SPRHA423R0593.pdf

PDF 140 KB Posted

Attached to
F-16 Heads-Up Display Federal contract opportunity
Solicitation number
SPRHA423R0593
Issued by
Defense Logistics Agency Aviation

About this file

This is a solicitation from the Defense Logistics Agency Aviation seeking proposals for the supply of 16 F-16 Heads-Up Displays. Offerors have the option to bid on a first article test requirement plus 15 production units, or waive the first article and bid on all 16 units. The solicitation includes line items for the first article, test report, and multiple quantities of production units to be delivered to various destinations in the United States by September 2024. Incumbent suppliers are identified who may become qualified sources by submitting qualification packages. The solicitation incorporates standard clauses on payment terms, small business set-asides, Buy American requirements, and other standard federal contracting terms.

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Heads-Up Display, newest first.
File Type Posted
CDRL_FATR.pdf PDF
EDL.pdf PDF
Unmarked Eng Data 2022.pdf PDF
SPI_012794724.pdf PDF
Pkg_SOW.pdf PDF
EDR.pdf PDF
MQR.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

SPRHA4-23-R-0593

X

6.SOLICITATION ISSUE DATE

3 JUL 2023

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 334511

8(A) SIZE STANDARD: 1,250

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

FMS REQUIREMENT

ROUTINE

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

This acquisition is restricted to qualified source(s): Industrial Electronic Engineers (CAGE 05464), International Enterprises Inc (CAGE 50218), Battelle Memorial Inst (CAGE 79986) and BAE Systems (CAGE 99789).

Contractors desiring to become a qualified source must submit a qualification package. Please see clause 52.209-1 and the attached Manufacturing Qualification Requirement for additional details.

Less than a truckload shipment is acceptable and authorized.

Early and partial deliveries are acceptable at no increase in cost to the Government.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR

INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE CONTRACTOR AGREES TO HOLD

ITS OFFERED PRICES FIRM FOR THE ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO

THE TERMS AND CONDITIONS STATED HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

SPRHA4

2. CONTRACT NUMBER

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:C

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH OR OTHERWISE

IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

9. (Agency Use) Solicitation: Offers will be received at the Issuing office until * on * . Late offers are subject to late proposal provisions incorporated herein. All offers are subject to such provisions, representations certifications and specifications as are attached or incorporated by reference.*

3-AUG-2023 11:59PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

DLA AVIATION - OGDEN, DLR PROCUREMENT OPS/AUB

6051 GUM LANE BLDG 1225

HILL AIR FORCE BASE UT 84056-5820

BUYER: Michelle L Mihu/DLA michelle.mihu@us.af.mil Phone: (385) 519- 8013

X

1. THIS CONTRACT IS A RATED ORDER UNDER DPAS

(15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE OF ITEMS

INVOLVED

DATE AND LOCAL TIME 3 AUG 2023 11:59 PM

SOLICITATION NUMBER SPRHA423R0593

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Michelle L Mihu/DLA

DLA AVIATION - OGDEN, DLR PROCUREMENT OPS/AUB

6051 GUM LANE BLDG 1225

HILL AIR FORCE BASE UT 84056-5820

SPRHA4-23-R-0593

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Please Note: this requirement is for sixteen (16) HUDs. Contractors may bid the 16 units in two ways:

Bid A = 1 First Article + 15 Production Articles or

Bid B = (First Article requirement waived) + 16 Production Articles

Bid A - First Article Required Item No.

NSN: 1270-01-514-2683 WF

MONITOR,HEAD-UP DIS

pilot aft seat heads up display aluminum case Manufacturer Part Number 79986 46431110-30 Associated Document(s) Line Item(s)

FD20202300593 0001

Priority: R Applicability: None ;

Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Class I ODS Substance Application/Use Quantity

NONE NONE NONE

Bid A - First Article Required Item No.

0001AA

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001AA AA

First Article

FIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202300593 0001

Bid A - First Article Required

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Foreign Military Sales :FMS Case:GR-D-KIX Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DGR002 ORIGIN

Type / Ship To PACRN Mark For

* DGR002 PAA DGRQ00

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

* DGR002 1 EA *120 Calendar Days DGRQ5V30904502 / PRI: 3

Proposed Delivery

* DGR002 1 EA

The contractor will be responsible for building and testing the First Article at their facility within 120 days ARO contract. Upon completion of the FA Testing, the contractor will submit the FA Test Report within 30 days, IAW

DD1423-1.

Approval of the FA Test Report will constitute approval of the First Article.

Once FA Test Report has been approved, the contractor will ship FA concurrently with Production Articles, CLIN 0001AC, to DGRQ00, Requisition No: DGRQ5V30904502 .

Bid A - First Article Required Item No.

0001AB

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

First Article Test Report

FIRST ARTICLE TEST REPORT

IAW DD 1423-1 ATTACHED HERETO

Associated Document(s) Line Item(s)

FD20202300593 0003

Bid A - First Article Required

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: AB Quality Assurance: IAW DD FORM 1423-1, Exhibit AB Type / Ship To Quantity (U/I) *ARO Contractor FA

Testing _ Req No / Pri

Required Delivery

+ IAW1423 1 LO *30 Calendar Days

Proposed Delivery

+ IAW1423 1 LO

For WAWF purposes only, when submitting the receiving report, the contractor will use Ship To FB2029 for this line item.

Bid A - First Article Required Item No.

0001AC

Firm Fixed Price Quantity U/I Unit Price Amount

2 EA

CLIN ACRN ACRN Total

0001AC AA

Production Article

PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202300593 0001

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DGR002 ORIGIN

Type / Ship To PACRN Mark For

* DGR002 PAA DGRQ00

Bid A - First Article Required Type / Ship To Quantity (U/I) *ARO Approval of

First Article _ Req No / Pri

Required Delivery

* DGR002 2 EA *120 Calendar Days DGRQ5V30904502 / PRI: 3

Proposed Delivery

* DGR002 2 EA

Bid A - First Article Required Item No.

0001AD

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

CLIN ACRN ACRN Total

0001AD AA

Production Article

PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202300593 0002

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DGR002 ORIGIN

Type / Ship To PACRN Mark For

* DGR002 PAA DGRQ00

Type / Ship To Quantity (U/I) *ARO Approval of

First Article _ Req No / Pri

Required Delivery

* DGR002 3 EA *120 Calendar Days DGRQ5V30934500 / PRI: 3

Proposed Delivery

Bid A - First Article Required

* DGR002 3 EA

Bid A - First Article Required Item No.

0001AE

Firm Fixed Price Quantity U/I Unit Price Amount

10 EA

CLIN ACRN ACRN Total

0001AE AB

Production Article

PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202300685 0001

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 ORIGIN

Type / Ship To PACRN Mark For A FB2029 PAA Account 09 Type / Ship To Quantity (U/I) *ARO Approval of

First Article _ Req No / Pri

Required Delivery

A FB2029 10 EA *120 Calendar Days Non-MilStrip

Proposed Delivery

A FB2029 10 EA

Bid B - First Article NOT Required Item No.

0001AF

Firm Fixed Price Quantity U/I Unit Price Amount

Bid B - First Article NOT Required

3 EA

CLIN ACRN ACRN Total

0001AF AA

Production Article

PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202300593 0001

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To PACRN Mark For

* DGR002 PAA DGRQ00

Type / Ship To Quantity (U/I) On or Before Req No / Pri

Required Delivery

* DGR002 3 EA 30 SEP 2024 DGRQ5V30904502 / PRI: 3

Proposed Delivery

* DGR002 3 EA

Bid B - First Article NOT Required Item No.

0001AG

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

CLIN ACRN ACRN Total

0001AG AA

Production Article

PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202300593 0002

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required

Bid B - First Article NOT Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DGR002 ORIGIN

Type / Ship To PACRN Mark For

* DGR002 PAA DGRQ00

Type / Ship To Quantity (U/I) On or Before _ Req No / Pri

Required Delivery

* DGR002 3 EA 30 SEP 2024 DGRQ5V30934500 / PRI: 3

Proposed Delivery

* DGR002 3 EA

Bid B - First Article NOT Required Item No.

0001AH

Firm Fixed Price Quantity U/I Unit Price Amount

10 EA

CLIN ACRN ACRN Total

0001AH AB

Production Article

PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202300685 0001

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

Bid B - First Article NOT Required

A FB2029 ORIGIN

Type / Ship To PACRN Mark For A FB2029 PAA Account 09 Type / Ship To Quantity (U/I) On or Before _ Req No / Pri

Required Delivery

A FB2029 10 EA 30 SEP 2024 Non-MilStrip

Proposed Delivery

A FB2029 10 EA

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: + IAW1423

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A FB2029

FB2029 OO ALC DDHU CNTRL RCV

CP 385 519 8898

5851 F AVE BLDG 849W

HILL AFB UT 84056

HILL AFB UT 84056

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

SHIP TO (FOREIGN MILITARY SALES)

TYPE/CODE: * DGR002

SUPPLEMENTAL ADDRESS CODE: DA2KIX

FMS CASE CODE/LOA: GR-D-KIX/001

MAPAC SHIP TO CODE: DGR002

MAPAC MARK FOR: DGRQ00

REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION C

DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2020)

(1) By submitting a quotation or offer, the contractor is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph

(2) of this procurement note, demonstrating the item conforms to the technical requirements, and, for part numbered items, is from an approved manufacturer.

(2) Supply Chain Traceability Documentation

(i) Supply chain traceability documentation shall include: basic item description; part number; drawing or specification; national stock number; manufacturing source; manufacturing source’s Commercial and Government Entity (CAGE) code; and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance.

(ii) Supply chain traceability documentation shall also include, when available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.

For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection- AvoidanceProgram/ ).

(iii) In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers’ parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.

(3) The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer’s request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.

PART I - THE SCHEDULE

SECTION D

PACKAGING AND MARKING

MIL-STD-130: Items shall be marked in accordance with MIL-STD-130. The National Stock Number (NSN), and when assigned, the Configuration Item Identifier (CII), serial number, and military type designation information shall be marked on major assemblies, units, groups, and sets. Special attention must be given to requirements governing the application of the actual manufacturer's Federal Supply Code for Manufacturers (FSCM) to the physical item. Items which are excluded in accordance with paragraph 1.1 of MIL-STD-130, Revision M, shall be marked in accordance with the appropriate document.

2. PACKAGE AND CONTAINER MARKING: Shipments will not be made until the NSN has been assigned, unless specifically authorized by the Contracting Officer.

MIL-STD-129/ASTM-D-3951:

a. Interior packages and shipping containers shall be marked in accordance with MIL-STD-129 when Military packing is specified and ASTM-D-3951 when commercial packaging is specified. The requirements of paragraph 2.h apply regardless of which packaging is utilized.

(1) Design manufacturer's name, trademark or manufacturer's code (from Cataloging Handbook H4-1 or H4-2), identifying number, and serial number, when applicable, shall be included in the identification marking.

(2) When applicable, the Air Force project designator code shall be included as the last line of the address marking and the project name related to the project code shall be marked in the clear on the exterior shipping container.

b. Tags and labels, when required, shall be contractor's tags or labels conforming to the requirements of MIL-STD-129 or as approved by the procuring activity. Contractor's forms which indicate serviceable condition shall not be any shade of green or red. Labels are authorized to be used on metal containers. Items requiring technical order (T.O.)

certification shall be annotated on inner and outer container tags or label with T.O. compliance.

c. When dummy containers are used in a unitized load, the dummy containers shall be clearly marked "DUMMY CONTAINER" and located in the load so that the marking will be plainly visible to receiving and storage personnel.

d. All interior packages and shipping containers for articles and materials classified as hazardous or restricted under provisions of Title 49, Code of Federal Regulations, or AFR 71-4/DLAM 4145.3/TM 38-250/NAVSUP PUB 505/MCO P

4030.19 shall be marked, regardless of exemption for mode of transportation, with proper shipping name of item;

flash point of all liquids having a flash point of 200 degrees F. or below; and percentage concentration of acids and corrosive liquids. In addition, the quantity of each hazardous or restricted material included in a container shall be annotated adjacent to the shipping name of the item, e.g., Acetic Acid (80% concentration) -- 1 qt.

e. On shipments of firearms regardless of mode of transportation, selected elements of identification and contractor data markings shall be omitted or obliterated in accordance with the requirements of MIL-STD-129 regarding sensitive items and packing lists shall be placed only inside the containers.

f. Special markings for packages and containers when specified on AFMC Form 158 shall be complied with as a part of

MIL-STD-129.

g. All special coated terneplate containers shall be marked with the legend "CAUTION--DO NOT REUSE AS FOOD

CONTAINERS."

h. Bar code markings in accordance with MIL-STD-129 shall apply to all units, intermediate and exterior containers for all items going into stock regardless of package size or levels of package specified (including commercial packaging). In addition to the NSN/NATO stock number, the exterior shipping container shall include the 13 digit contract number (plus, if applicable, the four digit call number). Excluded from Bar Code Marking are:

(1) Foreign Military Sales.

(2) Direct Vendor Delivery (DVD)/Government Furnished Equipment (GFE) shipments.

(3) Multipack Exterior Shipping Containers. (Unit and intermediate containers do require a bar coded NSN/NATO stock number. However, the next container (unit or intermediate) inside the multipack will also require a bar coded NSN/NATO stock number and contract number with call number, if applicable, in the lower right hand corner).

(4) All unpacked or uncrated items; e.g., vehicles, tires, etc.

i. Shipments of wheeled items weighing 2,000 pounds or more and scheduled for transportation by military aircraft will be marked with the individual axle weights in accordance with MIL-STD-129.

3. WARRANTED ITEMS: When the contract contains warranty requirements, warranty information shall be applied on containers and items as follows:

a. Container markings shall be as specified in MIL-STD-129. The period or conditions of the warranty shall be specifically stated, i.e., landings, flight hours, operating hours, days from shipping date, etc.

b. Items shall be marked in accordance with requirements of MIL-STD-130. Markings shall be located in a manner so as to be conspicuous to the person removing the item from service. When no deleterious effect or functional degradation is caused, the markings shall be black letters on yellow FED-STD-595 color 13655) background. The marking shall include the same period or condition required on the containers.

SHIPPING CONTAINER MARKING

All shipping containers shall be marked meeting the following criteria:

(a) MIL-STD-129 R, Standard Practice for Military Marking.

(b) Bar code format shall conform to bar code symbology Format 3 of 9, Code 39 as specified in MIL-STD-129 R.

(c) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 R , e.g., unit serial numbers, original equipment manufacturer’s (OEM) name, or OEM model number, as specified on the AFMC Form 158:

PACRN(s) Applicable Additional Bar Coding or Marking Requirements (if applicable)

PAA NOT APPLICABLE

MILITARY PACKAGING AND MARKING

Items shall be packaged in accordance with MIL-STD-2073-1E, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129R, Standard Practice for Military Marking.

The MIL-STD-2073-1 SPI/Specification is as follows:

PACRN PRESERVATION LVL PACKING LVL QUP SPI NUMBER SPI REVISION SPI DATE

PAA MIL B 001 F012794724 E 12FEB2018

PACRN SUPPLEMENTAL PACKAGING

PAA NOT APPLICABLE

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS

(FEB 1998)

(IAW FAR 9.308-2)

Test criteria are as follows:

Lot/Item Contractor Test/Inspection Requirements 0001AA See Drawing 46430010

Disposition of the First Article shall be as follows:

Lot/Item Approved 0001AA Shipped concurrently with 0001AC to Ship To DGRQ00, Req No DGRQ5V30904502

Lot/Item Disapproved 0001AA Retained by contractor

(The above Clause/Provision has been modified.)

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)

(IAW FAR 46.302)

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(IAW FAR 46.311, DFARS 246.202-4(1))

(a) The Contractor shall comply with the higher-level quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*

*See Individual Line Item Schedule

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503) Government Contract Quality Assurance Inspection and Acceptance will be at (Final):

[CONTRACTOR FILL-IN]

Item No(s): See schedule for items with the following code(s) listed below :

Inspection Code and Address:

Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).

Item No(s): 0001AB

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b))

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c))

52.247-29 F.O.B. ORIGIN (FEB 2006)

(IAW FAR 47.303-1(c))

52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)

(IAW FAR 47.303-2(c))

52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)

(IAW FAR 47.303-17(f))

F.O.B. ORIGIN (OCT 1993)

(IAW FAR 47.305(b)) Any supply item applicable to this document shall be delivered F.O.B. at:

F.O.B. Address:

[CONTRACTOR FILL-IN]

COMMERCIAL BILL OF LADING SHIPMENTS – CARRIER’S RATES

The contractor shall ensure that proposed carrier’s rates are equal to or better than rates available to the Government.

Contact the transportation officer for this contract, as identified by the administrative contracting officer, for confirmation that the proposed carrier’s rates are no higher than those otherwise available to the government. List the shipping costs on the invoice to the government and attach a copy of the carrier’s billing. Failure to properly annotate the invoice and provide a copy of the carrier’s billing may result in those cost not being reimbursed or only partially reimbursed.

UNILATERAL AMENDED SHIPPING INSTRUCTIONS (ASIs), F.O.B. ORIGIN

(a) An ASI is a change to the shipping instructions of one or more units or shipment lots of a contract line item. Multiple ASIs for multiple contract line items may be issued under one document.

(b) Unilateral ASIs with changes only to the "Ship To and Mark For" instructions, issued 20 calendar days or more before the contract scheduled delivery date, shall be accepted by the Contractor at no change in contract price.

(c) All other ASIs, including those requiring a change to the "Ship To and Mark For" which are issued 19 days or less before the contract scheduled delivery date; and those for changes to the preservation, packaging, and packing requirements or the f.o.b.

point, shall be subject to the negotiation of an equitable adjustment under the contract.

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer. _____________Combination_________________________________

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer. ______Not Applicable

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC See block 14 Issue By DoDAAC See block 7 Admin DoDAAC See block 12 Inspect By DoDAAC See Section B Ship To Code See Section B Ship From Code See Section B Mark For Code See Section B Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) N/A Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact. ___________ Not Applicable _________________

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 9711X8242 .0002 4F X LC SH 0KIXGR 000000 00000 001000 503000 F03000 $0.00

PSR: 041199 FSR: 038303 DSR: 265818 CIN: F2DCCW3130A1030000AA

AB 97 X4930 .FC04 64 3 47 GH 15F16Z 01N000 00000 EERRCT 503000 F03000 $0.00

PSR: K31114 FSR: 001679 DSR: 315540 CIN: F2DCCW3139A1010000AA

ACRN TOTAL $ 0.00

TRANSPORTATION APPROPRIATION CHARGEABLE

The Transportation Allotment Identification (TAI) relates directly to the above ACRN(s). For example the TAI "TAA" is for the same line item(s) as ACRN "AA".

FMS TRANSPORTATION ALLOTMENT SHALL BE USED ONLY WHEN SHIPMENT ON GOVERNMENT BILL OF LADING IS AUTHORIZED

TAI ATAC NOTE

TAA D283 9711X8242.0002 4FX LCSH 0KIXGR 000000 00000 0

TAB FRS3

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

5352.201-9101 OMBUDSMAN (OCT 2019)

(IAW AFFARS 5301.9103)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern.

The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Kristina Lenderman at 385 519 -8209 , FAX 000 000 -0000 , email kristina.lenderman@dla.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements.

Such inquiries shall be directed to the contracting officer.

52.202-1 DEFINITIONS (JUN 2020)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

(IAW FAR 3.808(b))

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(DEC 2022)

(IAW DFARS 203.970)

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)

(IAW FAR 4.303)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

(IAW FAR 4.1403(a))

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(NOV 2021)

(IAW FAR 4.1903)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED

ENTITIES (NOV 2021)

(IAW FAR 4.2004)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

(IAW 4.2105(b))

252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016)

(IAW DFARS 204.404-70(a))

252.204-7002 PAYMENT FOR SUBLINE ITEMS NOT SEPARATELY PRICED (APR 2020)

(IAW DFARS 204.7109(a))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING (JAN 2023)

(IAW DFARS 204.7304(c))

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (JAN 2023)

(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)

(IAW DFARS 204.2105(c))

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (JAN 2023)

(IAW DFARS 204.7304(e))

252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)

(IAW DFARS 204.804-70)

(a) At the conclusion of all applicable closeout requirements of Federal Acquisition Regulation 4.804, the Government and Contractor shall mutually agree on the residual dollar amount remaining on the contract. Both the Government and Contractor agree to waive payment of any residual dollar amount of $1,000 or less to which either party may be entitled at the time of contract closeout.

(b) A residual dollar amount includes all money owed to either party at the end of the contract and as a result of the contract, excluding amounts connected in any way with taxation or a violation of law or regulation.

(c) For purposes of determining residual dollar amounts, offsets (e.g., across multiple contracts or orders) may be considered only to the extent permitted by law.

52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)

(IAW FAR 9.206-2)

(a) Definition: "Qualification Requirement," as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.

(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.

Item No Agency Name/Address

0001 DLA AVIATION OGDEN

6051 GUM LANE BLDG 1225

HILL AIR FORCE BASE, UT 84056-5820

michelle.mihu@us.af.mil

(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.

Offeror's Name ______________________________

Manufacturer's Name _________________________

Source's Name ______________________________

Item Name _________________________________

Service Identification _________________________

Test Number _______________________________ (to the extent known)

(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.

(e) If an offeror, manufacturer, source, product, or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.

(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)

(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))

(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

*Lot/Item ***Calendar Days Before Test **Quantity

0001AA 14 1 EA

(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to ___***___ marked "FIRST ARTICLE TEST REPORT: Contract No. Lot/Item No. ___*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

*Lot/Item ****Approval Days ELIN No.

0001AA 30

FA Test Report Item ***Type/Location **Calendar Days

0001AB IAW DD 1423-1 30

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(NOV 2021)

(IAW FAR 9.409)

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(NOV 2015)

(IAW FAR 9.108-5(b))

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(MAY 2019)

(IAW DFARS 209.409)

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

(IAW FAR 11.304)

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b)) This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)

(IAW DFARS 211.274-6(a)(1), DFARS 212.301(f)(xii))

(a) Definitions. As used in this clause—

“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

(c) Unique item identifier.

(1) The Contractor shall provide a unique item identifier for the following:

(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

See Schedule as Applicable

(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

*Items less than $5000, which require UID, will be specifically identified in the schedule.

See Schedule as Applicable

(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).

(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).

(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.

(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:

(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .

(2) Embedded items shall be reported by one of the following methods—

(i) Use of the embedded items capability in WAWF;

(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or

(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.

52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)

(IAW FAR 15.209(b)(1))

52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(IAW FAR 15.209(h), AFFARS 53.15.209(h))

52.215-14 INTEGRITY OF UNIT PRICES (NOV 2021)

(IAW FAR 15.408(f)(1))

52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS

CONCERNS (OCT 2022)

(IAW FAR 19.1309(b))

(b) Waiver of evaluation preference.

__ Offeror elects to waive the evaluation preference.

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (DEVIATION 2023-O0002)

(IAW Deviation 2023-O0002, Revision 1)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (OCT 2022)

(IAW FAR 19.309(c))

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]

(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) and through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]

(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.

(7)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .