Solicitation Amendment SPRDL1-19-R-0329-0002.pdf
PDF 40 KB Posted
- Attached to
- DRESSED TRANSFER CASE W/ CONTAINER Federal contract opportunity
- Solicitation number
- SPRDL1-19-R-0329
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRDL119R0329-0004.pdf | ||
| SPRDL119R0329-0003.pdf | ||
| AK15626518.pdf | ||
| Solicitation_Amendment_SPRDL1-19-R-0329-0001.pdf | ||
| Solicitation_SPRDL1-19-R-0329.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0002 2019NOV15
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
GRETCHEN PERRY
EMAIL: GRETCHEN.E.PERRY.CIV@MAIL.MIL
SPRDL1-19-R-0329
2019OCT09
X
X 2019DEC09 11:30pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 12
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: GRETCHEN PERRY
Buyer Office Symbol/Telephone Number: ZGBB/(586)467-1181
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
1. The purpose of Amendment 0002 on Solicitation SPRDL1-19-R-0329 is to:
a. extend the closing date
b. change the buyer's assigned
c. update paragraphs A.1 Electronic Contracting Provision
d. update paragraphs C.1 Technical Data package Information
e. add paragraph L.10
2. The Closing date is changed as follows:
FROM: 19 NOV 2019
TO: 09 DEC 2019
3. The Buyer assigned is now Gretchen Perry, Gretchen.Perry@dla.mil
4. All other terms and conditions remain the unchanged
*** END OF NARRATIVE A0003 ***
A.1 Electronic Contracting Provision____________________________________
(a) Vendors should be aware that FedBizOpps (FBO) has moved to beta.SAM.gov and is now known as Contracting Opportunities.
(b) All DLA Land Warren solicitations will be publicized on the Contract Opportunities website (://www.beta.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(c) As directed in Section L of this solicitation, interested vendors are required to submit a quote or proposal via email to the _________
Contract Specialist listed on the solicitation.
(d) Requirements for tracking solicitations and submitting bid submissions:
1. Vendors must be registered for a beta.sam.gov account through https://login.gov in order to manage searches and track solicitations. Using the Contract Opportunities search function in beta.sam.gov, vendors will to be able to view the Solicitation and any modifications or amendments made by the Contract Specialist.
2. Vendors may Request Access to controlled documents such as the Technical Data Package (TDP). The link to Request Access to
TDPs is found in the Link/Attachments section of the solicitation posted on beta.sam.gov.
3. All bids and proposals must be submitted via email to the Contract Specialist on record. _________
(e) Note to offerors:
Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time (EST), for DLA Land Warren. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
It is Offeror's responsibility to ensure the proposal/quote is received by the Contract Specialist by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late.
Proposal/quote is defined to mean that ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
Solicitations may remain posted on beta.sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will need to send any late quotes, if applicable, directly to the Contract Specialist identified on the cover page
2 12
SPRDL1-19-R-0329
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
of this solicitation.
(f) Any awards issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or
Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at ://www.sba.gov/tools/local-assistance/ptac to locate a regional center.
A.2 Acknowledgment of Amendments________________________________
Acknowledge all the amendments you've received from us by identifying the amendment number and its issue date below:
Amendment Number Date
A.3 Notice of Reverse Auction Provision_______________________________________
After receipt of proposals, the contracting officer will determine if a reverse auction will be conducted. However, the use of a reverse auction does not preclude additional methods of price and/or cost analysis.
If a reverse auction is held, Contractors must be registered in the reverse auction system in order to participate in the auction.
Additionally, the Contractor representative participating in the auction must have taken the on-line reverse auction training prior to the reverse auction. Registration, on-line training, and other information regarding the reverse auction can be found at
://dla.procurexinc.com . If a reverse auction is held and a Contractor that provided a proposal to the solicitation does not participate in the auction, the initially proposed price(s) will be considered and evaluated.
A.4 All or None Commercial Item Acquisition____________________________________________
This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS.
Paragraph (h) is modified to say that you must offer to provide the total quantity of the items in this solicitation. ONLY ONE AWARD
WILL BE MADE AS A RESULT OF THIS SOLICITATION. OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS
SOLICITATION WILL NOT BE CONSIDERED FOR AWARD.
3 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE A0001 ***
4 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 Technical Data Package Information (Contract Opportunities in beta.sam.gov) Version
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[X] 2. The TDP for this solicitation resides within beta.sam.gov under the Contract Opportunities search function
(http://www.beta.sam.gov ), and is associated with this solicitation number and can be accessed in the attachements section
a. Log on to the beta.sam.gov website.
b. Enter your Marketing Partner Identification Number (MPIN).
c. Select Contract Opportunities in the search bar and search by solicitation number.
d. If solicitation is Export Controlled, select Verify MPIN.
(1)TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2)Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3)To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS).\~ If you are currently certified, your MPIN will be verified and you may proceed to the next step.\~ To obtain certification, go to
://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx click on documents and follow instructions provided.\~ Processing time is estimated at six (6) to ten (10) weeks after receipt. Contract Opportunities will allow you to access export controlled TDPs once certification is confirmed.
(4)Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Pending Access to controlled documents. This will generate an email to the
Contract Opportunities system administrator at DLA Warren with all the information needed for them to grant you access. Contract
Opportunities will subsequently automatically generate an email stating when you have permission to view or download TDP items.
Allow 2 3 working days to complete this Contract Opportunities-TDP access/approval process through beta.sam.gov.
f. If multiple individuals in your company need access to the Technical Data Package (TDP) for a solicitation, each individual MUST
Request Access and be granted approval to view the TDP. Those same individuals MUST be registered for a beta.sam.gov account through https://login.gov . Any individuals no longer with the company should be deleted. Questions related to registration in https://login.gov should be directed to https://login.gov/help/ . Questions related to accounts in beta.sam.gov should be directed to https://beta.sam.gov/help/ . Vendors are responsible for placing correct information in login.gov and beta.sam.gov accounts.
g. It is strongly suggested that you submit an access request and provide the contract specialist with the completed Use and Non-
Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
[ ] 4. The Government requires a Use and Non-Disclosure Agreement (NDA) to be signed by an authorized representative of your firm before you are granted access to the technical data. The appropriate Agreement is titled -4-, and is:
[ ] available by emailing the contract specialist listed on page 1 of this solicitation.
[ ] available as an attachment to this solicitation.
Follow the instructions on the Agreement, and email it to the contract specialist at -5-. The contract specialist will notify the Contract Opportunities administrator upon receiving the NDA. The administrator will grant approval to view/download the
TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the TDP. If you have any questions/problems viewing the TDP contact the contract specialist.
5 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.2 Drawing Limitations_______________________
(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are adequate ___ to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing _____________________________ process.
(d) The Contractor is responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited in _____________________________ accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the
Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
C.3 Configuration Control Engineering Changes
(a) The contractor may submit Engineering Change Proposal(s) (ECPs) and Request for Variance(s) (RFVs) for the requirements in the
Government provided Technical Data Package (TDP). If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all NORs necessary to completely define the requested change.
Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form
1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
6 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(d) Forms If any of the above listed forms are not included with the solicitation or contract, the contractor may locate forms on the
DOD Forms Website (://www.dtic.mil/whs/directives/forms/ ) or contact the contract specialist listed on page 1 of the solicitation or contract for copies of the forms.
C.4 Acquisition of Manufacturers Part Number: Components________________________________________________________
One or more of the drawings for part of the contract item set forth in the Schedule and in the Technical Data Package specify manufacturer's part numbers. Since complete Government technical data for such part or parts are not available, it is understood that the Contractor, by accepting this contract, agrees to furnish only the listed manufacturer's part number(s) for those components of the contract item, except as provided in the provision entitled NOTICE REGARDING "SOURCE-CONTROLLED" COMPONENTS. (In Section L or near the end of this solicitation.) It is further understood and agreed that references to manufacturer's part numbers herein shall be deemed to include all changes or revisions thereto which the approved manufacturer has made effective as of the first date of delivery of any of the items under this contract; provided, that no change or revision that affects the interchangeability (ability to be interchanged with ________ previous parts and to match with all mating parts when assembled) of the listed manufacturer's part shall be incorporated into the contract item without the prior written approval of the Procuring Contracting Officer
C.5 Use of Class 1 Ozone Depleting Substances (CIODS)
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the
Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: ://www.epa.gov/ozone/science/ods/index.html .
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.
(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing
C.6 Use of MIL-STD 1916_______________________
The Government will not accept lots whose samples submitted for acceptance contain nonconformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD-1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be VL IV for major characteristics and VL II for minor characteristics. MIL-HDBK-1916 provides guidance on the use of MIL-STD 1916.
*** END OF NARRATIVE C0001 ***
7 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 Data and Communications Submitted to the Government Electronically________________________________________________________________________
(a) The Government often employs contractors as system administrators to operate and maintain Government computer systems. These systems include local area networks, web sites, databases, other electronic records, e-mail accounts, other electronic data transfer mechanisms and computer software. The employees of these contracted system administrators sign nondisclosure agreements obligating them not to reveal information contained in files, documents, computers or systems that they administer. However, unless such information is protected in some way, contracted system administrators do have the ability to access such information.
(b) Potential contractors as well as any other parties are thus advised to take steps needed to prevent access by contracted system administrators to information submitted electronically to the Government. Absent such steps, it is assumed that contracted system administrators are permitted the capability to access the data. The access will be limited to that which is necessary for the contract system administrator to perform its duties for the Government. The access shall be subject to the condition that third party information is not to be revealed by the contracted system administrator.
L.2 Notice Regarding Source-Controlled Components_________________________________________________
(a) Please see the provision entitled ACQUISITION OF MANUFACTURER'S PART NUMBER: COMPONENTS in this solicitation. At least one component of the item to be purchased under this acquisition is restricted to specified manufacturer's part numbers as set forth in the
Technical Data Package. It is the responsibility of each offeror to ensure the availability of sufficient quantities of such source- _______ controlled components before making an offer in response to this solicitation. Except as described in paragraph (b) below, offers that__________ propose to substitute alternatives to the source-controlled components, even if the substitute items are represented as equivalent in all respects to the source-controlled components, will not be considered for contract award.
(b) Required Approval for Alternatives to the Source-Controlled Component:
(1) By meeting the following conditions, a firm may submit an offer conditioned on acceptance by the Government of alternatives to the source-controlled component(s) listed in the Technical Data Package:
-- Prior to receipt of this solicitation, the firm must have received written TACOM approval of a test procedure on its _____ proposed equivalent component.
-- The firm must indicate in its offer the date of the written TACOM approval, and the name and title of the approving official.
-- The firm must certify in its offer that it is in the process of having its item independently tested per the approved test procedure to demonstrate full physical, functional, and mechanical interchangeability of its part with an already-approved part cited in this solicitation, or that it is awaiting final TACOM engineering approval of the summary report furnished at the conclusion of testing; and
-- The firm must have secured final written approval of its part from TACOM engineering by the time of bid opening, (in the case of formally advertised acquisitions), or by the time of contract award, (in the case of negotiated acquisitions).
(2) Notwithstanding the foregoing, the Procuring Contracting Officer has the right to waive the above conditions in making an award when it is clearly established, in his sole discretion, that written approval of a nonlisted part from TACOM engineering can be obtained without delay in the anticipated date of award.
When either of the foregoing conditions are met, the Government reserves the right to make an award where use of the equivalent item is authorized in lieu of the source-controlled item. Where the foregoing conditions are not met, offeror will not be eligible for award unless he agrees to furnish the source-controlled item(s) from the indicated source(s).
(c) Any firm that manufactures or regularly sells an item which it views as equivalent in all respects to one of our required components, but that has not initiated approved qualification testing in order to demonstrate that its part is totally equivalent to the required component, should see the notice entitled PART NUMBERS NOT CURRENTLY APPROVED, located elsewhere in this Section L.
L.3 Acquisition of New Facilities, Special test Equipment or Special Tooling____________________________________________________________________________
(a) It is not the intent of the Government to acquire, or to have acquired for its account, any facilities, special test equipment, or special tooling as those terms are defined below. The Government shall under no circumstances reimburse the offeror for the cost of any new facilities, special test equipment, or special tooling as a separate item. An offeror may, however, amortize the cost of any such facilities, special test equipment, or special tooling it may require in the submitted price of the items. Such facilities, special
8 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
test equipment or special tooling shall not be subject to Government option rights to take title to the same except as specified in the
DEFAULT, TERMINATION FOR THE CONVENIENCE OF THE GOVERNMENT, and/or PROGRESS PAYMENT clauses of this contract.
(b) As used in this solicitation/contract, FACILITIES means industrial property (other than material, special tooling, military property, and special test equipment) for production, maintenance, research, development, or test, including real property and rights in it, buildings, structures, improvements, and plant equipment.
(c) As used in this solicitation/contract, SPECIAL TEST EQUIPMENT means either single or multipurpose integrated test units engineered, designed, fabricated, or modified to accomplish special purpose testing in the performance of the contract. Such testing units comprise electrical, electronic, hydraulic, pneumatic, mechanical, or other items or assemblies of equipment, that are mechanically, electrically, or electronically interconnected so as to become a new functional entity, causing the individual item or items to become interdependent and essential in the performance of special purpose testing in the development or production of particular supplies or services. The term SPECIAL TEST EQUIPMENT does not include: (1) material; (2) special tooling; (3) buildings and non-everable structures (except foundations and similar improvements necessary for the installation of special test equipment); and (4) plant equipment items used for general plant testing purposes.
(d) As used in this solicitation/contract, SPECIAL TOOLING means all jigs, dies, fixtures, molds, patterns, taps, gauges, other equipment and manufacturing aids, and their replacements, which are of such a specialized nature that, without substantial modification or alteration, their use is limited to the development or production of particular supplies or parts of them, or the performance of particular services. The term includes all components of such items, but does not include: (1) material; (2) special test equipment;
or (3) buildings, and non-severable structures (except foundations and similar improvements necessary for the installation of special tooling), general or special machine tools, or similar capital items.
L.4 Part Numbers Not Currently Approved_______________________________________
As specified elsewhere in this solicitation, part or all of the contract item to be procured is restricted to certain approved manufacturer's part numbers as set forth in the Schedule and/or the Technical Data Package. Any firm that produces an item which it believes to be equivalent to one of these approved part numbers is encouraged to have such item tested and approved, so that the item will be eligible to be bought on future acquisitions. Please write to the attention of the buyer at the email address indicated on the cover page of this solicitation and request a statement of the procedures by which items can be tested and approved for procurement.
Such an enquiry should cite the applicable National Stock Number (NSN), the already approved part number, the part number of the item which the enquirer believes to be identical to our approved item, and a brief statement of the basis on which the new item is believed to be equivalent to our already approved item.
L.5 Agency Protests___________________
Companies protesting this procurement may file a protest 1) with the contracting officer, 2) with the General Accounting Office, or 3) pursuant to Executive Order No. 12979, with the Agency for a decision by the Activity's Chief of the Contracting Office. Protests filed with the agency should clearly state that they are an "Agency Level Protest under Executive Order No. 12979." (Note: DLA procedures for
Agency Level Protests filed under Executive Order No. 12979 allow for a higher level decision on the initial protest than would occur with a protest to the contracting officer; this process is not an appellate review of a contracting officer's decision on a protest previously filed with the contracting officer). Absent a clear indication of the intent to file an agency level protest, protests will be presumed to be protests to the contracting officer.
NOTE: DLA Agency Protests for DLA Warren shall be filed with:
Chief of the Contracting Office
DLA Land Warren
Mail Stop 729; ZG
6501 E. Eleven Mile Road
Warren, MI 48397-5000
Contracting Officer Protests shall be submitted to the Contracting Officer designated in the solicitation or award.
L.6 Submission of Subcontracting Plan______________________________________
(a) Please refer to FAR 52.219-9, SMALL BUSINESS AND SMALL DISADVANTAGED BUSINESS SUBCONTRACTING PLAN, which is incorporated by
9 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
reference in Section I of this solicitation. The clause requires large businesses to submit a subcontracting plan for small and small disadvantaged business concerns. Such plans are not required from offerors that are small businesses.
(b) Large businesses may submit a copy of their plans (i) as an attachment to their offer in response to this solicitation; or
(ii) after the bid opening/proposal closing date, in response to the Government's telephonic request (in which case the copy must be provided within five workdays of the date of the request). The plan will be submitted to the buyer's e-mail address on the face page of the solicitation.
(c) Mark each page of your subcontracting plan with the solicitation number and date. If this is a negotiated acquisition, the
Government reserve the right to negotiate any and all elements of the proposed plan during negotiation of cost, technical, and/or managerial features of the proposal. The Government also reserve the right in negotiated acquisitions to discuss the subcontracting plan after receipt of any best and final offer, in which case such discussion shall not constitute a re-opening of negotiations.
(d) Failure to submit and, if applicable, negotiate an acceptable subcontracting plan which, in the judgment of the Contracting
Officer, provides the maximum practicable opportunity for small business and small disadvantaged business concerns to participate in the awarded contract shall render the offeror ineligible for award. In this connection, offerors should be aware of the statutory goal that has been placed on the Department of Defense to award five percent of its total planned subcontracting dollars to small disadvantaged businesses (to include Historically Black Colleges and Universities and Minority Institutions) at the prime contract and subcontract levels. In view of this Congressional mandate, large businesses shall provide specific explanation as a part of any written subcontracting plan furnished in response to this solicitation/contract that identifies a goal for subcontracting to small disadvantaged business concerns and/or Historically Black Colleges and Universities and/or Minority Institutions that, in the aggregate, amounts to less than five percent of the proposal's total subcontracting dollars.
L.7 Offerors Quality Assurance System______________________________________
(a) This solicitation will result in a contract that will require the contractor to use a quality-assurance system to ensure the quality of the contract items.
(b) To allow DLA Land Warren to analyze your proposed quality system, especially if that system is not based on a national or international standard, you must identify your system as part of your response to this solicitation.
(1) If the Government is requiring ISO 9001:2000 (tailored: delete paragraph 7.3) where you will be required to supply conforming product to an established design, and your quality system conforms to ISO 9002, MIL-I-45208 or another comparable specification or standard, this is sufficient description: you need not further describe your quality system in response to this solicitation.
(2) If the Government is requiring ISO 9001:2000 (untailored) where your capability to design and supply conforming product needs to be demonstrated, and your quality system conforms to ISO 9001, MIL-Q-9858, or another comparable specification or standard, this is sufficient description: you do not need to further describe your quality system in your response to this solicitation.
Note: If the Government is requiring ISO 9001:2000 (untailored), quality systems conforming to ISO 9002 or MIL-I-45208 or comparable quality systems are not acceptable for this contract.
(3) If your quality system does not conform to any of the standards listed immediately above, identify the name of the quality system you intend to use and provide a description of your proposed system in enough detail to let us assess its suitability for use in performing the resulting contract. This is of particular importance if your proposed system is unique, using quality control methods and techniques that your company has developed in-house.
(4) If you provide a description of your quality system, make sure that your description covers how your system:
(i) Achieves defect prevention, and
(ii) Provides process control, and
(iii) Ensures adequate quality controls throughout all areas of contract performance.
If some of the features of your system are described in other forms (brochures, for example, or articles), you may attach a copy of such items to your response to this solicitation. If your system is described in a textbook or publication that is available from a commercial or academic distributor, include a reference to the publication by author, title, copyright date, and publisher in your system description. You need not physically attach a copy of a textbook to your offer.
(c) If you already described your quality system as an attachment to another DLA Land Warren solicitation within the previous 90 days, you can either send us another copy, or simply identify the number of the previous solicitation.
10 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(d) If you do not provide us a description of your quality system, or if the description you send does not show all of the required features as stated in paragraph (b) above, your offer may be ineligible for contract award.
L.8 Reverse Auction____________________
The Contracting Officer may utilize on-line reverse auctioning as a means of conducting price discussions under this solicitation. If the Contracting Officer does not conduct a reverse auction, award may be made on the basis of initial offers or following discussions not using reverse auctioning as a pricing technique. If the Contracting Officer decides to use on-line reverse auctioning to conduct price negotiations, the Contracting Officer will notify offerors of this decision and the following provisions will apply.
(a) The award decision will be made in accordance with the evaluation factors as set forth in the solicitation. The reverse on-line auction will be used as a pricing technique during discussions to establish the final offered prices from each offeror. These prices will be used in conjunction with the evaluation factors stated elsewhere in the solicitation in order to make the award decision in accordance with the basis for award stated in the solicitation.
(b) Following the decision to conduct discussions using on-line reverse auctioning as a pricing technique, the Contracting Officer or his/her representative will provide offerors determined to be in the competitive range with information concerning the on-line auction process. The Government intends to use a commercial web-based product to conduct the reverse auction.
(c) Prior to or simultaneously with conducting the on-line reverse auction, the Contracting Officer may hold discussions with the offerors concerning matters appropriate for discussion, such as issues involving technical proposals or unbalanced pricing.
(d) The lowest offerors price(s) for each round of the reverse auction will be disclosed to other offerors and anyone else having authorized access to the on-line auction. This disclosure is anonymous, meaning that each offerors identity will be concealed from other offerors (although it will be known to the Government; only a generic identifier will be used for each offerors proposed pricing, such as Offeror A or lowest-priced offeror). By submitting a proposal in response to the solicitation, offerors agree to participate in the reverse auction and that their prices may be disclosed, including to other offerors, during the reverse auction.
(e) The reverse auction system currently in use designates offers as "Lead," meaning the current low price in that auction, or "Not
Lead," meaning not the current low price in that auction. In the event of a tie offer, the reverse auction provider's system designates the first offer of that price as "Lead" and the second or subsequent offer of that price as "Not Lead." Offerors shall not submit a tie offer, since this is inconsistent with the purpose of the reverse auction. If a tie offer is submitted, the "Not Lead" offeror that submitted the tie offer must offer a changed price; it will be ineligible for award if the final price in the auction is the tie offer price.
(f) An offerors final auction price at the close of the reverse auction will be considered its final proposal revision. No price revisions will be accepted after the close of the reverse auction, unless the Contracting Officer decides that further discussions are needed and final proposal revisions are again requested in accordance with Federal Acquisition Regulation (FAR) 15.307, or the ______
Contracting Officer determines that it would be in the best interest of the Government to re-open the auction.
(g) The following information is provided regarding the procedures to be followed if a reverse auction is conducted.
(1) Each offeror identified by the Contracting Officer as a participant in the reverse auction will be contacted by Defense Logistic
Agencys commercial reverse auction service provider to advise the offeror of the event and to provide an explanation of the process.
(2) In order for an Offeror to participate in the reverse auction, such offeror must agree with terms and conditions of the entire solicitation, including this provision, and agree to the commercial reverse auction service providers terms and conditions for using its service. Information concerning the reverse auction process and the commercial service providers terms and conditions is embedded within the email notification sent by the on-line reverse auction pricing tool system administrator.
(3) Offerors shall secure the passwords and other confidential materials provided by the commercial reverse auction service provider or the Government and ensure they are used only for purposes of participation in the reverse auction. Offerors shall keep their own and other offerors pricing in confidence until after contract award.
(4) Any offeror unable to enter pricing through the commercial reverse auction service providers system during a reverse auction must notify the Contracting Officer or designated representative immediately. The Contracting Officer may, at his/her sole discretion, extend or re-open the reverse auction if the reason for the offerors inability to enter pricing is determined to be without fault on the part of the offeror and outside the offerors control.
(5) The reverse auction will be conducted using the commercial reverse auction service providers website as embedded in the email notification. Offerors shall be responsible for providing their own computer and internet connection.
(6) Training:
(i) The commercial reverse auction service provider will provide familiarization training to offerors employees; this training may be provided through written material, the commercial reverse auction service providers website, and/or other means.
(ii) An employee of an offeror who successfully completes the training shall be designated as a 'trained offeror.' Only trained offerors may participate in a reverse auction. The Contracting Officer reserves the right to request that offerors provide an alternate offeror employee to become a 'trained offeror.' The Contracting Officer also reserves the right to take away the 'trained offeror' designation from any trained offeror who fails to abide by the solicitations or commercial reverse auction service providers terms and conditions.
11 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.9 Notice of Offerors Intending to Offer Other Than New Material__________________________________________________________________
(a) We intend to acquire only new material. Unless this contract otherwise requires virgin material or supplies composed of, or manufactured from, virgin material, the contractor shall provide supplies that are new, as defined in this clause.
(b) Definitions:
(1) "New" means composed of previously unused components, whether manufactured from virgin material, recovered material in the form of raw material, or materials and by-products generated from, and reused within, an original manufacturing process; provided that the supplies meet contract requirements, including but not limited to, performance, reliability, and life expectancy.
(2) "Reconditioned" means restored to the original normal operating condition by readjustments and material replacement.
(3) "Recovered material" means waste materials and by-products that have been recovered or diverted from solid waste including post-consumer material, but such term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(4) "Remanufactured" means factory rebuilt to original specifications.
(5) "Virgin material" means previously unused raw material,including previously unused copper, aluminum, lead, zinc, iron, other metal or metal ore, or any undeveloped resource that is, or with new technology will become, a source of raw materials
(6) "Residual Inventory" means inventory from a transferred or terminated Government or commercial contract.
(c) Used, reconditioned, remanufactured supplies, unused former Government surplus property, or residual inventory shall not be used unless the contractor has proposed the use of such supplies, and the Contracting Officer has authorized their use.
(d) Offers to provide other than new material shall be submitted to the Contracting Officer for approval:
(1) Offerors of other than new material must provide sufficient information from which a determination of acceptability can be made. Contractors who intend to offer other than new material are to fill out the Other Than New Material Worksheet at:
http://contracting.tacom.army.mil/acqinfo/OT_NEW_MATERIAL.htm . Form must be completely filled out and is to accompany your offer. _
(e) If the use of used, reconditioned, remanufactured items, unused former Government surplus property, or residual inventory are approved by the Contracting Officer, we may require you to meet specific marking, inspection, and testing requirements beyond those found in this solicitation. We will negotiate these additional requirements with you before award and put them in any resulting contract.
L.10 E-mail Offer Submissions_____________________________
(a) Vendors should email offers to the Contracting Specialist identified on the cover page of the solicitation.
(b) Submissions must be received by the deadline as stated in the solicitation. All electronics formats are acceptable, PDF format is preferred.
(c) An electronic read-receipt is recommended for submission confirmation. Vendors will receive an e-mail reply by the Contracting
Specialist stating whether the e-mail was received by the deadline.
(d) Questions regarding email submissions should be directed to the Contracting Specialist identified on the cover page of the solicitation.
*** END OF NARRATIVE L0001 ***