SPI.pdf
PDF 178 KB Posted
- Attached to
- PUMP, FUEL Federal contract opportunity
- Solicitation number
- SPRDL119R0056
About this file
special packaging instructions
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CUSHIONING.pdf | ||
| SPRDL119R0056-0001.pdf | ||
| SPRDL119R0056.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 2169, JUN 1997 (EG) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 2 Designed using Perform Pro, WHS/DIOR, Jun 97
SPECIAL PACKAGING INSTRUCTION
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE 2. CAGE 3. SPI NO.
(84760) FUEL INJECTION PUMP 19207 AK
4. NATIONAL STOCK NO. 5. DATE 6. REVISION
7. QUP 8. ICQ 9. UNIT PACK WT (LB.) 10. UNIT PACK CU (CU. FT.) 11. UNIT PACK SIZE (INCHES)
1 EACH NONE 15.0 0.447 12.3 X 9.1 X 6.9
12. MILITARY PRESERVATION 18.
STEPS
19.
REQD
20.
DESCRIPTION MIL-STD-2073-1D, METHOD 42
13. CLEANING 1-B INTERNAL PRESERVATIVE: MIL-PRF-21260, GR SAE 10W
MIL-STD-2073-1D 2-C CLOSURE: NAS 847
14. DRYING 3-D EXTERNAL PRESERVATIVE: MIL-PRF-21260, GR SAE 10W
MIL-STD-2073-1D 4-E 1 WRAP: MIL-PRF-121, TYPE I, SIZE: 20 X 29
15. PACKING 5-F CUSHIONING: ASTM D4727, TY CF, CL DOM
6-G 1 CONTAINER: ASTM D5118, TY CF, CL DOM, VARIETY SW,
a. LEVEL A GR. 275, ST RSC, SIZE: 11-1/8 X 6-1/8 X 8-1/8
MIL-STD-2073-1D & NOTE I 7 1 BAG: MIL-DTL-117, TY I, CL E, ST 1, SIZE: 16 X 21
b. LEVEL B 8-G 1 CONTAINER: ASTM D5118, TY CF, CL WR, GR W5c, MIL-STD-2073-1D & NOTE I ST RSC, SIZE: 8-7/8 X 6-5/8 X 11-3/4
16. MARKING
MIL-STD-129 & NOTE H
17. NOTES/DRAWING
A. INSPECT THE PRESERVATION AND UNIT PACK IN ACCORDANCE WITH MIL-STD-2073-1. INSPECT THE PACKING IN ACCORDANCE WITH MIL-STD-1186 AND THE APPLICABLE CONTAINER SPECIFICATION.
B. FLUSH OR SLUSH INTERNALLY AND THOROUGHLY DRAIN EXCESS.
C. PLUG OR CAP ALL PUMP PORTS USING APPROPRIATE SIZES.
D. APPLY PRESERVATIVE TO UNPAINTED AND UNPLATED METALLIC SURFACES.
E. SECURE WRAP USING TAPE.
F. FOR FABRICATION AND PLACEMENT OF CUSHIONING SEE PAGE 2.
G. CLOSE CONTAINER IN ACCORDANCE WITH ASTM D1974, METHOD 2B3.
H. THE UNIT CONTAINER SHALL ALSO BE MARKED ON THE TOP AND ONE SIDE, IN ACCORDANCE WITH MIL-STD-129-SPECIAL MARKINGS, “REUSABLE CONTAINER AND CUSHIONING, DO NOT DESTROY.
OPEN ALONG TAPE SEAMS, AS NEEDED, USING SHALLOW-BLADED KNIFE.”
I. PACKING:
LEVEL A PACKING SHALL BE ACCOMPLISHED USING WOOD-CLEATED PANELBOARD SHIPPING
BOXES, CONFORMING TO ASTM-D 6251, TYPE III, CLASS 2 OR NAILED WOOD BOXES CONFORMING TO
ASTM-D 6880, CLASS 2.
LEVEL B PACKING SHALL BE ACCOMPLISHED USING FIBERBOARD BOXES, WEATHER RESISTANT,
CONFORMING TO ASTM-D 5118 OR TRIPLEWALL, CORRUGATED FIBERBOARD BOXES, CLASS 2,
CONFORMING TO ASTM-D 5168. CLOSURE, SEALING, AND REINFORCEMENT SHALL BE IAW SPECIFIC, APPLICABLE METHODS OF ASTM-D 1974, OR AS REFERENCED IN THE CONTAINER SPECIFICATION.
WHEN TOTAL QUANTITY TO BE SHIPPED TO THE SAME DESTINATION EXCEEDS 125 POUNDS,
EXTERIOR PACKS WITHOUT SKIDS SHALL BE PALLETIZED IN ACCORDANCE WITH MIL-STD-147.
DD FORM 2169, JUN 1997 (EG) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 2 Designed using Perform Pro, WHS/DIOR, Jun 97
SPECIAL PACKAGING INSTRUCTION (Continuation Sheet) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply wi th a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1. PART OR DRAWING NO. (CAGE) NOMENCLATURE 2. CAGE 3. SPI NO.
(84760) FUEL INJECTION PUMP 19207 AK
4. NATIONAL STOCK NO. 5. DATE 6. REVISION
17. NOTES/DRAWING
File details come from the government source that posted it.