SPRRA118R0040.pdf
PDF 142 KB Posted
- Attached to
- HUB, ROTOR, HELICOPTER Federal contract opportunity
- Solicitation number
- SPRRA1-18-R-0040
- Issued by
- Defense Logistics Agency Aviation
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRRA118R0040-Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
SPRRA1-18-R-0040
X
2018FEB01
2018MAR05
DOA1
2018FEB01 SEE SCHEDULE
SPRRA1
DEFENSE LOGISTICS AGENCY
5201 MARTIN ROAD/DLA-AVN-AH
REDSTONE ARSENAL AL 35898-7340
LASHONDRA ELLIS
(256)955-5331
DLA-AVN
LASHONDRA.ELLIS@DLA.MIL
1 62
X 1
X 4
X 17 X 18
X 20
X 22
X 31
X 42
X 43
X 51
X 61
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: LASHONDRA ELLIS
Buyer Office Symbol/Telephone Number: DLA-AVN/(256)955-5331
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A-1. THIS REQUIREMENT IS FOR LIMITED SOURCE TO ROTAIR INDUSTRIES, INC., CAGE 54878 , AEREX MANUFACTURING, INC., CAGE 5K840, AND SIKORSKY
AIRCRAFT CORPORATION, CAGE 78286, IAW 10 U.S.C. 2304 (c)(1) FAR 6.302-1(a)(2) A LIMITED NUMBER OF RESPONSIBLE SOURCES, AND NO OTHER
TYPE OF SUPPLIES OR SERVICES WILL SATISFY AGENCY REQUIREMENTS, FULL AND OPEN COMPETITION.
A-2. THIS REQUIREMENT IS IN SUPPORT OF THE UH-60 BLACKHAWK WEAPON SYSTEM.
A-3. FLIGHT SAFETY/CRITICAL SAFETY ITEM (CSI) IS NOT REQUIRED
A-4. PRODUCTION LOT TESTING (PLT) IS NOT REQUIRED.
A-5. FIRST ARTICLE TEST (FAT) IS REQUIRED
A-6. FAT UNIT SHALL NOT BE RETAINED AS A MATERIAL STANDARD. TEST ITEM WILL NOT BE DESTROYED AS PART OF TESTING.
A-7. SNRR MARKINGS ARE REQUIRED.
A-8. TAMMS-A ARE REQUIRED.
A-9. IUID MARKINGS ARE NOT REQUIRED.
A-10. ARMS EXPORT CONTROL IS APPLICABLE THE TECHNICAL DATA PACKAGE PROVIDED ON CD CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22 U.S.C., SEC 2751 ET SEQ.) OR EXECUTIVE ORDER 12470. VIOLATION OF THESE EXPORT LAWS ARE SUBJECT TO
SEVERE CRIMINAL PENALTIES.
A-11. THIS IS A FIVE (5)YEAR INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ), FIRM FIXED PRICE EFFORT. FUNDS WILL BE OBLIGATED UPON THE
ISSUANCE OF THE DELIVERY ORDER.
A-12. CONTRACTOR POINT OF CONTACT:
NAME: ___________________________________
TELEPHONE NUMBER: ___________________________________
E-MAIL ADDRESS: ________________________________________
A-13. DCMA ACO POINT OF CONTACT:
NAME: ___________________________
TELEPHONE NUMBER: ______________________________
E-MAIL ADDRESS: _______________________________________________
A-14. CONTRACT SPECIALIST POINT OF CONTACT:
NAME: _LASHONDRA T. ELLIS __________________
OFFICE SYMBOL: DLA-AVN-AHA ___________
TELEPHONE NUMBER: _256-955-5331_______ ____________
E-MAIL ADDRESS: __LASHONDRA.ELLIS@DLA.MIL_ _______________________
A-15. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.
A.16. REVERSE AUCTION EVALUATION IS INCLUDED ON THIS REQUIREMENT, REFER TO REVERSE AUCTION NOTICE IN SECTION L.
A-17. CONTRACTOR FIRST ARTICLE TEST
Number of samples to be tested = _1_ _
Deliver FOB: Destination
Inspection: Origin
Acceptance: Origin
BY: _348 DACA__ ________
Ship To: ATTN: DLA Aviation Huntsville Post Award Team
2 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
5201 Martin Road
Redstone Arsenal, Alabama 35898
(With an information copy to the Administering Contracting Officer)
Or
Email To: DLAHSVPostAwardTeam@dla.mil
Delivery Schedule:
348 Days ARO: Contractor First Article completed and Report Submission
30 Days: Government Review and Notification to Contractor
162 DAFAA: Delivery of Production Units
540 DARO
FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE TESTED IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON A MUTUALLY AGREED UPON DATE BETWEEN
THE GOVERNMENT AND THE CONTRACTOR. THE DATE SHALL OCCUR WITH ENOUGH TIME IN ADVANCE TO BEGIN SCHEDULED DELIVERIES 540 DACA. THE _________
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING 30 DAYS PRIOR TO THE PROPOSED DATE OF FIRST ARTICLE TESTING. THE FIRST
ARTICLE TEST REPORT IS DUE 15 DAYS AFTER FAT. THE PREFERRED METHOD OF TRANSMITTAL IS CD. THE GOVERNMENT HAS 30 DAYS TO
APPROVE/DISAPPROVE THE TEST REPORT.
NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403-3, RELATIVE TO THE REQUIREMENTS FOR OBTAINING OTHER
THAN CERTIFIED COST OR PRICING DATA. IF THIS IS CONSIDERED TO BE A SOLE SOURCE REQUIREMENT, YOU ARE REQUIRED TO SUBMIT OTHER THAN COST
AND PRICING DATA, IF REQUESTED. OFFEROR MAY USE THEIR OWN FORMAT TO PROVIDE, AT A MINIMUM, A BREAKDOWN OF ALL THE COST ELEMENTS TO
INCLUDE PROFIT/FEE WHICH COMPRISE THE TOTAL PROPOSED PRICE OR SALES HISTORY. FAILURE TO PROVIDE OTHER THAN COST AND PRICING DATA IF
REQUESTED WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE.
FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED FOR
PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE
THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION
AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN
DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN
PART, AS APPROPRIATE.
*** END OF NARRATIVE A0001 ***
3 62
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
THIS IS A FIVE YEAR INDEFINITE DELIVERY INDEFINITE
QUANTITY (IDIQ) SOLICITATION. FUNDS WILL BE
OBLIGATED/CITED UPON THE ISSUANCE OF EACH DELIVERY
ORDER. THE GOVERNMENT WILL ONLY BE OBLIGATED TO
ORDER THE STATED MINIMUM QUANTITY. THE GOVERNMENT
IS NOT OBLIGATED TO ISSUE ANY ADDITIONAL ORDERS
AGAINST THIS CONTRACT; HOWEVER, THE GOVERNMENT
RESERVES THE RIGHT TO ORDER UP TO THE MAXIMUM
QUANTITY.
THE GOVERNMENT HAS SEGREGATED THE POTENTIAL
QUANTITIES INTO FIVE YEARS. HOWEVER, THIS DOES NOT
PRECLUDE EXERCISING ITS RIGHTS UNDER FAR 52.216-19
BY ORDERING THE MAXIMUM QUANTITY SPECIFIED IN FAR
52.216-19(B)(1) AT ANY TIME DURING THE INDEFINITE
QUANTITY PERIOD. THE GOVERNMENT'S MINIMUM QUANTITY
TO BE AWARDED SIMULTANEOUSLY WITH THE AWARD OF THE
BASIC CONTRACT IS 100 EACH MINIMUM OR UP TO 500
EACH MAXIMUM.
THE INITIAL DELIVERY ORDER WILL MEET OR EXCEED THE
MINIMUM QUANTITY AT THE FIRST YEAR PRICING. THE
GOVERNMENT'S MINIMUM DELIVERY ORDER QUANTITY DURING
THE INDEFINITE QUANTITY PERIOD IS 70 EACH AT A RATE
OF 25 PER MONTH. THE GOVERNMENT'S MAXIMUM
DELIVERY ORDER QUANTITY DURING THE INDEFINITE
QUANTITY PERIOD IS 500 EACH AT A RATE OF 25 PER
MONTH.
PRICES QUOTED FOR EACH YEAR WILL BE VALID FOR ALL
QUANTITIES ORDERED DURING THAT ORDERING PERIOD.
THE SOLICITATION IS FOR THE SUPPLIES AS DETAILED ON
THE FOLLOWING PAGES. OFFERORS ARE CAUTIONED TO
INSURE THAT OFFERS ARE PROVIDED ON ALL QUANTITIES.
FAILURE TO PROPOSE ALL CLINS, WILL RESULT IN A
DETERMINATION OF NON-RESPONSIVENESS.
YEAR 1 WILL BE FROM DATE OF AWARD THROUGH DAY 365
DAYS AFTER RECEIPT OF ORDER (DARO).
YEAR 2 WILL BEGIN 366 DARO AND END 730 DARO.
YEAR 3 WILL BEGIN 731 DARO AND END 1,095 DARO.
YEAR 4 WILL BEGIN 1096 DARO AND END 1,460 DARO.
YEAR 5 WILL BEGIN 1461 DARO AND END 1,825 DARO.
THE CONTRACTOR SHALL PROVIDE UNIT PRICES FOR EACH
CLIN BELOW.
ALL REFERENCES TO F.O.B. ORIGIN THROUGHOUT THIS
SOLICITATION APPLY ONLY TO ALL QUANTITIES ORDERED
AFTER THE FIRST ORDERING PERIOD.
THE ESTIMATED (E) QUANTITY LISTED HEREIN DOES NOT
COMMIT THE GOVERNMENT TO ORDER THAT OR ANY QUANTITY
ABOVE THE MINIMUM QUANTITY.
4 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative A001)
APPROVED SOURCES:
ROTAIR INDUSTRIES, INC., CAGE 54878
AEREX MANUFACTURING, INC., CAGE 5K840
SIKORSKY AIRCRAFT CORPORATION, CAGE 78286
AS A RESULT OF THIS SOLICITATION EITHER CLIN 0001AA
OR 0001AB WILL BE AWARDED.
IF CLIN 0001AA IS AWARDED WITH THE FIRST DELIVERY
ORDERS, ANY SUBSEQUENT DELIVERIES ORDERS UNDER THE
FIRST YEAR ORDERING PERIOD WILL BE AWARDED UNDER
CLIN 0001AB.
(End of narrative A002)
0001 HUB,ROTOR,HELICOPTE
NSN: 1615-01-083-6812
Mfr CAGE: 81996
Mfr Part Number: 70102-11101-042
0001AA PRODUCTION QTY W/FIRST ARTICLE TESTING 100 (E) EA $ $ ______________________________________ ______________ __________________
COMMODITY NAME: HUB,ROTOR,HELICOPTE
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 70102-11101-042
REVISION: 3
STDP 70102-11101 REVISION P
SS70102-11101 REVISION H
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
5 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
LEVEL PRESERVATION: Military
LEVEL PACKING: B
**ADDITIONAL PACKAGING REQUIREMENTS**
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [22.7]
LN [22.0]
WD [22.0]
DP [11.0]
ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15
COMPLIANT.
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [41]
JII/CD [1]
JIII/PM [00]
JIV/WM [GB]
JV/CD [NA]
JVI/CT [B]
JVII/UC [ED]
JVII/IC [00]
JIX/A/PK [F]
JX/SM [00]
JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Government Approval/Disapproval Days: 30
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W25G1U) SU W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND,PA,17070-5002
DELIVERIES SHALL COMMENCE 540 DAYS AFTER THE DATE
OF DELIVERY ORDER AWARD AT A RATE OF 25 EACH PER
MONTH.
FOR DELIVERIES TO NEW CUMBERLAND ARMY DEPOT
(W25G1U) ANNOTATE COMMERCIAL AND GOVERNMENT TRUCK
BILLS OF LADING: DELIVERY THROUGH SOUTH GATE ONLY,
BUILDING MISSION DOOR 113, 134. CARRIER TO CALL
(717) 770- 6969/7172 FOR APPOINTMENT 24 HOURS IN
ADVANCE OF DELIVERY. APPOINTMENT HOURS: MONDAY
THROUGH FRIDAY BETWEEN 0800-1600.
6 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative F001)
0001AB PRODUCTION QTY W/OUT FIRST ARTICLE TESTING 100 (E) EA $ $ __________________________________________ ______________ __________________
COMMODITY NAME: HUB,ROTOR,HELICOPTE
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 70102-11101-042
REVISION: 3
STDP 70102-11101 REVISION P
SS70102-11101 REVISION H
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
**ADDITIONAL PACKAGING REQUIREMENTS**
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [22.7]
LN [22.0]
WD [22.0]
DP [11.0]
ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15
COMPLIANT.
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [41]
JII/CD [1]
JIII/PM [00]
JIV/WM [GB]
JV/CD [NA]
JVI/CT [B]
JVII/UC [ED]
JVII/IC [00]
JIX/A/PK [F]
JX/SM [00]
JVIIIA/OPI [M]
(End of narrative D001)
7 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W25G1U) SU W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND,PA,17070-5002
DELIVERIES SHALL COMMENCE 360 DAYS AFTER THE DATE
OF DELIVERY ORDER AWARD AT A RATE OF 25 EACH PER
MONTH.
FOR DELIVERIES TO NEW CUMBERLAND ARMY DEPOT
(W25G1U) ANNOTATE COMMERCIAL AND GOVERNMENT TRUCK
BILLS OF LADING: DELIVERY THROUGH SOUTH GATE ONLY,
BUILDING MISSION DOOR 113, 134. CARRIER TO CALL
(717) 770-6969/7172 FOR APPOINTMENT 24 HOURS IN
ADVANCE OF DELIVERY. APPOINTMENT HOURS: MONDAY
THROUGH FRIDAY BETWEEN 0800-1600.
(End of narrative F001)
0002 HUB,ROTOR,HELICOPTE
NSN: 1615-01-083-6812
Mfr CAGE: 81996
Mfr Part Number: 70102-11101-042
0002AA PRODUCTION QTY YEAR 2 100 (E) EA $ $ _____________________ ______________ __________________
COMMODITY NAME: HUB,ROTOR,HELICOPTE
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 70102-11101-042
REVISION: 3
STDP 70102-11101 REVISION P
SS70102-11101 REVISION H
(End of narrative C001)
8 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
**ADDITIONAL PACKAGING REQUIREMENTS**
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [22.7]
LN [22.0]
WD [22.0]
DP [11.0]
ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15
COMPLIANT.
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [41]
JII/CD [1]
JIII/PM [00]
JIV/WM [GB]
JV/CD [NA]
JVI/CT [B]
JVII/UC [ED]
JVII/IC [00]
JIX/A/PK [F]
JX/SM [00]
JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
DELIVERIES SHALL COMMENCE 360 DAYS AFTER THE DATE
OF DELIVERY ORDER AWARD AT A RATE OF 25 EACH PER
MONTH.
(End of narrative F001)
9 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0003 HUB,ROTOR,HELICOPTE
NSN: 1615-01-083-6812
Mfr CAGE: 81996
Mfr Part Number: 70102-11101-042
0003AA PRODUCTION QTY YEAR 3 100 (E) EA $ $ _____________________ ______________ __________________
COMMODITY NAME: HUB,ROTOR,HELICOPTE
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 70102-11101-042
REVISION: 3
STDP 70102-11101 REVISION P
SS70102-11101 REVISION H
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
**ADDITIONAL PACKAGING REQUIREMENTS**
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [22.7]
LN [22.0]
WD [22.0]
DP [11.0]
ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15
COMPLIANT.
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [41]
JII/CD [1]
JIII/PM [00]
JIV/WM [GB]
JV/CD [NA]
JVI/CT [B]
JVII/UC [ED]
JVII/IC [00]
JIX/A/PK [F]
10 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
JX/SM [00]
JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
DELIVERIES SHALL COMMENCE 360 DAYS AFTER THE DATE
OF DELIVERY ORDER AWARD AT A RATE OF 25 EACH PER
MONTH.
(End of narrative F001)
0004 HUB,ROTOR,HELICOPTE
NSN: 1615-01-083-6812
Mfr CAGE: 81996
Mfr Part Number: 70102-11101-042
0004AA PRODUCTION QTY YEAR 4 100 (E) EA $ $ _____________________ ______________ __________________
COMMODITY NAME: HUB,ROTOR,HELICOPTE
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 70102-11101-042
REVISION: 3
STDP 70102-11101 REVISION P
SS70102-11101 REVISION H
(End of narrative C001)
11 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
**ADDITIONAL PACKAGING REQUIREMENTS**
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [22.7]
LN [22.0]
WD [22.0]
DP [11.0]
ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15
COMPLIANT.
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [41]
JII/CD [1]
JIII/PM [00]
JIV/WM [GB]
JV/CD [NA]
JVI/CT [B]
JVII/UC [ED]
JVII/IC [00]
JIX/A/PK [F]
JX/SM [00]
JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
DELIVERIES SHALL COMMENCE 360 DAYS AFTER THE DATE
OF DELIVERY ORDER AWARD AT A RATE OF 25 EACH PER
MONTH.
(End of narrative F001)
12 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0005 HUB,ROTOR,HELICOPTE
NSN: 1615-01-083-6812
Mfr CAGE: 81996
Mfr Part Number: 70102-11101-042
0005AA PRODUCTION QTY YEAR 5 100 (E) EA $ $ _____________________ ______________ __________________
COMMODITY NAME: HUB,ROTOR,HELICOPTE
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 70102-11101-042
REVISION: 3
STDP 70102-11101 REVISION P
SS70102-11101 REVISION H
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
**ADDITIONAL PACKAGING REQUIREMENTS**
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [22.7]
LN [22.0]
WD [22.0]
DP [11.0]
ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15
COMPLIANT.
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [41]
JII/CD [1]
JIII/PM [00]
JIV/WM [GB]
JV/CD [NA]
JVI/CT [B]
JVII/UC [ED]
JVII/IC [00]
JIX/A/PK [F]
JX/SM [00]
13 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
DELIVERIES SHALL COMMENCE 360 DAYS AFTER THE DATE
OF DELIVERY ORDER AWARD AT A RATE OF 25 EACH PER
MONTH.
(End of narrative F001)
0006 FIRST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** _________________________ ______________ __________________
COMMODITY NAME: FIRST ARTICLE TEST REPORT
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 AS REQUIRED
FOB POINT: Destination
SHIP TO:
(SPRRA1) DLA AVIATION AT HUNTSVILLE, AL
DLR PROCUREMENT OPERATIONS (AH)
5201 MARTIN ROAD
14 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
REDSTONE ARSENAL,AL,35898-7340
FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE
TESTED IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON
A MUTUALLY AGREED UPON DATE BETWEEN THE
GOVERNMENT AND THE CONTRACTOR. THE DATE SHALL OCCUR
WITH ENOUGH TIME IN ADVANCE TO BEGIN SCHEDULED
DELIVERIES 540 DACA. THE CONTRACTOR SHALL NOTIFY
THE CONTRACTING OFFICER IN WRITING 30 DAYS PRIOR TO
THE PROPOSED DATE OF FIRST ARTICLE TESTING. THE
FIRST ARTICLE TEST REPORT IS DUE 15 DAYS AFTER FAT.
THE PREFERRED METHOD OF TRANSMITTAL IS CD. THE
GOVERNMENT HAS 30 DAYS TO APPROVE/DISAPPROVE THE
TEST REPORT.
(End of narrative F001)
0007 CONTRACT DATA REQUIREMENTS LIST _______________________________
A001 THE ARMY MAINTENANCE MANAGEMENT SYSTEM-AVIATION 1 EA $ ** NSP ** $ ** NSP ** _______________________________________________ ______________ __________________
COMMODITY NAME: HUB,ROTOR,HELICOPTE
Description/Specs./Work Statement _________________________________
PROCUREMENT DOCUMENTATION TITLE:
DI-SESS-81758A
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 AS REQUIRED
FOB POINT: Destination
SHIP TO:
(W81D17) W0H9 US ARMY AVN & MISSILES CMD
MAINTENANCE INFO OP BRANCH MIO
SPARKMAN CIR BLDG 5301 2ND FLOOR
REDSTONE ARSENAL AL 35898-5230
15 62
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A002 SERIAL NUMBER REQUIREMENT REPORTING 1 EA $ ** NSP ** $ ** NSP ** ___________________________________ ______________ __________________
COMMODITY NAME: HUB,ROTOR,HELICOPTE
Description/Specs./Work Statement _________________________________
PROCUREMENT DOCUMENTATION TITLE:
DI-SESS-81759A
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 AS REQUIRED
FOB POINT: Destination
SHIP TO:
(W81D17) W0H9 US ARMY AVN & MISSILES CMD
MAINTENANCE INFO OP BRANCH MIO
SPARKMAN CIR BLDG 5301 2ND FLOOR
REDSTONE ARSENAL AL 35898-5230
16 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
Quality systems -- Model for quality assurance and design, development, production, installation and servicing, American National
Standards Institute/American Society for Quality Control ANSI/ISO/ASQ 9001:2008, AS 9100 Or Equivalent, Tailoring: All Paragraphs Under
7.3 (DESIGN AND DEVELOPMENT) DO NOT APPLY.
Contractor must identify below the title, number (if any), date, and tailoring (if any) of the specific system(s) that will be used to satisfy this requirement.
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E06 Inspection and Acceptance at Origin (SEP 2016)
The contractor shall indicate the location where supplies will be inspected:
Commercial and Government Entity (CAGE) code:___________________________
Address:
Applicable to contract line-item numbers(s) (CLIN(s)):__________________
The contractor shall indicate the location where packaging will be inspected:
( ) Same as for supplies OR
CAGE code: ________________________________________________________________________
Address: ________________________________________________________________________
Applicable to CLIN(s): ________________________________________________________________________
*** END OF NARRATIVE E0001 ***
17 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
F-2 52.242-15 STOP-WORK ORDER AUG/1989
F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-4 52.247-34 F.O.B. DESTINATION NOV/1991
F-5 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
F-6 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984
F-7 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
0001AA 100(E) 540 DARO
0001AB 100(E) 540 DARO
0002AA 100(E) 540 DARO
0003AA 100(E) 540 DARO
0004AA 100(E) 540 DARO
0005AA 100(E) 540 DARO
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
0001AA 100(E) ___ DARO
0001AB 100(E) ___ DARO
0002AA 100(E) ___ DARO
0003AA 100(E) ___ DARO
0004AA 100(E) ___ DARO
0005AA 100(E) ___ DARO
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding
18 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of Clause)
F-8 52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT SEP/2000
(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of TBD AT THE TIME OF AWARD per calendar day of delay.
(b) If the Government terminates this contract in whole or in part under the Default -- Fixed-Price Supply and Service clause, the
Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default -- Fixed-Price Supply and Service clause in this contract.
(End of Clause)
19 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION G - CONTRACT ADMINISTRATION DATA
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS MAY/2013
(a) Definitions. As used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this
Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
COMBO
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
ORIGIN/ORIGIN
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD
Issue By DoDAAC SPRRA1
Admin DoDAAC TBD
Inspect By DoDAAC TBD
Ship To Code TBD
Ship From Code TBD
Mark For Code TBD
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC TBD
Other DoDAAC(s) TBD
20 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email
Notifications" field of WAWF once a document is submitted in the system.
N/A
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
N/A
(2) For technical WAWF help, contact the WAWF helpdesk at 866-
618-5988.
(End of clause)
21 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION H - SPECIAL CONTRACT REQUIREMENTS
52.209-4005 SOURCES ELIGIBLE FOR AWARD CONSIDERATION____________________________________________________
(a) Competition under this solicitation is restricted to the following sources:
(1) Approved Sources listed in Section B -- sources that have been approved by the prime manufacturer or the Government for supply of item(s) listed in this solicitation, to assure the requisite safe, dependable, effective operation and support of military equipment;
(2) Sources that have been approved prior to award -- other than approved sources listed in Section B;
(3) Non-manufacturers--offers from non-manufacturers (distributors) will only be considered for award if the required item(s) is new material and has been or will be obtained from a source of supply which has been approved prior to award. The source and part number of the item the offeror intends to supply must be stated in the offer.
(4) Surplus Dealers--offerors of Government surplus in accordance with Section I clause entitled "Material Requirements, FAR 52.211-5, will only be considered for award if the former Government surplus or residual inventory resulting from terminated contracts was originally manufactured by an approved source of supply.
(b) Only offers submitted by the above sources will be considered for award under this solicitation.
(c) Offerors (prospective manufacturers or non-manufacturers [distributors]) who wish to become an approved source of supply for an item listed in this solicitation should proceed per the instructions set forth in paragraph (d) below. It is noted that offeror requests for source approval in conjunction with this procurement will not be a cause for delay in this solicitation action. However, if it is determined that additional sources will clearly benefit the Government and that any delay incident to their approval would not impact readiness, a reasonable delay may be entertained. Whether or not such delay will occur will be solely at the discretion of the
Government, and the time set for opening of the Invitation for Bids or the closing date of the Request for Proposals may or may not be extended. An extension will be witnessed by issuance of an amendment to this solicitation.
(d) Offerors (prospective manufacturers or non-manufacturers [distributors]) seeking to obtain source approval, must submit a Source
Approval Request (SAR) package, for review and approval, to the Engineering Directorate (ED), Quality Engineering Division. Source approval must be obtained prior to being considered for contract award. Approvals are made on an individual part number basis for a specific manufacturing location (CAGE). Firms are encouraged to seek source approval in order to compete for future solicitations by following the SAR submission guidance provided on the website http://amcomdmz.redstone.army.mil/casl_cmo/casldba.casl_cmo_samsar.
Questions concerning SAR submissions can be directed to the ED SAR Team at EDSAR@amrdec.army.mil or call the SAR Team at 256-313-8978, 256-313-0341, or 256-313-8994.
(e) The Aviation and Missile Lifecycle Management Command (AMCOM) may require additional data, testing, or plant visits before it is able to completely evaluate a SAR. This may require the offeror (at no expense to the Government) to supply parts for testing, engine run up, or flight tests. In that event, the requestor will be so advised. AMCOM reserves the right to approve a contractor for award prior to completion of physical testing of the offered item. In such cases, the contractor shall perform any outstanding tests and provide all required documentation at no cost to the Government prior to entering upon full production. Lack of successful performance within the specified timeframe shall be grounds for a no cost termination.
(f) When a SAR is received, it will be processed for evaluation. If the evaluation and approval (including preparation or update of the requisite technical data package (TDP)) occurs before award, the requestor will be considered for award if a proposal was submitted per
(d) above. If the evaluation/TDP preparation has not been completed prior to award, AMCOM will continue the process until complete. If the requestors SAR becomes approved, the requestor will be eligible for consideration on all future solicitations for the item.
(g) All approval or disapproval notices shall be officially provided to the contractor by the appropriate technical official.
(h) Non-manufacturers (distributors) seeking to supply an item from a non-approved source must first ensure that the source becomes approved in accordance with (d) above prior to contract award.
52.209-4020 FIRST ARTICLE INSPECTION AND TEST - CONTRACTOR TESTED - ADDITIONAL REQUIREMENTS___________________________________________________________________________________________
a. The first article shall be inspected and tested by the contractor in accordance with the requirements of the contract. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used
22 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the
Contractor (including subcontractors) using the technical data package applicable to this procurement. If applicable, the Contractor or its subcontractor shall produce or demonstrate proof that any fixtures, tool masters, jigs, or similar devices used in the inspection and/or testing of the first article have been subjected to an initial inspection, or other suitable means supporting their accuracy, before being used in the manufacturing/production process.
b. At a minimum, first article inspection and test shall include:
(1) A 100% inspection (or as set forth in relevant specifications) of all physical and functional characteristics, to include but not limited to, any drawings, as well as any other requirements which may be set forth by other applicable specifications, or in any technical data packages, and/or any other special/functional testing as set forth in this contract;
(2) A review of parts, components and/or assemblies for compliance to identification markings;
(3) A review of packaging for compliance to preservation, packaging, packing, and marking requirements;
(4) A review for compliance within the Technical Data Package or as otherwise stated in this contract that approved manufacturing sources have been used for special processes, controlled parts, components, and/or assemblies;
(5) The verification through documented evidence that all inspection, testing, measuring and diagnostic equipment used in the inspection/test of the first article piece(s) have been subjected to an initial inspection, or other means supporting their accuracy, and are maintained in accordance with contractual calibration standards.
c. Unless otherwise specified in the contract, the contractor shall NOT retain the first article provided under this contract to serve as the manufacturing standard of acceptance.
d. A First Article Test Report (FATR) shall be prepared and submitted in accordance with FAR 52.209-3. The report will include all necessary documentation to demonstrate and support full compliance with the first article inspection and test requirements as set forth in this contract (including supplier's and vendor's inspection records and certifications, when applicable). The FATR shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specifications and/or Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contrator to allow the designated Government representative to determine that the First Article test was successfully completed.
e. Additional first article testing may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 3 years, or (iii) whenever a change occurs in place of performance, manufacturing locations or processes, material used, drawing, specification or source of supply. When conditions
(i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Should the Government require additional first article testing the Contractor may be entitled to an equitable adjustment.
52.209-4024 REQUEST FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL_________________________________________________________________
The requirement for FIRST ARTICLE APPROVAL may be waived, in whole or in part, by the Government, provided that sufficient information is provided to determine whether the request is to be approved. A partial waiver is defined as a waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP) and/or the solicitation/contract, i.e. vibration test, salt water spray test, or a test on a component or subassembly of the procured item. A full waiver is defined as a waiver of all
First Article testing as required by the TDP and/or the solicitation/contract.
All waiver requests require a First Article Waiver Worksheet to be completed and submitted to the Government along with all supporting documentation. The worksheet will be provided by the Buyer upon request. No requests will be considered if the worksheet and supporting
23 62
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
documentation are not submitted to the Government. The worksheet must be completed in its entirety. For those sections of the worksheet which do not apply, annotate with N/A (not applicable). To substantiate or clarify information provided, the Government may request additional information.
Submission of the FAT waiver request (and supporting documentation) to the Government does not guarantee that the waiver will be granted.
The First Article Waiver Worksheet and additional supporting documentation must be submitted on Company letterhead and signed by an authorized agent of the Company.
Supporting documentation.
(1) The request for waiver must be accompanied by the First Article Waiver Worksheet, and documentation in support of the request. The documentation may include, but is not limited to:
(i) Copy of the Administrative Contracting Officers (ACOs) or Procuring Contracting Officers (PCOs) letter approving a First Article
Test report on a recent contract for the same or similar item;
(ii) Copy of a First Article Test report for the same or a similar item as that solicited herein;
(iii) Copy of an ACO or PCO letter approving a prior waiver request; or
(iv) If the waiver request is based on similarity, a copy of the drawing/other appropriate technical requirements of the similar item.
(2) If a copy of a First Article Test report is submitted in support of a request for waiver, the test report must have been approved and signed by an authorized representative of the United States Government.
(3) The First Article Waiver Worksheet and all supporting documentation should be submitted by email. If the First Article Waiver
Worksheet and supporting documentation cannot be transmitted by email, the PCO should be contacted for further instruction.
Note: If a waiver is granted, an accelerated delivery schedule will apply.
Note: Cost considerations shall apply for approving a waiver or a portion thereof of a First Article Test.
52.211-4008 REVISIONS TO DRAWINGS/PART NUMBERS______________________________________________
(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the
Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.
If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.