REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of
(This is NOT an Order)
1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating
See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)
See Schedule
7. Delivery
FOB Other Destination
5B. For Information Call: (Name and telephone no.) (No collect calls)
8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)
See Schedule
10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.
Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. Schedule (Include applicable Federal, State, and local taxes)
Item Number (a)
Supplies/Services (b)
Quantity (c)
Unit (d)
Unit Price (e)
Amount (f)
(See Schedule)
12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage
NOTE: Additional provisions and representations are are not attached.
13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation
16. Signer
a. Name (Type or Print) b. Telephone
Area Code
c. Title (Type or Print) Number
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)
X
SPRDL1-20-Q-0130 2020JUL21 DOA4
SPRDL1DLA LAND WARREN
WARREN, MI 48397-5000
ROBERT HARRISON (586)467-1159
ZGAB
EMAIL: ROBERT.W.HARRISON30.CIV@MAIL.MIL
X
2020AUG21
1 66
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: ROBERT HARRISON
Buyer Office Symbol/Telephone Number: ZGAB/(586)467-1159
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A.4 Acknowledgment of Amendments________________________________
Acknowledge all the amendments received from the Contracting Office by identifying the amendment number and its issue date below:
Amendment Number Date
************ End of Narrative A.4 ************
A.8 Electronic Contracting Provision____________________________________
(a) Vendors should be aware that FedBizOpps (FBO) has moved to https://beta.SAM.gov and is now known as Contracting Opportunities.
(b) All DLA Land Warren solicitations will be publicized on the Contract Opportunities website (https://beta.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or referenced with instructions in the solicitation.
(c) As directed in Section L of this solicitation, interested vendors shall submit a quote or proposal via email to the Contract _________
Specialist listed on the solicitation. The email shall include subject header: Proposal Submission SPRDL1-XX-X-XXXX (company name) on the solicitation.
(d) Requirements for tracking solicitations and submitting bid submissions:
1. Vendors must be registered for a beta.sam.gov account through https://login.gov in order to manage searches and track solicitations. Using the Contract Opportunities search function in beta.sam.gov, vendors will to be able to view the Solicitation and any modifications or amendments made by the Contract Specialist.
2. Vendors may Request Access to controlled documents such as the Technical Data Package (TDP). Interested vendors must request
TDPs via email to the Contracting Specialist as directed in Section C of this solicitation. __________
3. All bids and proposals must be submitted via email to the Contract Specialist on record. _________
(e) Note to offerors:
Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time (EST), for DLA Land Warren. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
It is Offeror's responsibility to ensure the proposal/quote is received by the Contract Specialist by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late.
Proposal/quote is defined to mean that ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
Solicitations may remain posted on beta.sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will need to send any late quotes, if applicable, directly to the Contract Specialist identified on the cover page of this solicitation.
(f) Any awards issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will
2 66
SPRDL1-20-Q-0130
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or
Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the Procuring Contracting Officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at https://www.sba.gov/tools/local-assistance/ptac to locate a regional center.
************ End of Narrative A.8 ************
A.9 All or None________________
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.
************ End of Narrative A.9 ************
*** END OF NARRATIVE A0001 ***
3 66
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 MOTOR,HYDRAULIC
NSN: 4320-01-102-6981
Mfr CAGE: 19207
Mfr Part Number: 12265504
0001AA PRODUCTION QUANTITY 18 EA $ $ ___________________ ______________ __________________
COMMODITY NAME: MOTOR,HYDRAULIC
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH0C0660EH PRON AMD: 04
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12265504
DATE: 08-MAY-2020
First Article Test is required. Waiver may be authorized; see waiver provision in Section L.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV0126968Z W562RP J 3
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 18 0450
FOB POINT: Destination
SHIP TO:
(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
4 66
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AB DATA ITEM: FIRST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** ____________________________________ ______________ __________________
COMMODITY NAME: FIRST ARTICLE TEST
A FIRST ARTICLE TEST REPORT IS REQUIRED IN ACCORDANCE
WITH THE CLAUSE
ENTITLED "FIRST ARTICLE APPROVAL--CONTRACTOR TESTING",
FAR 52.209-3.
THE PRICE FOR FIRST ARTICLE TESTING IN THE TOTAL
AMOUNT OF $_______________ IS INCLUDED IN THE TOTAL
AMOUNT FOR CLIN 0001AA.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0220
FOB POINT: Destination
SHIP TO:
(Y00006) SEE FIRST ARTICLE TEST CLAUSE
FOR DISTRIBUTION
5 66
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002 MOTOR, HYDRAULIC
NSN: 4320-01-102-6981
Mfr CAGE: 19207
Mfr Part Number: 12265504
0002AA UNEXERCISED OPTION QUANTITY 18 EA $ $ ___________________________ ______________ __________________
COMMODITY NAME: MOTOR, HYDRAULIC
CLIN CONTRACT TYPE:
Firm Fixed Price
OPTION QUANTITY, PURSUANT TO THE NARRATIVE ENTITLED
SEPARATELY PRICED OPTION FOR INCREASED QUANTITY IN
SECTION I OF THE BASIC CONTRACT.
The quantity stated for the option CLIN DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated for award.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12265504
DATE: 08-MAY-2020
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 18 0240
6 66
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
7 66
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 Use of MIL-STD 1916_______________________
The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the Procuring Contracting Officer. The Contractor shall use MIL-STD-1916, DOD Preferred Methods of Acceptance of
Product. The Verification Level (VL) shall be VL IV for major characteristics and VL II for minor characteristics. MIL-HDBK-1916 provides guidance on the use of MIL-STD 1916.
************ End of Narrative C.1 ************
C.5 Technical Data Package Information (Contract Opportunities in beta.sam.gov) Version________________________________________________________________________________________
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLINs Web-located TDP. To access the TDP, you will have to copy or type the links URL to your web browser address bar at the top of the screen.
[ X ] 3. The TDP for this solicitation resides within beta.sam.gov under the Contract Opportunities search function
(https://beta.sam.gov ), and is associated with this solicitation number and can be accessed via this URL:
https://beta.sam.gov/opp/577b2893c9234665ab580b558d8f187f/view
a. Log on to the beta.sam.gov website.
b. Enter your Marketing Partner Identification Number (MPIN).
c. Select Contract Opportunities in the search bar and search by solicitation number.
d. If solicitation is Export Controlled, select Verify MPIN.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec
2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and Contractors must have a current DD 2345, Militarily Critical Technical Data
Agreement on file with Defense Logistics Information Service (DLIS).\~ If you are currently certified, your MPIN will be verified and you may proceed to the next step.\~ To obtain certification, login to the Joint Certification Program (JCP) https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx . Click on documents and follow instructions provided.\~ Processing time is estimated at six (6) to ten (10) weeks after receipt. Contract Opportunities will allow you to access export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Pending Access to controlled documents. This will generate an email to the Contract Opportunities system administrator at DLA Warren with all the information needed for them to grant you access.
Contract Opportunities will subsequently automatically generate an email stating when you have permission to view or download
TDP items. Allow 2 3 working days to complete this Contract Opportunities-TDP access/approval process through beta.sam.gov.
f. Only one individual in your company can request access to the Technical Data Package (TDP) for a solicitation. That individual must be registered as the Data Custodian, as identified in the JCP, and be granted approval to view the Technical
Data Package (TDP) for a solicitation. The Data Custodian MUST be registered for a beta.sam.gov account through
8 66
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
https://login.gov . Any individual(s) no longer with the company should be deleted. Questions related to registration in https://login.gov should be directed to https://login.gov/help/ . Questions related to accounts in beta.sam.gov should be directed to https://beta.sam.gov/help/ . Vendors are responsible for placing correct information in login.gov and beta.sam.gov accounts.
g. It is strongly suggested that you submit an access request and provide the Contract Specialist with the completed Use and
Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
[ ] 4. The Government requires a Use and Non-Disclosure Agreement (NDA) to be signed by the Data Custodian of your firm, as identified in the JCP, before access is granted to the technical data. The appropriate Agreement is titled -4-, and is:
[ ] available by emailing the Contract Specialist listed on page 1 of this solicitation.
[ ] available as an attachment to this solicitation.
Follow the instructions on the Agreement, and email it to the Contract Specialist at -5-. The Contract Specialist will notify the
Contract Opportunities administrator upon receiving the NDA. The Administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the
TDP. If you have any questions/problems viewing the TDP contact the Contract Specialist.
************ End of Narrative C.5 ************
C.13 Configuration Control Engineering Changes_______________________________________________
(a) The Contractor may submit Engineering Change Proposal(s) (ECPs) and Request for Variance(s) (RFVs) for the requirements in the
Government provided Technical Data Package (TDP). If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The Contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notice of Revisions (NORs) necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The Contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD
Form 1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the Contractor will be routine priority unless otherwise justified. If the Contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The Contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The Contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the Contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Procuring Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the
Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
(d) Forms If any of the above listed forms are not included with the solicitation or contract, the Contractor may locate forms on the
DOD Forms Website (https://www.esd.whs.mil/Directives/forms/dd1500_1999/ ) or contact the Contract Specialist listed on page 1 of the solicitation or contract for copies of the forms.
************ End of Narrative C.13 ************
C.18 Use of Class 1 Ozone Depleting Substances (CIODS)______________________________________________________
(a) Definitions.
9 66
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: https://www.epa.gov/clean-air-act-overview/clean-air-act-title-vi-stratospheric-ozone-protection
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.
(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.
(a)\*()No Class II Ozone Depleting Substances shall be required in the performance of this contract without Government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.
************ End of Narrative C.18 ************
C.22 Contractor Retention of Supply Chain Traceability Documentation_____________________________________________________________________
1) By submitting a quotation or offer, the Contractor, if it is not the manufacturer of the item, is confirming it currently has, or will obtain before delivery, and shall retain documented evidence (supply chain traceability documentation), as described in paragraph
(2) below, demonstrating the item is from the approved manufacturer and conforms to the technical requirements.
(2) At a minimum, the supply chain traceability documentation for the item shall include: basic item description, part number and/or national stock number, manufacturing source, manufacturing sources Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.
(3) Contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance
Program (CDAP) website http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/ .
(4) The contractor shall immediately make documentation available to the contracting officer upon request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for six years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
************ End of Narrative C.22 ************
*** END OF NARRATIVE C0001 ***
PACKAGING AND MARKING
D.7 Packaging Requirements (Selective Group Packaging Requirements)___________________________________________________________________
(a) Military preservation, packing, and marking for this contract shall be accomplished in accordance with the specific requirements identified below and all the applicable requirements of MIL-STD-2073-1.
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(b) MIL-STD-2073-1, Appendix J establishes and defines codes used in describing military packaging methods and materials. The following codes from Appendix J apply:
(1) Preservation Method Code: 42 (Table j.i.
10 66
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
and j.ia.)
(2) Cleaning Procedure Code: 1 (Table j.ii)
(3) Preservative Material Code: 09 (Table j.iii)
(4) Wrapping Material Code: GH (Table j.iv)
(5) Cushioning and Dunnage Code: NA (Table j.v)
(6) Thickness of Cushioning or Dunnage Code: A (Table j.vi)
(7) Unit Container Code: ZZ (Table j.vii)
(8) Intermediate Container Code: ED (Table j.vii)
(9) Quantity per Intermediate Container Code:
AAA (Appendix J.4.11)
(10) Packing Code: A (Table j.IX and J.IXa)
(11) Special Marking Code: 00 (Zero) (Table j.x)
(c) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(d) Marking:
(1) All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R, including bar coding and Military Shipment Label (MSL). The Contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information Guide.
When an item is assigned Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at http://dodprocurementtoolbox.com/page/unique-id/tools ) for development of the UII and MIL-STD-129, Revision R for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.625-M and the requirements of the International Standards for Phytosanitary Measures 15
(ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens.
Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and
11 66
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
(f) These packaging requirements are intended to provide protection against environmentally induced corrosion and deterioration, physical and mechanical damage, and other forms of degradation during storage, multiple handling, and shipment associated with the military distribution system. The Government encourages Contractors to submit requests for changes that will result in savings or improve the packaging. Please submit request for changes in accordance with the RFD clause of the contract. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing at
Contractors expense.
(g) Hazardous Materials (as applicable):
(1) Hazardous Materials is defined as a substance or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO
P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(h) SUPPLEMENTAL INSTRUCTIONS: ZZ = Pack and preserve IAW Method of Preservation 42. Intermediate Container Quantity = 016.
************ End of Narrative D.7 ************
*** END OF NARRATIVE D0001 ***
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2015
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E.12 Notice Regarding First Article Test Sample_______________________________________________
(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of 2 that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract
12 66
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
price. A quantity of 0 that successfully passes all specified tests, less the destructive tests, if any, SHALL NOT serve as a manufacturing standard for the remainder of the contract.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design, 2) as an aid in identifying any process changes, or 3) as the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the Contractor will notify the Procuring Contracting Officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
************ End of Narrative E.12 ************
E.13 Inspection and Acceptance First Article Approval_____________________________________________________
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
(1) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with dwg 12265504 and MIL-PRF-62365.
(2) The First Article Test Report (FATR) shall be compiled by the Contractor to the Contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the Contractor to allow the designated Government representative to determine that the First Article Test was successfully completed.
************ End of Narrative E.13 ***********
E.18 Inspection and Acceptance Points - Origin______________________________________________
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT:
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT:
(Name) (CAGE)
Address) (City) (State) (Zip)
************ End of Narrative E.18 ************
E.25 Notice Regarding First Article___________________________________
(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be
13 66
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ordered by the Procuring Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
(b) When any of the conditions above occurs, the Contractor shall notify the Procuring Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
************ End of Narrative E.25 ************
E.26 Interchangeability of Components_____________________________________
(a) DESIGN CHANGES TO ITEMS NOT UNDER GOVERNMENT DESIGN CONTROL. Once the Government accepts the first production test item, or ___________________________________________________________ accepts the first end item you deliver, (whichever comes first) you must not make design changes to any item or part that is not under
Government design control.
(b) WHEN THE POLICY CAN BE WAIVED. The Procuring Contracting Officer (PCO) will consider waiving this policy at your request. If _____________________________ your request reaches the PCO after the first production item test has been performed, then we may conduct another first production test at your expense.
(c) PRODUCTION OR DELIVERY DELAYS. Any production or delivery delays caused by this retesting will not be the basis for: _____________________________
(1) an "excusable delay" as defined in the DEFAULT clause of this contract.
(2) be the basis for an increase in contract price or delivery schedule extension.
************ End of Narrative E.26 ************
E.28 Drawings for Inspection____________________________
(a) When requested, the Contractor shall make available to the Government Inspector the drawings and specifications to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings and specifications will be returned to the Contractor.
(b) If the Contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.), the Contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.
(c) The Government may rely on the Contractor's Certificate of Conformance, IAW FAR 52.246-15, that the item tendered for acceptance conforms to the contract requirements. However, conditions may warrant that the Contractor be required to make available to the
Government the drawings, specifications, or other technical data such that the Government can determine if the item meets the contract requirements. These conditions may include, but are not limited to, the following: 1) Complex items or items which have quality characteristics for which contractual conformance must be established through precise measurements and functional operation, either as an individual item or in conjunction with other items, 2) Items used in critical applications or items denoted as critical on technical data, 3) Items with known quality conformance issues, 4) Items with an unstable design history, and/or 5) Contractor changes in technical requirements, technical data, and/or production processes which impact the fit, form, or function of the item.
************ End of Narrative E.28 ************
E.36 Delegation of Authority for First Article Approval_______________________________________________________
The Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO) is hereby delegated the authority to approve or disapprove the First Article Test Report submitted in accordance with this contract (FAR 52.209-3 First Article Testing- Contractor
First Article). Any reference to Procuring Contracting Officer (PCO) as it relates to the submission of, and approval/disapproval of the
FAT Report shall be deemed to mean the DCMA ACO. ACO approval will be predicated upon Quality Assurance Representative (QAR) acceptance of the FAT Report. ACO approval authorizes the Contractor to proceed with production.
************ End of Narrative E.36 ************
14 66
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE E0001 ***
DELIVERIES OR PERFORMANCE
4 52.242-15 STOP-WORK ORDER AUG/1989
5 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
6 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
7 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION MAR/2016
(a) Definitions. As used in this clause--
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
"Concatenated unique item identifier" means
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards
Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid_equivalents.html .
"DoD item unique identification" means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number. For items that are serialized within the part, lot, or batch number within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier; the original part, lot, or batch number; and the serial number.
"Enterprise" means the entity (e.g., a manufacturer or vendor) responsible for assigning unique item identifiers to items.
"Enterprise identifier" means a code that is uniquely assigned to an enterprise by an issuing agency.
"Governments unit acquisition cost" means
(1) For fixed-price type line, subline, or exhibit line items, the unit price identified in the contract at the time of delivery;
(2) For cost-type or undefinitized line, subline, or exhibit line items, the Contractors estimated fully burdened unit cost to the
Government at the time of delivery; and
(3) For items produced under a time-and-materials contract, the Contractors estimated fully burdened unit cost to the Government at the time of delivery.
"Issuing agency" means an organization responsible for assigning a globally unique identifier to an enterprise, as indicated in the
Register of Issuing Agency Codes for ISO/IEC 15459, located at http://www.aimglobal.org/?Reg_Authority15459 .
"Issuing agency code" means a code that designates the registration (or controlling) authority for the enterprise identifier.
"Item" means a single hardware article or a single unit formed by a grouping of subassemblies, components, or constituent parts.
"Lot or batch number" means an identifying number assigned by the enterprise to a designated group of items, usually referred to as
15 66
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
either a lot or a batch, all of which were manufactured under identical conditions.
"Machine-readable" means an automatic identification technology media, such as bar codes, contact memory buttons, radio frequency identification, or optical memory cards.
"Original part number" means a combination of numbers or letters assigned by the enterprise at item creation to a class of items with the same form, fit, function, and interface.
"Parent item" means the item assembly, intermediate component, or subassembly that has an embedded item with a unique item identifier or DoD recognized unique identification equivalent.
"Serial number within the enterprise identifier" means a combination of numbers, letters, or symbols assigned by the enterprise to an item that provides for the differentiation of that item from any other like and unlike item and is never used again within the enterprise.
"Serial number within the part, lot, or batch number" means a combination of numbers or letters assigned by the enterprise to an item that provides for the differentiation of that item from any other like item within a part, lot, or batch number assignment.
"Serialization within the enterprise identifier" means each item produced is assigned a serial number that is unique among all the tangible items produced by the enterprise and is never used again. The enterprise is responsible for ensuring unique serialization within the enterprise identifier.
"Serialization within the part, lot, or batch number" means each item of a particular part, lot, or batch number is assigned a unique serial number within that part, lot, or batch number assignment. The enterprise is responsible for ensuring unique serialization within the part, lot, or batch number within the enterprise identifier.
"Type designation" means a combination of letters and numerals assigned by the Government to a major end item, assembly or subassembly, as appropriate, to provide a convenient means of differentiating between items having the same basic name and to indicate modifications and changes thereto.
"Unique item identifier" means a set of data elements marked on items that is globally unique and unambiguous. The term includes a concatenated unique item identifier or a DoD recognized unique identification equivalent.
"Unique item identifier type" means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at http://www.acq.osd.mil/dpap/pdi/uid/uii_types.html .
(b) The Contractor shall deliver all items under a contract line, subline, or exhibit line item.
(c) Unique item identifier.
(1) The Contractor shall provide a unique item identifier for the following:
(i) Delivered items for which the Government's unit acquisition cost is $5,000 or more, except for the following line items:
Contract Line, Subline, or
Exhibit Line Item Number Item Description
__N/A______________ ___________________________________
(ii) Items for which the Government's unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:
Contract Line, Subline, or
Exhibit Line Item Number Item Description
__N/A______________ ___________________________________
(iii) Subassemblies, components, and parts embedded within delivered items, items with…