SPRDL119D0143-P00001.pdf

PDF 35 KB Posted

Attached to
Radiator, Engine COO Federal contract opportunity
Solicitation number
SPRDL1-19-R-0188
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

View the file

Other files for this federal contract opportunity

Other files attached to Radiator, Engine COO, newest first.
File Type Posted
SPRDL119D0143.pdf PDF
SPI.pdf PDF
SPRDL119R0188.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

P00001 2019SEP09

SPRDL1

DLA LAND WARREN

WARREN, MI 48397-5000

SARAH TYLER

EMAIL: SARAH.M.TYLER7.CIV@MAIL.MIL

S3605A

DCMA DAYTON

AREA A, BUILDING 30

1725 VAN PATTON DRIVE

WRIGHT-PATTERSON AFB, OH 45433-5302

7PEZ4

TALAN INDUSTRIES LLC

732 NORTHHAMPTON CT

DELAWARE, OH 43015-4009

SPRDL1-19-D-0143

2019JUL25

NO CHANGE TO OBLIGATION DATA

X mutual agreement by both parties

X

SEE SECOND PAGE FOR DESCRIPTION

/SIGNED/ 2019SEP09

SARAH TYLER

SARAH.M.TYLER7.CIV@MAIL.MIL (586)467-1164

1 16

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: SARAH TYLER

Buyer Office Symbol/Telephone Number: ZGAC/(586)467-1164

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Kind of Modification: G

Type of Business: Other Small Business Performing in U.S.

Surveillance Criticality Designator: B

Contract Expiration Date: 2024JUL22

Paying Office: HQ0337

DFAS-CO/NORTH ENTITLEMENT OPERATION

P.O. BOX 182317

COLUMBUS OH 43218-2266

*** End of Narrative A0000 ***

The purpose of this Modification P00001 to SPRDL1-19-D-0143 is to:

1. Remove CLIN 0016AA and all applicable references to First Article Testing Requirements.

2. Change the Inspection Point from Origin to Destination.

3. All other terms and conditions of this contract remain unchanged.

*** END OF NARRATIVE A0002 ***

2 16

SPRDL1-19-D-0143

P00001

TALAN INDUSTRIES LLC

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

This Procurement is a Total Small Business Set-Aside.

(End of narrative A001)

IN THE FIRST FOUR DIGIT ITEM NUMBERS (CLINS) THAT

FOLLOW, THE NUMBERING SYSTEM THAT IS USED IS AS

FOLLOWS:

THE FIRST THREE DIGITS SIGNIFY THE ITEM. THE FOURTH

(LAST DIGIT) INDICATES THE CONTRACT YEAR, i.e., CLIN

0011 IS FOR THE FIRST ITEM - FIRST ORDERING YEAR,

CLIN 0012 IS FOR THE FIRST ITEM - SECOND ORDERING

YEAR, CLIN 0013 IS FOR THE FIRST ITEM - THIRD

ORDERING YEAR, ETC.

THE FINAL LINE ITEM(S) ASSOCIATED WITH EACH

PART, SUCH AS FAT, TECHNICAL MANUALS, SERVICES,

OR TRAINING, WILL BECOME THE LAST ITEM NUMBER

IN NUMERICAL SEQUENCE FOR EACH ITEM, e.g.

0015 (5-YEAR LONG-TERM CONTRACT) OR 0013

(3-YEAR LONG-TERM CONTRACT).

THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE

SOLICITATION AND RESULTING CONTRACT:

FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE OF___________________

AWARD PLUS 364 DAYS.

SECOND ORDERING YEAR OF THE CONTRACT IS 365 DAYS____________________

THROUGH 729 DAYS AFTER CONTRACT AWARD.

THIRD ORDERING YEAR OF THE CONTRACT IS 730 DAYS___________________

THROUGH 1,094 DAYS AFTER CONTRACT AWARD.

