Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0002 2020OCT02
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
SHARON COLEMAN
EMAIL: SHARON.F.COLEMAN.CIV@MAIL.MIL
SPRDL1-20-Q-0163
2020SEP23
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 12
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: SHARON COLEMAN
Buyer Office Symbol/Telephone Number: ZGAC/(586)467-1172
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of Amendment 0002 to Solicitation SPRDL1-20-Q-0163 is to:
1. Remove the First Article Test Report (FATR) CLIN 00001AB and delete the FAR clause 52.209-3 (First Article Approval--Contractor
Testing (ALT I & II) as well as all narratives mentioning First Article Testing such as:
a. E.4 (First Article Test (Contractor Testing))
b. E.25(Notice Regarding First Article)
c. L.16 (Provision for Waiver of Required First Article Approval)
d. L.17 (Caution Concerning the Pricing of First Article Approval)
e. M.2 (Evaluation Factors for First Article Test Requirement)
2. All other terms and conditions of the base solicitation remain unchanged and in full force and effect.
*** END OF NARRATIVE A0004 ***
2 12
SPRDL1-20-Q-0163
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001AB DELETED _______
3 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
E.18 Inspection and Acceptance Points - Origin______________________________________________
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT:
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT:
(Name) (CAGE)
Address) (City) (State) (Zip)
************ End of Narrative E.18 ************
E.20 Rework and Repair of Nonconforming Material________________________________________________
a. Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
b. Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review and approval prior to implementation.
c. Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Procuring Contracting
Officer for review and written approval prior to implementation.
d. Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the non-conformances and a description of the action taken or to be taken to prevent recurrence.
e. The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
************ End of Narrative E.20 ************
E.26 Interchangeability of Components_____________________________________
(a) DESIGN CHANGES TO ITEMS NOT UNDER GOVERNMENT DESIGN CONTROL. Once the Government accepts the first production test item, or ___________________________________________________________ accepts the first end item you deliver, (whichever comes first) you must not make design changes to any item or part that is not under
Government design control.
(b) WHEN THE POLICY CAN BE WAIVED. The Procuring Contracting Officer (PCO) will consider waiving this policy at your request. If _____________________________
4 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
your request reaches the PCO after the first production item test has been performed, then we may conduct another first production test at your expense.
(c) PRODUCTION OR DELIVERY DELAYS. Any production or delivery delays caused by this retesting will not be the basis for: _____________________________
(1) an "excusable delay" as defined in the DEFAULT clause of this contract.
(2) be the basis for an increase in contract price or delivery schedule extension.
************ End of Narrative E.26 ************
E.28 Drawings for Inspection____________________________
(a) When requested, the Contractor shall make available to the Government Inspector the drawings and specifications to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings and specifications will be returned to the Contractor.
(b) If the Contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.), the Contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.
(c) The Government may rely on the Contractor's Certificate of Conformance, IAW FAR 52.246-15, that the item tendered for acceptance conforms to the contract requirements. However, conditions may warrant that the Contractor be required to make available to the
Government the drawings, specifications, or other technical data such that the Government can determine if the item meets the contract requirements. These conditions may include, but are not limited to, the following: 1) Complex items or items which have quality characteristics for which contractual conformance must be established through precise measurements and functional operation, either as an individual item or in conjunction with other items, 2) Items used in critical applications or items denoted as critical on technical data, 3) Items with known quality conformance issues, 4) Items with an unstable design history, and/or 5) Contractor changes in technical requirements, technical data, and/or production processes which impact the fit, form, or function of the item.
************ End of Narrative E.28 ************
*** END OF NARRATIVE E0001 ***
5 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CONTRACT CLAUSES
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
1 DELETED 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE SEP/1989
I (JAN 1997) AND ALTERNATE II (SEP 1989)
6 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.4 Data and Communications Submitted to the Government Electronically________________________________________________________________________
(a) The Government often employs Contractors as system administrators to operate and maintain Government computer systems. These systems include local area networks, web sites, databases, other electronic records, e-mail accounts, other electronic data transfer mechanisms and computer software. The employees of these contracted system administrators sign nondisclosure agreements obligating them not to reveal information contained in files, documents, computers or systems that they administer. However, unless such information is protected in some way, contracted system administrators do have the ability to access such information.
(b) Potential Contractors as well as any other parties are thus advised to take steps needed to prevent access by contracted system administrators to information submitted electronically to the Government. Absent such steps, it is assumed that contracted system administrators are permitted the capability to access the data. The access will be limited to that which is necessary for the contract system administrator to perform its duties for the Government. The access shall be subject to the condition that third party information is not to be revealed by the contracted system administrator.
************ End of Narrative L.4 ************
L.5 Source Notes on Drawings Conform to Mil Tech Data Requirements_____________________________________________________________________
Notwithstanding the fact that ordnance drawings furnished with this solicitation may list particular manufacturer part numbers as approved sources, or as being the same as, or equivalent to, the ordnance part described on the drawing, the item to be supplied under this solicitation must conform to all specific technical requirements expressed on such drawing(s). To the extent that there may be any inconsistency between a manufacturer's part number and specific technical requirements expressed on an ordnance drawing which references the manufacturer's part number, the specific technical requirements shall control and take precedence. Offerors shall bear the responsibility of verifying that the approved part as supplied will conform with all such specific technical requirements.
************ End of Narrative L.5 ************
L.6 Notice Regarding Required Manufacturers Part Number / Source Controlled Components / Source Controlled Contract Items_________________________________________________________________________________________________________________________
(a) \*()This acquisition may contain one of the following:
(i) \*()It may be restricted to the manufacturer's part number or numbers identified in the Schedule (Section B), or in the Technical Data Package. Please see the narrative entitled ACQUISITION OF MANUFACTURER'S PART NUMBER in this solicitation.
(ii) It is possible at least one component of the item to be purchased under this acquisition is restricted to specified manufacturer's part numbers as set forth in the Technical Data Package. Please see the narrative entitled ACQUISITION OF MANUFACTURER'S PART NUMBER: COMPONENTS in this solicitation.
(iii) The drawings in the Technical Data Package for this requirement may contain reference notes indicating one or more sources of supply that have previously furnished the items depicted on the drawings.
(b) With the exceptions described in paragraph c below, and in the narrative entitled REPRESENTATION OF INTENT
TO SUPPLY A SOURCE-CONTROLLED ITEM, offers that propose to furnish any alternative to the required manufacturer's part number(s) will not be considered for contract award. It is understood that, by submitting an offer under this solicitation, Offeror agrees to supply one of the required part numbers unless the conditions set forth either in paragraph (c) below or in the narrative entitled REPRESENTATION OF INTENT TO SUPPLY A SOURCE-CONTROLLED ITEM are met.
(c) Required Approval for Equivalent Items
(1) \*()If a firm manufactures an item which it believes to be totally equivalent to the required item(s), it may submit an offer based on the equivalent item if the following conditions are met:
i. Prior to receipt of this solicitation, the firm must have received written Government Engineering approval of a test procedure on its non-listed item.
ii. The firm must indicate in its offer the date of the written Government Engineering approval of its test procedure, and the name and title of the approving official.
iii. The firm indicates in its offer that it is in the process of having its item independently tested per the approved test procedure to demonstrate full physical, functional, and mechanical interchangeability of its part with an already approved part cited in this solicitation, or that it is awaiting final Government Engineering approval of the summary report furnished
7 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
at the conclusion of independent testing; and
iv. The firm must have secured final written approval of its part from Government Engineering by the time of bid opening (in the case of formally advertised acquisitions) or by the time of contract award (in the case of negotiated acquisitions).
v. Notwithstanding the foregoing, the Government expressly reserves to the Procuring Contracting Officer the right to waive the conditions set forth in paragraph (c)1 above in making an award when it is clearly established that written approval from Government Engineering of a non-listed part number can be obtained without delay in the anticipated date of award.
(2) When the foregoing conditions are met, the Government reserves the right to make an award for a non-listed item. In no other instance will award be made to any firm that does not agree to furnish one of the required part numbers listed in this solicitation.
(3) Any firm that manufactures or regularly sells an item which it views as equivalent in all respects to one of our required part numbers, but that has not initiated approved qualification testing in order to demonstrate that its part is totally equivalent to the required part, should see the notice entitled PART NUMBERS NOT CURRENTLY APPROVED, located elsewhere in this Section L.
(d) It is the responsibility of each Offeror to ensure the availability of sufficient quantities of source-controlled components before making an offer in response to this solicitation. Except as described in paragraph (e) below, offers that propose to substitute alternatives to the source-controlled components, even if the substitute items are represented as equivalent in all respects to the source-controlled components, will not be considered for contract award.
(e) Required Approval for Alternatives to the Source-Controlled Component:
(1) \*()By meeting the following conditions, a firm may submit an offer conditioned on acceptance by the Government of alternatives to the source-controlled component(s) listed in the Technical Data Package:
-- Prior to receipt of this solicitation, the firm must have received written Government Engineering approval of a test procedure on its proposed equivalent component.
-- The firm must indicate in its offer the date of the written Government Engineering approval, and the name and title of the approving official.
-- The firm must certify in its offer that it is in the process of having its item independently tested per the approved test procedure to demonstrate full physical, functional, and mechanical interchangeability of its part with an already-approved part cited in this solicitation, or that it is awaiting final Government Engineering approval of the summary report furnished at the conclusion of testing; and
-- The firm must have secured final written approval of its part from Government Engineering by the time of bid opening
(in the case of formally advertised acquisitions) or by the time of contract award (in the case of negotiated acquisitions).
(2) Notwithstanding the foregoing, the Procuring Contracting Officer has the right to waive the above conditions in making an award when it is clearly established that written approval of a non-listed part from Government Engineering can be obtained without delay in the anticipated date of award.
When either of the foregoing conditions are met, the Government reserves the right to make an award where use of the equivalent item is authorized in lieu of the source-controlled item. Where the foregoing conditions are not met, Offeror will not be eligible for award unless agreeing to furnish the source-controlled item(s) from the indicated source(s).
(3) Any firm that manufactures or regularly sells an item which it views as equivalent in all respects to one of our required components, but that has not initiated approved qualification testing in order to demonstrate that its part is totally equivalent to the required component, should see the notice entitled PART NUMBERS NOT CURRENTLY APPROVED, located elsewhere in this Section L.
(f) If the drawings in the Technical Data Package for this requirement contain reference notes indicating one or more sources of supply have previously furnished the items depicted on the drawings, these notes also specify some sort of approval requirement, typically phrased in one of the following ways:
(1) or equal
(2) or approved substantial equal
(3) Ordnance Corps approval required
(4) Ordnance Corps Engineering approval required
(g) With the exceptions described in paragraph (h) below, and in the narrative entitled REPRESENTATION OF INTENT TO SUPPLY A
8 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SOURCE-CONTROLLED ITEM), the listing of sources of supply on drawings with such approval requirements means that only those listed sources may furnish the items depicted on such drawings. Thus, any Offeror responding to this solicitation and not meeting the exception criteria set forth herein will be deemed to have agreed to furnish the contract item from a listed source.
(h) Required Approval for Non-listed Part Number:
(1) When the following conditions are met, the Government reserves the right to consider and accept an offer conditioned on a manufacturer's part number not cited in the Technical Data Package. In order to be eligible for such consideration, any firm offering a non-listed part number must:
-- have received, prior to receipt of this solicitation, written TACOM approval of a test plan on its item, designed to demonstrate that the non-listed part is physically, functionally, and mechanically interchangeable with the listed part number(s) cited herein;
-- indicate in its offer the date of the formal Government Engineering approval of the test plan, and the name and title of the approving official;
-- be in the process of having its non-listed part number tested by an independent testing facility under the terms of the approved plan, or be awaiting final Government Engineering approval of the summary report furnished at the conclusion of testing;
and
-- have secured final written approval of its part from Government Engineering by the time of bid opening (in the case of formally advertised acquisitions) or by the time of contract award (in the case of negotiated acquisitions).
(2) Notwithstanding the foregoing, the Procuring Contracting Officer has the right to waive the above conditions in making an award when it is clearly established that written approval from Government Engineering can be obtained without delay in the anticipated date of award.
(3) Any firm that cannot comply with conditions in paragraph (c) above upon submission of its offer under this solicitation, but that believes one of its part numbers to be equivalent to the approved part number(s) cited in this solicitation, is invited to begin the qualification procedure to gain approval of such non-listed part number for purposes of future acquisition action. Please see the narrative entitled PART NUMBERS NOT CURRENTLY APPROVED, which is located elsewhere in this Section L.
************ End of Narrative L.6 ************
L.11 Acquisition of New Facilities, Special test Equipment or Special Tooling_____________________________________________________________________________
(a) It is not the intent of the Government to acquire, or to have acquired for its account, any facilities, special test equipment, or special tooling as those terms are defined below. The Government shall under no circumstances reimburse the Offeror for the cost of any new facilities, special test equipment, or special tooling as a separate item. An Offeror may, however, amortize the cost of any such facilities, special test equipment, or special tooling it may require in the submitted price of the items. Such facilities, special test equipment or special tooling shall not be subject to Government option rights to take title to the same except as specified in the
DEFAULT, TERMINATION FOR THE CONVENIENCE OF THE GOVERNMENT, and/or PROGRESS PAYMENT clauses of this contract.
************ End of Narrative L.11 ************
L.12 Part Numbers Not Currently Approved________________________________________
As specified elsewhere in this solicitation, part or all of the contract item to be procured is restricted to certain approved manufacturer's part numbers as set forth in the Schedule and/or the Technical Data Package. Any firm that produces an item which it believes to be equivalent to one of these approved part numbers is encouraged to have such item tested and approved, so that the item will be eligible to be bought on future acquisitions. Please write to the attention of the Contract Specialist at the email address indicated on the cover page of this solicitation and request a statement of the procedures by which items can be tested and approved for procurement. Such an inquiry should cite the applicable National Stock Number (NSN), the already approved part number, the part number of the item which the enquirer believes to be identical to our approved item, and a brief statement of the basis on which the new item is believed to be equivalent to the already approved item.
************ End of Narrative L.12 ************
L.13 Reverse Auction_____________________
The Procuring Contracting Officer (PCO) may utilize on-line reverse auctioning as a means of conducting price discussions under this solicitation. If the PCO does not conduct a reverse auction, award may be made on the basis of initial offers or following discussions not using reverse auctioning as a pricing technique. If the PCO decides to use on-line reverse auctioning to conduct price negotiations, 9 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
the PCO will notify offerors of this decision and the following provisions will apply.
(a) The award decision will be made in accordance with the evaluation factors as set forth in the solicitation. The reverse on-line auction will be used as a pricing technique during discussions to establish the final offered prices from each offeror. These prices will be used in conjunction with the evaluation factors stated elsewhere in the solicitation in order to make the award decision in accordance with the basis for award stated in the solicitation.
(b) Following the decision to conduct discussions using on-line reverse auctioning as a pricing technique, the PCO or his/her representative will provide offerors determined to be in the competitive range with information concerning the on-line auction process.
The Government intends to use a commercial web-based product to conduct the reverse auction.
(c) Prior to or simultaneously with conducting the on-line reverse auction, the PCO may hold discussions with the offerors concerning matters appropriate for discussion, such as issues involving technical proposals or unbalanced pricing.
(d) The lowest offerors price(s) for each round of the reverse auction will be disclosed to other offerors and anyone else having authorized access to the on-line auction. This disclosure is anonymous, meaning that each offerors identity will be concealed from other offerors (although it will be known to the Government; only a generic identifier will be used for each offerors proposed pricing, such as Offeror A or lowest-priced offeror). By submitting a proposal in response to the solicitation, offerors agree to participate in the reverse auction and that their prices may be disclosed, including to other offerors, during the reverse auction.
(e) The reverse auction system currently in use designates offers as "Lead," meaning the current low price in that auction, or "Not
Lead," meaning not the current low price in that auction. In the event of a tie offer, the reverse auction provider's system designates the first offer of that price as "Lead" and the second or subsequent offer of that price as "Not Lead." Offerors shall not submit a tie offer, since this is inconsistent with the purpose of the reverse auction. If a tie offer is submitted, the "Not Lead" offeror that submitted the tie offer must offer a changed price; it will be ineligible for award if the final price in the auction is the tie offer price.
(f) An offerors final auction price at the close of the reverse auction will be considered its final proposal revision. No price revisions will be accepted after the close of the reverse auction, unless the PCO decides that further discussions are needed and final proposal revisions are again requested in accordance with Federal Acquisition Regulation (FAR) 15.307, or the PCO determines that it would be in the best interest of the Government to re-open the auction.
(g) The following information is provided regarding the procedures to be followed if a reverse auction is conducted.
(1) Each offeror identified by the PCO as a participant in the reverse auction will be contacted by Defense Logistic Agencys commercial reverse auction service provider to advise the offeror of the event and to provide an explanation of the process.
(2) In order for an Offeror to participate in the reverse auction, such offeror must agree with terms and conditions of the entire solicitation, including this provision, and agree to the commercial reverse auction service providers terms and conditions for using its service. Information concerning the reverse auction process and the commercial service providers terms and conditions is embedded within the email notification sent by the on-line reverse auction pricing tool system administrator.
(3) Offerors shall secure the passwords and other confidential materials provided by the commercial reverse auction service provider or the Government and ensure they are used only for purposes of participation in the reverse auction. Offerors shall keep their own and other offerors pricing in confidence until after contract award.
(4) Any offeror unable to enter pricing through the commercial reverse auction service providers system during a reverse auction must notify the PCO or designated representative immediately. The PCO may, at his/her sole discretion, extend or re-open the reverse auction if the reason for the offerors inability to enter pricing is determined to be without fault on the part of the offeror and outside the offerors control.
(5) The reverse auction will be conducted using the commercial reverse auction service providers website as embedded in the email notification. Offerors shall be responsible for providing their own computer and internet connection.
(6) Training:
(i) The commercial reverse auction service provider will provide familiarization training to offerors employees; this training may be provided through written material, the commercial reverse auction service providers website, and/or other means.
(ii) An employee of an offeror who successfully completes the training shall be designated as a 'trained offeror.' Only trained offerors may participate in a reverse auction. The PCO reserves the right to request that offerors provide an alternate offeror employee to become a 'trained offeror.' The PCO also reserves the right to take away the 'trained offeror' designation from any trained offeror who fails to abide by the solicitations or commercial reverse auction service providers terms and conditions.
************ End of Narrative L.13 ************
L.15 Agency Protests____________________
Companies protesting this procurement may file a protest 1) with the Procuring contracting officer, 2) with the General Accounting
Office, or 3) pursuant to Executive Order No. 12979, with the Agency for a decision by the Activity's Chief of the Contracting Office.
Protests filed with the agency should clearly state that they are an "Agency Level Protest under Executive Order No. 12979." (Note: DLA procedures for Agency Level Protests filed under Executive Order No. 12979 allow for a higher level decision on the initial protest than would occur with a protest to the Procuring Contracting Officer; this process is not an appellate review of a Procuring Contracting
Officer's decision on a protest previously filed with the Procuring Contracting Officer). Absent a clear indication of the intent to file an agency level protest, protests will be presumed to be protests to the Procuring contracting officer.
NOTE: DLA Agency Protests for DLA Warren shall be filed with:
Chief of the Contracting Office
10 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DLA Land Warren
Mail Stop 729; ZG
6501 E. Eleven Mile Road
Warren, MI 48397-5000
Contracting Officer Protests shall be submitted to the Contracting Officer designated in the solicitation or award.
************ End of Narrative L.15 ************
L.18 Destinations for Option Quantities________________________________________
To compute a price for any option quantity, assume you will be shipping a proportional share of the option quantity to each destination scheduled to receive shipments of the same item under the basic contract. For example, if the basic contract involves one third of the quantity to go to destination X, and two thirds to destination Y, assume those same percentages will apply to any option quantities the Government will exercise.
************ End of Narrative L.18 ************
L.19 Packaging Level for Option Quantities__________________________________________
For purposes of computing a price for the option quantity specified in Section B of this solicitation and unless otherwise indicated in Section B, it is understood and agreed that the option unit price includes the same level(s) of packing/packaging as those that apply to the basic contract quantity.
************ End of Narrative L.19 ************
L.24 Notice of Offerors Intending to Offer Other Than New Material___________________________________________________________________
(a) The Government intends to acquire only new material. Unless this contract otherwise requires virgin material or supplies composed of, or manufactured from, virgin material, the Contractor shall provide supplies that are new, as defined in this clause.
(b) Definitions:
(1) "New" means composed of previously unused components, whether manufactured from virgin material, recovered material in the form of raw material, or materials and by-products generated from, and reused within, an original manufacturing process; provided that the supplies meet contract requirements, including but not limited to, performance, reliability, and life expectancy.
(2) "Reconditioned" means restored to the original normal operating condition by readjustments and material replacement.
(3) "Recovered material" means waste materials and by-products that have been recovered or diverted from solid waste including post-consumer material, but such term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(4) "Remanufactured" means factory rebuilt to original specifications.
(5) "Virgin material" means previously unused raw material, including previously unused copper, aluminum, lead, zinc, iron, other metal or metal ore, or any undeveloped resource that is, or with new technology will become, a source of raw materials.
(6) "Residual Inventory" means inventory from a transferred or terminated Government or commercial contract.
(c) Used, reconditioned, remanufactured supplies, unused former Government surplus property, or residual inventory shall not be used unless the Contractor has proposed the use of such supplies, and the Procuring Contracting Officer has authorized their use.
(d) Offers to provide other than new material shall be submitted to the Procuring Contracting Officer for approval:
(1) Offerors of other than new material must provide sufficient information from which a determination of acceptability can be made. Contractors who intend to offer other than new material must contact the Contracting Office listed on the first page of this solicitation to obtain an Other Than New Material Worksheet. Form must be completely filled out and is to accompany your offer.
(e) If the use of used, reconditioned, remanufactured items, unused former Government surplus property, or residual inventory are approved by the Procuring Contracting Officer, we may require you to meet specific marking, inspection, and testing requirements beyond those found in this solicitation. We will negotiate these additional requirements with you before award and put them in any resulting contract.
************ End of Narrative L.24 ************
11 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.25 E-mail Offer Submissions_____________________________
(a) Vendors shall email offers to the Contracting Specialist identified on the cover page of the solicitation. The email shall include subject header: Proposal Submission SPRDL1-20-Q-0163(company name) on the solicitation.
(b) Submissions must be received by the deadline as stated in the solicitation. All electronics formats are acceptable, PDF format is preferred.
(c) An electronic read-receipt is recommended for submission confirmation. Vendors will receive an e-mail reply by the Contracting
Specialist stating whether the e-mail was received by the deadline.
(d) Questions regarding email submissions should be directed to the Contracting Specialist identified on the cover page of the solicitation.
************ End of Narrative L.25 ************
*** END OF NARRATIVE L0001 ***
EVALUATION FACTORS FOR AWARD
M.8 Evaluation of Incomplete Option Pricing___________________________________________
(a) Per FAR 17.203(d), Offerors may price the option CLIN in this solicitation incrementally, by entering different option unit prices that will apply to different subquantities or quantity ranges (in the event that the Government elects to exercise less than 100% of the option). Notwithstanding this, the provision entitled EVALUATION OF OPTIONS (FAR 52.217-5, located elsewhere in this Section M) indicates that the Government's evaluation for contract award will include each Offeror's price for 100% of the option quantity.
(b) If an Offeror specifies unit prices that apply to one or more option quantity ranges, but does not specify a unit price for 100% of the option, the Government will evaluate that offer for award as follows. The option price for such offer shall be deemed to be the higher of (i) the unit price that applies to the basic (non-option) quantity, or (ii) the highest unit price that is identified against any range or subquantity of the option CLIN.
************ End of Narrative M.8 ************
M.10 Contractor Responsibility and Eligibility for Award________________________________________________________
(a) The Government will award a contract to the offeror that:
(1) submits the lowest evaluated offer if award is based on price only, or the offer that provides the best value to the
Government if factors in addition to price are identified elsewhere in this solicitation, and ___
(2) submits a bid or proposal that meets all the material requirements of this solicitation, and ___
(3) meets all the responsibility criteria at FAR 9.104.
(b) To make sure that the Offeror meets the responsibility criteria at FAR 9.104 we may:
(1) arrange a visit to the Offerors plant and perform a pre-award survey;
(2) ask the Offeror to provide financial, technical, production, or managerial background information.
(c) If the Offeror does not provide the Government with the requested data within 7 days from the date of request, or if facility visit is refused, the Government may determine the Offeror non-responsible.
(d) If the Government visits the facility, please make certain that current certified financial statements and other data relevant to the bid or proposal is available for review.
************ End of Narrative M.10 ************
*** END OF NARRATIVE M0001 ***
12 12
| SUPPLEMENTAL INFORMATION |
| SUPPLIES OR SERVICES AND PRICES/COSTS |
| INSPECTION AND ACCEPTANCE |
| CONTRACT CLAUSES |
| INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS |