Award - SPRDL120P0066.pdf

PDF 96 KB Posted

Attached to
Axle Assembly & Centrifugal Pump Federal contract opportunity
Solicitation number
SPRDL1-20-P-0066
Issued by
Defense Logistics Agency Land and Maritime

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

Offeror To Complete Block 12, 17, 23, 24, & 30

1. Requisition Number Page Of

2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date

7. For Solicitation Information Call:

A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time

9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:

Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program

Hubzone Small Business EDWOSB

Service-Disabled Veteran-Owned Small Business NAICS:

Email: 8(A) Size Standard:

11. Delivery For FOB Destination Unless Block Is Marked

12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating

See Schedule 14. Method Of Solicitation RFQ IFB RFP

15. Deliver To Code 16. Administered By Code

Telephone No.

17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code

Telephone No.

17b. Check If Remittance Is Different And Put Such Address In Offer

18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

(Use Reverse and/or Attach Additional Sheets As Necessary)

25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)

27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.

27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.

28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.

Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:

30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)

30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed

Authorized For Local Reproduction Previous Edition Is Not Usable

Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212

SEE SCHEDULE

SPRDL1-20-P-0066 2020JAN14

JOHN MOSES (586)467-1212

JOHN.P.MOSES.CIV@MAIL.MIL

SPRDL1

DLA LAND WARREN

WARREN, MI 48397-5000

336330

X DOA4

X

SEE SCHEDULE

S1403A

DCMA CHICAGO

1523 WEST CENTRAL ROAD

BLDG 203

ARLINGTON HEIGHTS IL 60005-2451

10988 31VE6

CNH INDUSTRIAL AMERICA, LLC

700 STATE ST

RACINE, WI 53404-3343

HQ0339

DFAS - COLUMBUS CENTER

WEST ENTITLEMENT OPERATIONS

P O BOX 182317

COLUMBUS OH 43218-2317

SEE SCHEDULE

SEE CONTRACT ADMINISTRATION DATA $112,279.27

X X

X SPRDL120Q0019

SEE SCHEDULE

/SIGNED/

DONALD MERKLE

DONALD.E.MERKLE2.CIV@MAIL.MIL (586)467-1217 2020JAN14

1 39

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

32a. Quantity In Column 21 Has Been

Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________

32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative

32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative

32g. E-Mail of Authorized Government Representative

33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final

38. S/R Account No. 39. S/R Voucher Number 40. Paid By

41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)

42c. Date Rec’d (YY/MM/DD) 42d. Total Containers

Standard Form 1449 (Rev. 2/2012) Back

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: JOHN MOSES

Buyer Office Symbol/Telephone Number: ZGBC/(586)467-1212

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Type of Business: Large Business Performing in U.S.

Surveillance Criticality Designator: B

*** End of Narrative A0000 ***

2 39

SPRDL1-20-P-0066

CNH INDUSTRIAL AMERICA, LLC

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 AXLE ASSEMBLY

NSN: 2520-01-615-5705

Mfr CAGE: 10988

Mfr Part Number: 87364069

0001AA Production Quantity 10 EA $ 10,126.96000 $ 101,269.60 ___________________ ______________ __________________

COMMODITY NAME: AXLE ASSEMBLY

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH0C0081EH PRON AMD: 03 ACRN: AA

AMS CD: SM2B1100000

PSC: 2520

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: NO TDP

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE AND SPI FOR DETAILS

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W56HZW9289W101 W25G1U J 2

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 10 12-AUG-2020

FOB POINT: Destination

SHIP TO:

(W25G1U) SU W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2001 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND,PA,17070-5002

CONTRACT/DELIVERY ORDER NUMBER ______________________________

SPRDL1-20-P-0066/0000

3 39

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0002 AXLE ASSEMBLY

NSN: 2520-01-615-5705

Mfr CAGE: 10988

Mfr Part Number: 87364069

0002AA UNEXERCISED OPTION QUANTITY 10 EA $ 10,126.96000 $ 101,269.60 ___________________________ ______________ __________________

COMMODITY NAME: AXLE ASSEMBLY

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 2520

OPTION QUANTITY, PURSUANT TO SECTION

I NARRATIVE ENTITLED "SEPARATELY PRICED

OPTION FOR INCREASED QUANTITY"

The quantity stated for the option CLIN

DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.

The option quantity is not being exercised at the time of award of the basic contract.

The option expiration date is 365 days __________ after contract award.

