SPRRA118R0064.pdf

PDF 142 KB Posted

Attached to
ROD END ASSY, DAMPER Federal contract opportunity
Solicitation number
SPRRA1-18-R-0064
Issued by
Defense Logistics Agency Aviation

About this file

Solicitation

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

SPRRA1-18-R-0064

X

2018JAN19

2018FEB19

DOA1

2018JAN19 SEE SCHEDULE

SPRRA1

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

LASHONDRA ELLIS

(256)955-5331

DLA-AVN

LASHONDRA.ELLIS@DLA.MIL

1 60

X 1

X 4

X 15 X 16

X 18

X 20

X 32

X 43

X 44

X 51

X 60

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: LASHONDRA ELLIS

Buyer Office Symbol/Telephone Number: DLA-AVN/(256)955-5331

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

A-1. THIS REQUIREMENT IS 100% SMALL BUSINESS SET-ASIDE IN ACCORDANCE WITH FAR 19.502-2. ONLY OFFERS FROM SMALL BUSINESS FIRMS WILL BE

CONSIDERED.

A-2. THIS REQUIREMENT IS IN SUPPORT OF THE UH-60 BLACKHAWK WEAPON SYSTEM.

A-3. FLIGHT SAFETY/CRITICAL SAFETY ITEM (CSI) IS NOT REQUIRED.

A-4. PRODUCTION LOT TESTING (PLT) IS NOT REQUIRED.

A-5. FIRST ARTICLE TEST (FAT) IS REQUIRED.

A-6. FAT UNIT SHALL NOT BE RETAINED AS A MATERIAL STANDARD. TEST ITEM WILL NOT BE DESTROYED AS PART OF TESTING.

A-7. SNRR MARKINGS ARE NOT REQUIRED.

A-8. TAMMS-A ARE NOT REQUIRED.

A-9. IUID MARKINGS ARE NOT REQUIRED.

A-10. ARMS EXPORT CONTROL IS APPLICABLE THE TECHNICAL DATA PACKAGE PROVIDED ON CD CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22 U.S.C., SEC 2751 ET SEQ.) OR EXECUTIVE ORDER 12470. VIOLATION OF THESE EXPORT LAWS ARE SUBJECT TO

SEVERE CRIMINAL PENALTIES.

A-11. THIS IS A FIVE (5)YEAR INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ), FIRM FIXED PRICE EFFORT. FUNDS WILL BE OBLIGATED UPON THE

ISSUANCE OF THE DELIVERY ORDER.

A-12. CONTRACTOR POINT OF CONTACT:

NAME: ___________________________________

TELEPHONE NUMBER: ___________________________________

E-MAIL ADDRESS: ________________________________________

A-13. DCMA ACO POINT OF CONTACT:

NAME: ___________________________

TELEPHONE NUMBER: ______________________________

E-MAIL ADDRESS: _______________________________________________

A-14. CONTRACT SPECIALIST POINT OF CONTACT:

NAME: _LASHONDRA T. ELLIS __________________

OFFICE SYMBOL: DLA-AVN-AHA ___________

TELEPHONE NUMBER: _256-955-5331_______ ____________

E-MAIL ADDRESS: __LASHONDRA.ELLIS@DLA.MIL_ _______________________

A-15. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.

A.16. REVERSE AUCTION EVALUATION IS INCLUDED ON THIS REQUIREMENT, REFER TO REVERSE AUCTION NOTICE IN SECTION L.

A-17. CONTRACTOR FIRST ARTICLE TEST

Number of samples to be tested = _1_ _

Deliver FOB: Destination

Inspection: Origin

Acceptance: Origin

BY: _588 DACA__ ________

Ship To: ATTN: DLA Aviation Huntsville Post Award Team

5201 Martin Road

2 60

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Redstone Arsenal, Alabama 35898

(With an information copy to the Administering Contracting Officer)

Or

Email To: DLAHSVPostAwardTeam@dla.mil

Delivery Schedule:

588 Days ARO: Contractor First Article completed and Report Submission

30 Days: Government Review and Notification to Contractor

282 DAFAA: Delivery of Production Units

900 DARO

FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE TESTED IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON A MUTUALLY AGREED UPON DATE BETWEEN

THE GOVERNMENT AND THE CONTRACTOR. THE DATE SHALL OCCUR WITH ENOUGH TIME IN ADVANCE TO BEGIN SCHEDULED DELIVERIES 900 DACA. THE _________

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING 30 DAYS PRIOR TO THE PROPOSED DATE OF FIRST ARTICLE TESTING. THE FIRST

ARTICLE TEST REPORT IS DUE 15 DAYS AFTER FAT. THE PREFERRED METHOD OF TRANSMITTAL IS CD. THE GOVERNMENT HAS 30 DAYS TO

APPROVE/DISAPPROVE THE TEST REPORT.

NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403-3, RELATIVE TO THE REQUIREMENTS FOR OBTAINING OTHER

THAN CERTIFIED COST OR PRICING DATA. IF THIS IS CONSIDERED TO BE A SOLE SOURCE REQUIREMENT, YOU ARE REQUIRED TO SUBMIT OTHER THAN COST

AND PRICING DATA, IF REQUESTED. OFFEROR MAY USE THEIR OWN FORMAT TO PROVIDE, AT A MINIMUM, A BREAKDOWN OF ALL THE COST ELEMENTS TO

INCLUDE PROFIT/FEE WHICH COMPRISE THE TOTAL PROPOSED PRICE OR SALES HISTORY. FAILURE TO PROVIDE OTHER THAN COST AND PRICING DATA IF

REQUESTED WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE.

FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED FOR

PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE

THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION

AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN

PART, AS APPROPRIATE.

*** END OF NARRATIVE A0001 ***

3 60

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

THIS IS A FIVE YEAR INDEFINITE DELIVERY INDEFINITE

QUANTITY (IDIQ) SOLICITATION. FUNDS WILL BE

OBLIGATED/CITED UPON THE ISSUANCE OF EACH DELIVERY

ORDER. THE GOVERNMENT WILL ONLY BE OBLIGATED TO

ORDER THE STATED MINIMUM QUANTITY. THE GOVERNMENT

IS NOT OBLIGATED TO ISSUE ANY ADDITIONAL ORDERS

AGAINST THIS CONTRACT; HOWEVER, THE GOVERNMENT

RESERVES THE RIGHT TO ORDER UP TO THE MAXIMUM

QUANTITY.

THE GOVERNMENT HAS SEGREGATED THE POTENTIAL

QUANTITIES INTO FIVE YEARS. HOWEVER, THIS DOES NOT

PRECLUDE EXERCISING ITS RIGHTS UNDER FAR 52.216-19

BY ORDERING THE MAXIMUM QUANTITY SPECIFIED IN FAR

52.216-19(B)(1) AT ANY TIME DURING THE INDEFINITE

QUANTITY PERIOD. THE GOVERNMENT'S MINIMUM QUANTITY

TO BE AWARDED SIMULTANEOUSLY WITH THE AWARD OF THE

BASIC CONTRACT IS 100 EACH MINIMUM OR UP TO 500

EACH MAXIMUM.

THE INITIAL DELIVERY ORDER WILL MEET OR EXCEED THE

MINIMUM QUANTITY AT THE FIRST YEAR PRICING. THE

GOVERNMENT'S MINIMUM DELIVERY ORDER QUANTITY DURING

THE INDEFINITE QUANTITY PERIOD IS 100 EACH AT A

RATE OF 20 PER MONTH. THE GOVERNMENT'S MAXIMUM

DELIVERY ORDER QUANTITY DURING THE INDEFINITE

QUANTITY PERIOD IS 500 EACH.

PRICES QUOTED FOR EACH YEAR WILL BE VALID FOR ALL

QUANTITIES ORDERED DURING THAT ORDERING PERIOD.

THE SOLICITATION IS FOR THE SUPPLIES AS DETAILED ON

THE FOLLOWING PAGES. OFFERORS ARE CAUTIONED TO

INSURE THAT OFFERS ARE PROVIDED ON ALL QUANTITIES.

FAILURE TO PROPOSE ALL CLINS, WILL RESULT IN A

DETERMINATION OF NON-RESPONSIVENESS.

YEAR 1 WILL BE FROM DATE OF AWARD THROUGH DAY 365

DAYS AFTER RECEIPT OF ORDER (DARO).

YEAR 2 WILL BEGIN 366 DARO AND END 730 DARO.

YEAR 3 WILL BEGIN 731 DARO AND END 1,095 DARO.

YEAR 4 WILL BEGIN 1096 DARO AND END 1,460 DARO.

YEAR 5 WILL BEGIN 1461 DARO AND END 1,825 DARO.

THE CONTRACTOR SHALL PROVIDE UNIT PRICES FOR EACH

CLIN BELOW.

ALL REFERENCES TO F.O.B. ORIGIN THROUGHOUT THIS

SOLICITATION APPLY ONLY TO ALL QUANTITIES ORDERED

AFTER THE FIRST ORDERING PERIOD.

THE ESTIMATED (E) QUANTITY LISTED HEREIN DOES NOT

COMMIT THE GOVERNMENT TO ORDER THAT OR ANY QUANTITY

ABOVE THE MINIMUM QUANTITY.

4 60

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative A001)

THIS IS 100% SMALL BUSINESS SET ASIDE.

AS A RESULT OF THIS SOLICITATION EITHER CLIN 0001AA

OR 0001AB WILL BE AWARDED.

IF CLIN 0001AA IS AWARDED WITH THE FIRST DELIVERY

ORDERS, ANY SUBSEQUENT DELIVERIES ORDERS UNDER THE

FIRST YEAR ORDERING PERIOD WILL BE AWARDED UNDER

CLIN 0001AB.

(End of narrative A002)

0001 ROD END ASSY,DAMPER

NSN: 1615-01-089-0441

Mfr CAGE: 81996

Mfr Part Number: 70106-08104-041

0001AA PRODUCTION QTY W/FIRST ARTICLE TESTING 100 (E) EA $ $ ______________________________________ ______________ __________________

COMMODITY NAME: ROD END ASSY,DAMPER

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70106-08104-041

REVISION: 5

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

**ADDITIONAL PACKAGING REQUIREMENTS**

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [4.0]

LN [10.0]

WD [8.0]

DP [7.0]

5 60

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [41]

JII/CD [1]

JIII/PM [00]

JIV/WM [EB]

JV/CD [BG]

JVI/CT [A]

JVII/UC [ED]

JVII/IC [00]

JIX/A/PK [F]

JX/SM [00]

JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Government Approval/Disapproval Days: 30

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(SW3119) DLA DISTRIBUTION WARNER ROBINS

455 BYRON STREET

BLDG 376

ROBINS A F B,GA,31098-1887

DELIVERIES SHALL COMMENCE 900 DAYS AFTER THE DATE

OF DELIVERY ORDER AWARD AT A RATE OF 20 EACH PER

MONTH.

(End of narrative F001)

0001AB PRODUCTION QTY W/OUT FIRST ARTICLE TESTING 100 (E) EA $ $ __________________________________________ ______________ __________________

COMMODITY NAME: ROD END ASSY,DAMPER

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70106-08104-041

REVISION: 5

Packaging and Marking _____________________

6 60

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

**ADDITIONAL PACKAGING REQUIREMENTS**

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [4.0]

LN [10.0]

WD [8.0]

DP [7.0]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [41]

JII/CD [1]

JIII/PM [00]

JIV/WM [EB]

JV/CD [BG]

JVI/CT [A]

JVII/UC [ED]

JVII/IC [00]

JIX/A/PK [F]

JX/SM [00]

JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(SW3119) DLA DISTRIBUTION WARNER ROBINS

455 BYRON STREET

BLDG 376

ROBINS A F B,GA,31098-1887

DELIVERIES SHALL COMMENCE 600 DAYS AFTER THE DATE

OF DELIVERY ORDER AWARD AT A RATE OF 20 EACH PER

MONTH.

(End of narrative F001)

7 60

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0002 ROD END ASSY,DAMPER

NSN: 1615-01-089-0441

Mfr CAGE: 81996

Mfr Part Number: 70106-08104-041

0002AA PRODUCTION QTY YEAR 2 100 (E) EA $ $ _____________________ ______________ __________________

COMMODITY NAME: ROD END ASSY,DAMPER

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70106-08104-041

REVISION: 5

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

**ADDITIONAL PACKAGING REQUIREMENTS**

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [4.0]

LN [10.0]

WD [8.0]

DP [7.0]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [41]

JII/CD [1]

JIII/PM [00]

JIV/WM [EB]

JV/CD [BG]

JVI/CT [A]

JVII/UC [ED]

JVII/IC [00]

JIX/A/PK [F]

JX/SM [00]

JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

8 60

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

DELIVERIES SHALL COMMENCE 600 DAYS AFTER THE DATE

OF DELIVERY ORDER AWARD AT A RATE OF 20 EACH PER

MONTH.

(End of narrative F001)

0003 ROD END ASSY,DAMPER

NSN: 1615-01-089-0441

Mfr CAGE: 81996

Mfr Part Number: 70106-08104-041

0003AA PRODUCTION QTY YEAR 3 100 (E) EA $ $ _____________________ ______________ __________________

COMMODITY NAME: ROD END ASSY,DAMPER

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70106-08104-041

REVISION: 5

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

**ADDITIONAL PACKAGING REQUIREMENTS**

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [4.0]

LN [10.0]

WD [8.0]

DP [7.0]

9 60

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [41]

JII/CD [1]

JIII/PM [00]

JIV/WM [EB]

JV/CD [BG]

JVI/CT [A]

JVII/UC [ED]

JVII/IC [00]

JIX/A/PK [F]

JX/SM [00]

JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

DELIVERIES SHALL COMMENCE 600 DAYS AFTER THE DATE

OF DELIVERY ORDER AWARD AT A RATE OF 20 EACH PER

MONTH.

(End of narrative F001)

0004 ROD END ASSY,DAMPER

NSN: 1615-01-089-0441

Mfr CAGE: 81996

Mfr Part Number: 70106-08104-041

0004AA PRODUCTION QTY YEAR 4 100 (E) EA $ $ _____________________ ______________ __________________

COMMODITY NAME: ROD END ASSY,DAMPER

CLIN CONTRACT TYPE:

Firm Fixed Price

10 60

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70106-08104-041

REVISION: 5

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

**ADDITIONAL PACKAGING REQUIREMENTS**

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [4.0]

LN [10.0]

WD [8.0]

DP [7.0]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [41]

JII/CD [1]

JIII/PM [00]

JIV/WM [EB]

JV/CD [BG]

JVI/CT [A]

JVII/UC [ED]

JVII/IC [00]

JIX/A/PK [F]

JX/SM [00]

JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

11 60

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

DELIVERIES SHALL COMMENCE 600 DAYS AFTER THE DATE

OF DELIVERY ORDER AWARD AT A RATE OF 20 EACH PER

MONTH.

(End of narrative F001)

0005 ROD END ASSY,DAMPER

NSN: 1615-01-089-0441

Mfr CAGE: 81996

Mfr Part Number: 70106-08104-041

0005AA PRODUCTION QTY YEAR 5 100 (E) EA $ $ _____________________ ______________ __________________

COMMODITY NAME: ROD END ASSY,DAMPER

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 70106-08104-041

REVISION: 5

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

**ADDITIONAL PACKAGING REQUIREMENTS**

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [4.0]

LN [10.0]

WD [8.0]

DP [7.0]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [41]

JII/CD [1]

JIII/PM [00]

JIV/WM [EB]

JV/CD [BG]

JVI/CT [A]

JVII/UC [ED]

JVII/IC [00]

JIX/A/PK [F]

JX/SM [00]

12 60

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

DELIVERIES SHALL COMMENCE 600 DAYS AFTER THE DATE

OF DELIVERY ORDER AWARD AT A RATE OF 20 EACH PER

MONTH.

(End of narrative F001)

0006 FIRST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** _________________________ ______________ __________________

COMMODITY NAME: FIRST ARTICLE TEST REPORT

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 3

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 AS REQUIRED

FOB POINT: Destination

SHIP TO:

(SPRRA1) DLA AVIATION AT HUNTSVILLE, AL

DLR PROCUREMENT OPERATIONS (AH)

5201 MARTIN ROAD

13 60

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

REDSTONE ARSENAL,AL,35898-7340

FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE

TESTED IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON

A MUTUALLY AGREED UPON DATE BETWEEN THE

GOVERNMENT AND THE CONTRACTOR. THE DATE SHALL OCCUR

WITH ENOUGH TIME IN ADVANCE TO BEGIN SCHEDULED

DELIVERIES 900 DACA. THE CONTRACTOR SHALL NOTIFY

THE CONTRACTING OFFICER IN WRITING 30 DAYS PRIOR TO

THE PROPOSED DATE OF FIRST ARTICLE TESTING. THE

FIRST ARTICLE TEST REPORT IS DUE 15 DAYS AFTER FAT.

THE PREFERRED METHOD OF TRANSMITTAL IS CD. THE

GOVERNMENT HAS 30 DAYS TO APPROVE/DISAPPROVE THE

TEST REPORT.

(End of narrative F001)

14 60

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/ or https://www.acquisition.gov/

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

Quality systems -- Model for quality assurance and design, development, production, installation and servicing, American National

Standards Institute/American Society for Quality Control ANSI/ISO/ASQ 9001:2008, AS 9100 Or Equivalent, Tailoring: All Paragraphs Under

7.3 (DESIGN AND DEVELOPMENT) DO NOT APPLY.

Contractor must identify below the title, number (if any), date, and tailoring (if any) of the specific system(s) that will be used to satisfy this requirement.

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E06 Inspection and Acceptance at Origin (SEP 2016)

The contractor shall indicate the location where supplies will be inspected:

Commercial and Government Entity (CAGE) code:___________________________

Address:________________________________________________________________________

Applicable to contract line-item numbers(s) (CLIN(s)):__________________

The contractor shall indicate the location where packaging will be inspected:

( ) Same as for supplies OR

CAGE code: ________________________________________________________________________

Address: ________________________________________________________________________

Applicable to CLIN(s): ________________________________________________________________________

*** END OF NARRATIVE E0001 ***

15 60

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/ or https://www.acquisition.gov/

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989

F-2 52.242-15 STOP-WORK ORDER AUG/1989

F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

F-4 52.247-34 F.O.B. DESTINATION NOV/1991

F-5 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

F-6 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984

F-7 52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS JAN/1991

F-8 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

0001AA 100(E) 900 DARO

0001AB 100(E) 600 DARO

0002AA 100(E) 600 DARO

0003AA 100(E) 600 DARO

0004AA 100(E) 600 DARO

0005AA 100(E) 600 DARO

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFERORS PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

0001AA 100(E) ___ DARO

0001AB 100(E) ___ DARO

0002AA 100(E) ___ DARO

0003AA 100(E) ___ DARO

0004AA 100(E) ___ DARO

0005AA 100(E) ___ DARO

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

Contractors date of receipt of the contract or notice of award by adding

16 60

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of Clause)

F-9 52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT SEP/2000

(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of TBD AT TIME OF AWARD per calendar day of delay.

(b) If the Government terminates this contract in whole or in part under the Default -- Fixed-Price Supply and Service clause, the

Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default -- Fixed-Price Supply and Service clause in this contract.

(End of Clause)

17 60

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION G - CONTRACT ADMINISTRATION DATA

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS MAY/2013

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this

Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

COMBO

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

ORIGIN/ORIGIN

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC TBD

Issue By DoDAAC SPRRA1

Admin DoDAAC TBD

Inspect By DoDAAC TBD

Ship To Code TBD

Ship From Code TBD

Mark For Code TBD

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) N/A

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC TBD

Other DoDAAC(s) TBD

18 60

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email

Notifications" field of WAWF once a document is submitted in the system.

TBD

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

TBD

(2) For technical WAWF help, contact the WAWF helpdesk at 866-

618-5988.

(End of clause)

19 60

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

52.247-4005 STATEMENT OF WORK (SOW) - FEDERAL AVIATION ADMINISTRATION (FAA) AIRWORTHINESS APPROVAL TAG______________________________________________________________________________________________________

If any of the items that are the subject of this procurement are also currently being sold to commercial customers and an FAA Form 8130-

3, Airworthiness Approval Tag, is required to accompany these parts, the offeror shall:

a. Identify, in its proposal, these parts; and

b. If awarded the contract, provide FAA Form 8130-3 to the Government upon delivery of the parts.

52.246-4009 FLIGHT SAFETY PART SUPPLIER INTERFACE AND OVERSIGHT PROGRAM REQUIREMENTS____________________________________________________________________________________

This contract is for a Flight Safety part (FSP) and requires special controls as identified in Quality Engineering Standard (QE-STD-1).

In addition to the QE-STD-1 requirements, the contractor shall comply with the following:

a. The Contractor shall prepare manufacturing planning documentation in accordance with paragraph 6.1 of QE-STD-1 and DI-MISC-80508A.

Any Contractor recommended changes to the manufacturing planning documentation which affect critical characteristics shall be approved by the Government. The Contractor shall not implement any process changes which affect critical characteristics without prior Government approval.

b. Written notification shall be given to the Procuring Contracting Officer (PCO) as soon as possible but at least 30 days prior to first delivery indicating the time frame when the parts being procured under this contract will be actively in production in order that a Supplier Interface and Oversight Program (SIOP) on-site review can be scheduled if such a review is determined by the Government to be necessary. The Contractor will cooperate with and allow the Government to conduct a SIOP onsite review (1-3 days typically) while the parts are actively in production. This review may also require site visits to critical process subcontractors. The purpose of the SIOP on-site review is to thoroughly review manufacturing processes and documentation for FSP and provide feed-back and direction regarding the FSP program.

NOTE: Some of the personnel that support the SIOP program (e.g. evaluate manufacturing planning and participate in the SIOP on- site reviews) are employees of the U.S. Army Aviation and Missile Command (AMCOM) programmatic and technical services support contractors employed under the AMCOM Express Program. AMCOM's Directorate for Aviation Engineering (AMRDEC) will, within thirty days of contract award, identify the programmatic and technical services support contractors who may be involved with this contract and may require access to your company's proprietary data (e.g., frozen manufacturing planning) and facilities in performing their duties. Since these contractor personnel are not Federal employees, they will be allowed access only if a Non-Disclosure Agreement (NDA) between their employer and your company has been established. A standard NDA will accompany the AMRDEC notification. If a NDA with the identified support contractor has not been entered into by your company, sign and submit the NDA with the frozen manufacturing planning to the PCO within thirty days of contract award. If there are objections to the NDA or the terms or conditions thereof, contact, in writing, the

PCO within 10 days of receipt of the AMRDEC notification so as to allow sufficient time for a mutually acceptable arrangement be reached.

52.246-4005 FROZEN PLANNING/VERIFICATION OF CONTINUITY OF FROZEN PLANNING_________________________________________________________________________

1. By submitting this proposal, the offeror verifies that the manufacturing or maintenance and overhaul (M&O) planning relative to critical characteristics of the Critical Safety Item ("CSI") that was frozen in accordance with Quality Engineering Standard (QE-

STD)1/QE-STD-2 (as applicable):

a. Has not changed since approval by the U.S. Army Aviation and Missile Command Aviation Engineering Directorate (USAAMCOM AED) or by predecessor USAAMCOM commands (e.g., U.S. Army Aviation and Troop Command (USAATCOM) or U.S. Army Aviation Systems Command (USAAVSCOM)).

OR

b. Has changed and all changes have been approved by USAAMCOM AED or by predecessor USAAMCOM commands (e.g., USAATCOM or USAAVSCOM).

OR

c. Has changed, all changes have been submitted to USAAMCOM AED for approval, and changes will not be implemented until approval is obtained from USAAMCOM AED.

2. Within 30 days of contract award, the contractor shall submit to the USAAMCOM AED a copy of the current version of its frozen manufacturing or M&O planning for the CSI being procured under the resulting contract.

3. In the event that it is determined by the Government that the offeror has never had its manufacturing or M&O plan reviewed and/or approved by USAAMCOM AED, the offeror may be required to have its manufacturing or M&O plan approved prior to First Article Test/Product

Verification Audit (FAT/PVA) or prior to the start of Production/Overhaul if the FAT/PVA requirement was waived, in the event the offeror is awarded the contract resulting from this solicitation.

20 60

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

52.209-4011 FLIGHT SAFETY PARTS CRITICAL CHARACTERISTICS NEW MANUFACTURE QE-STD-1, 1 OCT 96___________________________________________________________________________________________

Purpose - Paragraph 1.0

Scope - 2.0

References - 3.0

Definitions - 4.0

Policy - 5.0

Requirements - 6.0

Manufacturing Planning - 6.1

Plan Content - 6.1.1

Frozen Planning Requirements - 6.1.2

Changes to Frozen Planning - 6.1.3

Audits - 6.2

Critical Characteristics - 6.3

Inspection of Critical Characteristics - 6.3.1

Variability Reduction Methods - 6.3.2

NonConforming Critical Characteristics - 6.3.3

Contradictory Critical Characteristics - 6.3.4

Delivered Nonconformances - 6.3.5

Records - 6.4

Traceability of Records - 6.4.1

Purchasing Records - 6.4.2

Retention of Records - 6.4.3

Certification of Personnel - 6.5

Tolerance of Measurement & Test Equipment - 6.6

Serialization - 6.7

1.0 PURPOSE: To establish the minimum level of activity that is required to manufacture Flight Safety Parts (FSPs) containing

Manufacturing Critical Characteristics (CCs). Requirements established herein are intended to establish and maintain the integrity of

CCs throughout the manufacturing process.

2.0 SCOPE: This document is to be used in conjunction with other contractually specified quality requirements. This document shall apply to all FSPs.

3.0 REFERENCES:

a. ANSI/ASQC B1, B2, B3-1996

b. ISO 10012-1

c. Competition Advocate's Shopping List (CASL)

d. AMCOM Regulation 702-7 Flight Safety Critical Aircraft Parts/New Source Testing Program Management

4.0 DEFINITIONS:

a. FSP (Airframe): Any part, assembly, or installation containing a critical characteristic (CC) whose failure, malfunction, or absence could cause loss of or serious damage to the aircraft, and/or serious injury or death to the occupants.

b. FSP (Engine): Any part, assembly, or installation containing a critical characteristic whose failure, malfunction, or absence could cause an uncommanded engine shut down, and/or an uncontained engine failure resulting in loss of, or serious damage to the aircraft and/or serious injury or death to the occupants.

c. Critical Characteristic: Any feature throughout the life cycle of a FSP, such as dimension, finish, material or assembly, manufacturing or inspection process, installation, operation, field maintenance, or depot overhaul requirement which if nonconforming, missing or degraded could cause the failure or malfunction of the FSP.

d. Approved Source: A manufacturer or vendor who has satisfied, prior to contract award, all AMCOM source approval requirements as set forth in the CASL to include, if applicable, engineering testing requirements (fatigue, endurance, and/or interchangeability).

5.0 POLICY: AMCOM will only procure Flight Safety Parts from approved sources. So as to maintain the integrity and quality of these critical spare parts, manufacturers of FSPs, components, sub-assemblies, and assemblies are required to adhere to the requirements of this document in its entirety. If a contractor has difficulty in maintaining process control as evident through such things as internal management audits, customer audits, the receipt of quality deficiency reports for parts previously supplied to AMCOM et. al., this will require immediate corrective action for the current contract and could affect the award of future contracts to that contractor.

6.0 REQUIREMENTS: All requirements of this document (paras. 6.1 - 6.7) shall be complied with by a contractor receiving a contract to produce FSPs. If a process or processes that involve a CC is subcontracted, this document must be imposed, in its entirety, on the subcontractor performing the work.

6.1 MANUFACTURING PLANNING:

6.1.1 PLAN CONTENT: All manufacturing, assembly, and inspection points shall be controlled by detailed procedures outlining each step or parameter of the process along with any materials, tooling, equipment, environmental control, and operator certification required that

21 60

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

leads to the specific production of an end item. Plans shall clearly identify all CCs and will include identification, in accordance with contractor procedures, as to its particular revision. All process plans shall clearly define sequence of operation, machine type, and accept/reject limits for the specific process or operation. Critical processes not easily verified by subsequent inspection shall clearly define process operating parameters with tolerances.

6.1.2 FROZEN PLANNING REQUIREMENTS: The contractor is responsible for developing manufacturing planning. Review and control of these plans will be the responsibility of the Contractor's Control Board (CCB) consisting of qualified personnel equipped with adequate resources to assure development of complete, reliable, and traceable documentation. Parts manufactured utilizing these plans shall meet all contractual requirements. Plans developed for FSPs shall be frozen when:

a. In the case of FSPs not requiring engineering testing, under the first production contract for the FSP at such time a successful First Article Test is completed, or at the start of production if FAT is not required.

b. In the case of FSPs requiring engineering test, at the time articles are manufactured which successfully meet the engineering test requirements.

Once frozen, plans shall remain frozen throughout the existing contract and all subsequent contracts for the item unless changes to the planning are made in accordance with this standard.

6.1.3 CHANGES TO FROZEN PLANNING: The portion of the frozen manufacturing plan pertaining to a CC shall not be changed without prior CCB recommendation, justification to AMCOM, and receipt of approval by the Procuring Contracting Officer (PCO). Changes not affecting critical characteristics or occurring as the result of an AMCOM approved Engineering Change Proposal (ECP), require CCB approval only.

All changes to frozen planning affecting CCs will be submitted to AMCOM. When the item, CC, or process is produced by a subcontractor, the planning shall be reviewed and approved by the contractor, and be subject to the same restrictions as above.

6.2 AUDITS: Contractors are to perform self-audits of their frozen planning when that planning applies to CCs produced or verified in house. At a minimum, audits will be performed at the start of each production contract, annually, and when process changes occur. It is incumbent upon the prime contractor to assure that subcontractors accomplish self-audits, and the prime shall maintain records verifying that their vendors are in full compliance with the audit requirement. All audit findings will be recorded and corrective action will be documented.

6.3 CRITICAL CHARACTERISTICS:

6.3.1 INSPECTION OF CRITICAL CHARACTERISTICS: All CCs which can be nondestructively inspected/tested shall be subjected to 100 percent inspection by the contractor or subcontractor. Critical characteristics which require destructive testing are to be tested on a lot or batch basis, with no skip lots allowed. All inspection records shall identify the FSP part number, serial or lot number, and characteristic inspected. Critical characteristics shall be identified on the inspection records in such a manner as to draw attention to them. Inspection records shall reflect the exact readings or dimensions, date of inspection, identity of inspector, and any required inspection certification. These requirements are in addition to other contractual requirements.

6.3.2 VARIABILITY REDUCTION METHODS: Once the program demonstrates that the critical processes are statistically in control, stable, and capable, the contractor may submit to the PCO for approval its documentation with a request to implement a Statistical Process Control

(SPC) program in lieu of 100 percent inspection. This approval authority may be delegated to the Defense Contract Management Agency

(DCMA) by the PCO in which case AMCOM will be informed of any approval or suspension of SPC. At the Government's discretion, 100 percent inspection may be reinstated if the process controls prove inadequate.

6.3.3 NONCONFORMING CRITICAL CHARACTERISTICS: Nonconformances of CCs shall not be dispositioned "use as is" or "repair" through contractor action, rework to print is acceptable. Waivers or deviations may be requested as specified in the contract. Request for waivers or deviations of CCs shall be classified as critical and will be forwarded to AMCOM for approval/disapproval.

6.3.4 CONTRADICTORY CRITICAL CHARACTERISTICS: Contradictions between the AMCOM FSP Spares Technical Data Package (STDP) list of critical characteristics and the drawing/specifications shall not be resolved by the order of precedence paragraph in the STDP. The contractor shall notify the PCO immediately and any work pertaining to the critical characteristic in question shall be stopped until a written resolution to the contradiction is issued to the contractor from the PCO.

6.3.5 DELIVERED NONCONFORMANCES: Contractors shall notify the PCO immediately of any discovered nonconformances that may exist in previously delivered FSPs. Notification is required whether or not the characteristic in question has been classified as a critical characteristic. Notification shall include a description of the suspected nonconformance, contract number, part number, and affected serial numbers or lot numbers, when applicable.

6.4 RECORDS:

6.4.1 TRACEABILITY OF RECORDS: All records relating to FSPs shall be traceable to the date and place of production. Records shall provide the degree of traceability required to enable subsequent verification of all aspects of material, manufacture, special process, personnel certification, variability control charts (if applicable), assembly, and inspection of CCs. Special processes include but are not limited to heat treat, shotpeening, and nondestructive testing.

22 60

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

6.4.2 PURCHASING RECORDS: All purchase orders for subcontracted products or processes that contain CCs must clearly identify the CC and reference this document for compliance. All documents and referenced data for FSPs shall be available for review by the Government to determine compliance.

6.4.3 RETENTION OF RECORDS: The contractor shall retain copies of all records generated pursuant to this standard and make these records available to the Government upon request. Records shall be retained for a period of at least five years after the contractor ceases to manufacture the part for which this standard applies. At the end of this period, or in the event of relocation or shutdown, all records shall be offered to the PCO prior to disposal.

6.5 CERTIFICATION OF PERSONNEL: Contractor personnel performing work or having inspection responsibilities pertaining to CCs, shall be certified to the appropriate professional level as outlined in the applicable national standards, best commercial practices, or as contractually required. A system for tracking personnel certification shall be an element in the contractor internal audit program to assure all certifications are maintained in a current status.

6.6 TOLERANCE OF MEASURING & TEST EQUIPMENT (M&TE): M&TE used to inspect FSPs must be discriminate to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.