Signed-SPRDL125Q0024-2.27.25.pdf

PDF 156 KB Posted

Attached to
Wiring Harness Federal contract opportunity
Solicitation number
SPRDL1-25-Q-0024
Issued by
Defense Logistics Agency Land and Maritime

About this file

This is a Request for Quotation (RFQ) issued by DLA Land Warren for a wiring harness (NSN: 6150-01-106-7911, MFPN: 12298035). The solicitation (SPRDL1-25-Q-0024) is a small business set-aside requiring delivery of 184 units within 630 days after contract award, with First Article Testing requirements that must be completed within 330 days.

The RFQ includes provisions for First Article Testing waiver requests and requires ISO 9001:2015 quality standards. Delivery will be FOB Destination to DLA Distribution Red River in Texarkana, TX. The solicitation incorporates extensive technical requirements including packaging specifications, hazardous materials handling procedures if applicable, and quality assurance provisions. Quotes must be submitted electronically to the Contract Specialist Rosanna Madigan by March 31, 2025. The evaluation will be based on lowest price technically acceptable offer, with consideration given to First Article Test costs and delivery schedule requirements.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of

(This is NOT an Order)

1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating

See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)

See Schedule

7. Delivery

FOB Other Destination

5B. For Information Call: (Name and telephone no.) (No collect calls)

8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)

See Schedule

10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.

Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. Schedule (Include applicable Federal, State, and local taxes)

Item Number (a)

Supplies/Services (b)

Quantity (c)

Unit (d)

Unit Price (e)

Amount (f)

(See Schedule)

12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage

NOTE: Additional provisions and representations are are not attached.

13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation

16. Signer

a. Name (Type or Print) b. Telephone

Area Code

c. Title (Type or Print) Number

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)

X

SPRDL1-25-Q-0024 2025FEB27 DOA4

SPRDL1DLA LAND WARREN

WARREN, MI 48397-5000

ROSANNA MADIGAN (586)467-1166

ZGAB

EMAIL: ROSANNA.MADIGAN@DLA.MIL

X

2025MAR31

1 76

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: ROSANNA MADIGAN

Buyer Office Symbol/Telephone Number: ZGAB/(586)467-1166

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

AS7001

Acknowledgment of Amendments____________________________

Acknowledge all the amendments received from the Contracting Office by identifying the amendment number and its issue date below:

Amendment Number Date

************ End of Narrative ************

AS7311

Electronic Contracting Provision________________________________

(a) All DLA Land Warren solicitations will be publicized on the Contract Opportunities website https://SAM.gov . Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or referenced with instructions in the solicitation.

(b) As directed in Section L of this solicitation, interested vendors shall submit a quote or proposal via email to the Contract _________

Specialist listed on the solicitation. The email shall include subject header: Proposal Submission SPRDL1-XX-X-XXXX (company name) on the solicitation.

(c) Requirements for tracking solicitations and submitting bid submissions:

1. Vendors must be registered for a sam.gov account through https://login.gov in order to manage searches and track solicitations.

Using the Contract Opportunities search function in sam.gov, vendors will be able to view the Solicitation and any modifications or amendments made by the Contract Specialist.

2. Vendors may Request Access to controlled documents such as the Technical Data Package (TDP). Interested vendors must request TDPs as directed in Section C of this solicitation.

3. All bids and proposals must be submitted via email to the Contract Specialist on record. _________

(d) Note to offerors:

Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time (EST), for DLA Land Warren. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

It is Offeror's responsibility to ensure the proposal/quote is received by the Contract Specialist by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late.

Proposal/quote is defined to mean that ALL volumes or parts required in the solicitation are included in the electronic submission.

2 76

SPRDL1-25-Q-0024

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

Solicitations may remain posted on sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will need to send any late quotes, if applicable, directly to the Contract Specialist identified on the cover page of this solicitation.

(e) Any awards issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or

Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the Procuring Contracting Officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(f) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the

Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.

************ End of Narrative ************

AS7316

All or None____________

Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.

************ End of Narrative ************

*** END OF NARRATIVE A0001 ***

3 76

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 WIRING HARNESS

NSN: 6150-01-106-7911

Mfr CAGE: 19207

Mfr Part Number: 12298035

This Procurement is Set-Aside for Small Business

Concerns with FPI/Unicor allowed to quote/propose.

(End of narrative A001)

0001AA Production Quantity 184 EA $ $ ___________________ ______________ __________________

COMMODITY NAME: WIRING HARNESS

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH4C1170EH PRON AMD: 01

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 12298035

DATE: 19-SEP-2024

The Technical Data Package (TDP) for this item contains purchased parts. Refer to the product drawing(s) for details.

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING NARRATIVE

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Government Approval/Disapproval Days: 60

Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.

4 76

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W56HZV4256033V W562RM J 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 184 0630

FOB POINT: Destination

SHIP TO:

(W562RM) SR W0MC ARMY GENERAL SUPPLY

DLA DISTRIBUTION RED RIVER

HIGHWAY 82 WEST

TEXARKANA,TX,75507-5000

5 76

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0001AB FIRST ARTICLE TEST AND REPORT 1 EA $ ** NSP ** $ ** NSP ** _____________________________ ______________ __________________

COMMODITY NAME: WIRING HARNESS

CLIN CONTRACT TYPE:

Firm Fixed Price

A FIRST ARTICLE TEST REPORT IS REQUIRED IN ACCORDANCE

WITH THE CLAUSE ENTITLED "FIRST ARTICLE APPROVAL--

CONTRACTOR TESTING",

FAR 52.209-3.

THE PRICE FOR FIRST ARTICLE TESTING IN THE TOTAL

AMOUNT OF $_______________ IS INCLUDED IN THE TOTAL

AMOUNT FOR CLIN 0001AA.

(End of narrative B001)

First Article Test is required. Waiver may be authorized; see waiver provision in Section L.

(End of narrative C001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 3

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0330

FOB POINT: Destination

SHIP TO:

(SPRDL1) DLA LAND WARREN

ZGA

6501 EAST ELEVEN MILE ROAD

WARREN,MI,48397-5000

6 76

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

7 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

CS6334

Technical Data Package Information (Contract Opportunities in SAM.gov) Version_______________________________________________________________________________

The following Xd item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line-Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLINs Web-located TDP. To access the TDP, you will have to copy or type the links URL to your web browser address bar at the top of the screen.

Note: To copy a link from a .pdf file, click on the Text Select Tool, then highlight the URL, copy and paste it into your browser, and hit the Enter key.

CLIN: NA

TDP Link (URL): NA

[ x ] 3. The TDP for this solicitation resides within sam.gov under the Contract Opportunities search function https://sam.gov , and is associated with this solicitation number and can be accessed via this URL: https://sam.gov/opp/1136cdc816aa475b8343f67e403f97be/view

a. Log on to the SAM.gov website.

b. Select Contract Opportunities in the search bar and search by solicitation number.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec

2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, vendors and Contractors must have a current DD 2345, Militarily Critical Technical Data

Agreement on file with Defense Logistics Information Service (DLIS).\~ If you are currently certified, your MPIN will be verified and you may proceed to the next step.\~ To obtain certification, login to the Joint Certification Program (JCP) https://www.dla.mil/Logistics-Operations/Services/JCP/ . Click on documents and follow instructions provided.\~

Processing time is estimated at six (6) to ten (10) weeks after receipt. Contract Opportunities will allow you to access export controlled TDPs once certification is confirmed.

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

c. If technical data is otherwise restricted, click the document title to request access. A window will pop-up, select Request

Access to controlled documents and enter the Reason for Access. This will generate an email to the Contract Opportunities system administrator at DLA Warren with all the information needed for them to grant you access. Contract Opportunities will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 3 working days to complete this Contract Opportunities-TDP access/approval process through sam.gov.

d. Only one individual in your company can request access to the Technical Data Package (TDP) for a solicitation. That individual must be registered as the Data Custodian, as identified in the JCP, and be granted approval to view the Technical

Data Package (TDP) for a solicitation. The Data Custodian MUST be registered for a sam.gov account through https://login.gov

. Any individual(s) no longer with the company should be deleted. Questions related to registration in https://login.gov should be directed to https://login.gov/help/ . Questions related to accounts in sam.gov should be directed to https://sam.gov/content/help . Vendors are responsible for placing correct information in login.gov and sam.gov accounts.

8 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

e. It is strongly suggested that you submit an access request and provide the Contract Specialist with the completed Use and

Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.

[ ] 4. The Government requires a Use and Non-Disclosure Agreement (NDA) to be signed by the Data Custodian of your firm, as identified in the JCP, before access is granted to the technical data. The appropriate Agreement is titled -4-, and is:

[ ] available by emailing the Contract Specialist listed on page 1 of this solicitation.

[ ] available as an attachment to this solicitation.

Follow the instructions on the Agreement and email it to the Contract Specialist at -5-. The Contract Specialist will notify the

Contract Opportunities administrator upon receiving the NDA. The Administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the

TDP. If you have any questions/problems viewing the TDP contact the Contract Specialist.

************ End of Narrative ************

CS7002

Drawing Limitations___________________

(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are ___ adequate to permit manufacture, and:

(1) depict the completed (item(s), and

(2) serve as the basis for inspection of the completed item(s).

(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.

(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the _____________________________ manufacturing process.

(d) The Contractor is responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited _____________________________ in accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the

Contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Procuring Contracting Officer or Contract Specialist prior to the solicitation closing date.

(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.

************ End of Narrative ************

CS7004

Configuration Control Engineering Changes__________________________________________

(a) The Contractor may submit Engineering Change Proposal(s) (ECPs) and Request for Variance(s) (RFVs) for the requirements in the

Government provided Technical Data Package (TDP). If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.

(1) ECPs - The Contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notice of Revisions (NORs) necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The Contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.

(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD

Form 1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.

(ii) All ECPs submitted by the Contractor will be routine priority unless otherwise justified. If the Contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.

9 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(2) RFVs - The Contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The Contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.

(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the Contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Procuring Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the

Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.

(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).

(d) Forms If any of the above listed forms are not included with the solicitation or contract, the Contractor may locate forms on the

DOD Forms Website https://www.esd.whs.mil/Directives/forms/dd1500_1999/ or contact the Contract Specialist listed on page 1 of the solicitation or contract for copies of the forms.

************ End of Narrative ************

CS7016

Acquisition of Manufacturers Part Number: Components____________________________________________________

One or more of the drawings for part of the contract item set forth in the Schedule and in the Technical Data Package specify manufacturer's part numbers. Since complete Government technical data for such part or parts are not available, it is understood that the Contractor, by accepting this contract, agrees to furnish only the listed manufacturer's part number(s) for those components of the contract item, except as provided in the narrative entitled NOTICE REGARDING REQUIRED MANUFACTURERS PART NUMBER. It is further ___________________________________________________ understood and agreed that references to manufacturer's part numbers herein shall be deemed to include all changes or revisions thereto which the approved manufacturer has made effective as of the first date of delivery of any of the items under this contract; provided, ________ that no change or revision that affects the interchangeability (ability to be interchanged with previous parts and to match with all mating parts when assembled) of the listed manufacturer's part shall be incorporated into the contract item without the prior written approval of the Procuring Contracting Officer.

************ End of Narrative ************

CS7151

Use of Class 1 Ozone Depleting Substances (CIODS)_________________________________________________

(a) Definitions.

(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: https://www.epa.gov/clean-air-act-overview/clean-air-act-title-vi-stratospheric-ozone-protection

(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.

(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.

(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.

(a)\*()No Class II Ozone Depleting Substances shall be required in the performance of this contract without Government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.

************ End of Narrative ************

CS8001

10 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Contractor Retention of Supply Chain Traceability Documentation________________________________________________________________

1) By submitting a quotation or offer, the Contractor, is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) below, demonstrating the item conforms to the technical requirements, and for part numbered items, is from an approved manufacturer.

2) Supply Chain Traceability Documentation

i. \*. Supply chain traceability documentation shall include: basic item description, part number; drawing or specification;

national stock number, manufacturing source, manufacturing sources Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to

Government acceptance. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.

ii. Supply chain traceability documentation shall also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/ .

iii. In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.

3) The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officers request. The contracting officer determines the acceptability and sufficiency of documentation.

The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.

************ End of Narrative ************

*** END OF NARRATIVE C0001 ***

PACKAGING AND MARKING

DS6516

Packaging Requirements (Selective Group Packaging Requirements)_______________________________________________________________

(a) Military preservation, packing, and marking for this contract shall be accomplished in accordance with the specific requirements identified below and all the applicable requirements of MIL-STD-2073-1.

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: B

(3) QUANTITY PER UNIT PACKAGE: 001

(b) MIL-STD-2073-1, Appendix J establishes and defines codes used in describing military packaging methods and materials. The following codes from Appendix J apply:

(1) Preservation Method Code: 42 (Table j.i.

and j.ia.)

(2) Cleaning Procedure Code: 1 (Table j.ii)

(3) Preservative Material Code: 00 (Table j.iii)

11 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(4) Wrapping Material Code: 00 (Table j.iv)

(5) Cushioning and Dunnage Code: NA (Table j.v)

(6) Thickness of Cushioning or Dunnage Code: A (Table j.vi)

(7) Unit Container Code: ZZ (Table j.vii)

(8) Intermediate Container Code: ED (Table j.vii)

(9) Quantity per Intermediate Container Code: AAA(Appendix J.4.11)

(10) Packing Code: A (Table j.IX and J.IXa)

(11) Special Marking Code: 00 (Table j.x)

(c) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(d) Marking:

(1) All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R, including bar coding and Military Shipment Label (MSL). The Contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information Guide.

When an item is assigned Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at http://dodprocurementtoolbox.com/page/unique-id/tools ) for development of the UII and MIL-STD-129, Revision R for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.625-M and the requirements of the International Standards for Phytosanitary Measures 15

(ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood

Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.

(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention

Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens.

Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

(f) These packaging requirements are intended to provide protection against environmentally induced corrosion and deterioration, physical and mechanical damage, and other forms of degradation during storage, multiple handling, and shipment associated with the military distribution system. The Government encourages Contractors to submit requests for changes that will result in savings or improve the packaging. Please submit request for changes in accordance with the RFD clause of the contract. Government reserves the

12 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing at

Contractors expense.

(g) Hazardous Materials (as applicable):

(1) Hazardous Materials is defined as a substance or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.

(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) Packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO

P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(h) SUPPLEMENTAL INSTRUCTIONS: COIL TO 10" DIA. CUSH ENDS. BOX EC/BAG BS/BOX ED

************ End of Narrative ***********

*** END OF NARRATIVE D0001 ***

INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2015 or equivalent

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

ES6019

Use of MIL-STD 1916___________________

a. The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the Procuring Contracting Officer (PCO). The Contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of

Product. The Verification Level (VL) shall be VL IV for major characteristics and VL II for minor characteristics.

b. MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.

************ End of Narrative ************

13 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

ES6304

Notice Regarding First Article Test Sample__________________________________________

(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of 3 that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of 3 that successfully passes all specified tests, less the destructive tests, if any, 0 serve as a manufacturing standard for the remainder of the contract.

(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design, 2) as an aid in identifying any process changes, or 3) as the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.

(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the Contractor will notify the Procuring Contracting Officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.

************ End of Narrative *************

ES6333

Inspection and Acceptance First Article Approval________________________________________________

In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:

(1) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with Spec 12292178

(2) The First Article Test Report (FATR) shall be compiled by the Contractor to the Contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the Contractor to allow the designated Government representative to determine that the First Article Test was successfully completed.

************ End of Narrative *************

ES7001

Inspection and Acceptance Points - Origin_________________________________________

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.

Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT:

(Name) (CAGE)

(Address) (City) (State) (Zip)

ACCEPTANCE POINT:

(Name) (CAGE)

14 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Address) (City) (State) (Zip)

************ End of Narrative ************

ES7032

Notice Regarding First Article______________________________

(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Procuring Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.

(b) When any of the conditions above occurs, the Contractor shall notify the Procuring Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.

(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.

************ End of Narrative ************

ES7043

Interchangeability of Components________________________________

(a) DESIGN CHANGES TO ITEMS NOT UNDER GOVERNMENT DESIGN CONTROL. Once the Government accepts the first production test item, or ___________________________________________________________ accepts the first end item you deliver, (whichever comes first) you must not make design changes to any item or part that is not under

Government design control.

(b) WHEN THE POLICY CAN BE WAIVED. The Procuring Contracting Officer (PCO) will consider waiving this policy at your request. If _____________________________ your request reaches the PCO after the first production item test has been performed, then we may conduct another first production test at your expense.

(c) PRODUCTION OR DELIVERY DELAYS. Any production or delivery delays caused by this retesting will not be the basis for: _____________________________

(1) an "excusable delay" as defined in the DEFAULT clause of this contract.

(2) be the basis for an increase in contract price or delivery schedule extension.

************ End of Narrative ************

ES7222

250 Mile Radius First Article_____________________________

IN ADDITION TO INSPECTION REQUIREMENTS SPECIFIED IN APPLICABLE

DRAWINGS AND/OR SPECIFICATIONS, THE FOLLOWING QUALITY

REQUIREMENTS SHALL APPLY TO THIS CONTRACT:

1.\~ FIRST ARTICLE APPROVAL:\~ First Article Approval testing shall be performed by the Contractor, when a vehicle for which the contract item is designed, is available within a 250 Mile Radius of the Contractor's plant at which the First Article sample was fabricated.\~ The First Article sample shall be installed on the vehicle for trial installation.\~ Installation inspection shall determine proper fit and function.\~ Examinations and test shall be in accordance with applicable drawings, Supplementary Quality

Assurance Provisions (SQAP) and/or specifications.\~ The Administrative Contracting Officer (ACO) shall designate the place where the

First Article shall be installed on the vehicle by the Contractor.

2.\~ In the event a vehicle is not available within the specified 250 Mile Radius, First Article Approval testing shall be performed by the Government.\~ When First Article Approval-Government Testing is applicable the Administrative Contracting Officer (ACO) shall designate where the First Article shall be delivered to the Government for testing and the contract price shall be equitably adjusted taking into consideration the amount included in the contract price for First Article Approval and Test by the Contractor.

3. The First Article Test Report (FATR) shall be compiled by the Contractor to the Contractor's own format.\~ The FATR shall document

15 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable).\~

The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic.\~ The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the Contractor to allow the designated

Government representative to determine that the First Article Test was successfully completed.

************ End of Narrative ************

ES7345

Delegation of Authority for First Article Approval__________________________________________________

The Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO) is hereby delegated the authority to approve or disapprove the First Article Test Report submitted in accordance with this contract (FAR 52.209-3 First Article Testing- Contractor

First Article). Any reference to Procuring Contracting Officer (PCO) as it relates to the submission of, and approval/disapproval of the

FAT Report shall be deemed to mean the DCMA ACO. ACO approval will be predicated upon Quality Assurance Representative (QAR) acceptance of the FAT Report. ACO approval authorizes the Contractor to proceed with production.

************ End of Narrative ************

*** END OF NARRATIVE E0001 ***

DELIVERIES OR PERFORMANCE

4 52.242-15 STOP-WORK ORDER AUG/1989

5 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

6 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

7 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) JAN/2023

IUID is not required for this procurement.

(End of clause)

FS6051

Delivery Schedule_________________

(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.

(b) DEFINITIONS:

(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.

(2) DELIVERY is defined as follows:

FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(4) by the time specified in the individual contract; or

FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The Contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.

(c) The Government requires delivery to be made according to the following schedule:

(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

0001AA 184 630

0001AB 01 330

16 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(2) GOVERNMENT REQUIRED DELIVERY SCHEDULE IF THERE IS NO FIRST ARTICLE TEST (FAT), OR IF FAT IS WAIVED

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

0001AA 184 270

(d) Accelerated delivery schedule is acceptable.

(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:

(1) OFFERORS PROPOSED ACCELERATED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

(2) OFFERORS PROPOSED ACCELERATED DELIVERY SCHEDULE WITHOUT FIRST ARTICLE TEST (FAT), or IF FAT IS WAIVED

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

************ End of Narrative ************

FS7003

Depot Addresses for the Applicable Mode of Shipments: In-The-Clear Addresses____________________________________________________________________________

For Delivery, consult the Transportation Office for the applicable Depot as referenced below or Commercial carriers should consult the

Transportation Facilities Guide (TFG) within the Global Freight Management (GFM) system for detailed instructions.

DLA Distribution- Susquehanna

Defense Dist. Depot

Susquehanna

New Cumberland, PA 17070-5001

Rail/ Motor SPLC*: 206721 and 209405

MILSTRIP Address Code: W25G1U

Transportation Office: (717) 770-6091 or 1-800-307-8496

DLA Distribution- San Joaquin

XU Def Dist. Depot

San Joaquin

25600 S. Chrisman Rd.

Rec Whse 10

Tracy, CA 95304-5000

Rail/ Motor SPLC*: 875670 / 875675 / 875694

MILSTRIP Address Code: W62G2T

Transportation Office: (209) 839-5396

DLA Distribution- Anniston

Anniston Army Depot

Bynum, AL 36201-5021

Rail/ Motor SPLC*: 471995 / 471996 / 471974

MILSTRIP Address Code: W31G1Z

Transportation Office: (256)676-2574 or (256) 676-2712

DLA Distribution- Letterkenny

Letterkenny Army Depot

17 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Chambersburg, PA 17201-4150

Rail/ Motor SPLC*: 209741 / 209770 / 209740

MILSTRIP Address Code: W25G1R

Transportation Office: (717) 267-5220

DLA Distribution- Red River

Red River Army Depot

Texarkana, TX 75507-5000

Rail/ Motor SPLC*: 661136 / 661157 / 661150

MILSTRIP Address Code: W45G19 / W562RM / SW3227

Prior to delivery, contact DLA Distribution Red River, TX Truck Control for an appointment: 903-716-3577 or

"mailto:ddrt.truck@dla.mil%20 "

For Truck Deliveries, enter the following address for GPS:

RRAD Commercial Truck Entrance

100 Armory Dr.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .