SPRRA116Q0066_DUE_6_MAY_2016.pdf

PDF 71 KB Posted

Attached to
BOLT, SHEAR Federal contract opportunity
Solicitation number
SPRRA1-16-Q-0066
Issued by
Defense Logistics Agency Aviation

About this file

SOLICITATION SPRRA1-16-Q-0066 BOLT SHEAR NSN 5306-01-583-8163 Mfr CAGE 80205 Mfr Part Number MS14181-03024

View the file

Other files for this federal contract opportunity

Other files attached to BOLT, SHEAR, newest first.
File Type Posted
SPRRA116Q0066_0001.pdf PDF
FAI_ORIENTATION_Attachment.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of

(This is NOT an Order)

1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating

See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)

See Schedule

7. Delivery

FOB Other Destination

5B. For Information Call: (Name and telephone no.) (No collect calls)

8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)

See Schedule

10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.

Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. Schedule (Include applicable Federal, State, and local taxes)

Item Number (a)

Supplies/Services (b)

Quantity (c)

Unit (d)

Unit Price (e)

Amount (f)

(See Schedule)

12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage

NOTE: Additional provisions and representations are are not attached.

13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation

16. Signer

a. Name (Type or Print) b. Telephone

Area Code

c. Title (Type or Print) Number

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)

X

SPRRA1-16-Q-0066 DOA1

SPRRA1DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

RICKEY L. COOK (256)876-0303

DLA-AVN-AHA

EMAIL: RICKEY.COOK@DLA.MIL

X

2016APR25

1 37

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: RICKEY L. COOK

Buyer Office Symbol/Telephone Number: DLA-AVN-AHA/(256)876-0303

Type of Contract 1: Firm Fixed Price

Kind of Contract: Other

*** End of Narrative A0000 ***

FIRST ARTICLE TEST IS REQUIRED. ___________

THIS IS NOT A FLIGHT SAFETY/CRITICAL SAFETY PART. ______

IUID MARKINGS ARE NOT REQUIRED. ________________

SNRR AND TAMMS-A ARE NOT REQUIRED. ________________

SERIAL NUMBERING IS NOT REQUIRED. _______________

BAR CODE MARKING IS REQUIRED. ___________

PROPOSAL SHALL BE SUBMITTED IN ACCORDANCE WITH FAR PART 15.208. FACSIMILE SUBMISSIONS ARE NOT AUTHORIZED. CONTRACTOR MAY E-MAIL OFFER ___

TO RICKEY.COOK@DLA.MIL AND DLAHSVAPACHETEAM@DLA.MIL OR MAIL TO: ___________________ ________________________

DEFENSE LOGISTICS AGENCY

ATTN: RICKEY COOK

DLA AVIATION, BLDG 5201, 2ND FLOOR

REDSTONE ARSENAL, AL 35898-5280

COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: ___________________________________________________

TELEPHONE NUMBER: _______________________________________

FAX NUMBER: ____________________________________________

E-MAIL ADDRESS: ________________________________________

NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403-3 RELATIVE TO THE REQUIREMENTS FOR OBTAINING OTHER ______

THAN COST AND PRICING DATA. THIS IS NOT CONSIDERED TO BE AN INDEPENDENTLY COMPETITIVE REQUIREMENT; THEREFORE YOU ARE REQUIRED TO SUBMIT__________________________

OTHER THAN COST AND PRICING DATA WITH YOUR PROPOSAL. OFFEROR MAY USE THEIR OWN FORMAT TO PROVIDE AT A MINIMUM A BREAKDOWN OF ALL THE __________________

COST ELEMENTS TO INCLUDE PROFIT/FEE WHICH COMPRISE THE TOTAL PROPOSED PRICE OR SALES HISTORY. FAILURE TO PROVIDE OTHER THAN COST AND ____________________

PRICING DATA WITH YOUR PROPOSAL WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE._______________________________

PROPOSAL WILL BE EVALUATED IN ACCORDANCE WITH DLAD CLAUSE 52.215-9011 (SECTION M).

THIS SOLICITATION INCLUDES PROVISIONS 52.215-9023, REVERSE AUCTION. SINCE A REVERSE AUCTION MAY BE CONDUCTED, OFFERORS ARE ENCOURAGED TO

ACCESS THE PROCUREX SITE AND REVIEW THE REVERSE AUCTION HELP TUTORIALS AT://DLA.PROCUREX.COM TO LEARN MORE ABOUT HOW TO PARTICIPATE IN

AN AUCTION.

