retain and continue to maintain depreciation and amortization schedules based on the asset records maintained before each

Contractor ownership change.

(c) The Contractor shall include the substance of this clause in all subcontracts under this contract that meet the applicability requirement of FAR 15.408(k).

(End of Clause)

I-82 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION JUL/2013

(a) Definitions. As used in this clause--

"Long-term contract" means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

"Small business concern" means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part

121 and the size standard in paragraph (c) of this clause. Such a concern is "not dominant in its field of operation" when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or…