SPRRA118R0116.pdf

PDF 117 KB Posted

Attached to
SPRRA1-18-R-0116 Federal contract opportunity
Solicitation number
SPRRA1-18-R-0116
Issued by
Defense Logistics Agency Aviation

About this file

Solicitation SPRRA1-18-R-0116

View the file

Other files for this federal contract opportunity

Other files attached to SPRRA1-18-R-0116, newest first.
File Type Posted
SPRRA118R0116-0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

SPRRA1-18-R-0116

X

2018MAR13

2018APR16

DOA1

2018MAR13 SEE SCHEDULE

SPRRA1

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

CHRISTOPHER LEONARD

(256)876-4021

DLA-AVN-AHA-B

CHRISTOPHER.LEONARD@DLA.MIL

1 59

X 1

X 5

X 17 X 18

X 22

X 24

X 30

X 40

X 51

X 59

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: CHRISTOPHER LEONARD

Buyer Office Symbol/Telephone Number: DLA-AVN-AHA-B/(256)876-4021

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

A-1. THIS REQUIREMENT IS FOR LIMITED SOURCE TO TIMKEN AEROSPACE TRANSMISSIONS, LLC CAGE 15152 AND SIKORSKY AIRCRAFT CORP CAGE 78286 IAW ____________________________________ _____ _______________________ _____

10 U.S.C. 2304 (c)(1) FAR 6.302-1 (A)(2) "A LIMITED NUMBER OF RESPONSIBLE SOURCES, AND NO OTHER TYPE OF SUPPLIES OR SERVICES WILL

SATISFY AGENCY REQUIREMENTS, FULL AND OPEN, COMPETITION."

A-2. THIS REQUIREMENT IS IN SUPPORT OF THE BE UH-60 BLACKHAWK WEAPON SYSTEM. ________________________________

A-3. FLIGHT SAFETY/CRITICAL SAFETY ITEM (CSI) IS NOT REQUIRED. ______

A-4. PRODUCTION LOT TESTING IS NOT REQUIRED. ______

A-5. CONTRACTOR'S FIRST ARTICLE TEST IS REQUIRED. __

A-6. FAT UNIT SHALL NOT BE RETAINED AS A MATERIAL STANDARD. TEST ITEM WILL NOT BE DESTROYED AS PART OF TESTING. _________ ________

A-7. SNRR MARKINGS ARE NOT REQUIRED. _______

A-8. TAMMS-A IS NOT REQUIRED. ______

A-9. IUID MARKINGS ARE REQUIRED. ___

A-10. FATIGUE TESTING IS NOT REQUIRED. ______

A-11. ARMS EXPORT CONTROL ARE APPLICABLE. THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ___

ACT TITLE 22, U.S.C., SEC 2751 ET SEQ.)OR EXECUTIVE ORDER 12470. VIOLATION OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES.

A-12. THIS IS A FIVE (5) YEAR INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ), FIRM FIXED PRICE EFFORT FOR PART NUMBER:70357-06305-042. _______________

A-13. CONTRACTOR POINT OF CONTACT INFORMATION: TBD

NAME: ___________________________________

TELEPHONE NUMBER: ___________________________________

E-MAIL ADDRESS: ________________________________________

A-14. DCMA ACO POINT OF CONTACT INFORMATION: TBD

NAME: ___________________________

TELEPHONE NUMBER: ______________________________

E-MAIL ADDRESS: _______________________________________________

(supplier name)____ approved subcontracting plan is hereby incorporated by reference and made a part of this contract. The effective period of this plan is _____ (insert date)_____ to ( insert date)____.

A-15. CONTRACT SPECIALIST POINT OF CONTACT INFORMATION:

NAME: CHRISTOPHER LEONARD

OFFICE SYMBOL: DLA-AVN-AHAB

TELEPHONE NUMBER: 256-876-4021

E-MAIL ADDRESS: CHRISTOPHER.LEONARD@DLA.MIL

A-16. FUNDS WILL BE OBLIGATED/CITED UPON ISSUANCE OF EACH DELIVERY ORDER.

A-17. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT

2 59

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A-18. PROCUREMENT HISTORY IS AVAILABLE AS FOLLOWS:

CONTRACT:SPRRA1-13-C-0042; 5 EA; UNIT PRICE $4,990.00; AWARDED ON 30 SEP 2013 TO W AND G MACHINE COMPANY, INC (33682)

A-19. CONTRACTOR FIRST ARTICLE TEST (BUYER FILL- IN REQUIRED)

Number of samples to be tested = ___1______ (Buyer must fill-in number of samples)

Deliver FOB: Destination

Inspection: Origin

Acceptance: Destination (By the PCO)

BY: 191 (Delivery Date for First Article Test Report)

Ship To: ATTN: DLA Aviation Huntsville Post Award Team

5201 Martin Road

Redstone Arsenal, Alabama 35898

(With an information copy to the Administering Contracting Officer)

Or

Email To: DLAHSVPostAwardTeam@dla.mil

Delivery Schedule:

398 Days ARO: Contractor First Article completed and Report Submission (Insert Days)

30 Days: Government Review and Notification to Contractor (Insert Days)

642 DAFAA: Delivery of Production Units (Insert Days)

642 DARO (Insert Total Number of days)

FAT VERBIAGE:_______________

FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE TESTED IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON A MUTUALLY AGREED UPON DATE BETWEEN

THE GOVERNMENT AND THE CONTRACTOR. THE DATE SHALL OCCUR WITH ENOUGH TIME IN ADVANCE TO BEGIN SCHEDULED DELIVERIES 642 DACA. THE

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING 30 DAYS PRIOR TO THE PROPOSED DATE OF FIRST ARTICLE TESTING. THE FIRST

ARTICLE TEST REPORT IS DUE 15 DAYS AFTER FAT. THE PREFERRED METHOD OF TRANSMITTAL IS CD. THE GOVERNMENT HAS 30 DAYS TO

APPROVE/DISAPPROVE THE TEST REPORT.

Certified Cost and Pricing Data:________________________________

NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403-4, RELATIVE TO THE REQUIREMENT FOR OBTAINING CERTIFIED

COST AND PRICING DATA. IN THE EVENT THIS REQUIREMENT IS SOLE SOURCE, THE SOLE OFFEROR IS REQUIRED TO SUBMIT CERTIFIED COST AND PRICING

DATA UPON REQUEST. FAILURE TO PROVIDE CERTIFIED COST AND PRICING DATA WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE.

Long Lead Time and or Long Term Contracts_________________________________________

FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED FOR

PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE

THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION

AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN

PART, AS APPROPRIATE.

3 59

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE A0001 ***

4 59

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

APPROVED SOURCES:

TIMKEN AEROSPACE TRANSMISSIONS, LLC CAGE (15152)

SIKORSKY AIRCRAFT CORP, CAGE (78286)

The Government will ether award CLIN 0001AA or 0001AB as a result of this solicitation.

This requirement is FULL AND OPEN COMPETITION IAW FAR

6.401(b). Only offers from approved sources will be considered.

(End of narrative A001)

0001 HOUSING ASSEMBLY, GEARBOX

NSN: 1615-01-125-0779

Mfr CAGE: 81996

Mfr Part Number: 70357-06305-042

THIS IS A FIVE YEAR INDEFINITE DELIVERY INDEFINITE

QUANTITY (IDIQ) SOLICITATION NUMBER: SPRRA1-18-R-

0116. FUNDS WILL BE OBLIGATED/CITED UPON THE

ISSUANCE OF EACH DELIVERY ORDER. THE GOVERNMENT WILL

ONLY BE OBLIGATED TO ORDER THE STATED MINIMUM

QUANTITY. THE GOVERNMENT IS NOT OBLIGATED TO ISSUE

ANY ADDITIONAL ORDERS AGAINST THIS CONTRACT; HOWEVER,

THE GOVERNMENT RESERVES THE RIGHT TO ORDER UP TO THE

MAXIMUM QUANTITY.

THE GOVERNMENT HAS SEGREGATED THE POTENTIAL

QUANTITIES INTO FIVE YEAR PERIODS. HOWEVER, THIS

DOES NOT PRECLUDE EXERCISING ITS RIGHTS UNDER FAR

52.216-19 BY ORDERING THE MAXIMUM QUANTITY SPECIFIED

IN FAR 52.216-19(b)(1) AT ANY TIME DURING THE

INDEFINITE QUANTITY PERIOD.

THE GOVERNMENT INTENDS TO AWARD ONLY ONE BASIC

INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT AS A

RESULT OF THIS SOLICITATION.

THE GOVERNMENT'S MINIMUM QUANTITY TO BE AWARDED

SIMULTANEOUSLY WITH THE AWARD OF THE BASIC CONTRACT

IS 32 EACH. THE INITIAL DELIVERY ORDER WILL MEET OR

EXCEED THE MINIMUM QUANTITY AT THE FIRST YEAR

PRICING. THE GOVERNMENT'S MAXIMUM QUANTITY DURING

THE INDEFINITE QUANTITY PERIOD IS 170 EACH. THE

DELIVERY ORDER MINIMUM ORDER QUANTITY IS 10. AT NO

TIME WILL THE CONTRACTOR BE REQUIRED TO SHIP MORE

5 59

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

THAN 10 UNITS PER MONTH UNLESS MUTUALLY AGREED TO BY

BOTH PARTIES.

PRICES QUOTED FOR EACH YEAR WILL BE VALID FOR ALL

QUANTITIES ORDERED DURING THAT ORDERING PERIOD.

THE SOLICITATION IS FOR THE SUPPLIES AS DETAILED ON

THE FOLLOWING PAGES. OFFERORS ARE CAUTIONED TO

INSURE THAT OFFERS ARE PROVIDED ON ALL QUANTITIES.

FAILURE TO PROPOSE ALL CLINS, WILL RESULT IN A

DETERMINATION OF NON RESPONSIVENESS.

YEAR 1 WILL BE FROM DATE OF AWARD THROUGH DAY 365

DAYS AFTER CONTRACT AWARD (DACA).

YEAR 2 WILL BEGIN 366 DACA AND END 730 DACA.

YEAR 3 WILL BEGIN 731 DACA AND END 1,095 DACA.

YEAR 4 WILL BEGIN 1,096 DACA AND END 1,460 DACA.

YEAR 5 WILL BEGIN 1,461 DACA AND END 1,826 DACA.

THE CONTRACTOR SHALL PROVIDE UNIT PRICES FOR EACH

CLIN BELOW.

ALL REFERENCES TO F.O.B. ORIGIN THROUGHOUT THIS

SOLICITATION APPLY ONLY TO ALL QUANTITIES ORDERED

AFTER THE FIRST ORDERING PERIOD.

THE ESTIMATED (E) QUANTITY LISTED HEREIN DOES NOT

COMMIT THE GOVERNMENT TO ORDER THAT OR ANY QUANTITY

ABOVE THE MINIMUM QUANTITY.

(End of narrative A002)

0001AA PRODUCTION QUANTITY YEAR ONE WITH KTR FAT 32 (E) EA $ $ _________________________________________ ______________ __________________

COMMODITY NAME: HOUSING ASSEMBLY, GEARBOX

CLIN CONTRACT TYPE:

Firm Fixed Price

FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE ______

TESTED IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON ______

A MUTUALLY AGREED UPON DATE BETWEEN THE GOVERNMENT

AND THE CONTRACTOR. THE DATE SHALL OCCUR WITH ENOUGH

TIME IN ADVANCE TO BEGIN SCHEDULED DELIVERIES 642 ___

DACA. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING____

OFFICER IN WRITING 30 DAYS PRIOR TO THE PROPOSED ________

DATE OF FIRST ARTICLE TESTING. THE FIRST ARTICLE

TEST REPORT IS DUE 15 DAYS AFTER FAT. THE PREFERRED

METHOD OF TRANSMITTAL IS CD. THE GOVERNMENT HAS 30 __

DAYS TO APPROVE/DISAPPROVE THE TEST REPORT._____ ___________________________________

(End of narrative B001)

6 59

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70357-06305-042

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1 CODES, APPENDIX J

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ADDITIONAL PACKAGING REQUIREMENTS

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [9]

LN [14.0]

WD [14.0]

DP [12.5]

MIL-STD-129 MARKINGS SHALL APPLY

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [GB]

JV/CD [GA] JVI/CT [D] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W25G1U) SU W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2001 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND,PA,17070-5002

THIRTY TWO (32) EACH WILL BE SHIPPED TO NEW

CUMBERLAND, PA 17070-5002. DELIVERIES SHALL COMMENCE

642 DAYS AFTER THE DATE OF AWARD AT A RATE OF 10 PER

MONTH UNTIL SHIPMENT IS COMPLETE.

NEW CUMBERLAND ARMY DEPOT (W25G1U)

FOR DELIVERIES TO NEW CUMBERLAND ARMY DEPOT (W25G1U) -

7 59

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

ANNOTATE COMMERCIAL AND GOVERNMENT TRUCK BILLS OF

LADING: DELIVERY THROUGH SOUTH GATE ONLY, BUILDING

MISSION DOOR 113, 134. CARRIER TO CALL (717) 770-

6969/7172 FOR APPOINTMENT 24 HOURS IN ADVANCE OF

DELIVERY. APPOINTMENT HOURS: MONDAY THROUGH FRIDAY

BETWEEN 0800-1600.

(End of narrative F001)

0001AB PRODUCTION QUANTITY W/O KTR FAT 32 (E) EA $ $ _______________________________ ______________ __________________

COMMODITY NAME: HOUSING ASSEMBLY, GEARBOX

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70357-06305-042

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1 CODES, APPENDIX J

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ADDITIONAL PACKAGING REQUIREMENTS

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [9]

LN [14.0]

WD [14.0]

DP [12.5]

MIL-STD-129 MARKINGS SHALL APPLY

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [GB]

JV/CD [GA] JVI/CT [D] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

8 59

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(W25G1U) SU W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2001 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND,PA,17070-5002

THIRTY TWO (32) EACH WILL BE SHIPPED TO NEW

CUMBERLAND, PA 17070-5002. DELIVERIES SHALL COMMENCE

428 DAYS AFTER THE DATE OF AWARD AT A RATE OF 10 PER___ __

MONTH UNTIL SHIPMENT IS COMPLETE.

NEW CUMBERLAND ARMY DEPOT (W25G1U)

FOR DELIVERIES TO NEW CUMBERLAND ARMY DEPOT (W25G1U) -

ANNOTATE COMMERCIAL AND GOVERNMENT TRUCK BILLS OF

LADING: DELIVERY THROUGH SOUTH GATE ONLY, BUILDING

MISSION DOOR 113, 134. CARRIER TO CALL (717) 770-

6969/7172 FOR APPOINTMENT 24 HOURS IN ADVANCE OF

DELIVERY. APPOINTMENT HOURS: MONDAY THROUGH FRIDAY

BETWEEN 0800-1600.

(End of narrative F001)

0002 HOUSING ASSEMBLY, GEARBOX

NSN: 1615-01-125-0779

Mfr CAGE: 81996

Mfr Part Number: 70357-06305-042

0002AA PRODUCTION QUANTITY (YEAR TWO) 35 (E) EA $ $ ______________________________ ______________ __________________

COMMODITY NAME: HOUSING ASSEMBLY, GEARBOX

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

9 59

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

TOP DRAWING NR: 70357-06305-042

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1 CODES, APPENDIX J

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ADDITIONAL PACKAGING REQUIREMENTS

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [9]

LN [14.0]

WD [14.0]

DP [12.5]

MIL-STD-129 MARKINGS SHALL APPLY

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [GB]

JV/CD [GA] JVI/CT [D] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

DELIVERIES SHALL COMMENCE 428 DAYS AFTER THE DATE OF ___

AWARD AT A RATE OF 10 PER MONTH UNTIL SHIPMENT IS ___

COMPLETE.

10 59

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative F001)

0003 HOUSING ASSEMBLY, GEARBOX

NSN: 1615-01-125-0779

Mfr CAGE: 81996

Mfr Part Number: 70357-06305-042

0003AA PRODUCTION QUANTITY (YEAR THREE) 35 (E) EA $ $ ________________________________ ______________ __________________

COMMODITY NAME: HOUSING ASSEMBLY, GEARBOX

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70357-06305-042

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1 CODES, APPENDIX J

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ADDITIONAL PACKAGING REQUIREMENTS

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [9]

LN [14.0]

WD [14.0]

DP [12.5]

MIL-STD-129 MARKINGS SHALL APPLY

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [GB]

JV/CD [GA] JVI/CT [D] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

(End of narrative D001)

11 59

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

DELIVERIES SHALL COMMENCE 428 DAYS AFTER THE DATE OF ___

AWARD AT A RATE OF 10 PER MONTH UNTIL SHIPMENT IS ___

COMPLETE.

(End of narrative F001)

0004 HOUSING ASSEMBLY, GEARBOX

NSN: 1615-01-125-0779

Mfr CAGE: 81996

Mfr Part Number: 70357-06305-042

0004AA PRODUCTION QUANTITY (YEAR FOUR) 35 (E) EA $ $ _______________________________ ______________ __________________

COMMODITY NAME: HOUSING ASSEMBLY, GEARBOX

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70357-06305-042

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1 CODES, APPENDIX J

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ADDITIONAL PACKAGING REQUIREMENTS

12 59

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [9]

LN [14.0]

WD [14.0]

DP [12.5]

MIL-STD-129 MARKINGS SHALL APPLY

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [GB]

JV/CD [GA] JVI/CT [D] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

DELIVERIES SHALL COMMENCE 428 DAYS AFTER THE DATE OF ___

AWARD AT A RATE OF 10 PER MONTH UNTIL SHIPMENT IS ___

COMPLETE.

(End of narrative F001)

0005 HOUSING ASSEMBLY, GEARBOX

NSN: 1615-01-125-0779

13 59

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Mfr CAGE: 81996

Mfr Part Number: 70357-06305-042

0005AA PRODUCTION QUANTITY (YEAR FIVE) 33 (E) EA $ $ _______________________________ ______________ __________________

COMMODITY NAME: HOUSING ASSEMBLY, GEARBOX

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70357-06305-042

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1 CODES, APPENDIX J

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ADDITIONAL PACKAGING REQUIREMENTS

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [9]

LN [14.0]

WD [14.0]

DP [12.5]

MIL-STD-129 MARKINGS SHALL APPLY

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [GB]

JV/CD [GA] JVI/CT [D] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

14 59

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

DELIVERIES SHALL COMMENCE 428 DAYS AFTER THE DATE OF ___

AWARD AT A RATE OF 10 PER MONTH UNTIL SHIPMENT IS ___

COMPLETE.

(End of narrative F001)

0006 FIRST ARTICLE TEST REPORT $ ** NSP ** $ ** NSP ** _________________________ ______________ __________________

COMMODITY NAME: HOUSING ASSEMBLY, GEARBOX

Packaging and Marking _____________________

Deliveries or Performance _________________________

FOB POINT:

SHIP TO:

(SPRRA1) DLA AVIATION AT HUNTSVILLE, AL

DLR PROCUREMENT OPERATIONS (AH)

5201 MARTIN ROAD

REDSTONE ARSENAL,AL,35898-7340

FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE __

TESTED IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON __

A MUTUALLY AGREED UPON DATE BETWEEN THE GOVERNMENT

AND THE CONTRACTOR. THE DATE SHALL OCCUR WITH ENOUGH

TIME IN ADVANCE TO BEGIN SCHEDULED DELIVERIES 642 ___

DACA. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER IN WRITING 30 DAYS PRIOR TO THE PROPOSED

DATE OF FIRST ARTICLE TESTING. THE FIRST ARTICLE

TEST REPORT IS DUE 15 DAYS AFTER FAT. THE PREFERRED

METHOD OF TRANSMITTAL IS CD. THE GOVERNMENT HAS 30 __

DAYS TO APPROVE/DISAPPROVE THE TEST REPORT. ___________________

(End of narrative F001)

15 59

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

16 59

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

The contractor shall comply with the higher-level quality standard titled Quality systems -- Model for quality assurance and design, development, production, installation and servicing, American National Standards Institute/American Society for Quality Control

ANSI/ISO/ASQ 9001:2008, AS 9100 Or Equivalent, Tailoring: All Paragraphs Under 7.3 (DESIGN AND DEVELOPMENT) DO NOT APPLY. Contractor must identify below the title, number (if any), date, and tailoring (if any) of the specific system(s) that will be used to satisfy this requirement.

TITLE NUMBER DATE TAILORED

17 59

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/ or https://www.acquisition.gov/

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989

F-2 52.242-15 STOP-WORK ORDER AUG/1989

F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

F-4 52.247-29 F.O.B. ORIGIN FEB/2006

F-5 52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY FEB/2006

F-6 52.247-34 F.O.B. DESTINATION NOV/1991

F-7 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

F-8 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984

F-9 52.247-59 F.O.B. ORIGIN--CARLOAD AND TRUCKLOAD SHIPMENTS APR/1984

F-10 52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS JAN/1991

F-11 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

0001AA 32 (E) 642 DACA

0001AB 32 (E) 428 DACA

0002AA 35 (E) 428 DACA

0003AA 35 (E) 428 DACA

0004AA 35 (E) 428 DACA

0005AA 33 (E) 428 DACA

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFERORS PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

Contractors date of receipt of the contract or notice of award by adding

18 59

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of Clause)

F-12 252.211-7006 PASSIVE RADIO FREQUENCY IDENTIFICATION DEC/2017

(a) Definitions. As used in this clause--

"Advance shipment notice" means an electronic notification used to list the contents of a shipment of goods as well as additional information relating to the shipment, such as passive radio frequency dentification (RFID) or item unique identification (IUID) information, order information, product description, physical characteristics, type of packaging, marking, carrier information, and configuration of goods within the transportation equipment.

"Bulk commodities" means the following commodities, when shipped in rail tank cars, tanker trucks, trailers, other bulk wheeled conveyances, or pipelines:

(1) Sand.

(2) Gravel.

(3) Bulk liquids (water, chemicals, or petroleum products).

(4) Ready-mix concrete or similar construction materials.

(5) Coal or combustibles such as firewood.

(6) Agricultural products such as seeds, grains, or animal feed.

"Case" means either a MIL-STD-129 defined exterior container within a palletized unit load or a MIL-STD-129 defined individual shipping container.

"Electronic Product Code\TM\ (EPC)" means an identification scheme for universally identifying physical objects via RFID tags and other means. The standardized EPC\TM\ data consists of an EPC\TM\ (or EPC\TM\ identifier) that uniquely identifies an individual object, as well as an optional filter value when judged to be necessary to enable effective and efficient reading of the EPC\TM\ tags. In addition to this standardized data, certain classes of EPC\TM\ tags will allow user-defined data. The EPC\TM\ Tag Data Standards will define the length and position of this data, without defining its content.

"EPCglobal" means a subscriber-driven organization comprised of industry leaders and organizations focused on creating global standards for the adoption of passive RFID technology.

"Exterior container" means a MIL-STD-129 defined container, bundle, or assembly that is sufficient by reason of material, design, and construction to protect unit packs and intermediate containers and their contents during shipment and storage. It can be a unit pack or a container with a combination of unit packs or intermediate containers. An exterior container may or may not be used as a shipping container.

"Palletized unit load" means a MIL-STD-129 defined quantity of items, packed or unpacked, arranged on a pallet in a specified manner and secured, strapped, or fastened on the pallet so that the whole palletized load is handled as a single unit. A palletized or skidded load is not considered to be a shipping container. A loaded 463L System pallet is not considered to be a palletized unit load. Refer to the

Defense Transportation Regulation, DoD 4500.9-R, Part II, Chapter 203, for marking of 463L System pallets.

"Passive RFID tag" means a tag that reflects energy from the reader/interrogator or that receives and temporarily stores a small amount of energy from the reader/interrogator signal in order to generate the tag response. The only acceptable tags are EPC Class 1 passive

RFID tags that meet the EPCglobal\TM\ Class 1 Generation 2 standard.

"Radio frequency identification (RFID)" means an automatic identification and data capture technology comprising one or more reader/interrogators and one or more radio frequency transponders in which data transfer is achieved by means of suitably modulated inductive or radiating electromagnetic carriers.

"Shipping container" means a MIL-STD-129 defined exterior container that meets carrier regulations and is of sufficient strength, by reason of material, design, and construction, to be shipped safely without further packing (e.g., wooden boxes or crates, fiber and metal drums, and corrugated and solid fiberboard boxes).

(b)(1) Except as provided in paragraph (b)(2) of this clause, the Contractor shall affix passive RFID tags, at the case- and palletized-

19 59

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

unit-load packaging levels, for shipments of items that--

(i) Are in any of the following classes of supply, as defined in DoD Manual 4140.01, Volume 6, DoD Supply Chain Materiel Management

Procedures: Materiel Returns, Retention, and Disposition:

(A) Subclass of Class I--Packaged operational rations.

(B) Class II--Clothing, individual equipment, tentage, organizational tool kits, hand tools, and administrative and housekeeping supplies and equipment.

(C) Class IIIP--Packaged petroleum, lubricants, oils, preservatives, chemicals, and additives.

(D) Class IV--Construction and barrier materials.

(E) Class VI--Personal demand items (non-military sales items).

(F) Subclass of Class VIII--Medical materials (excluding pharmaceuticals, biologicals, and reagents--suppliers should limit the mixing of excluded and non-excluded materials).

(G) Class IX--Repair parts and components including kits, assemblies and subassemblies, reparable and consumable items required for maintenance support of all equipment, excluding medical-peculiar repair parts; and

(ii) Are being shipped to one of the locations listed at http://www.acq.osd.mil/log/sci/RFID_ship-to-locations.html or to--

(A) A location outside the contiguous United States when the shipment has been assigned Transportation Priority 1, or to--

(B) The following location(s) deemed necessary by the requiring activity:

Contract line, subline, or exhibit Location name City State DoDAAC line item number

0001AA SU W1A8 DLA DISTRIBUTION DDSP NEW CUMBERLAND, PA W25G1U

0001AB SU W1A8 DLA DISTRIBUTION DDSP NEW CUMBERLAND, PA W25G1U

(2) The following are excluded from the requirements of paragraph (b)(1) of this clause:

(i) Shipments of bulk commodities.

(ii) Shipments to locations other than Defense Distribution Depots when the contract includes the clause at FAR 52.213-1, Fast

Payment Procedures.

(c) The Contractor shall--

(1) Ensure that the data encoded on each passive RFID tag are globally unique (i.e., the tag ID is never repeated across two or more

RFID tags) and conforms to the requirements in paragraph (d) of this clause;

(2) Use passive tags that are readable; and

(3) Ensure that the passive tag is affixed at the appropriate location on the specific level of packaging, in accordance with MIL-STD-

129 (Section 4.9.2) tag placement specifications.

(d) Data syntax and standards. The Contractor shall encode an approved RFID tag using the instructions provided in the EPC\TM\ Tag Data

Standards in effect at the time of contract award. The EPC\TM\ Tag Data Standards are available at http://www.epcglobalinc.org/standards/ .

(1) If the Contractor is an EPCglobal\TM\ subscriber and possesses a unique EPC\TM\ company prefix, the Contractor may use any of the identifiers and encoding instructions described in the most recent EPC\TM\ Tag Data Standards document to encode tags.

(2) If the Contractor chooses to employ the DoD identifier, the Contractor shall use its previously assigned Commercial and Government

Entity (CAGE) code and shall encode the tags in accordance with the tag identifier details located at http://www.acq.osd.mil/log/sci/ait.html . If the Contractor uses a third-party packaging house to encode its tags, the CAGE code of the third-party packaging house is acceptable.

20 59

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(3) Regardless of the selected encoding scheme, the Contractor with which the Department holds the contract is responsible for ensuring that the tag ID encoded on each passive RFID tag is globally unique, per the requirements in paragraph (c)(1) of this clause.

(e) Advance shipment notice. The Contractor shall use Wide Area WorkFlow (WAWF), as required by DFARS 252.232-7003, Electronic

Submission of Payment Requests, to electronically submit advance shipment notice(s) with the RFID tag ID(s) (specified in paragraph (d) of this clause) in advance of the shipment in accordance with the procedures at https://wawf.eb.mil/ .

(End of clause)

RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN

1. The Governments Quality Assurance Representative (QAR) will inspect supplies described by manufacturer's name/code and part number at origin location(s):

a. The QAR may require that objective evidence be furnished establishing the name and address of the plant that manufactures the supplies to ensure that a domestic product is being supplied.

b. Objective evidence of performance must be present for all quality assurance requirements specified in the contract. The QAR may require additional examinations and tests to determine:

i. Completeness of item

ii. Material is new and unused

iii. Absence of rust

iv. Contamination, or deterioration

v. Correct identification/item marking

vi. Correct packaging

vii. Absence of any damage

viii. Compliance with preparation for delivery

2. If the supplier is not the manufacturer of the supplies, objective evidence must be furnished to establish that the supplies were produced by the approved manufacturer.

3. For supplies designated as former Government surplus (whether described by manufacturers name/code and part number, or by Military or

Federal specification or drawing), the original package markings of each item shall be verified to previous Government contract number and part number. Any deviation shall be cause for rejection of the item. The Procuring Activity may add additional inspection requirements based on the evaluation of the surplus offer. Such additional requirements will be identified before the award.

(End of TQ Requirement)

*** END OF NARRATIVE F0001 ***

21 59

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION G - CONTRACT ADMINISTRATION DATA

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS MAY/2013

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this

Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

THE CONTRACTOR IS ENCOURAGED TO USE THE COMBINATION INVOICE AND RECEIVING REPORT (COMBO) FOR SUBMITTING INVOICES FOR SUPPLIES. THIS

ELIMINATES THE NEED TO SEPERATELY PROCESS A RECEIVING REPORT AND INVOICE.

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

INSPECTION: SOURCE

ACCEPTANCE: SOURCE

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC TBD

Issue By DoDAAC SPRRA1

Admin DoDAAC TBD

Inspect By DoDAAC TBD

Ship To Code TBD

Ship From Code TBD

Mark For Code TBD

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) N/A

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

22 59

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Other DoDAAC(s) N/A

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email

Notifications" field of WAWF once a document is submitted in the system.

TBD AT TIME OF AWARD

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

TBD AT TIME OF AWARD

(2) For technical WAWF help, contact the WAWF helpdesk at 866-

618-5988.

(End of clause)

23 59

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

BAR CODE MARKINGS_________________

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

CALIBRATION___________

The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National

Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test

Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International

Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.

ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR DEVIATION, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, &__________________________________________________________________________________________________________________________________

SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS________________________________________________________________

1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for Deviations (RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.

2. Format.

a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government

Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II

ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.

b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523, pages 1 through 7 (as applicable), be prepared.

Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.

c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using RDMR Form 523

(page 1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification Codes", and Block 7 "Priority."

d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFD. RFDs shall be prepared using RDMR Form 527 or RDMR Form 530 (Type I, see block 5 of the form.)

e. The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV. RFVs shall be prepared using RDMR Form 528.

f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract

Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFD/RFV proposal.

g. Classification of RFDs/RFVs.

(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health;

performance; interchangeability; reliability; survivability; maintainability; effective use or operation; weight;

appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.

(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.

24 59

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs g(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.

h. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.

i. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.

j. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.

k. Times allowed for technical decisions for ECP and RFD/RFV proposals will be worked out via mutual agreement between the

Contractor and the Government.

l. The Contractor shall submit, concurrent with the ECP, a separate AMSAM-RD Form 525, "Specification Change Notice" (SCN), for each specification that would require revision if the ECP were approved.

m. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.

n. The Contractor shall utilize RDMR Form 526, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.

o. The Contractor shall utilize RDMR Form 524, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub- sections entitled "WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.

3. Submittal. The Contractor shall submit…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.