ACCELERATED DELIVERY IS ACCETABLE AT NO ADDITIONAL COST TO THE GOVERNMENT.

THE GOVERNMENT RESERVSE THE RIGHT TO AWARD THE CLINS OF THIS SOLICITATION EITHER ON THE SAME CONTRACT OR A SEPERATE CONTRACT.

THE RESULTANT CONTRACT WILL BE AWARDED SUBJECT TO CERTIFICATION OF FUNDS.

FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED FOR

PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE

THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIRMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION

2 37

SPRRA1-16-Q-0066

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN

PART, AS APPROPRIATE.

GOVERNMENT FIRST ARTICLE TEST

NUMBER OF SAMPLES TO BE TESTED = 1 EACH. ______

DELIVER FOB: DESTINATION

INSPECTION: ORIGIN

ACCEPTANCE: DESTINATION (BY THE PCO)

BY: 191 DAYS AFTER CONTRACT AWARD (DACA). ___

SHIP TO: SPRRA1 (PROCURING CONTRACTING OFFICER (PCO)) ______

DLA AVIATION AT HUNTSVILLE, AL

DLR PROCUREMENT OPERATIONS (AH)

5201 MARTIN ROAD

REDSTONE ARSENAL,AL,35898-7340

Delivery Schedule:

191 Days ARO: Delivery of Government First Article(s) units.___

*** END OF NARRATIVE A0001 ***

3 37

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

APPROVED SOURCE:

*** END OF NARRATIVE B0001 ***

4 37

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0001 BOLT, SHEAR

NSN: 5306-01-583-8163

Mfr CAGE: 80205

Mfr Part Number: MS14181-03024

THIS IS A FIVE YEAR INDEFINITE DELIVERY INDEFINITE

QUANTITY (IDIQ) CONTRACT. FUNDS WILL BE OBLIGATED

CITED UPON THE ISSUANCE OF EACH DELIVERY ORDER.

THE GOVERNMENT WILL ONLY BE OBLIGATED TO ORDER THE

STATED MINIMUM QUANTITY. THE GOVERNMENT IS NOT

OBLIGATED TO ISSUE ANY ADDITIONAL ORDERS AGAINST THIS

CONTRACT; HOWEVER, THE GOVERNMENT RESERVES THE RIGHT

TO ORDER UP TO THE MAXIMUM QUANTITY.

THE GOVERNMENT HAS SEGREGATED THE POTENTIAL

QUANTITIES INTO FIVE-ONE YEAR PERIODS. HOWEVER, THIS

DOES NOT PRECLUDE EXERCISING ITS RIGHTS UNDER FAR

52.216-19 BY ORDERING THE MAXIMUM QUANTITY SPECIFIED

IN FAR 52.216-19(b)(1) AT ANY TIME DURING THE

INDEFINITE QUANTITY PERIOD.

THE GOVERNMENT'S MINIMUM QUANTITY TO BE AWARDED

SIMULTANEOUSLY WITH THE AWARD OF THE BASIC CONTRACT

IS 1200 EACH. ____

THE GOVERNMENT'S MAXIMUM QUANTITY DURING THE

INDEFINITE QUANTITY IS 6000 EACH. THE DELIVERY ORDER ____

MINIMUM ORDER QUANTITY IS 1200 EACH. ____

PRICES QUOTED FOR EACH YEAR WILL BE VALID FOR ALL

QUANTITIES ORDERED DURING THAT YEAR. THE SOLICITATION

IS FOR THE SUPPLIES AS DETAILED ON THE FOLLOWING

PAGES. THE CONTRACTOR IS CAUTIONED TO ENSURE THAT

OFFERS ARE PROVIDED ON ALL QUANTITIES. FAILURE TO _______________

PROPOSE ALL CLINS, WILL RESULT IN A DETERMINATION OF

NON RESPONSIVENESS.

YEAR ONE WILL BE FROM DATE OF AWARD THROUGH DAY 365

DAYS AFTER CONTRACT AWARD (DACA).

YEAR TWO WILL BEGIN 366 DACA AND END 730 DACA.

YEAR THREE WILL BEGIN 731 DACA AND END 1,095 DACA.