(End of narrative B001)

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: NO TDP

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE AND SPI FOR DETAILS

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 10 0210

4 39

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

FOB POINT: Destination

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

CONTRACT/DELIVERY ORDER NUMBER ______________________________

SPRDL1-20-P-0066/0000

5 39

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0003 PUMP, CENTRIFUGAL

NSN: 4320-01-567-7008

Mfr CAGE: 10988

Mfr Part Number: 87546977

0003AA Production Quantity 3 EA $ 3,669.89000 $ 11,009.67 ___________________ ______________ __________________

COMMODITY NAME: PUMP, CENTRIFUGAL

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH0C0017EH PRON AMD: 02 ACRN: AA

AMS CD: SM2B1100000

PSC: 4320

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: NO TDP

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE AND SPI FOR DETAILS

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W56HZV9277W104 W25G1U J 2

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 3 12-AUG-2020

FOB POINT: Destination

SHIP TO:

(W25G1U) SU W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2001 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND,PA,17070-5002

CONTRACT/DELIVERY ORDER NUMBER ______________________________

SPRDL1-20-P-0066/0000

6 39

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0004 PUMP, CENTRIFUGAL

NSN: 4320-01-567-7008

Mfr CAGE: 10988

Mfr Part Number: 87546977

0004AA UNEXERCISED OPTION QUANTITY 3 EA $ 3,669.89000 $ 11,009.67 ___________________________ ______________ __________________

COMMODITY NAME: PUMP, CENTRIFUGAL

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 4320

OPTION QUANTITY, PURSUANT TO SECTION

I NARRATIVE ENTITLED "SEPARATELY PRICED

OPTION FOR INCREASED QUANTITY"

The quantity stated for the option CLIN

DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.

The option quantity is not being exercised at the time of award of the basic contract.

The option expiration date is 365 days __________ after contract award.

(End of narrative B001)

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: NO TDP

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE AND SPI FOR DETAILS

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 3 0210

7 39

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

FOB POINT: Destination

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

CONTRACT/DELIVERY ORDER NUMBER ______________________________

SPRDL1-20-P-0066/0000

8 39

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.5 Technical Data Package Information (FBO) Version ________________________________________________

The following Xd item applies to this solicitation:

[X] _ 1. There is no Technical Data Package (TDP) included with this solicitation.

[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLINs Web-located TDP. To access the TDP, you will have to copy or type the links URL to your web browser address bar at the top of the screen.

Note: To copy a link from a .pdf file, click on the Text Select Tool, then highlight the URL, copy and paste it into your browser, and hit the Enter key.

CLIN: N/A

TDP Link (URL): N/A

[ ] 3. The TDP for this solicitation resides within FedBizOpps (https://http://www.fbo.gov ), and is associated with this solicitation number and can be accessed via this URL:

N/A

a. Log on to the FBO web site.

b. Enter your Marketing Partner Identification Number (MPIN).

c. Search for the solicitation number.

d. If solicitation is Export Controlled, select Verify MPIN.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec

2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data

Agreement on file with Defense Logistics Information Service (DLIS). If you are currently certified, your MPIN will be verified and you may proceed to the next step. To obtain certification, go to https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx click on documents and follow instructions provided.

Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow you to access export controlled TDPs once certification is confirmed.

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the

Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the FBO system administrator at DLA Warren with all the information needed for them to grant you access. FBO will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 3 working days to complete this FBO-TDP access/approval process through the FBO system.

f. If multiple individuals in your company need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in Federal Business Opportunities (FBO). Any individuals no longer with the company should be deleted.

Questions related to registration in FBO should be directed to https://www.fbo.gov/index The FBO helpdesk phone number is (866) 606-

8220. Vendors are responsible for placing correct information in FBO.

g. It is strongly suggested that you submit the explicit access request and provide the contract specialist with the completed Use and

Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.

9 39

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

h. A user guide for FBO can be found at https://http://www.fbo.gov - on the right is User Guides - click on Vendor.

[ ] 4. The Government requires a Use and Non-Disclosure Agreement (NDA) to be signed by an authorized representative of your firm before you are granted access to the technical data. The appropriate Agreement is titled N/A, and is:

[ ] available by emailing the contract specialist listed on page 1 of this solicitation.

[ ] available as an attachment to this solicitation.

Follow the instructions on the Agreement, and email/fax it to the contract specialist at N/A. The contract specialist will notify the

FBO administrator upon receiving the NDA. The administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the TDP. If you have any questions/problems viewing the TDP contact the contract specialist

************ End of Narrative C.5 ************

C.12 Acquisition of Manufacturers Part Number ________________________________________

This acquisition is restricted to the item description set forth in the Schedule which specifies a manufacturer's part number.

Since complete Government data for the item are not available, it is understood and agreed that references to specifications and drawings herein shall be deemed to include all changes or revisions thereto which the contractor has made effective as of the date of delivery of any of the items provided for in this contract; provided, that no such change or revision which affects the interchangeability of the item (ability to be interchanged with previous parts or to connect with all mating parts when assembled) shall be effected without the approval of the Procuring Contracting Officer. The contractor agrees that he will furnish to the Administrative

Contracting Officer or Government Inspector, for the purpose of making inspection under any resulting contract, copies of the applicable specifications and drawings indicating all changes or revisions.

************ End of Narrative C.12 ************

C.14 Acquisition of Source-Controlled Part Number ____________________________________________

Acquisition under this contract is restricted to:

(1) The manufacturer's part number or numbers set forth in the Schedule or the Technical Data Package; and

(2) Other manufacturer's part numbers that are physically, functionally, and mechanically interchangeable with the manufacturer's part number(s) listed in the Technical Data Package; provided (i) that these nonlisted part numbers have been furnished to one of the approved manufacturers listed in the Technical Data Package, which firm has then, without making any changes in the characteristics or properties of the part, redesignated that part with one of the approved part numbers; and (ii) that firms tendering a nonlisted part number as described in this paragraph (2) have executed the provision 52.211-4038 entitled REPRESENTATION OF INTENT TO

SUPPLY A SOURCE-CONTROLLED ITEM herein.

************ End of Narrative C.14 ************

C.18 Use of Class 1 Ozone Depleting Substances (CIODS) _________________________________________________

(a) Definitions.

(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: http://www.epa.gov/ozone/science/ods/index.html .

(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.

(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.

(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government

10 39

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing

************ End of Narrative C.18 ************

*** END OF NARRATIVE C0001 ***

11 39

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

PACKAGING AND MARKING

********** The below packaging narrative applies to CLINs 0001AA and 0002AA **********

D.6 Packaging Requirements (Special Packaging Instructions) _______________________________________________________

(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of MIL-STD-2073-1, and the Special Packaging Instruction, see below.

(1) LEVEL OF PRESERVATION: Military __________

(2) LEVEL OF PACKING: A ___

(3) QUANTITY PER UNIT PACKAGE: 001 _____

(4) SPECIAL PACKAGING INSTRUCTION NUMBER: AK16155705 ____________

(a) REVISION: see SPI _________

(b) DATE OF REVISION: 25 Jan 2013 _____________

(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: N/A

(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging

Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the

"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")

(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(c) Marking:

(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and Military

Shipment Label (MSL). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information

Guide. When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7006, refer to the DoD Guide to Uniquely Identifying Items for development of the UII and MIL-STD-129, Revision R for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.625-M and the requirements of the International Standards for Phytosanitary Measures 15

(ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood

Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.

(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

12 39

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention

Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens.

Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

(e) Hazardous Materials (As applicable):

(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.

(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO

P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the

SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to

PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

(g) SUPPLEMENTAL INSTRUCTIONS: See the attached SPI for details. _________________________________

************ End of Narrative D.6 ************

********** The below packaging narrative applies to CLINs 0003AA and 0004AA **********

D.6 Packaging Requirements (Special Packaging Instructions) _______________________________________________________

(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of MIL-STD-2073-1, and the Special Packaging Instruction, see below.

(1) LEVEL OF PRESERVATION: Military __________

(2) LEVEL OF PACKING: A ___

(3) QUANTITY PER UNIT PACKAGE: 001 _____

(4) SPECIAL PACKAGING INSTRUCTION NUMBER: AK15677008 ____________

(a) REVISION: A ___

(b) DATE OF REVISION: 01 Mar 2010 _____________

13 39

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: N/A

(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging

Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the

"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")

(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(c) Marking:

(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and Military

Shipment Label (MSL). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information

Guide. When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7006, refer to the DoD Guide to Uniquely Identifying Items for development of the UII and MIL-STD-129, Revision R for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.625-M and the requirements of the International Standards for Phytosanitary Measures 15

(ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood

Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.

(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention

Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens.

Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

(e) Hazardous Materials (As applicable):

(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.

(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

14 39

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO

P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the

SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to

PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

(g) SUPPLEMENTAL INSTRUCTIONS: See the attached SPI for details. ________________________________

************ End of Narrative D.6 ************

*** END OF NARRATIVE D0001 ***

15 39

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

INSPECTION AND ACCEPTANCE

E.17 Inspection - Acceptance Criteria and Marking Requirement for Other Than New Material ____________________________________________________________________________________

(a) This clause applies only when recovered, reconditioned, remanufactured material or residual inventory is being offered for sale to the Government.

(b) Marking requirements. In addition to the packaging and marking requirements specified elsewhere in the contract, the supplier shall tag the following information on each item:

(1) The supplier's name, address, city and state.

(2) The supplier's Federal Supply Code for Manufacturers (FSCM).

(3) This contract or purchase order number.

(4) The National Stock Number (NSN) and nomenclature.

(5) The category the item falls into, either:

(i) "Recovered Material" means waste materials and by-products that have been recovered or diverted from solid waste including postconsumer material, but such term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(ii) "Reconditioned" means restored to the original normal operating condition by readjustments and material replacement.

(iii) "Remanufactured" means factory rebuilt to original specifications.

(iv) "Residual Inventory" means inventory from a transferred or terminated Government or Commercial contract.

(v) "New, Unused United States Government Surplus Property" means material that was produced under a United States

Government contract and sold through the Defense Property Disposal Service (DPDS) as new surplus property.

(c) Other than new material shall not be offered to the Government for inspection, acceptance or tests if it requires any work beyond that specified in paragraphs d.(2)(i) through d.(2)(v) and paragraph (f) of this clause in order to conform to the TDP, unless performance of such work is approved in advance in writing by the PCO.

(d) Inspection requirements.

(1) The Contractor shall conduct the tests described in paragraph (f). of this clause on all the items selected by the

Government Quality Assurance Representative (QAR), in accordance with the procedures established in paragraph (e) below.

(2) The Contractor shall perform sufficient examinations and tests on the material to ensure that the item(s) will comply with fit, form and functional characteristics. At a minimum, the contractor shall perform 100% inspection on all the items, to ensure:

(i) Completeness of assembly.

(ii) Freedom from rust, contamination or deterioration.

(iii) Proper identification.

(iv) Freedom from any obvious or suspected damage which may render the item or equipment unfit for issue, shipment or continued storage.

(v) The material meets the latest requirements of the TDPL listed in this solicitation/contract.

(3) The Contractor shall prepare a CERTIFICATE OF CONFORMING MATERIAL to certify that supplies comply with the requirements of paragraph d(2)(i) through d(2)(v) and paragraph f of this clause. At the time of inspection/acceptance, one copy of the Certificate shall be provided to the QAR and a copy shall also be attached to each copy of the DD Form 250. The certificate(s) may be for the entire or partial quantities, and shall be executed and furnished by the Contractor or by subcontractors (provided subcontractors' certificates are countersigned by a responsible official of the Contractor). Certificates of conforming material shall include the information below:

(i) This contract's (or purchase order's) number, which is: (N/A)

(ii) The complete nomenclature of supplies, together with lot numbers or other identification, and the quantity in each lot or shipment;

16 39

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(iii) An inspection report of the results of the inspection and any tests performed, including the name of the company conducting the inspection and the date thereof;

(iv) The following certification, with the signature and title of the certifying official: The undersigned, individually and as the authorized representative of the Contractor, warrants and represents that:

(A) All of the information supplied above is true and accurate.

(B) The material covered by this certificate conforms to all contract requirements (including, but not limited to, the drawing and specifications).

(C) The analysis appearing herein is a true and accurate analysis, and

(D) This certificate is made with knowledge that the information within this certification may be used as a basis for contract payment.

(v) Where supplies, which were accepted on the basis of a COC, are found not to conform to all contractual requirements, the Contractor agrees, if notice of the nonconformance is received from the Government within a reasonable time after discovery, to replace or correct supplies, at the Government's option, at no additional cost to the Government.

(e) Inspection/acceptance procedures.

(1) The Contractor shall notify the Administrative Contracting Officer (ACO) at least 20 days before the conduct of the inspections and tests prescribed in paragraph (f), so that the Government representatives will be present to witness such tests.

(2) At the time of Government inspection, the Contractor shall cooperate with the Government Quality Assurance Representative

(QAR) in the following inspection procedures:

(i) The entire quantity called for under this contract must be available at the place specified in the contract for inspection. The QAR will make his sample selection from the entire quantity, selecting at his discretion items for inspection.

(ii) The Contractor shall perform the tests described in paragraph (f). of this clause in the presence of the QAR, unless a waiver has been received in writing from the PCO.

(iii) The Government QAR will visually verify that the remaining material is in accordance with paragraph d(2)(i) through d(2)(v) above and review the Certificate of Conforming Material prepared per paragraph d(3) of this clause.

(iv) Any defective material found during inspection will be rejected by the QAR, who will notify the ACO and PCO of the rejection and the reasons thereof. Defective material will be isolated from the contract amount and the balance of the contract quantity shall be inspected for the defect.

(v) The QAR will also verify Contractor's records such as: year material was purchased, the agency from whom the material was purchased, and sale number. If there is any discrepancy between the Contractor records and the Contractor representation in its bid or proposal prior to award, the PCO will be notified of the discrepancy.

(3) If the supplies furnished under this contract are found not to conform to the contract requirements, the Government may, upon notice furnished within a reasonable time after discovery of such nonconformity, reject the supplies and require replacement thereof. The Contractor has the right to request that a reinspection or retest be performed at the Contractor's expense.

(4) The Contractor shall retain inspection records for each lot or shipment, listing results for each test or inspection specified by the contract, for a period of four years following issuance of final payment under the contract.

(5) In the event that this contract is terminated for default, the Government reserves the right to reprocure new material if acceptable used, reconditioned or surplus material is not available. The Contractor shall be liable for the excess cost of such reprocurement of new material in accordance with the terms of the DEFAULT clause of this contract.

(f) Inspection/acceptance criteria.

(1) NOTE: The inspection criteria specified below constitute acceptable tests for new, unused United States Government surplus sold through the Defense Property Disposal Service. If offered material is for used, reconditioned, recovered, remanufactured or surplus material, from terminated government contracts, additional test and inspection requirements may be directed by the PCO/QAR, as specified.

(2) The inspection/acceptance criteria, which apply under this paragraph, are attached as Special Inspection/Acceptance

Criteria: (N/A).

17 39

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(g) Inspection report. The contractor shall prepare an inspection report of the results of the inspections, examinations, and tests specified in paragraphs d(2)(i) through d(2)(v) and paragraph (f) of this clause, including the date performed and the name of the contractor's inspector. One copy of the report shall be forwarded to the PCO.

************ End of Narrative E.17 ************

E.18 Inspection and Acceptance Points - Origin _________________________________________

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.

Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT:

_Bentley World Packaging 31VE6_____________________ _________________________________

(Name) (CAGE)

_4077 N. First St Milwaukee, WI 53212_______________ _______________________________________

(Address) (City) (State) (Zip)

ACCEPTANCE POINT:

_Bentley World Packaging 31VE6______________________ __________________________________

(Name) (CAGE)

_4077 N. First St Milwaukee, WI 53212________________ _______________________________________

(Address) (City) (State) (Zip)

************ End of Narrative E.18 ************

E.28 Drawings for Inspection _______________________

(a) When requested, the Contractor shall make available to the Government Inspector the drawings and specifications to which the product was manufactured. Upon completion of product inspection and acceptance by the Government inspector, all drawings and specifications will be returned to the Contractor.

(b) If the Contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.), the Contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.

(c) The Government may rely on the Contractor's Certificate of Conformance, IAW FAR 52.246-15, that the item tendered for acceptance conforms to the contract requirements. However, conditions may warrant that the Contractor be required to make available to the

Government the drawings, specifications, or other technical data such that the Government can determine if the item meets the contract requirements. These conditions may include, but are not limited to, the following: 1) Complex items or items which have quality characteristics for which contractual conformance must be established through precise measurements and functional operation, either as an individual item or in conjunction with other items. 2) Items used in critical applications or items denoted as critical on technical data. 3) Items with known quality conformance issues. 4) Items with an unstable design history. 5) Contractor changes in technical requirements, technical data, and/or production processes which impact the fit, form, or function of the item.

************ End of Narrative E.28 ************

*** END OF NARRATIVE E0001 ***

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984

18 39

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DELIVERIES OR PERFORMANCE

F.1 Delivery Schedule _________________

(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.

(b) DEFINITIONS:

(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.

(2) DELIVERY is defined as follows:

FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(4) by the time specified in the individual contract; or

FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.

(c) The Government requires delivery to be made according to the following schedule:

(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

N/A

(2) GOVERNMENT REQUIRED DELIVERY SCHEDULE IF THERE IS NO FIRST ARTICLE TEST (FAT), OR IF FAT IS WAIVED

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

0001AA 10 each 210 days

0002AA 10 each 210 days (if/when exercised)

0003AA 3 each 210 days

0004AA 3 each 210 days (if/when exercised)

(d) Accelerated delivery schedule IS acceptable. ____

(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:

(1) OFFERORS PROPOSED ACCELERATED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .