EH9L0311EHCDRL_tacom.docx
DOCX document 20 KB Posted
- Attached to
- Box, Turret Position Federal contract opportunity
- Solicitation number
- SPRDL1-20-Q-0022
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRDL120Q0022-0001.pdf | ||
| SPRDL120Q0022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
DD FORM 1423 (MECHANIZED)
CATEGORY: MISC
SYSTEM/ITEM: BOX, TURRET POSITION INDICATOR
TO CONTRACT/PR: EH9L0311EH
NSN: 1005-01-101-6250
1. SEQUENCE NUMBER
2. TITLE OF DATA ITEM
3. SUBTITLE
4. DATA ITEM NUMBER
5. CONTRACT REFERENCE
6. TECHNICAL OFFICE
7. DD 250
8. APP CODE
9. DIST STATEMENT REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF 1ST SUBMISSION
13. DATE OF SUBSEQUENT SUBMISSION
14. DRFT/REG/REPRO/DISTRIBUTION/COPIES
15. TOTAL
16. REMARKS
1. A001
2. ENGINEERING CHANGE PROPOSAL (ECP)
3. N/A
4. DI-SESS-80639
5. SECTION C
6. RDAR-EIS-PD
7. LT
8. N/A
9. SEE BLOCK 16
10. ASREQ
11. N/A
12. ASREQ
13. ASREQ
14. SEE BLOCK 16
15. TOTAL 0 / 2 / 0
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT
CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED
METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A002
2. REQUEST FOR VARIANCE (RFV)
3. N/A
4. DI-SESS-80640
5. SECTION C
6. RDAR-EIS-PD
7. LT
8. N/A
9. SEE BLOCK 16
10. ASREQ
11. N/A
12. ASREQ
13. ASREQ
14. SEE BLOCK 16
15. TOTAL 0 / 2 / 0
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT
CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED
METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A003
2. NOTICE OF REVISION (NOR)
3. N/A
4. DI-SESS-80642
5. SECTION C
6. RDAR-EIS-PD
7. LT
8. N/A
9. SEE BLOCK 16
10. ASREQ
11. N/A
12. ASREQ
13. ASREQ
14. SEE BLOCK 16
15. TOTAL 0 / 2 / 0
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT
CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED
METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A004
2. TEST PROCEDURE-PHOSPHATE COATING
3. PRE-PRODUCTION PROCEDURE
4. DI-NDTI-80603
5. TT-C-490, TYPE 1, PARAS 3.2.1, 3.2.2
6. RDAR-MEE-W(R)
7. XX
8. A
9. N/A
10. ONE/R
11. N/A
12. 60DAC
13. N/A
14. THRU CONTRACTING OFFICER 0 / 1 / 0
15. TOTAL 0 / 1 / 0
16. REMARKS
SUBMIT ELECTRONICALLY TO THE GOVERNMENT CONTRACT SPECIALIST.
BLOCK 8 CONT. - PRIOR TO PRODUCTION, APPROVAL THRU THE CONTRACTING
OFFICER IS REQUIRED W/IN 90 DAYS AFTER CONTRACT AWARD. CONTRACTING
OFFICER WILL ROUTE INTERNALLY TO THE APPROVING OFFICE (FCDD-ACE-QP).
CONTRACTING OFFICER SHALL PROVIDE PROCEDURE AND TEST REVIEW
RESPONSE BACK TO CONTRACTOR. COATED PANELS PER PARA 3.2.2 SHALL INCLUDE
THREE WITH PHOSPHATE ONLY, THREE WITH PHOSPHATE AND PRIMER, AND THREE
WITH PHOSPHATE, PRIMER AND TOP COAT. THE PANELS SHALL BE MAILED TO THE
FOLLOWING ADDRESS:
Combat Capabilities Development Command Armaments Center Attn: FCDD-ACE-QP/Mark Godlewski 1 Rock Island Arsenal Bldg. 62 2nd Floor, NW Wing Rock Island, IL 61299-7300
A DD FORM 250 IS NOT REQUIRED FOR PHOSPHATE COATING PROCEDURE APPROVAL. CONTRACTOR FORMAT ACCEPTABLE.
1. A005
2. TEST/INSPECTION REPORT
3. FIRST ARTICLE TEST REPORT (FATR)CONTRACTOR FACILITY
4. DI-NDTI-80809
5. SECTION E
6. RDAR-EIQ-P
7. XX
8. A* 9.
10. ASREQ
11. N/A
12. ASREQ
13. ASREQ
14. THRU QAR 0 / 1 / 0 PCO 0 /1 / 0 RDAR-EIQ-P O / 1 / 0
15. TOTAL 0 / 3 / 0
16. REMARKS
REQUIRED BY THE AUTHORITY IN BOX 4, PARA 10.2 AND ITS SUBPARAGRAPHS.
CONTRACTOR FORMAT IS ACCEPTABLE.
BOX 5: CONTRACT REFERENCE. THE CONTRACTOR SHALL PROVIDE TO THE PROCURING
CONTRACTING OFFICER, QAR, AND RDAR-EIQ-P AT LEAST 15 CALENDAR DAYS ADVANCE
NOTICE (IN WRITING) OF THE SCHEDULED DATE, TIME AND LOCATION OF START OF
FAT, SO THAT THE GOVERNMENT MAY WITNESS THE TESTS. THE GOVERNMENT WILL
REVIEW THE FATR AND PROVIDE FEEDBACK TO THE CONTRACTOR WITHIN 30 DAYS OF
RECEIPT OF FATR.
BLOCK 13: SUBSEQUENT SUBMISSION ONLY IF INITIAL FAT FAILS.
BLOCK 16: FATR MAY BE SUBMITTED ELECTRONICALLY THROUGH THE QAR, CONTRACTING
OFFICER, AND QUALITY ASSURANCE. QUALITY ASSURANCE ELECTRONIC SUBMISSION:
USARMY.RIA.ARDEC.MBX.RDAR-QEP2@MAIL.MIL -----------------------------------------------------------------------------
DATE: 23 AUGUST 2019
File details come from the government source that posted it. Updated .