YEAR FOUR WILL BEGIN 1,096 DACA AND END 1,460 DACA.

YEAR FIVE WILL BEGIN 1,461 AND END 1,826 DACA.

ALL REFERENCES TO F.O.B. ORIGIN THROUGHOUT THIS

SOLICITATION APPLY ONLY TO ALL QUANTITIES ORDERED

AFTER YEAR ONE.

THE ESTIMATED (E) QUANTITY LISTED DOES NOT COMMIT THE

GOVERNMENT TO ORDER THAT OR ANY QUANTITY ABOVE THE

MINIMUM QUANTITY.

5 37

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative A001)

0001AA PRODUCTION QUANTITY WITH CONTRACTOR TESTED FIRST ________________________________________________

ARTICLE 1200 EA $ _______ __________________

See Range Pricing

COMMODITY NAME: BOLT, SHEAR

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

1 1200 $

1201 2400 $

2401 3600 $

3601 4800 $

4801 6000 $

THE GOVERNMENT WILL EITHER AWARD CLIN 0001AA OR

0001AB AND INTENDS TO MAKE ONE AWARD AS A RESULT OF

THIS SOLICITATION.

(End of narrative B001)

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: MS14181-03024

REVISION: C

DATE: 28-JAN-2015

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: Minimal

**ADDITIONAL PACKAGING REQUIREMENTS**

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [1.0]

LN [3.0]

WD [3.0]

DP [3.0]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [31]

JII/CD [1]

JIII/PM [00]

JIV/WM [00]

6 37

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

JV/CD [00]

JVI/CT [0]

JVII/UC [BD]

JVII/IC [D3]

JIX/A/PK [U]

JX/SM [00]

JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W25G1U) SU W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2001 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND,PA,17070-5002

DELIVERIES SHALL COMMENCE 305 DAYS AFTER THE

DATE OF DELIVERY ORDER AWARD FOR ALL QUANTITIES

PLACED ON THE ORDER.

(End of narrative F001)

0001AB PRODUCTION QUANTITY WITHOUT CONTRACTOR TESTED _____________________________________________

FIRST ARTICLE 1200 EA $ _____________ __________________

See Range Pricing

COMMODITY NAME: BOLT, SHEAR

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

1 1200 $

1201 2400 $

2401 3600 $

3601 4800 $

4801 6000 $

THE GOVERNMENT WILL EITHER AWARD CLIN 0001AA OR

0001AB AND INTENDS TO MAKE ONE AWARD AS A RESULT OF

THIS SOLICITATION.

(End of narrative B001)

7 37

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: MS14181-03024

REVISION: C

DATE: 28-JAN-2015

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: Minimal

**ADDITIONAL PACKAGING REQUIREMENTS**

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [1.0]

LN [3.0]

WD [3.0]

DP [3.0]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [31]

JII/CD [1]

JIII/PM [00]

JIV/WM [00]

JV/CD [00]

JVI/CT [0]

JVII/UC [BD]

JVII/IC [D3]

JIX/A/PK [U]

JX/SM [00]

JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W25G1U) SU W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2001 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND,PA,17070-5002

8 37

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

DELIVERIES SHALL COMMENCE 203 DAYS AFTER THE

DATE OF DELIVERY ORDER AWARD FOR ALL QUANTITIES

PLACED ON THE ORDER.

(End of narrative F001)

0001AC FIRST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** _________________________ ______________ __________________

COMMODITY NAME: BOLT, SHEAR

CLIN CONTRACT TYPE:

Firm Fixed Price

FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE TESTED

IS 1 EACH. BEGIN TESTING 173 DAYS AFTER CONTRACT ___

AWARD (DACA). END TESTING 176 DACA. FIRST ARTICLE ___

TEST REPORT DUE 191 DACA. THE GOVERNMENT HAS 30 DAYS ___ __

TO APPROVE/DISAPPROVE THE TEST REPORT.

THE FIRST ARTICLE TEST UNIT SHALL NOT BE RETAINED BY

THE CONTRACTOR AS A MANUFACTURING STANDARD.

FAR 52.209-3 ALTERNATE I IS INCLUDED UNDER WHICH THE

CONTRACTOR IS REQUIRED TO PRODUCE THE FIRST ARTICLE

AND THE PRODUCTION QUANTITY AT THE SAME FACILITY.

(End of narrative B001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 3

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 AS REQUIRED

FOB POINT: Destination

SHIP TO:

(SPRRA1) DLA AVIATION AT HUNTSVILLE, AL

DLR PROCUREMENT OPERATIONS (AH)

5201 MARTIN ROAD

REDSTONE ARSENAL,AL,35898-7340

9 37

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0002 BOLT, SHEAR

NSN: 5306-01-583-8163

Mfr CAGE: 80205

Mfr Part Number: MS14181-03024

0002AA YEAR TWO PRODUCTION QUANTITY 1200 (E) EA $ ____________________________ __________________

See Range Pricing

COMMODITY NAME: BOLT, SHEAR

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

1 1200 $

1201 2400 $

2401 3600 $

3601 4800 $

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: MS14181-03024

REVISION: C

DATE: 28-JAN-2015

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: Minimal

**ADDITIONAL PACKAGING REQUIREMENTS**

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [1.0]

LN [3.0]

WD [3.0]

DP [3.0]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [31]

JII/CD [1]

JIII/PM [00]

JIV/WM [00]

JV/CD [00]

JVI/CT [0]

JVII/UC [BD]

JVII/IC [D3]

JIX/A/PK [U]

JX/SM [00]

10 37

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

DELIVERIES SHALL COMMENCE 203 DAYS AFTER THE

DATE OF DELIVERY ORDER AWARD FOR ALL QUANTITIES

PLACED ON THE ORDER.

(End of narrative F001)

0003 BOLT, SHEAR

NSN: 5306-01-583-8163

Mfr CAGE: 80205

Mfr Part Number: MS14181-03024

0003AA YEAR THREE PRODUCTION QUANTITY 1200 (E) EA $ ______________________________ __________________

See Range Pricing

COMMODITY NAME: BOLT, SHEAR

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

1 1200 $

1201 2400 $

2401 3600 $

3601 4800 $

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: MS14181-03024

REVISION: C

11 37

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

DATE: 28-JAN-2015

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: Minimal

**ADDITIONAL PACKAGING REQUIREMENTS**

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [1.0]

LN [3.0]

WD [3.0]

DP [3.0]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [31]

JII/CD [1]

JIII/PM [00]

JIV/WM [00]

JV/CD [00]

JVI/CT [0]

JVII/UC [BD]

JVII/IC [D3]

JIX/A/PK [U]

JX/SM [00]

JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

DELIVERIES SHALL COMMENCE 203 DAYS AFTER THE

DATE OF DELIVERY ORDER AWARD FOR ALL QUANTITIES

PLACED ON THE ORDER.

12 37

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative F001)

0004 BOLT, SHEAR

NSN: 5306-01-583-8163

Mfr CAGE: 80205

Mfr Part Number: MS14181-03024

0004AA YEAR FOUR PRODUCTION QUANTITY 1200 (E) EA $ _____________________________ __________________

See Range Pricing

COMMODITY NAME: BOLT, SHEAR

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

1 1200 $

1201 2400 $

2401 3600 $

3601 4800 $

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: MS14181-03024

REVISION: C

DATE: 28-JAN-2015

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: Minimal

**ADDITIONAL PACKAGING REQUIREMENTS**

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [1.0]

LN [3.0]

WD [3.0]

DP [3.0]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [31]

JII/CD [1]

JIII/PM [00]

13 37

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

JIV/WM [00]

JV/CD [00]

JVI/CT [0]

JVII/UC [BD]

JVII/IC [D3]

JIX/A/PK [U]

JX/SM [00]

JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

DELIVERIES SHALL COMMENCE 203 DAYS AFTER THE

DATE OF DELIVERY ORDER AWARD FOR ALL QUANTITIES

PLACED ON THE ORDER.

(End of narrative F001)

0005 BOLT, SHEAR

NSN: 5306-01-583-8163

Mfr CAGE: 80205

Mfr Part Number: MS14181-03024

0005AA YEAR FIVE PRODUCTION QUANTITY 1200 (E) EA $ _____________________________ __________________

See Range Pricing

COMMODITY NAME: BOLT, SHEAR

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

1 1200 $

1201 2400 $

14 37

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

2401 3600 $

3601 4800 $

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: MS14181-03024

REVISION: C

DATE: 28-JAN-2015

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: Minimal

**ADDITIONAL PACKAGING REQUIREMENTS**

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [1.0]

LN [3.0]

WD [3.0]

DP [3.0]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [31]

JII/CD [1]

JIII/PM [00]

JIV/WM [00]

JV/CD [00]

JVI/CT [0]

JVII/UC [BD]

JVII/IC [D3]

JIX/A/PK [U]

JX/SM [00]

JVIIIA/OPI [M]

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

15 37

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

REQUISITION.

DELIVERIES SHALL COMMENCE 203 DAYS AFTER THE

DATE OF DELIVERY ORDER AWARD FOR ALL QUANTITIES

PLACED ON THE ORDER.

(End of narrative F001)

16 37

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.209-4000 BID ["]A["] REQUIRED (USAAMCOM) OCT/1992

In order to insure being considered responsive all bidders are required to insert a price for "Bid "A" First Article Approval -

Contractor Testing Required", notwithstanding that they may furnish the information indicated in the provision in Section L entitled

"First Article Approval: Alternate Offers/Bids/Quotes".

(End of Clause)

2 52.209-4710 PRODUCTION QUANTITY WITH FIRST ARTICLE - CONTRACTOR TESTING JUN/1997

(USAAMCOM)

A first article is required but is not being procured as a separate CLIN. CLIN 0001 includes one (1) each first article and contractor testing of the first article, in accordance with FIRST ARTICLE APPROVAL - CONTRACTOR TESTING, FAR 52.209-3 (ALTERNATE I). The first article, when accepted, will become part of the production quantity. See the first article approval clause for the first article test report delivery schedule.

Since the First Article, after acceptance, will be used as part of the production units, it shall not be subjected to environmental testing unless such testing is specifically identified on the documentation as acceptance testing that must be performed on all production units. First Article inspection, at a minimum, shall include evaluation of processes, material, any related certification, surface finish, dimensional and functional requirements of the contract, applicable specifications and drawings.

(End of Clause)

17 37

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

PACKAGING AND MARKING

3 52.208-4700 WOOD PACKING MATERIALS REQUIREMENTS JUL/2007

A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).

B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures

(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and ouside of the United

States must meet ISPM 15 whenever WPM is used to ship DOD cargo.

(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD

HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement

Regulations (see http://www.alsc.org/).

(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.

D. Replacement Preservative for Pentachlorophenol

If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or

1.8 percent copper 8 quinolinolate.

(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated.

All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention

Standard. The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their

National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

(End of Clause)

4 52.247-4700 BAR CODE MARKINGS (USAAMCOM) MAY/2014

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

(End of Clause)

DELIVERIES OR PERFORMANCE

5 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989

6 52.242-15 STOP-WORK ORDER AUG/1989

7 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

8 52.247-29 F.O.B. ORIGIN FEB/2006

9 52.247-34 F.O.B. DESTINATION NOV/1991

18 37

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

10 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

11 52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS JAN/1991

12 252.211-7008 USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS SEP/2010

13 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

0001AA 1200 305

0001AB 1200 203

0002AA 1200 (E) 203

0003AA 1200 (E) 203

0004AA 1200 (E) 203

0005AA 1200 (E) 203

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFERORS PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

0001AA 1200 _______

0001AB 1200 _______

0002AA 1200 (E) _______

0003AA 1200 (E) _______

0004AA 1200 (E) _______

0005AA 1200 (E) _______

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

Contractors date of receipt of the contract or notice of award by adding

(1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of Clause)

52.211-9020 Time of Delivery Accelerated Delivery.

As prescribed in 11.404 (a)(S-90) (2)(ii), insert the following clause:

TIME OF DELIVERY ACCELERATED (JUN 2008)

Unless otherwise authorized in the award, accelerated delivery is acceptable only if there is no additional cost or obligation to the

Government for accelerated delivery.

19 37

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(End of Clause)

52.246-9008 Inspection and Acceptance at Origin.

As prescribed in 46.503-90(b)(3), insert the following clause:

INSPECTION AND ACCEPTANCE AT ORIGIN (NOV 2011)

(a) Inspection and acceptance are at origin.

(b) The point of acceptance will be the point of last inspection before shipment unless otherwise indicated by the offeror.

(c) The Offeror shall indicate below the location where supplies will be inspected:

Supplies:

Plant: ___________________________________

Commercial and Government entity (CAGE) code:__________________

Street: __________________________________

City/State/Zip: ______________________________

Applicable to contract line-item numbers(s) (CLIN(s)): __________________________________

(d) The Offeror shall indicate below the location where packaging will be inspected:

Packaging:

( ) Same as for supplies or, Plant: __________________________________ CAGE Code: ___________________

Street: _________________________________

City/State/Zip: _____________________________

Applicable to CLIN(s): ___________________________________________________

(e) For CLIN(s) described by manufacturer's name/code and part number:

(1) Contractor must present evidence of performance of all quality assurance requirements specified in the contract and ensure that item will serve its intended purpose by performing examinations and tests to determine (A) completeness of item, (B) absence of rust, contamination, or deterioration, (C) correct identification, (D) absence of any damage, and (E) compliance with preparation for delivery. If the Contractor is not the manufacturer of the supplies, evidence must be furnished to establish that the supplies were produced by the manufacturer.

(2) The word "manufacturer" means the actual manufacturer of each CLIN. The Governments Quality Assurance Representative may require that evidence be furnished establishing the name and address of the plant that manufactures each CLIN to ensure that a domestic product is being supplied.

(f) For CLIN(S) designated as former Government surplus (whether described by manufacturers name/code and part number, or by Military or

Federal specification or drawing), the original package markings of each item shall be verified to previous Government contract number and part number (as specified in Defense Logistics Acquisition Directive (DLAD) 52.211-9000, Section I of the award). Any deviation from this number shall be cause for rejection of the item.

(g) Additional inspection requirements may be required, based on the evaluation of the surplus offer, by the procuring activity. Such additional requirements, if necessary, will be identified before the award.

(End of Clause)

*** END OF NARRATIVE F0001 ***

20 37

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SPECIAL CONTRACT REQUIREMENTS

14 52.243-4000 ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR DEVIATION, MAR/2011

REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, &

SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS

1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for Deviations (RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.

2. Format.

a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.

b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.

c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using RDMR Form

523 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification Codes", and Block 7 "Priority."

d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFD. RFDs shall be prepared using RDMR Form 527 or RDMR Form 530 (Type I, see block

5 of the form.)

e. The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV. RFVs shall be prepared using RDMR Form 528.

f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract

Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFD/RFV proposal.

g. Classification of RFDs/RFVs.

(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance;

interchangeability; reliability; survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.

(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.

(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs g(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.

h. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.

i. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.

j. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.

k. Times allowed for technical decisions for ECP and RFD/RFV proposals will be worked out via mutual agreement between the

Contractor and the Government.

21 37

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

l. The Contractor shall submit, concurrent with the ECP, a separate AMSAM-RD Form 525, "Specification Change Notice" (SCN), for each specification that would require revision if the ECP were approved.

m. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.

n. The Contractor shall utilize RDMR Form 526, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.

o. The Contractor shall utilize RDMR Form 524, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled

"WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.

3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO).

One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, RFVs or RFDs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.

4. Distribution.

a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft

Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Army Contracting Command - Redstone Website (https://wwwproc.redstone.army.mil/acquisition/forms_check.html) by ______________________________________________________________ clicking on "Forms/Checksheets." The forms are in both "Adobe Acrobat" and "Form Flow" formats. In order to access and use the forms, the user must have the "Adobe Acrobat" or "Form Flow" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO. Contractors who do not have access to the Army Contracting Command - Redstone website will need to contact the PCO, the appropriate Project Office Configuration Management Office, or the Technical Data Management Division (RDMR-SET) to have the forms sent to their facility.

b. Hard Copy Distribution of Class I or II ECPs and RFD/RFVs, For each Class I or II ECP, or each RFD/RFV that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation pertaining to the proposed engineering change action to the PCO. Assistance in preparing any of these proposals may be obtained from the ACO or AMCOM Change Control Point at:

Aviation and Missile Research, Development, and Engineering Center

ATTN: RDMR-SET

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-1335

c. Hard Copy Distribution of VECPs. For each VECP that the ACO determines to be in compliance with this provision, the

Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any VECP that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation to the PCO. The Contractor shall also submit one copy of the VECP to the Value Engineering Program Manager (VEPM) whose address is below. Assistance in preparing VECPs may be obtained from the VEPM.

Aviation and Missile Research, Development, and Engineering Center

ATTN: RDMR-SEI

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-8163

5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.

6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The Government will notify the Contractor in writing if a proposal is determined to be unacceptable.

(End of clause)

22 37

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CONTRACT CLAUSES

15 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS OCT/2015

16 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE JUL/2013

17 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE JUL/2015

18 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH OCT/2015

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

19 52.211-5 MATERIAL REQUIREMENTS AUG/2000

20 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT OCT/1997

21 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES FEB/1997

22 52.222-3 CONVICT LABOR JUN/2003

23 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS--OVERTIME COMPENSATION MAY/2014

24 52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES FEB/2016

25 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT EXCEEDING MAY/2014

$15,000

26 52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR/2015

27 52.222-26 EQUAL OPPORTUNITY APR/2015

28 52.222-37 EMPLOYMENT REPORTS ON VETERANS OCT/2015

29 52.222-50 COMBATING TRAFFICKING IN PERSONS MAR/2015

30 52.223-6 DRUG-FREE WORKPLACE MAY/2001

31 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING AUG/2011

32 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES JUN/2008

33 52.228-7 INSURANCE--LIABILITY TO THIRD PERSONS MAR/1996

34 52.232-1 PAYMENTS APR/1984

35 52.232-8 DISCOUNTS FOR PROMPT PAYMENT FEB/2002

36 52.232-11 EXTRAS APR/1984

37 52.232-18 AVAILABILITY OF FUNDS APR/1984

38 52.232-23 ASSIGNMENT OF CLAIMS MAY/2014

39 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984) APR/1984

40 52.232-25 PROMPT PAYMENT JUL/2013

41 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT JUL/2013

42 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN/2013

43 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS DEC/2013

44 52.233-1 DISPUTES MAY/2014

45 52.233-3 PROTEST AFTER AWARD AUG/1996

46 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT/2004

47 52.243-1 CHANGES--FIXED PRICE AUG/1987

48 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS DEC/2015

49 52.247-63 PREFERENCE FOR U.S.-FLAG AIR CARRIERS JUN/2003

50 52.248-1 VALUE ENGINEERING OCT/2010

51 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) APR/1984

52 52.253-1 COMPUTER GENERATED FORMS JAN/1991

53 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS SEP/2011

54 252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT- DEC/2008

RELATED FELONIES

55 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS SEP/2013

56 252.204-7000 DISCLOSURE OF INFORMATION AUG/2013

57 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT APR/1992

58 252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT FEB/2014

59 252.204-7015 DISCLOSURE OF INFORMATION TO LITIGATION SUPPORT CONTRACTORS FEB/2014

60 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE OCT/2015

GOVERNMENT OF A TERRORIST COUNTRY

61 252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC NOV/2014

62 252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS DEC/2012

63 252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES FEB/2013

64 252.227-7013 RIGHTS IN TECHNICAL DATA--NONCOMMERCIAL ITEMS FEB/2014

65 252.227-7016 RIGHTS IN BID OR PROPOSAL INFORMATION JAN/2011

66 252.227-7030 TECHNICAL DATA--WITHHOLDING OF PAYMENT MAR/2000

67 252.227-7037 VALIDATION OF RESTRICTIVE MARKINGS ON TECHNICAL DATA JUN/2013

68 252.231-7000 SUPPLEMENTAL COST PRINCIPLES DEC/1991

69 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS JUN/2012

70 252.232-7010 LEVIES ON CONTRACT PAYMENTS DEC/2006

71 252.243-7001 PRICING OF CONTRACT MODIFICATIONS DEC/1991

72 252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT DEC/2012

23 37

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

73 252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS JUN/2013

74 252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT MAR/2008

75 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA--BASIC APR/2014

76 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING SEP/1989

(a) The Contractor shall test 1 unit(s) of Lot/Item 0001AA as specified in this contract. At least 30 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within 191 calendar days from the date of this contract to Efrain Acevedo marked First Article Test Report: Contract No. TO BE DETERMINED AT TIME OF AWARD, Lot/Item No. TO BE DETERMINED AT TIME OF AWARD. Within

30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the

Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the

Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(End of Clause)

77 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE JAN/1997

I (JAN 1997)

(a) The Contractor shall test 1 unit of Lot/Item 0001AA as specified in this contract. At least 30 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within 191 calendar days from the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .