SPRRA117R0007.pdf
PDF 152 KB Posted
- Attached to
- HOUSING ASSY, GEARBOX Federal contract opportunity
- Solicitation number
- SPRRA1-17-R-0007
- Issued by
- Defense Logistics Agency Aviation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FAI_ORIENTATION_Attachment_for_PADDS.pdf | ||
| PLT_IMPROVEMENT_LETTER.pdf | ||
| FATWAIVERWORKSHEET-RevisionC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
SPRRA1-17-R-0007
X
2017MAR01
2017APR0304:30pm
DOA1
2017MAR01 SEE SCHEDULE
SPRRA1
DEFENSE LOGISTICS AGENCY
5201 MARTIN ROAD/DLA-AVN-AH
REDSTONE ARSENAL AL 35898-7340
ALTON KING
(256)955-9300
DLA-AVN-AHAB
ALTON.KING@DLA.MIL
1 65
X 1
X 4
X 14 X 15
X 20
X 22
X 29
X 43
X 44
X 53
X 64
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: ALTON KING
Buyer Office Symbol/Telephone Number: DLA-AVN-AHAB/(256)955-9300
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A-1. This requirement is 100% Small Business Set-Aside In Accordance With (IAW) Federal Acquisition Regulation (FAR) 6.206. Only offers from Small Business firms will be considered.
A-2. This requirement is in support of the UH-60 Blackhawk Weapon System.
A-3. Flight Safety/Critical Safety Item (CSI) is not required. ___
A-4. Production Lot Testing (PLT) is not required. ___
A-5. First Article Testing (FAT) is required. __
A-6. FAT unit shall not be destroyed as part of the testing program. _________
A-7. SNRR Markings are not required. ___
A-8. TAMMS-A Markings are not required. ___
A-9. IUID Markings are not required. ___
A-10. RFID Markings are not required. ___
A-11. Casting Qualifications/Casting is required. __
A-12. Arms Export Control is applicable. __
This document contains Technical Data whose export is restricted by the Arms Export Control Act (Title
22,U.S.C., SEC 2751 ET ESQ.) or Executive Order 12470. Violation of these Export Laws are subject to severe criminal penalties.
A-13. Serial Numbering is not required. ___
A-14. Fit Check is not required. ___
A-15. This is a Five Year Indefinite Delivery Indefinite Quantity (IDIQ), Firm Fixed Price effort.
A-16. Contractor Point of Contact Information:
NAME: ___________________________________
TELEPHONE NUMBER: ___________________________________
E-MAIL ADDRESS: ________________________________________
A-17. DCMA / ACO Point of Contact Information:
NAME: ___________________________
TELEPHONE NUMBER: ______________________________
E-MAIL ADDRESS: _______________________________________________
A-18. Contract Specialist Point of Contact Information:
NAME: Alton King __________
OFFICE SYMBOL: DLA-AVN-AHAC ____________
TELEPHONE NUMBER: (256) 955-9300 ______________
E-MAIL ADDRESS: alton.king@dla.mil __________________
A-19. Reverse Auction Evaluation is included on this requiremet, Refer to DLAD Clause Section I 52.215-9023.
2 65
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A-20. First Article Test Requirements:
GOVERNMENT FIRST ARTICLE TEST_______________________________
Number of samples to be tested = 1 each
(1 - each = First Article Test with Report)
Deliver FOB: Destination
Inspection: Origin
Acceptance: Destination (By the PCO)
BY: 326 (Delivery Date of First Article)
Ship To: Lindy Grays
5201 Martin Road
Redstone Arsenal, AL 35898
Delivery Schedule:
Within Days ARO: Delivery of Government First Article(s) units
326 Days: Contractor First Article completed and Report Submission
30 Days: Government Review and Notification to Contractor
507 DAFAA: Delivery of Production Units
A-20. NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403-4, RELATIVE TO THE REQUIREMENT FOR OBTAINING
CERTIFIED COST AND PRICING DATA. IN THE EVENT THIS REQUIREMENT IS SOLE SOURCE, THE SOLE OFFEROR IS REQUIRED TO SUBMIT CERTIFIED COST AND
PRICING DATA UPON REQUEST. FAILURE TO PROVIDE CERTIFIED COST AND PRICING DATA WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE.
A-21. FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED
FOR PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE
THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION
AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN
DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN
PART, AS APPROPRIATE.
*** END OF NARRATIVE A0001 ***
3 65
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
This solicitation is 100% restricted to small businesses.
The Government will either award CLIN 0001AA or
0001AB in Order 0001 for the miniumum quantity of
140.
(End of narrative A001)
This is a five year Indefinite Delivery Indefinite
Quantity (IDIQ) Solicitation Number: SPRRA1-17-R-
0007. Funds will be obligated/cited upon the issuance of each delivery order. The Government will only be obligated to order the stated minimum quantity. The Government is not obligated to issue any additional orders against this contract; however, the Government reserves the right to order up to the maximum quantity.
The Government has segregated the potential quantities into five one-year periods. However, this does not preclude exercising its rights under FAR
52.216-19 by ordering the maximum quantity specified in FAR 52.216-19(b)(1) at any time during the indefinite quantity period.
The Government intends to award only one basic
Indefinite Delivery Indefinite Quantity contract as a result of this solicitation.
The Government's minimum quantity to be awarded simultaneously with the award of the basic contract is 140 each. The initial delivery order will meet or exceed the minimum quantity at the first year pricing. The Government's maximum quantity during the indefinite quantity period is 1000 each. The delivery order minimum order quantity is for Year 1 is 12. The delivery order minimum order quantity is for Year 1 is 18.
Prices quoted for each year will be valid for all quantities ordered during that ordering period.
The solicitation is for the supplies as detailed on the following pages. Offerors are cautioned to insure that offers are provided on all quantities.
Failure to propose all CLINs, will result in a determination of non- responsiveness.
Ordering Period 1 will be from date of award through day 365 days after contract award (DACA).
Ordering Period 2 will begin 366 DACA and end 730
DACA.
Ordering Period 3 will begin 731 DACA and end 1,095
DACA.
Ordering Period 4 will begin 1,096 DACA and end 1,460
4 65
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DACA.
Ordering Period 5 will begin 1,461 DACA and end 1,825
DACA.
The contractor shall provide unit prices for each
CLIN below.
All references to F.O.B. origin throughout this solicitation apply only to all quantities ordered after the first ordering period.
The estimated (E) quantity listed herein does not commit the Government to order that or any quantity above the minimum quantity.
(End of narrative A002)
0001 HOUSING ASSY,GEARBO
NSN: 1615-01-090-5939
Mfr CAGE: 81996
Mfr Part Number: 70351-08018-042
0001AA PRODUCTION QUANTITY WITH FAT - ORDERING PERIOD ONE 140 (E) EA $ $ __________________________________________________ ______________ __________________
COMMODITY NAME: HOUSING ASSY,GEARBO
CLIN CONTRACT TYPE:
Firm Fixed Price
FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE TESTED
IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON A
MUTUALLY AGREED UPON DATE BETWEEN THE GOVERNMENT AND
THE CONTRACTOR. THE DATE SHALL OCCUR WITH ENOUGH TIME
IN ADVANCE TO BEGIN SCHEDULED DELIVERIES 338 DACA.
THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
IN WRITIING 30 DAYS PRIOR TO THE PROPOSED DATE OF
FIRST ARTICLE TESTING. THE FIRST ARTICLE TEST REPORT
IS DUE 15 DAYS AFTER FAT. THE PREFERRED METHOD OF
TRANSMITTAL IS CD. THE GOVERNMENT HAS 30 DAYS TO
APPROVE/DISAPPROVE THE TEST REPORT.
THE FIRST ARTICLE TEST UNIT SHALL NOT BE RETAINED BY
THE CONTRACTOR AS A MANUFACTURING STANDARD.
FAR 52.209-3 ALTERNATE I IS INCLUDED UNDER WHICH THE
CONTRACTOR IS REQUIRED TO PRODUCE THE FIRST ARTICLE
AND THE PRODUCTION QUANTITY AT THE SAME FACILITY.
(End of narrative B001)
Packaging and Marking _____________________
5 65
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-2073-1 CODES, APPENDIX J
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Additional Packaging Requirements_________________________________
MIL-STD-129 markings shall apply.
All wood packing material (WPM) must be ISPM-15 compliant.
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [18]
LN [19]
WD [19]
DP [15]
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [42] JII/CD [1] JIII/PM [00] JIV/WM [EA]
JV/CD [BG] JVI/CT [F]
JVII/UC [ED] JVII/IC [00]JIX/A/PK [F] JX/SM [00]
JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Government Approval/Disapproval Days: 30
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W45H08) SR W0MU USA DEP CORPUS CHRISTI
540 FIRST ST SE BLDG 1846
CORPUS CHRISTI,TX,78419-5255
140 each will be be shipped to Corpus Christi, TX.
Delivery shall commence 338 days after receipt of award at a rate of 12 each per month until shipped complete.
(End of narrative F001)
0001AB PRODUCTION QUANTITY WITHOUT FAT - ORDERING PERIOD _________________________________________________
ONE 140 (E) EA $ $ ___ ______________ __________________
COMMODITY NAME: HOUSING ASSY,GEARBO
CLIN CONTRACT TYPE:
6 65
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-2073-1 CODES, APPENDIX J
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Additional Packaging Requirements_________________________________
MIL-STD-129 markings shall apply.
All wood packing material (WPM) must be ISPM-15 compliant.
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [18]
LN [19]
WD [19]
DP [15]
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [42] JII/CD [1] JIII/PM [00] JIV/WM [EA]
JV/CD [BG] JVI/CT [F]
JVII/UC [ED] JVII/IC [00]JIX/A/PK [F] JX/SM [00]
JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W45H08) SR W0MU USA DEP CORPUS CHRISTI
540 FIRST ST SE BLDG 1846
CORPUS CHRISTI,TX,78419-5255
140 each will be be shipped to Corpus Chrisit, TX.
Delivery shall commence 338 days after receipt of award at a rate of 12 each per month until shipped complete.
(End of narrative F001)
0002 HOUSING ASSY,GEARBO
7 65
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
NSN: 1615-01-090-5939
Mfr CAGE: 81996
Mfr Part Number: 70351-08018-042
0002AA PRODUCTION QUANTITY - ORDERING PERIOD TWO 215 (E) EA $ $ _________________________________________ ______________ __________________
COMMODITY NAME: HOUSING ASSY,GEARBO
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-2073-1 CODES, APPENDIX J
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Additional Packaging Requirements_________________________________
MIL-STD-129 markings shall apply.
All wood packing material (WPM) must be ISPM-15 compliant.
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [18]
LN [19]
WD [19]
DP [15]
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [42] JII/CD [1] JIII/PM [00] JIV/WM [EA]
JV/CD [BG] JVI/CT [F]
JVII/UC [ED] JVII/IC [00]JIX/A/PK [F] JX/SM [00]
JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
8 65
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Delivery shall commence 338 days after receipt of award at a rate of 18 each per month until shipped complete.
(End of narrative F001)
0003 HOUSING ASSY,GEARBO
NSN: 1615-01-090-5939
Mfr CAGE: 81996
Mfr Part Number: 70351-08018-042
0003AA PRODUCTION QUANTITY - ORDERING PERIOD THREE 215 (E) EA $ $ ___________________________________________ ______________ __________________
COMMODITY NAME: HOUSING ASSY,GEARBO
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-2073-1 CODES, APPENDIX J
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Additional Packaging Requirements_________________________________
MIL-STD-129 markings shall apply.
All wood packing material (WPM) must be ISPM-15 compliant.
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [18]
LN [19]
WD [19]
DP [15]
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [42] JII/CD [1] JIII/PM [00] JIV/WM [EA]
JV/CD [BG] JVI/CT [F]
JVII/UC [ED] JVII/IC [00]JIX/A/PK [F] JX/SM [00]
JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
9 65
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
Delivery shall commence 338 days after receipt of award at a rate of 18 each per month until shipped complete.
(End of narrative F001)
0004 HOUSING ASSY,GEARBO
NSN: 1615-01-090-5939
Mfr CAGE: 81996
Mfr Part Number: 70351-08018-042
0004AA PRODUCTION QUANTITY - ORDERING PERIOD FOUR 215 (E) EA $ $ __________________________________________ ______________ __________________
COMMODITY NAME: HOUSING ASSY,GEARBO
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-2073-1 CODES, APPENDIX J
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Additional Packaging Requirements_________________________________
MIL-STD-129 markings shall apply.
All wood packing material (WPM) must be ISPM-15 compliant.
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [18]
LN [19]
WD [19]
DP [15]
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [42] JII/CD [1] JIII/PM [00] JIV/WM [EA]
10 65
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
JV/CD [BG] JVI/CT [F]
JVII/UC [ED] JVII/IC [00]JIX/A/PK [F] JX/SM [00]
JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
Delivery shall commence 338 days after receipt of award at a rate of 18 each per month until shipped complete.
(End of narrative F001)
0005 HOUSING ASSY,GEARBO
NSN: 1615-01-090-5939
Mfr CAGE: 81996
Mfr Part Number: 70351-08018-042
0005AA PRODUCTION QUANTITY - ORDERING PERIOD FIVE 215 (E) EA $ $ __________________________________________ ______________ __________________
COMMODITY NAME: HOUSING ASSY,GEARBO
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-2073-1 CODES, APPENDIX J
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Additional Packaging Requirements_________________________________
MIL-STD-129 markings shall apply.
11 65
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
All wood packing material (WPM) must be ISPM-15 compliant.
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [18]
LN [19]
WD [19]
DP [15]
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [42] JII/CD [1] JIII/PM [00] JIV/WM [EA]
JV/CD [BG] JVI/CT [F]
JVII/UC [ED] JVII/IC [00]JIX/A/PK [F] JX/SM [00]
JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
Delivery shall commence 338 days after receipt of award at a rate of 18 each per month until shipped complete.
(End of narrative F001)
0006 FIRST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** _________________________ ______________ __________________
COMMODITY NAME: HOUSING ASSY, GEARBO
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
12 65
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 AS REQUIRED
FOB POINT: Destination
SHIP TO:
(SPRRA1) DLA AVIATION AT HUNTSVILLE, AL
DLR PROCUREMENT OPERATIONS (AH)
5201 MARTIN ROAD
REDSTONE ARSENAL,AL,35898-7340
FIRST ARTICLE TEST ITEM IS 3 DAYS. UNITS TO BE TESTED
IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON A
MUTUALLY AGREED UPON DATE BETWEEN THE GOVENRMENT AND
THE CONTRACTOR. THE DATE SHALL OCCUR WITH ENOUGH TIME
IN ADVANCE TO BEGIN SCHEDULED DELIVERIES 507 DACA.
FIRST ARTICLE TEST SHALL END 311 DACA.
THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
IN WRITING 30 DAYS PRIOR TO THE PROPOSED DATE OF
FIRST ARTICLE TESTING.
THE FIRST ARTICLE TEST REPORT IS DUE 326 DACA. THE
PREFERRED METHOD OF TRANSMITTAL IS CD. THE GOVERNMENT
HAS 30 DAYS TO APPROVE/DISAPPROVE THE TEST.
(End of narrative F001)
13 65
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-1 CONTRACTOR INSPECTION REQUIREMENTS APR/1984
E-2 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
The contractor shall comply with the higher-level quality standard titled Quality systems -- Model for quality assurance and design, development, production, installation and servicing, American National Standards Institute/American Society for Quality Control
ANSI/ISO/ASQ 9001:2008, AS 9100 Or Equivalent, Tailoring: All Paragraphs Under 7.3 (DESIGN AND DEVELOPMENT) DO NOT APPLY. Contractor must identify below the title, number (if any), date, and tailoring (if any) of the specific system(s) that will be used to satisfy this requirement.
TITLE NUMBER DATE TAILORED
(End of clause)
14 65
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
F-2 52.242-15 STOP-WORK ORDER AUG/1989
F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-4 52.247-29 F.O.B. ORIGIN FEB/2006
F-5 52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY FEB/2006
F-6 52.247-34 F.O.B. DESTINATION NOV/1991
F-7 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
F-8 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984
F-9 52.247-59 F.O.B. ORIGIN--CARLOAD AND TRUCKLOAD SHIPMENTS APR/1984
F-10 52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS JAN/1991
F-11 52.211-9 DESIRED AND REQUIRED TIME OF DELIVERY JUN/1997
(a) The Government desires delivery to be made according to the following schedule:
DESIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
0001AA 140 EA 507
0001AB 140 EA 338
0002AA 215 EA 338
0003AA 215 EA 338
0004AA 215 EA 338
0005AA 215 EA 338
If the offeror is unable to meet the desired delivery schedule, it may, without prejudicing evaluation of its offer, propose a delivery schedule below. However, the offerors proposed delivery schedule must not extend the delivery period beyond the time for delivery in the
Governments required delivery schedule as follows:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
0001AA 140 EA 507
0001AB 140 EA 338
0002AA 215 EA 338
0003AA 215 EA 338
0004AA 215 EA 338
0005AA 215 EA 338
Offers that propose delivery of a quantity under such terms or conditions that delivery will not clearly fall within the applicable required delivery period specified above, will be considered non-responsive and rejected. If the offeror proposes no other delivery schedule, the desired delivery schedule above will apply.
15 65
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
OFFERORS PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day the award is dated. Therefore, the offeror shall compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of Clause)
F-12 252.211-7006 PASSIVE RADIO FREQUENCY IDENTIFICATION JUN/2016
(a) Definitions. As used in this clause--
"Advance shipment notice" means an electronic notification used to list the contents of a shipment of goods as well as additional information relating to the shipment, such as passive radio frequency dentification (RFID) or item unique identification (IUID) information, order information, product description, physical characteristics, type of packaging, marking, carrier information, and configuration of goods within the transportation equipment.
"Bulk commodities" means the following commodities, when shipped in rail tank cars, tanker trucks, trailers, other bulk wheeled conveyances, or pipelines:
(1) Sand.
(2) Gravel.
(3) Bulk liquids (water, chemicals, or petroleum products).
(4) Ready-mix concrete or similar construction materials.
(5) Coal or combustibles such as firewood.
(6) Agricultural products such as seeds, grains, or animal feed.
"Case" means either a MIL-STD-129 defined exterior container within a palletized unit load or a MIL-STD-129 defined individual shipping container.
"Electronic Product Code\TM\ (EPC)" means an identification scheme for universally identifying physical objects via RFID tags and other means. The standardized EPC\TM\ data consists of an EPC\TM\ (or EPC\TM\ identifier) that uniquely identifies an individual object, as well as an optional filter value when judged to be necessary to enable effective and efficient reading of the EPC\TM\ tags. In addition to this standardized data, certain classes of EPC\TM\ tags will allow user-defined data. The EPC\TM\ Tag Data Standards will define the length and position of this data, without defining its content.
"EPCglobal" means a subscriber-driven organization comprised of industry leaders and organizations focused on creating global standards for the adoption of passive RFID technology.
"Exterior container" means a MIL-STD-129 defined container, bundle, or assembly that is sufficient by reason of material, design, and construction to protect unit packs and intermediate containers and their contents during shipment and storage. It can be a unit pack or a container with a combination of unit packs or intermediate containers. An exterior container may or may not be used as a shipping container.
"Palletized unit load" means a MIL-STD-129 defined quantity of items, packed or unpacked, arranged on a pallet in a specified manner and secured, strapped, or fastened on the pallet so that the whole palletized load is handled as a single unit. A palletized or skidded load is not considered to be a shipping container. A loaded 463L System pallet is not considered to be a palletized unit load. Refer to the
Defense Transportation Regulation, DoD 4500.9-R, Part II, Chapter 203, for marking of 463L System pallets.
"Passive RFID tag" means a tag that reflects energy from the reader/interrogator or that receives and temporarily stores a small amount of energy from the reader/interrogator signal in order to generate the tag response. The only acceptable tags are EPC Class 1 passive
RFID tags that meet the EPCglobal\TM\ Class 1 Generation 2 standard.
16 65
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
"Radio frequency identification (RFID)" means an automatic identification and data capture technology comprising one or more reader/interrogators and one or more radio frequency transponders in which data transfer is achieved by means of suitably modulated inductive or radiating electromagnetic carriers.
"Shipping container" means a MIL-STD-129 defined exterior container that meets carrier regulations and is of sufficient strength, by reason of material, design, and construction, to be shipped safely without further packing (e.g., wooden boxes or crates, fiber and metal drums, and corrugated and solid fiberboard boxes).
(b)(1) Except as provided in paragraph (b)(2) of this clause, the Contractor shall affix passive RFID tags, at the case- and palletized-unit-load packaging levels, for shipments of items that--
(i) Are in any of the following classes of supply, as defined in DoD 4140.1-R, DoD Supply Chain Materiel Management Regulation, AP1.1.11:
(A) Subclass of Class I--Packaged operational rations.
(B) Class II--Clothing, individual equipment, tentage, organizational tool kits, hand tools, and administrative and housekeeping supplies and equipment.
(C) Class IIIP--Packaged petroleum, lubricants, oils, preservatives, chemicals, and additives.
(D) Class IV--Construction and barrier materials.
(E) Class VI--Personal demand items (non-military sales items).
(F) Subclass of Class VIII--Medical materials (excluding pharmaceuticals, biologicals, and reagents--suppliers should limit the mixing of excluded and non-excluded materials).
(G) Class IX--Repair parts and components including kits, assemblies and subassemblies, reparable and consumable items required for maintenance support of all equipment, excluding medical-peculiar repair parts; and
(ii) Are being shipped to one of the locations listed at http://www.acq.osd.mil/log/sci/RFID_ship-to-locations.html or to--
(A) A location outside the contiguous United States when the shipment has been assigned Transportation Priority 1, or to--
(B) The following location(s) deemed necessary by the requiring activity:
Contract line, subline, or exhibit Location name City State DoDAAC line item number
0001AA CORPUS CHRISTI DEPOT CORPUS CRISTI TX W45H08
0001AB CORPUS CHRISTI DEPOT CORPUS CRISTI TX W45H08
(2) The following are excluded from the requirements of paragraph (b)(1) of this clause:
(i) Shipments of bulk commodities.
(ii) Shipments to locations other than Defense Distribution Depots when the contract includes the clause at FAR 52.213-1, Fast
Payment Procedures.
(c) The Contractor shall--
(1) Ensure that the data encoded on each passive RFID tag are globally unique (i.e., the tag ID is never repeated across two or more
RFID tags) and conforms to the requirements in paragraph (d) of this clause;
(2) Use passive tags that are readable; and
(3) Ensure that the passive tag is affixed at the appropriate location on the specific level of packaging, in accordance with MIL-STD-
129 (Section 4.9.2) tag placement specifications.
(d) Data syntax and standards. The Contractor shall encode an approved RFID tag using the instructions provided in the EPC\TM\ Tag Data
Standards in effect at the time of contract award. The EPC\TM\ Tag Data Standards are available at
17 65
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
http://www.epcglobalinc.org/standards/.
(1) If the Contractor is an EPCglobal\TM\ subscriber and possesses a unique EPC\TM\ company prefix, the Contractor may use any of the identifiers and encoding instructions described in the most recent EPC\TM\ Tag Data Standards document to encode tags.
(2) If the Contractor chooses to employ the DoD identifier, the Contractor shall use its previously assigned Commercial and Government
Entity (CAGE) code and shall encode the tags in accordance with the tag identifier details located at http://www.acq.osd.mil/log/sci/ait.html. If the Contractor uses a third-party packaging house to encode its tags, the CAGE code of the third-party packaging house is acceptable.
(3) Regardless of the selected encoding scheme, the Contractor with which the Department holds the contract is responsible for ensuring that the tag ID encoded on each passive RFID tag is globally unique, per the requirements in paragraph (c)(1) of this clause.
(e) Advance shipment notice. The Contractor shall use Wide Area WorkFlow (WAWF), as required by DFARS 252.232-7003, Electronic
Submission of Payment Requests, to electronically submit advance shipment notice(s) with the RFID tag ID(s) (specified in paragraph (d) of this clause) in advance of the shipment in accordance with the procedures at https://wawf.eb.mil/.
(End of clause)
52.211-9020 Time of Delivery Accelerated Delivery
TIME OF DELIVERY ACCELERATED (JUN 2008)
Unless otherwise authorized in the award, accelerated delivery is acceptable only if there is no additional cost or obligation to the
Government for accelerated delivery.
(End of Clause)
*** END OF NARRATIVE F0001 ***
Inspection and Acceptance at Origin (SEP 2016)
The contractor shall indicate the location where supplies will be inspected:
Commercial and Government Entity (CAGE) code: _______________________________
Address: ____________________________________________________________________
Applicable to contract line-item numbers(s) CLIN(s)): _______________________
The contractor shall indicate the location where packages will be inspected:
( ) Same as for supplies OR
CAGE code: _________________________________________________________________
Address: ___________________________________________________________________
Applicable to CLIN(s): ______________________________________________________
End of Clause
*** END OF NARRATIVE F0002 ***
18 65
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
19 65
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION G - CONTRACT ADMINISTRATION DATA
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS MAY/2013
(a) Definitions. As used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this
Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
The contractor is encouraged to use the combination invoice and receiving report (combo) for submitting invoices for supplies. This eliminates the need to separately process a receiving report and invoice.
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
Inspection: Origin
Acceptance: Origin
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD at time of award
Issue By DoDAAC SPRRA1
Admin DoDAAC TBD at time of award
Inspect By DoDAAC TBD at time of award
Ship To Code TBD at time of award
Ship From Code N/A
Mark For Code TBD at time of award
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC TBD at time of award
20 65
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Other DoDAAC(s) N/A
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email
Notifications" field of WAWF once a document is submitted in the system.
ACO, TBD AT TIME OF AWARD
CA, TBED AT TIME OF AWARD
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
ACO, TBD AT TIME OF AWARD
CA, TBED AT TIME OF AWARD
(2) For technical WAWF help, contact the WAWF helpdesk at 866-
618-5988.
(End of clause)
21 65
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION H - SPECIAL CONTRACT REQUIREMENTS
WOOD PACKING MATERIALS REQUIREMENTS___________________________________
A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for
Phytosanitary Measures (ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and
WPM Enforcement http://www.alsc.org/)
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry.
The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.
D. Replacement Preservative for Pentachlorophenol
If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or 1.8 percent copper 8 quinolinolate.
(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection
Convention Standard. The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
BAR CODE MARKINGS_________________
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
CALIBRATION___________
The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards
Institute/National Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and
Measuring and Test Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.
ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR DEVIATION, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, &__________________________________________________________________________________________________________________________________
SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS________________________________________________________________
1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for
Deviations (RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and
22 65
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.
2. F_o_r_m_a_t_._
a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.
b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.
c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using RDMR Form 523 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible
Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification Codes", and
Block 7 "Priority."
d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFD. RFDs shall be prepared using RDMR Form 527 or
RDMR Form 530 (Type I, see block 5 of the form.)
e. The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV. RFVs shall be prepared using RDMR Form 528.
f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFD/RFV proposal.
g. Classification of RFDs/RFVs.
(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance; interchangeability; reliability; survivability; maintainability; effective use or operation;
weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.
(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.
(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs g(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.
h. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.
i. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.
j.…
This is the start of the file's text. The full file is on GovTribe.