FOURTH ORDERING YEAR OF THE CONTRACT IS 1,095 DAYS____________________

THROUGH 1,459 DAYS AFTER CONTRACT AWARD.

FIFTH ORDERING YEAR OF THE CONTRACT IS 1,460 DAYS___________________

THROUGH 1,824 DAYS AFTER CONTRACT AWARD.

NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL ORDER IS

THE PRICE FOR THE ORDERING YEAR IN WHICH THE ORDER IS

ISSUED. THE DELIVERY DATE DOES NOT DETERMINE THE

ORDERING YEAR.

The information presented below applies to Item No.

0011 Through 0015:

Guaranteed Minimum 5 Year Quantity (GMQ): 21 EACH

(This will be awarded at the time of the basic contract award)

Maximum 5 Year Contract Quantity: 750 EACH

ONLY THE GMQ IS GUARANTEED.

NOTE: EACH ORDERING YEAR QUANTITY IS AN ESTIMATE.

3 16

SPRDL1-19-D-0143

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative A002)

0011 RADIATOR, ENGINE COO

NSN: 2930-01-308-9191

Mfr CAGE: 19207

Mfr Part Number: 12352900

0011AA FIRST ORDERING YEAR EST 120 EA $ 3,734.39000 _____________________ ______________

COMMODITY NAME: RADIATOR, ENGINE COO

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 2930

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: TDP 12352900

DATE: 25-FEB-2019

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Origin

FOB POINT: Destination

4 16

SPRDL1-19-D-0143

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0012 RADIATOR, ENGINE COO

NSN: 2930-01-308-9191

Mfr CAGE: 19207

Mfr Part Number: 12352900

0012AA SECOND ORDERING YEAR EST 120 EA $ 3,446.23000 _____________________ ______________

COMMODITY NAME: RADIATOR, ENGINE COO

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 2930

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: TDP 12352900

DATE: 25-FEB-2019

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Origin

FOB POINT: Destination

5 16

SPRDL1-19-D-0143

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0013 RADIATOR, ENGINE COO

NSN: 2930-01-308-9191

Mfr CAGE: 19207

Mfr Part Number: 12352900

0013AA THIRD ORDERING YEAR EST 120 EA $ 3,547.73000 _____________________ ______________

COMMODITY NAME: RADIATOR, ENGINE COO

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 2930

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: TDP 12352900

DATE: 25-FEB-2019

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Origin

FOB POINT: Destination

6 16

SPRDL1-19-D-0143

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0014 RADIATOR, ENGINE COO

NSN: 2930-01-308-9191

Mfr CAGE: 19207

Mfr Part Number: 12352900

0014AA FOURTH ORDERING YEAR EST 120 EA $ 3,653.31000 _____________________ ______________

COMMODITY NAME: RADIATOR, ENGINE COO

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 2930

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: TDP 12352900

DATE: 25-FEB-2019

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Origin

FOB POINT: Destination

7 16

SPRDL1-19-D-0143

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0015 RADIATOR, ENGINE COO

NSN: 2930-01-308-9191

Mfr CAGE: 19207

Mfr Part Number: 12352900

0015AA FIFTH ORDERING YEAR EST 120 EA $ 3,763.11000 _____________________ ______________

COMMODITY NAME: RADIATOR, ENGINE COO

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 2930

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: TDP 12352900

DATE: 25-FEB-2019

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Origin

FOB POINT: Destination

0016AA DELETED _______

8 16

SPRDL1-19-D-0143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

Notice Regarding First Article Test Sample__________________________________________

**DELETE**

Inspection and Acceptance First Article Approval________________________________________________

**DELETE**

Inspection and Acceptance Points - Origin_________________________________________

**DELETE**

Notice Regarding First Article______________________________

**DELETE**

Interchangeability of Components________________________________

(a) DESIGN CHANGES TO ITEMS NOT UNDER GOV'T DESIGN CONTROL. Once the Government accepts the first production test item, or ______________________________________________________ accepts the first end item you deliver, (whichever comes first) you must not make design changes to any item or part that is not under

Government design control.

(b) WHEN THE POLICY CAN BE WAIVED. The Procuring Contracting Officer (PCO) will consider waiving this policy at your request. If _____________________________ your request reaches the PCO after the first production item test has been performed, then we may conduct another first production test at your expense.

(c) PRODUCTION OR DELIVERY DELAYS. Any production or delivery delays caused by this retesting will not be the basis for: _____________________________

(1) an "excusable delay" as defined in the DEFAULT clause of this contract.

(2) be the basis for an increase in contract price or delivery schedule extension.

Drawings for Inspection_______________________

(a) When requested, the Contractor shall make available to the Government Inspector the drawings and specifications to which the product was manufactured. Upon completion of product inspection and acceptance by the Government inspector, all drawings and specifications will be returned to the Contractor.

(b) If the Contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.), the Contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.

(c) The Government may rely on the Contractor's Certificate of Conformance, IAW FAR 52.246-15, that the item tendered for acceptance conforms to the contract requirements. However, conditions may warrant that the Contractor be required to make available to the

Government the drawings, specifications, or other technical data such that the Government can determine if the item meets the contract requirements. These conditions may include, but are not limited to, the following: 1) Complex items or items which have quality characteristics for which contractual conformance must be established through precise measurements and functional operation, either as an individual item or in conjunction with other items. 2) Items used in critical applications or items denoted as critical on technical data. 3) Items with known quality conformance issues. 4) Items with an unstable design history. 5) Contractor changes in technical requirements, technical data, and/or production processes which impact the fit, form, or function of the item.

Routing of Special Process Approvals____________________________________

(a) The Technical Data Package for this contract contains one or more of the following specifications:

MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base

TT-C-490 Chemical Conversion Coatings and Pretreatment for Ferrous

Surfaces (Base for Organic

Coatings)

9 16

SPRDL1-19-D-0143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

MIL-W-12332 Welding Resistance, Spot:

Weldable Aluminum Alloys

MIL-W-45210 Welding Resistance, Spot:

Weldable Aluminum Alloys

*Drawing 12479550 Ground Combat Vehicle Welding

Code - Steel

*Drawing 12472301 Ground Combat Vehicle Welding

Code - Aluminum

* If these drawings are not available with your procurement package, please contact the contract specialist on page 1.

(b) The specifications listed in paragraph 1 may require you to get approval from the Government prior to production for one or more special processes involved in producing the item. The following shall apply, unless stated elsewhere in the contract:

(1) You shall prepare the written procedures as the specification requires.

(2) Procedures requiring Government approval shall be routed to the Administrative Contracting Officer (ACO) for review and approval. If the ACO is unable to perform a review, the ACO shall forward the procedure to the Procuring Contracting Officer (PCO) for assistance in the review and approval process. The correct address for the PCO is on the face page of this contract.

(3) You shall cite (i) the contract number and (ii) the governing specification or standard on all procedures you submit for approval.

(4) The DCMA will provide a copy of their approval/rejection notices to the PCO.

(5) DCMA is required to qualify the processes of the major coating subcontractors used by the prime contractors.

Delegation of Authority for First Article Approval__________________________________________________

**DELETE**

Inspection Origin, Acceptance Destination_________________________________________

**ADD**

The Government's inspection of the supplies offered under this order shall take place at ORIGIN. The Government's acceptance of the supplies offered under this order shall take place at DESTINATION. Offeror must specify below the exact name and address of his facility, or his subcontractor's facility, where supplies to be furnished under this order will be available for origin inspection.

Contractor's Plant:

Talan Industries LLC 7PEZ4 (Manufacturing Division)

(Name and Address)

Subcontractor's Plant:

N/A

(Name and Address)

Requirements for Pretreatment and CARC Painted Material________________________________________________________

(a) Scope

(1) This clause applies to contracts requiring Chemical Conversion Coatings and Pretreatments for Metallic Substrates, Chemical

Agent Resistant Coating (CARC), and their related materials. The requirements in this clause clarify and supplement those in the contract, unless nullified elsewhere in the contract or through an approved Request for Deviation.

(2) Coating qualification, spot paint repair, and MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base coatings are not within the scope of this clause.

(b) Definitions

(1) The contracting agency, appropriate agency, procuring authority, engineering authority, procuring agency, and procuring

10 16

SPRDL1-19-D-0143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

activity is the PCO or designee.

(2) The prime contractor is the company awarded this contract, and the subcontractors comprise all companies involved in providing coated parts to the prime contractor, including companies that apply the coatings.

(c) General Requirements Clarifications

(1) The government retains the right for onsite verification of the prime contractors and its subcontractors products, processes, procedures, and test reports.

(2) The prime contractor shall be responsible for itself and its subcontractors to produce and maintain detailed process control plans, process control data, pre-production approval testing, ongoing quality control & quality control testing, and test reports.

This information shall be available upon government request.

(3) The prime contractor shall immediately notify the PCO and the Defense Contract Management Agency (DCMA) of any failure to meet preproduction and production requirements.

(4) Each cleaning method shall be treated as a separate step in the process documentation.

(5) The Gage Repeatability and Reproducibility (Gage R&R) error shall be less than 30 percent for all process and product measurement systems.

(6) Products with hexavalent chromium, including but not limited to certain fastener finishes, shall not be used. Additionally, CARC topcoats containing siliceous additives to control gloss are prohibited.

(7) CARC primer and CARC topcoat shall not be applied directly to bare metal or plastic, except as provided for in MIL-DTL-53072.

(8) If the contract specifies application of CARC materials over a non-CARC coating, then both CARC primer and CARC topcoat are required. The complete coating system shall meet the requirements for CARC defined in TT-C-490.

(9) Neutral salt spray (NSS) testing shall not be used to validate compliance with materiel life cycle requirements; NSS is a production quality test and does not predict field performance.

(d) Pre-Production Approval Clarifications

(1) Pre-production testing shall include:

(i) Thickness of each layer of the coating system;

(ii) Coating system adhesion;

(iii) Salt spray performance; and

(iv) For phosphate pretreatments, the phosphate coating weight, crystal size and shape, and scanning electron microscope photos of the phosphate coatings at 500x and 1000x magnification.

(2) Pre-production test samples shall be from the material used for production parts, pieces cut from production representative parts, or production representative parts. Standardized test coupons shall not be used.

(3) Nine samples shall be produced for the required testing and shall include: three cleaned and pretreated test samples, three samples with the complete paint system and, depending on the CARC paint system, either three samples with pretreatment plus primer or three samples with metal-rich primer plus primer.

(4) One or more ISO 17025 laboratories shall conduct pre-production testing on the nine test samples in accordance with (IAW) the applicable test method accreditations. The applicable ISO 17025 test method accreditations include ASTM B117 Salt Spray, ASTM B244

Thickness of Non-Conductive Coatings on Non-Magnetic Metals, ASTM B487 Measurement of Metal and Oxide Coating Thickness, ASTM B499

Thickness of Non-Conductive Coatings on Magnetic Metals, and ASTM D3359 Measuring Adhesion by Tape Test.

(5) Unless required elsewhere in the contract and specifications, the CARC coating system applied to hot and cold rolled steel shall meet a minimum of 336 hours neutral salt spray resistance IAW ASTM B117.

(6) Test procedures shall be submitted IAW the Contract Data Requirements List (CDRL) DI-NDTI-80603 documenting Pretreatment and

Chemical Agent Resistant Coating procedures when this CDRL is included in the contract.

(7) Test reports from the ISO 17025 accredited labs shall be submitted for Pretreatment and Chemical Agent Resistant Coating testing specified in paragraph (d)(4) of this clause IAW the Contract Data Requirements List (CDRL) DI-NDTI-80809 when this CDRL is included in the contract.

(e) Production Testing Clarifications

(1) At a minimum, ongoing production quality tests shall conducted and recorded daily for coating adhesion and coating thickness, and monthly for salt spray testing. Use of ISO accredited laboratories is optional for these ongoing tests of production parts.

(2) Production parts or pieces cut from production parts shall be used for ongoing production quality testing. Standardized test coupons shall not be used.

(3) Unless specified elsewhere in the contract and specifications, the CARC coating system applied to hot and cold rolled steel shall meet a minimum of 336 hours neutral salt spray resistance IAW ASTM B117.

*** END OF NARRATIVE E0002 ***

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

E-1 DELETED 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

11 16

SPRDL1-19-D-0143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

Delivery Schedule for Delivery Orders_____________________________________

**CHANGE**

(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.

(b) DEFINITIONS:

(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.

(2) DELIVERY is defined as follows:

FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(4) by the time specified in the individual contract; or

FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.

(c) The Government requires deliveries according to the following schedule on all orders:

(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE:

(i) If FAT is required, start deliveries n/a days after the delivery order date; and/or

(ii) If FAT is not required; FAT is waived; or for subsequent delivery orders to be delivered after initial FAT approval with first delivery order, start deliveries 120 days after delivery order date.

(iii) You will deliver 21 units every thirty days.

(iv) You can deliver more units every thirty days at no additional cost to the government.

(d) Accelerated delivery schedule is acceptable.

(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:

(1) CONTRACTOR PROPOSED ACCELERATED DELIVERY SCHEDULE:

(i) If FAT is required, deliveries will start ___ days after the delivery order date; and/or

(ii) If FAT is not required; FAT is waived; or for subsequent delivery orders to be delivered after initial FAT approval with first delivery order, deliveries will start ___ days after delivery order date.

Long Term Contracts FOB Destination____________________________________

For the purpose of offerors compiling FOB Destination offers, the final destination for the supplies will be one or more of the following destinations; in the following estimated percentages, if listed:

50% Def Dist Depot Red River (BR4)

50% DDSP New Cumberland Facility (AN5)

DEPOT ADDRESS FOR THE APPLICABLE MODE OF SHIPMENTS: IN-THE-CLEAR ADDRESSES__________________________________________________________________________

Rail/ Motor SPLC*: 206721 and 209405

MILSTRIP Address Code: W2561U

Rail Ship to: Transportation Officer

Defense Dist. Depot

Susquehanna

New Cumberland, PA

12 16

SPRDL1-19-D-0143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Motor Ship to: Transportation Officer

Defense Dist. Depot

Susquehanna

New Cumberland, PA

Parcel Post Mail to: Transportation Officer

Defense Dist. Depot

Susquehanna

New Cumberland, PA 17070-5001

NOTE: All deliveries to New Cumberland MUST be scheduled at least 10 days prior to the delivery date. The carrier or contractor must call the New Cumberland DDSP customer service number, 800-307-8496 and provide the following information: contract number, item name, National Stock Number, total weight and cube, and vendor. All shipments to this MILSTRIP address code (W25G1U) are for mission stock and they will need to know that as well, but if you have instructions from the Contracting Officer to use MILSTRIP address code W25N14 instead, you must inform the appointment-taker that the delivery is for Consolidation and Containerization Point (CCP) stock.

Appointments for FOB Origin shipments should be coordinated with DCMA Transportation.

Rail/ Motor SPLC*: 875670 and 875675

MILSTRIP Address Code: W62G2T

Rail Ship to: Transportation Officer

XU Def Dist. Depot

San Joaquin

2600 S. Chrisman Rd.

Rec Whse 10

Tracy, CA 95376-5000

Motor Ship to: Transportation Officer

XU Def Dist. Depot

San Joaquin

2600 S. Chrisman Rd.

Rec Whse 10

Tracy, CA 95376-5000

Parcel Post Mail to: Transportation Officer

Dist. Depot San Joaquin

P.O. Box 96001

Stockton, CA 95296-0130

Rail/ Motor SPLC*: 471995 and 471996

MILSTRIP Address Code: W31G1Z

Rail Ship to: Transportation Officer

Anniston Army Depot

Bynum, AL

Motor Ship to: Transportation Officer

Anniston Army Depot

Bynum, AL

Parcel Post Mail to: Transportation Officer

Anniston Army Depot

Bynum, AL 36201-5021

Rail/ Motor SPLC*: 209741 and 209770

MILSTRIP Address Code: W25G1R

Rail Ship to: Transportation Officer

13 16

SPRDL1-19-D-0143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Letterkenny Army Depot

Culbertson, PA

Motor Ship to: Transportation Officer

Letterkenny Army Depot

Chambersburg, PA

Parcel Post Mail to: Transportation Officer

Letterkenny Army Depot

Chambersburg, PA 17201-4150

Rail/ Motor SPLC*: 661136 and 661157

MILSTRIP Address Code: W45G19 and W562RM

Rail Ship to: Transportation Officer

Red River Army Depot

Defense, TX

Motor Ship to: Transportation Officer

Red River Army Depot

Texarkana, TX

Parcel Post Mail to: Transportation Officer

Red River Army Depot

Texarkana, TX 75507-5000

NOTE: Drivers must schedule an appointment for delivery at least 24 hours in advance. Deliveries will be scheduled for Monday-Friday, 0700-1300. E-mail or fax the PCO at CML (903)334-2208 or CML (903)334-2881. POC's are available Monday-Saturday, 0700-1730 with the exception of government holidays. For directions, please call CML (903)334-3060. Trucks enter through the commercial carrier route entrance and report to building 23 Truck Control 30 minutes prior to their scheduled appointment. Carriers that arrive at Truck Control without appointments will be placed at the end of the day's schedule unless there is an earlier opening and will be worked/unloaded as soon as possible.

POCs: ddrt-appt@dla.mil, Randy Cox, CML (903)334-2945, "mailto:Randy.Cox@dla.mil "

Angela Carr, CML (903)334-4950 "mailto:Angela.Carr@dla.mil "

Jane Haley, CML (903)334-4671 "mailto:Jane.Haley@dla.mil "

Darlene Phelps, CML (903)334-3818 "mailto:Darlene.Phelps@dla.mil " .

Rail/ Motor SPLC*: 764538 and 764535

MILSTRIP Address Code: W67G23

Rail Ship to: Transportation Officer

Tooele Army Depot

Warner, UT

Motor Ship to: Transportation Officer

Tooele Army Depot

Warner, UT

Parcel Post Mail to: Transportation Officer

Tooele Army Depot

Warner, UT 84074-5003

*** SPLC indicates Standard Point Locator Code.

NOTE: The following is applicable only when so specified in an individual order or delivery increment:

14 16

SPRDL1-19-D-0143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

This requirement is a depot replenishment buy, a portion of which is or may be required to fill Direct Support System (DSS) requisitions. Shipment shall be made, as specified, to one or more of:

New Cumberland Army Depot

Red River Army Depot

Sharpe Army Depot prior to shipments to any other depots as may be designated. When more than one depot is designated for DSS shipments, priority shipments will be made equally to each of the designated destinations.

*** END OF NARRATIVE F0001 ***

15 16

SPRDL1-19-D-0143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION I - CONTRACT CLAUSES

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

I-1 ADDED 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO AUG/2019

SURVEILLANCE SERVICES OR EQUIPMENT

I-2 DELETED 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE SEP/1989

I (JAN 1997) AND ALTERNATE II (SEP 1989)

16 16

SPRDL1-19-D-0143

SECTION A
SECTION B
SECTION E
SECTION F
SECTION I

File details come from the government source that posted it.