SPECIAL PACKAGING INSTRUCTION
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO.
6-974-000796 (12361) HOIST ASSEMBLY, TRUCK
2. CAGE
19207
3. SPI NO.
AK12131632
4. NATIONAL STOCK NO.
3950-01-213-1623
5. DATE
09-10-2015
6. REVISION
7. QUP
8. ICQ
NONE
9. UNIT PACK WT.
288.0
10. UNIT PACK CU
6.853
11. UNIT PACK SIZE (INCHES)
29.5 X 18.0 X 22.3
12. MILITARY PRESERVATION
MIL-STD-2073-1E, METHOD 10
18. STEPS 19.
REQD 20. DESCRIPTION
13. CLEANING
MIL-STD-2073-1E
1-C 1 CONTAINER: ASTM-D6256, TY II, CL 2, STYLE A
MODIFIED, SIZE: 27 ¼” X 16” X 16” I.D.
14. DRYING
MIL-STD-2073-1E
2-D:I A/R BLOCKING AND BRACING: ASTM-D6199
3-J 1 CABLE TIE: SAE AS33671- P/N: MS3367-6
15. PACKING
a. LEVEL A
MIL-STD-2073-1E AND NOTE K
b. LEVEL B
NOT APPLICABLE
16. MARKING
MIL-STD-129 AND NOTE L
17. NOTES/DRAWING:
A. INSPECT PRESERVATION, UNIT PACK, AND PACKING IN ACCORDANCE WITH MIL-STD-2073-1E AND THE
APPLICABLE CONTAINER SPECIFICATION.
B. LUMBER SIZES ARE NOMINAL UNLESS SPECIFIED.
C. PREPARE ASTM-D6256 CONTAINER SKID BASE AS FOLLOWS:
1. SKID RUNNERS ARE 2 X 4S. RUBBING STRIPS AND HEADERS ARE 4 X 4S; AND FLOORING IS 2 X 8
NOMINAL LUMBER. RUBBING STRIPS ARE BEVELED 45O X 1 ½” AT EACH END.
2. RUBBING STRIPS ARE FLUSH WITH END OF SKID RUNNERS.
3. HEADERS, SKID RUNNERS, AND RUBBING STRIPS ARE FASTENED TOGETHER USING ⅜” X 12”
CARRIAGE BOLTS COUNTERSUNK 1” ON BOTTOM OF RUBBING STRIPS.
4. RUBBING STRIPS ARE FASTENED TO SKID RUNNERS USING NAILS, ASTM-F1667, NUMBER 12D, CEMENT COATED, OR RING SHANK AS NECESSARY. SECOND BOLT PER RUBBING STRIP WILL BE
ADDED LATER IN PARAGRAPH G.
D. FABRICATE BLOCKING “A” AS FOLLOWS:
1. STACK BLOCKING “A”, ITEMS 1a, 2, 3, 4, AND 5 AS SHOWN ON PAGE 2, FIGURE 1.
2. USE NAILS, ASTM-F1667, NUMBER 8D, CEMENT COATED, OR RING SHANK AS NECESSARY TO
SECURE FIRST BLOCK TO LOAD BEARING BASE AND TO LAMINATE UPPER LAYERS.
3. PRE-DRILL TWO ½” DIAMETER HOLES AS SHOWN ON PAGE 2, FIGURE 1.
4. WILL BE CALLED BLOCKING “A” THROUGHOUT REST OF INSTRUCTIONS.
BILL OF MATERIAL BLOCKING “A”
ITEM SIZE QTY DESCRIPTION REFERENCE
1a 1b
2 X 5 X 16” 2 ASTM-D6199 SEE PAGE 2, FIGURE 1
SEE PAGE 3, FIGURE 5
2 2 X 4 ¾” X 16” 1 ASTM-D6199 SEE PAGE 2, FIGURE 1
3 2 X 4 ¾” X 6 ½” 2 45O BEVEL, ASTM-D6199 SEE PAGE 2, FIGURE 1
4 2 X 4 ¾” X 5” 2 45O BEVEL, ASTM-D6199 SEE PAGE 2, FIGURE 1
5 2 X 4 ¾” X 4” 4 ASTM-D6199 SEE PAGE 2, FIGURE 1
6 ½” DIA X 20”
HARDWARE
SET
4 SET CONSISTS OF: 1 PC ½” X 20”
CARRIAGE BOLT, 1 PC ½” FLAT
WASHER, 1 PC ½” LOCK WASHER,
AND 1 PC ½” NUT
SEE PAGE 4, FIGURE 6
DD FORM 2169, JUN 1997 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 4 Pages
- TL
SPECIAL PACKAGING INSTRUCTION (Continuation Sheet)
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO.
6-974-000796 (12361) HOIST ASSEMBLY, TRUCK
2. CAGE
19207
3. SPI NO.
AK12131632
09-08-2015
6. REVISION
PARAGRAPH D (CONTINUED)
FIGURE 1. BLOCKING “A”.
E. FABRICATE BLOCKING “B” AS FOLLOWS:
1. PRE-DRILL TWO ½” DIAMETER HOLES IN BLOCKING “B”, ITEM 4, AS SHOWN IN FIGURE 2, BELOW.
2. FASTEN BLOCKING “B”, ITEM 1 TO ONE OF THE BLOCKING “B”, ITEM 3, USING NAILS, ASTM F1667, NUMBER 12D, CEMENT COATED, OR RING SHANK AS REQUIRED. SEE FIGURES 2 AND 3, BELOW.
3. FASTEN BLOCKING “B”, ITEM 2 TO TWO OF THE BLOCKING “B”, ITEM 3, USING NAILS, ASTM F1667, NUMBER 12D, CEMENT COATED, OR RING SHANK AS REQUIRED. SEE FIGURES 2 AND 3, BELOW.
4. FASTEN BLOCKING “B”, ITEM 4 TO THE TWO ASSEMBLIES ABOVE AS SHOWN IN FIGURES 2 AND 3, BELOW. USE NAILS, ASTM F1667, NUMBER 12D, CEMENT COATED, OR RING SHANK AS REQUIRED.
5. WILL BE CALLED BLOCKING “B” THROUGHOUT REST OF INSTRUCTIONS.
FIGURE 2. BLOCKING “B” FABRICATION. FIGURE 3. BLOCKING “B” REAR VIEW.
BILL OF MATERIAL BLOCKING “B”
1 2 X 4” X 8 ¼” 1 ASTM-D6199 SEE FIGURES 2 AND 3, BELOW
2 2 X 5 ½” X 8 ¼” 1 ASTM-D6199 SEE FIGURES 2 AND 3, BELOW
3 2 X 3 ¾” X 8 ¼” 3 ASTM-D6199 SEE FIGURES 2 AND 3, BELOW
4 2 X 5 ¾” X 16” 1 ASTM-D6199 SEE FIGURES 2 AND 3, BELOW
DD FORM 2169C, JUN 1997 PREVIOUS EDITIONS ARE OBSOLETE. Page 2 of 4 Pages
1 ¾
3 ¼
6 ½
2 ⅝ 3
1 ¾
1 ¾
1a
1 ¾ 2 ⅜
¼
SITS FLUSH
TO OUTER
EDGE OF
ITEM 4
½
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO.
6-974-000796 (12361) HOIST ASSEMBLY, TRUCK
2. CAGE
19207
3. SPI NO.
AK12131632
6. REVISION
F. FABRICATE BLOCKING “C” AS FOLLOWS:
1. STACK UPSIDE DOWN BLOCKING “C”, ITEMS 2 AND 3 ONTO ITEM 1. SEE FIGURE 4, BELOW.
2. SECURE USING NAILS, ASTM F1667, NUMBER 12D, CEMENT COATED, OR RING SHANK AS REQUIRED.
3. PRE-DRILL TWO ½” DIAMETER HOLES IN BLOCKING “C”, AS SHOWN IN FIGURE 4, BELOW.
4. WILL BE CALLED BLOCKING “C” THROUGHOUT REST OF INSTRUCTIONS.
FIGURE 4. BLOCKING “C” FABRICATION.
G. PLACE BLOCKING “A”, ITEM 1b, ONTO LOAD BEARING BASE AS SHOWN IN FIGURE 5, BELOW. SECURE USING NAILS, ASTM F1667, NUMBER 12D, CEMENT COATED, OR RING SHANK AS REQUIRED. DRILL FOUR EACH ½” HOLES THROUGH THE LOAD BEARING BASE FLOOR, RUNNERS, AND RUBBING STRIPS USING THE PRE-DRILLED HOLES IN THE BLOCKING AS GUIDES. DRILL A COUNTERSINK 1” ON BOTTOM OF RUBBING
STRIPS WHERE BOLTS EXIT BOTTOM OF RUBBING STRIPS.
FIGURE 5. BLOCKING “A”, AND BLOCKING “A”, ITEM 1b, LOCATION.
BILL OF MATERIAL BLOCKING “C”
1 2 X 4 ¾” X 16” 1 ASTM-D6199 SEE FIGURE 4, BELOW
2 2 X 4 ¾” X 5 ½” 2 45O BEVEL, ASTM-D6199 SEE FIGURE 4, BELOW
3 4 ¾” X 6” 2 ½” CDX PLYWOOD, APA, PS-01 SEE FIGURE 4, BELOW
DD FORM 2169C, JUN 1997 PREVIOUS EDITIONS ARE OBSOLETE. Page 3 of 4 Pages
1 ¾
2 16
2 ⅜
1 ¾
1 ¾ 1b
1 ¾
4 ¾
BLOCKING “A”
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO.
6-974-000796 (12361) HOIST ASSEMBLY, TRUCK
2. CAGE
19207
3. SPI NO.
AK12131632
6. REVISION
H. PLACE “6-974-000796, HOIST ASSEMBLY, TRUCK” ONTO BLOCKING “A” AS ILLUSTRATED IN FIGURE 6, BELOW.
I. PLACE BLOCKINGS “B” AND “C” ON ITEM AS SHOWN IN FIGURE 6, BELOW. SECURE USING BLOCKING “A”
ITEM 6.
FIGURE 6. BLOCKINGS “B” AND “C” ASSEMBLY.
J. USE A CABLE TIE TO HOLD THE LOOSE CABLE LEAD AS SHOWN IN FIGURE 7, BELOW.
FIGURE 7. BLOCKINGS “F-5” AND “F-6” ASSEMBLY.
K. PACKING: THE UNIT CONTAINER IS THE SHIPPING CONTAINER.
L. THE UNIT CONTAINER SHALL BE MARKED ON THE TOP AND ALL FOUR SIDES WITH MINIMUM 1 INCH HIGH
BLACK LETTERS "REUSABLE CONTAINER, DO NOT DESTROY."
DD FORM 2169C, JUN 1997 PREVIOUS EDITIONS ARE OBSOLETE. Page 4 of 4 Pages
BLOCKING “A”
BLOCKING “B” BLOCKING “C”
BLOCKING “A”, ITEM 6
FOUR PLACES
CABLE TIE
File details come from the government source that posted it.