SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

SPRRA1-16-R-0074

X

2016APR13

2016MAY20

DOA1

2016APR13 SEE SCHEDULE

SPRRA1

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

TAWANA SIZEMORE

(256)955-7737

DLA-AVN-AHA

TAWANA.SIZEMORE@DLA.MIL

1 55

X 1

X 4

X 13 X 14 X 15

X 20

X 22

X 25

X 41

X 42

X 51

X 55

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: TAWANA SIZEMORE

Buyer Office Symbol/Telephone Number: DLA-AVN-AHA/(256)955-7737

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

THIS SOLICITATION IS ISSUED IN ACCORDANCE WITH FAR 6.203, THIS ACQUISITION IS LIMITED IN COMPETITION AS A 100% SMALL BUSINESS SET ASIDE

TO:BODINE TOOL AND MACHINE COMPANY, CAGE CODE: 07544

APEX MANUFACTURING COMPANY, INC CAGE CODE: 2V343

TECHNIC SPHERE SUPERPOWER, CAGE CODE: 3X771

FIRST ARTICLE TEST IS NOT REQUIRED.

SNRR AND TAMMS - A NOT REQUIRED.

THIS IS NOT A FLIGHT SAFETY/CRITICAL SAFETY PART.

SERIAL NUMBERING IS NOT REQUIRED.

IUID NOT REQUIRED.

EVALUATION OF OFFER WILL BE BASED ON THE ESTIMATED ANNUAL QUANTITY FOR EACH YEAR AND THE HIGHEST UNIT

PRICE OFFERED FOR EACH YEAR.

OFFER SHALL BE SUBMITTED INACCORDANCE WITH FAR CLAUSE 52.215-1.

FACSIMILE SUBMISSION ARE NOT AUTHORIZED. CONTRACTOR MAY E-MAIL

OFFER TO TAWANA.SIZEMORE@DLA.MIL OR MAIL TO:

DEFENSE LOGISTICS AGENCY DIRECTORATE

ATTN: TAWANA SIZEMORE

DSCR-AHA-C, BLDG 5201

REDSTONE ARSENAL, AL 35898-7340

COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: _______________________________________________

TELEPHONE: _________________________________________

FAX NUMBER: ________________________________________

E-MAIL ADDRESS: ____________________________________

THE GOVERNMENT INTENDS TO AWARD ONLY ONE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT AS A RESULT OF THIS SOLICITATION.

NO EXCESS DELIVERY SCHEDULES WILL BE ACCEPTED.

PROCUREMENT HISTORY:

CONRACT NUMBER DATE OF AWARD QTY UNIT PRICE

W58RGZ09D0057/ZB02/0005AA 9/3/2013 350 $385.00

FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED FOR

PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE

THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTOR'S RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE

COURSE OF ACTION AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMEMNDATION

2 55

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

WITHOUT WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE

TERMINATED IN WHOLE OR INPART,AS APPROPRIATE.

*** END OF NARRATIVE A0001 ***

3 55

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

APPROVED SOURCES:BODINE TOOL AND MACHINE COMPANY CAGE

CODE: 07544,

APEX MANUFACTURING COMPANY, INC CAGE CODE: 2V343,

TECHNIC SPHERE SUPERPOWER CAGE CODE: 3X771

(End of narrative A001)

THIS IS A FIVE YEAR INDEFINITE DELIVERY INDEFINITE

QUANTITY (IDIQ) SOLICITATION. FUNDS WILL BE OBLIGATED

/ CITED UPON THE ISSUANCE OF EACH DELIVERY ORDER. THE

GOVERNMENT WILL ONLY BE OBLIGATED TO ORDER THE STATED

MINIMUM QUANTITY FOR YEAR ONE. THE GOVERNMENT IS NOT

OBLIGATED TO ISSUE ANY ADDITIONAL ORDERS AGAINST THIS

CONTRACT; HOWEVER, THE GOVERNMENT RESERVES THE RIGHT

TO ORDER UP TO THE MAXIMUM QUANTITY.

THE GOVERNMENT HAS SEGREGATED THE POTENTIAL QUANTITIES

INTO FIVE YEARS. HOWEVER, THIS DOES NOT PRECLUDE

EXERCISING ITS RIGHTS UNDER FAR 52.216-19 BY

ORDERING THE MAXIMUM QUANTITY SPECIFIED IN FAR 52.216-

19(b)(1) AT ANY TIME DURING THE INDEFINITE QUANTITY

PERIOD.

THE GOVERNMENT'S MINIMUM QUANTITY TO BE AWARDED

SIMULTANEOUSLY WITH THE AWARD OF THE BASIC CONTRACT IS

125 EACH.

THE GOVERNMENT'S MAXIMUM QUANTITY DURING THE

INDEFINITE QUANTITY PERIOD IS 725 EACH. THE DELIVERY

ORDER MINIMUM ORDER QUANTITY IS 50. PRICES QUOTED FOR

EACH YEAR WILL BE VALID FOR ALL QUANTITIES ORDERED

DURING THAT YEAR.

THE GOVERNMENT REQUESTS QUANTITY BREAK (RANGE) PRICING

IN ACCORDANCE WITH THE RANGE PROVIDED IN SECTION B OF

THIS SOLICITATION.

THE SOLICITATION IS FOR THE SUPPLIES AS DETAILED ON

THE FOLLOWING PAGES. OFFERORS ARE CAUTIONED TO INSURE

THAT OFFERS ARE PROVIDED ON ALL QUANTITIES. FAILURE TO

PROPOSE ALL CLINS, WILL RESULT IN A DETERMINATION OF

NONRESPONSIVENESS.

YEAR 1 WILL BE FROM DATE OF AWARD THROUGH DAY 365 DAYS

AFTER CONTRACT AWARD (DACA).

YEAR 2 WILL BEGIN 366 DACA AND END 730 DACA.

YEAR 3 WILL BEGIN 731 DACA AND END 1,095 DACA.

YEAR 4 WILL BEGIN 1,096 DACA AND END 1,460 DACA.

YEAR 5 WILL BEGIN 1,461 DACA AND END 1,826 DACA.

THE CONTRACTOR SHALL PROVIDE UNIT PRICES FOR EACH CLIN

BELOW.

4 55

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

ALL REFERENCES TO F.O.B. ORIGIN THROUGHOUT THIS

SOLICITATION APPLY ONLY TO ALL QUANTITIES ORDERED

AFTER THE FIRST YEAR.

THE ESTIMATED (E) QUANTITY LISTED HEREIN DOES NOT

COMMIT THE GOVERNMENT TO ORDER THAT OR ANY QUANTITY

ABOVE THE MINIMUM QUANTITY.

(End of narrative A002)

0001 LINK ASSY,SCISSOR

NSN: 1560-01-132-0796

Mfr CAGE: 81996

Mfr Part Number: 70410-02456-042

0001AA YEAR ONE 125 (E) EA $ __________________ __________________

See Range Pricing

PROGRAM YEAR: 1

COMMODITY NAME: LINK ASSY,SCISSOR

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

1 125 $

126 250 $

251 375 $

376 500 $

501 625 $

626 725 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL STD 129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [0.4] LB

LN [6.0] IN

WD [4.5] IN

DP [4.5] IN

MIL-STD-129 MARKINGS SHALL APPLY.

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

MIL-STD-2073-1 CODES,

APPENDIX J:

JI/A/MP [33] JII/CD [1] JIII/PM [00] JIV/WM [GB]

5 55

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

JV/CD [NA] JVI/CT [A] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W25G1U) SU W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2001 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND,PA,17070-5002

FOR DELIVERIES TO NEW CUMBERLAND ARMY DEPOT (W25G1U) -

ANNOTATE COMMERCIAL AND GOVERNMENT TRUCK BILLS OF

LADING: DELIVERY THROUGH SOUTH GATE ONLY, BUILDING

MISSION DOOR 113, 134. CARRIER TO CALL (717) 770

6969/7172 FOR APPOINTMENT 24 HOURS IN ADVANCE OF

DELIVERY. APPOINTMENT HOURS: MONDAY THROUGH FRIDAY

BETWEEN 0800-1600.

YEAR ONE DELIVERIES SHALL COMMENCE 113 DAYS AFTER THE

DATE OF DELIVERY ORDER AWARD, AT A RATE OF 15 EACH PER

MONTH UNTIL SHIPPED COMPLETE.

ACCELERATED DELIVERY IS AUTHORIZED AT NO ADDITIONAL

COST TO THE GOVERNMENT.

(End of narrative F001)

0002 LINK ASSY,SCISSOR

NSN: 1560-01-132-0796

Mfr CAGE: 81996

Mfr Part Number: 70410-02456-042

0002AA YEAR TWO 150 (E) EA $ __________________ __________________

See Range Pricing

PROGRAM YEAR: 2

COMMODITY NAME: LINK ASSY,SCISSOR

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

1 125 $

6 55

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

126 250 $

251 375 $

376 500 $

501 600 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL STD 129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [0.4] LB

LN [6.0] IN

WD [4.5] IN

DP [4.5] IN

MIL-STD-129 MARKINGS SHALL APPLY.

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

MIL-STD-2073-1 CODES,

APPENDIX J:

JI/A/MP [33] JII/CD [1] JIII/PM [00] JIV/WM [GB]

JV/CD [NA] JVI/CT [A] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

YEAR TWO DELIVERIES SHALL COMMENCE 113 DAYS AFTER THE

DATE OF DELIVERY ORDER AWARD, AT A RATE OF 15 EACH PER

MONTH UNTIL SHIPPED COMPLETE.

ACCELERATED DELIVERY IS AUTHORIZED AT NO ADDITIONAL

COST TO THE GOVERNMENT.

(End of narrative F001)

7 55

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0003 LINK ASSY,SCISSOR

NSN: 1560-01-132-0796

Mfr CAGE: 81996

Mfr Part Number: 70410-02456-042

0003AA YEAR THREE 150 (E) EA $ __________________ __________________

See Range Pricing

PROGRAM YEAR: 3

COMMODITY NAME: LINK ASSY,SCISSOR

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

1 125 $

126 250 $

251 375 $

376 500 $

501 600 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL STD 129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [0.4] LB

LN [6.0] IN

WD [4.5] IN

DP [4.5] IN

MIL-STD-129 MARKINGS SHALL APPLY.

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

MIL-STD-2073-1 CODES,

APPENDIX J:

JI/A/MP [33] JII/CD [1] JIII/PM [00] JIV/WM [GB]

JV/CD [NA] JVI/CT [A] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

8 55

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

YEAR THREE DELIVERIES SHALL COMMENCE 113 DAYS AFTER

THE DATE OF DELIVERY ORDER AWARD, AT A RATE OF 15 EACH

PER

MONTH UNTIL SHIPPED COMPLETE.

ACCELERATED DELIVERY IS AUTHORIZED AT NO ADDITIONAL

COST TO THE GOVERNMENT.

(End of narrative F001)

0004 LINK ASSY,SCISSOR

NSN: 1560-01-132-0796

Mfr CAGE: 81996

Mfr Part Number: 70410-02456-042

0004AA YEAR FOUR 150 (E) EA $ __________________ __________________

See Range Pricing

PROGRAM YEAR: 4

COMMODITY NAME: LINK ASSY,SCISSOR

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

1 125 $

126 250 $

251 375 $

376 500 $

501 600 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL STD 129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

9 55

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

WT [0.4] LB

LN [6.0] IN

WD [4.5] IN

DP [4.5] IN

MIL-STD-129 MARKINGS SHALL APPLY.

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

MIL-STD-2073-1 CODES,

APPENDIX J:

JI/A/MP [33] JII/CD [1] JIII/PM [00] JIV/WM [GB]

JV/CD [NA] JVI/CT [A] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

YEAR FOUR DELIVERIES SHALL COMMENCE 113 DAYS AFTER THE

DATE OF DELIVERY ORDER AWARD, AT A RATE OF 15 EACH PER

MONTH UNTIL SHIPPED COMPLETE.

ACCELERATED DELIVERY IS AUTHORIZED AT NO ADDITIONAL

COST TO THE GOVERNMENT.

(End of narrative F001)

0005 LINK ASSY,SCISSOR

NSN: 1560-01-132-0796

Mfr CAGE: 81996

Mfr Part Number: 70410-02456-042

0005AA YEAR FIVE 150 (E) EA $ __________________ __________________

See Range Pricing

PROGRAM YEAR: 5

10 55

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

COMMODITY NAME: LINK ASSY,SCISSOR

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

1 125 $

126 250 $

251 375 $

376 500 $

501 600 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL STD 129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [0.4] LB

LN [6.0] IN

WD [4.5] IN

DP [4.5] IN

MIL-STD-129 MARKINGS SHALL APPLY.

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

MIL-STD-2073-1 CODES,

APPENDIX J:

JI/A/MP [33] JII/CD [1] JIII/PM [00] JIV/WM [GB]

JV/CD [NA] JVI/CT [A] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

YEAR FIVE DELIVERIES SHALL COMMENCE 113 DAYS AFTER THE

DATE OF DELIVERY ORDER AWARD, AT A RATE OF 15 EACH PER

11 55

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

MONTH UNTIL SHIPPED COMPLETE.

ACCELERATED DELIVERY IS AUTHORIZED AT NO ADDITIONAL

COST TO THE GOVERNMENT.

(End of narrative F001)

12 55

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

D-1 52.208-4700 WOOD PACKING MATERIALS REQUIREMENTS JUL/2007

A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).

B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures

(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and ouside of the United

States must meet ISPM 15 whenever WPM is used to ship DOD cargo.

(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD

HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement

Regulations (see http://www.alsc.org/).

(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.

D. Replacement Preservative for Pentachlorophenol

If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or

1.8 percent copper 8 quinolinolate.

(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated.

All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention

Standard. The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their

National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

(End of Clause)

D-2 52.247-4700 BAR CODE MARKINGS (USAAMCOM) MAY/2014

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

(End of Clause)

13 55

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

The contractor shall comply with the higher-level quality standard titled Quality systems -- Model for quality assurance and design, development, production, installation and servicing, American National Standards Institute/American Society for Quality Control

(ANSI/ASQC), International Organization for Standardization (ISO) Q9001:2000, SAE AS9100, or a Department of Defense approved quality system Single Process Initiative (SPI). Contractor must identify below the title, number (if any), date, and tailoring (if any) of the specific system(s) that will be used to satisfy this requirement.

TITLE NUMBER DATE TAILORED

(End of clause)

14 55

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989

F-2 52.242-15 STOP-WORK ORDER AUG/1989

F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

F-4 52.247-29 F.O.B. ORIGIN FEB/2006

F-5 52.247-34 F.O.B. DESTINATION NOV/1991

F-6 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

F-7 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984

F-8 52.247-59 F.O.B. ORIGIN--CARLOAD AND TRUCKLOAD SHIPMENTS APR/1984

F-9 52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS JAN/1991

F-10 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

0001AA 125 113

0002AA 150 113

0003AA 150 113

0004AA 150 113

0005AA 150 113

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFERORS PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

15 55

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Contractors date of receipt of the contract or notice of award by adding

(1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of Clause)

F-11 252.211-7006 PASSIVE RADIO FREQUENCY IDENTIFICATION SEP/2011

(a) Definitions. As used in this clause--

"Advance shipment notice" means an electronic notification used to list the contents of a shipment of goods as well as additional information relating to the shipment, such as passive radio frequency dentification (RFID) or item unique identification (IUID) information, order information, product description, physical characteristics, type of packaging, marking, carrier information, and configuration of goods within the transportation equipment.

"Bulk commodities" means the following commodities, when shipped in rail tank cars, tanker trucks, trailers, other bulk wheeled conveyances, or pipelines:

(1) Sand.

(2) Gravel.

(3) Bulk liquids (water, chemicals, or petroleum products).

(4) Ready-mix concrete or similar construction materials.

(5) Coal or combustibles such as firewood.

(6) Agricultural products such as seeds, grains, or animal feed.

"Case" means either a MIL-STD-129 defined exterior container within a palletized unit load or a MIL-STD-129 defined individual shipping container.

"Electronic Product Code\TM\ (EPC)" means an identification scheme for universally identifying physical objects via RFID tags and other means. The standardized EPC\TM\ data consists of an EPC\TM\ (or EPC\TM\ identifier) that uniquely identifies an individual object, as well as an optional filter value when judged to be necessary to enable effective and efficient reading of the EPC\TM\ tags. In addition to this standardized data, certain classes of EPC\TM\ tags will allow user-defined data. The EPC\TM\ Tag Data Standards will define the length and position of this data, without defining its content.

"EPCglobal" means a subscriber-driven organization comprised of industry leaders and organizations focused on creating global standards for the adoption of passive RFID technology.

"Exterior container" means a MIL-STD-129 defined container, bundle, or assembly that is sufficient by reason of material, design, and construction to protect unit packs and intermediate containers and their contents during shipment and storage. It can be a unit pack or a container with a combination of unit packs or intermediate containers. An exterior container may or may not be used as a shipping container.

"Palletized unit load" means a MIL-STD-129 defined quantity of items, packed or unpacked, arranged on a pallet in a specified manner and secured, strapped, or fastened on the pallet so that the whole palletized load is handled as a single unit. A palletized or skidded load is not considered to be a shipping container. A loaded 463L System pallet is not considered to be a palletized unit load. Refer to the

Defense Transportation Regulation, DoD 4500.9-R, Part II, Chapter 203, for marking of 463L System pallets.

"Passive RFID tag" means a tag that reflects energy from the reader/interrogator or that receives and temporarily stores a small amount of energy from the reader/interrogator signal in order to generate the tag response. The only acceptable tags are EPC Class 1 passive

RFID tags that meet the EPCglobal\TM\ Class 1 Generation 2 standard.

"Radio frequency identification (RFID)" means an automatic identification and data capture technology comprising one or more reader/interrogators and one or more radio frequency transponders in which data transfer is achieved by means of suitably modulated inductive or radiating electromagnetic carriers.

"Shipping container" means a MIL-STD-129 defined exterior container that meets carrier regulations and is of sufficient strength, by reason of material, design, and construction, to be shipped safely without further packing (e.g., wooden boxes or crates, fiber and metal drums, and corrugated and solid fiberboard boxes).

16 55

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(b)(1) Except as provided in paragraph (b)(2) of this clause, the Contractor shall affix passive RFID tags, at the case- and palletized-unit-load packaging levels, for shipments of items that--

(i) Are in any of the following classes of supply, as defined in DoD 4140.1-R, DoD Supply Chain Materiel Management Regulation, AP1.1.11:

(A) Subclass of Class I--Packaged operational rations.

(B) Class II--Clothing, individual equipment, tentage, organizational tool kits, hand tools, and administrative and housekeeping supplies and equipment.

(C) Class IIIP--Packaged petroleum, lubricants, oils, preservatives, chemicals, and additives.

(D) Class IV--Construction and barrier materials.

(E) Class VI--Personal demand items (non-military sales items).

(F) Subclass of Class VIII--Medical materials (excluding pharmaceuticals, biologicals, and reagents--suppliers should limit the mixing of excluded and non-excluded materials).

(G) Class IX--Repair parts and components including kits, assemblies and subassemblies, reparable and consumable items required for maintenance support of all equipment, excluding medical-peculiar repair parts; and

(ii) Are being shipped to one of the locations listed at http://www.acq.osd.mil/log/rfid/ or to--

(A) A location outside the contiguous United States when the shipment has been assigned Transportation Priority 1, or to--

(B) The following location(s) deemed necessary by the requiring activity:

Contract line, subline, or exhibit Location name City State DoDAAC line item number

00001AA SU W1A8 DLA DISTRIBUTION NEW CUMBERLAND, PA W25G1U

DDSP NEW CUMBERLAND FACILITY

2001 NORMANDY DRIVE DOOR 113 TO 134

(2) The following are excluded from the requirements of paragraph (b)(1) of this clause:

(i) Shipments of bulk commodities.

(ii) Shipments to locations other than Defense Distribution Depots when the contract includes the clause at FAR 52.213-1, Fast

Payment Procedures.

(c) The Contractor shall--

(1) Ensure that the data encoded on each passive RFID tag are globally unique (i.e., the tag ID is never repeated across two or more

RFID tags) and conforms to the requirements in paragraph (d) of this clause;

(2) Use passive tags that are readable; and

(3) Ensure that the passive tag is affixed at the appropriate location on the specific level of packaging, in accordance with MIL-STD-

129 (Section 4.9.2) tag placement specifications.

(d) Data syntax and standards. The Contractor shall encode an approved RFID tag using the instructions provided in the EPC\TM\ Tag Data

Standards in effect at the time of contract award. The EPC\TM\ Tag Data Standards are available at http://www.epcglobalinc.org/standards/.

(1) If the Contractor is an EPCglobal\TM\ subscriber and possesses a unique EPC\TM\ company prefix, the Contractor may use any of the identifiers and encoding instructions described in the most recent EPC\TM\ Tag Data Standards document to encode tags.

(2) If the Contractor chooses to employ the DoD identifier, the Contractor shall use its previously assigned Commercial and Government

Entity (CAGE) code and shall encode the tags in accordance with the tag identifier details located at

17 55

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

http://www.acq.osd.mil/log/rfid/tag_data.htm. If the Contractor uses a third-party packaging house to encode its tags, the CAGE code of the third-party packaging house is acceptable.

(3) Regardless of the selected encoding scheme, the Contractor with which the Department holds the contract is responsible for ensuring that the tag ID encoded on each passive RFID tag is globally unique, per the requirements in paragraph (c)(1) of this clause.

(e) Advance shipment notice. The Contractor shall use Wide Area WorkFlow (WAWF), as required by DFARS 252.232-7003, Electronic

Submission of Payment Requests, to electronically submit advance shipment notice(s) with the RFID tag ID(s) (specified in paragraph (d) of this clause) in advance of the shipment in accordance with the procedures at https://wawf.eb.mil/.

(End of clause)

52.246-9008 Inspection and Acceptance at Origin.

As prescribed in 46.503-90(b)(3), insert the following clause:

52.246-9008 INSPECTION AND ACCEPTANCE AT ORIGIN (NOV 2011)

(a) Inspection and acceptance are at origin.

(b) The point of acceptance will be the point of last inspection before shipment unless otherwise indicated by the offeror.

(c) The Offeror shall indicate below the location where supplies will be inspected:

Supplies:

Plant: ___________________________________

Commercial and Government entity (CAGE) code:__________________

Street: __________________________________

City/State/Zip: ______________________________

Applicable to contract line-item numbers(s) (CLIN(s)): __________________________________

(d) The Offeror shall indicate below the location where packaging will be inspected:

Packaging:

( ) Same as for supplies or, Plant: __________________________________ CAGE Code: ___________________

Street: _________________________________

City/State/Zip: _____________________________

Applicable to CLIN(s): ___________________________________________________

(e) For CLIN(s) described by manufacturer's name/code and part number:

(1) Contractor must present evidence of performance of all quality assurance requirements specified in the contract and ensure that item will serve its intended purpose by performing examinations and tests to determine (A) completeness of item, (B) absence of rust, contamination, or deterioration, (C) correct identification, (D) absence of any damage, and (E) compliance with preparation for delivery. If the Contractor is not the manufacturer of the supplies, evidence must be furnished to establish that the supplies were produced by the manufacturer.

(2) The word "manufacturer" means the actual manufacturer of each CLIN. The Governments Quality Assurance Representative may require that evidence be furnished establishing the name and address of the plant that manufactures each CLIN to ensure that a domestic product is being supplied.

(f) For CLIN(S) designated as former Government surplus (whether described by manufacturers name/code and part number, or by Military or

Federal specification or drawing), the original package markings of each item shall be verified to previous Government contract number and part number (as specified in Defense Logistics Acquisition Directive (DLAD) 52.211-9000, Section I of the award). Any deviation from this number shall be cause for rejection of the item.

(g) Additional inspection requirements may be required, based on the evaluation of the surplus offer, by the procuring activity. Such additional requirements, if necessary, will be identified before the award.

(End of Clause)

18 55

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE F0001 ***

19 55

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION G - CONTRACT ADMINISTRATION DATA

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS MAY/2013

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this

Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

Invoice and Receiving Report (Combo)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

Inspection location: Source

Acceptance location: Source

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC TBD

Issue By DoDAAC SPRRA1

Admin DoDAAC TBD

Inspect By DoDAAC TBD

Ship To Code To be determined at each delivery order

Ship From Code TBD

Mark For Code N/A

Service Approver (DoDAAC) TBD

Service Acceptor (DoDAAC) TBD

Accept at Other DoDAAC N/A

20 55

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

LPO DoDAAC N/A

DCAA Auditor DoDAAC TBD

Other DoDAAC(s) TBD

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email

Notifications" field of WAWF once a document is submitted in the system.

TBD

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

TBD

(2) For technical WAWF help, contact the WAWF helpdesk at 866-

618-5988.

(End of clause)

21 55

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

H-1 52.243-4000 ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR DEVIATION, MAR/2011

REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, &

SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS

1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for Deviations (RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.

2. Format.

a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.

b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.

c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using RDMR Form

523 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification Codes", and Block 7 "Priority."

d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFD. RFDs shall be prepared using RDMR Form 527 or RDMR Form 530 (Type I, see block

5 of the form.)

e. The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV. RFVs shall be prepared using RDMR Form 528.

f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract

Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFD/RFV proposal.

g. Classification of RFDs/RFVs.

(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance;

interchangeability; reliability; survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.

(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.

(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs g(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.

h. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.

i. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.

j. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.

k. Times allowed for technical decisions for ECP and RFD/RFV proposals will be worked out via mutual agreement between the

22 55

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Contractor and the Government.

l. The Contractor shall submit, concurrent with the ECP, a separate AMSAM-RD Form 525, "Specification Change Notice" (SCN), for each specification that would require revision if the ECP were approved.

m. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.

n. The Contractor shall utilize RDMR Form 526, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.

o. The Contractor shall utilize RDMR Form 524, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled

"WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.

3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO).

One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, RFVs or RFDs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.

4. Distribution.

a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft

Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Army Contracting Command - Redstone Website (https://wwwproc.redstone.army.mil/acquisition/forms_check.html) by ______________________________________________________________ clicking on "Forms/Checksheets." The forms are in both "Adobe Acrobat" and "Form Flow" formats. In order to access and use the forms, the user must have the "Adobe Acrobat" or "Form Flow" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO. Contractors who do not have access to the Army Contracting Command - Redstone website will need to contact the PCO, the appropriate Project Office Configuration Management Office, or the Technical Data Management Division (RDMR-SET) to have the forms sent to their facility.

b. Hard Copy Distribution of Class I or II ECPs and RFD/RFVs, For each Class I or II ECP, or each RFD/RFV that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .