SPRDL119P0315_Award.pdf

PDF 72 KB Posted

Attached to
Pump, Rotary Federal contract opportunity
Solicitation number
SPRDL1-19-Q-0172
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

View the file

Other files for this federal contract opportunity

Other files attached to Pump, Rotary, newest first.
File Type Posted
SPI_for_SPRDL119Q0172_AK04047385.pdf PDF
SPRDL119Q0172_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF

ORDER FOR SUPPLIES OR SERVICES

1. CONTRACT PURCH ORDER/AGREEMENT NO. 2. DELIVERY ORDER/CALL NO. 3. DATE OF ORDER/CALL

(YYYYMMMDD)

4. REQUISITION/PURCH REQUEST NO. 5. PRIORITY

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than 6) CODE 8. DELIVERY FOB

DESTINATION

OTHER

(See Schedule if other)

9. CONTRACTOR CODE FACILITY 10. DELIVER TO FOB POINT BY (Date) 11. X IF BUSINESS IS

SMALL

SMALL

NAME 12. DISCOUNT TERMS DISADVANTAGED

AND

ADDRESS

WOMAN-OWNED

13. MAIL INVOICES TO THE ADDRESS IN BLOCK

14. SHIP TO CODE 15. PAYMENT WILL BE MADE BY CODE MARK ALL

PACKAGES AND

PAPERS WITH

IDENTIFICATION

NUMBERS IN

BLOCKS 1 AND 2

16. DELIVERY/

CALL THIS DELIVERY ORDER IS ISSUED ON ANOTHER GOVERNMENT AGENCY OR IN ACCORDANCE WITH AND SUBJECT TO TERMS AND CONDITIONS OF ABOVE NUMBERED CONTRACT.

TYPE

OF

ORDER

PURCHASE

Reference your Oral Written Quotation ________________________ , Dated ________________.

____________________________ furnish the following on terms specified herein.

ACCEPTANCE. THE CONTRACTOR HEREBY ACCEPTS THE OFFER REPRESENTED BY THE NUMBERED PURCHASE ORDER AS IT MAY PREVIOUSLY HAVE BEEN OR IS NOW MODIFIED, SUBJECT TO ALL OF THE TERMS AND CONDITIONS SET FORTH, AND AGREES TO PERFORM THE SAME.

NAME OF CONTRACTOR SIGNATURE TYPED NAME AND TITLE DATE SIGNED

If this box is marked, supplier must sign Acceptance and return the following number of copies:

17. ACCOUNTING AND APPROPRIATION DATA/LOCAL USE

18. ITEM NO. 19. SCHEDULE OF SUPPLIES/SERVICE 20. QUANTITY

ORDERED/

ACCEPTED*

21.

UNIT

22. UNIT PRICE 23. AMOUNT

* If quantity accepted by the Government is 24. UNITED STATES OF AMERICA 25. TOTAL same as quantity ordered, indicate by X. 26.

If different, enter actual quantity accepted below DIFFERENCES quantity ordered and encircle. BY: CONTRACTING/ORDERING OFFICER 27a. QUANTITY IN COLUMN 20 HAS BEEN

INSPECTED RECEIVED ACCEPTED, AND CONFORMS TO CONTRACT EXCEPT AS NOTED ____________________________________________________

b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE c. DATE d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

(YYYYMMMDD) REPRESENTATIVE

e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 28. SHIP. NO. 29. D.O. VOUCHER NO. 30. INITIALS

PARTIAL

32. PAID BY 33. AMOUNT VERIFIED CORRECT FOR

f. TELEPHONE NUMBER g. E-MAIL ADDRESS

FINAL

31. PAYMENT 34. CHECK NUMBER

36. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT.

COMPLETE

a. DATE b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

PARTIAL

35. BILL OF LADING NO.

FINAL

37. RECEIVED AT 38. RECEIVED BY (Print) 39. DATE RECEIVED

40. TOTAL CON-

TAINERS

41. S/R ACCOUNT NUMBER 42. S/R VOUCHER NO.

DD FORM 1155, DEC 2001 PREVIOUS EDITION IS OBSOLETE.

SPRDL1-19-P-0315 2019SEP25 SEE SCHEDULE DOA4

SPRDL1

DLA LAND WARREN

WARREN, MI 48397-5000

DRAKE MARTINEZ

EMAIL: DRAKE.G.MARTINEZ.CIV@MAIL.MIL

S4201A

DCMA NEW CUMBERLAND

54 M AVE, STE 9

NEW CUMBERLAND PA 17070-5012

X

7SC27

JGX INDUSTRIES LLC.

1630 PUMPING STATION ROAD

GETTYSBURG, PA 17325-7149

SEE SCHEDULE

X

X

See Block 15

SEE SCHEDULE

HQ0337

DFAS-CO/NORTH ENTITLEMENT OPERATION

P.O. BOX 182317

COLUMBUS OH 43218-2266

X GREGORY YOHE

SPRDL119Q0172 2019AUG01

SEE CONTRACT ADMINISTRATION DATA

SEE SCHEDULE

DONALD MERKLE

DONALD.E.MERKLE2.CIV@MAIL.MIL (586)467-1217

2019SEP25 /SIGNED/ 2019SEP25

$88,200.00

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: DRAKE MARTINEZ

Buyer Office Symbol/Telephone Number: ZGBC/(586)467-1249

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Type of Business: Small Disadvantaged Business Performing in U.S.

Surveillance Criticality Designator: B

*** End of Narrative A0000 ***

2 32

SPRDL1-19-P-0315

JGX INDUSTRIES LLC.

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PUMP, ROTARY

NSN: 4320-00-404-7385

Mfr CAGE: 19207

Mfr Part Number: 11649924

0001AA PRODUCTION QUANTITY 180 EA $ 490.00000 $ 88,200.00 ___________________ ______________ __________________

COMMODITY NAME: PUMP, ROTARY

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH9C0750EH PRON AMD: 03 ACRN: AA

AMS CD: SM2B1100000

PSC: 4320

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 11649924

DATE: 22-MAR-2019

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE NARRATIVE AND SPI AK04047385 FOR DETAILS

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W56HZV9079967Z W562RP J 2

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 180 28-OCT-2019

FOB POINT: Destination

SHIP TO:

(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

CONTRACT/DELIVERY ORDER NUMBER ______________________________

SPRDL1-19-P-0315/0000

3 32

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0002 PUMP, ROTARY

NSN: 4320-00-404-7385

Mfr CAGE: 19207

Mfr Part Number: 11649924

0002AA UNEXERCISED OPTION QUATITY 180 EA $ 490.00000 $ 88,200.00 __________________________ ______________ __________________

COMMODITY NAME: PUMP, ROTARY

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 4320

OPTION QUANTITY, PURSUANT TO SECTION

I CLAUSE ENTITLED "SEPARATELY PRICED

OPTION FOR INCREASED QUANTITY"

The quantity stated for the option CLIN

DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.

The option expiration date is 365 days __________ after contract award.

(End of narrative B001)

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 11649924

DATE: 22-MAR-2019

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE NARRATIVE AND SPI AK04047385 FOR DETAILS

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 180 0045

FOB POINT: Destination

4 32

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

CONTRACT/DELIVERY ORDER NUMBER ______________________________

SPRDL1-19-P-0315/0000

5 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 Use of MIL-STD 1916_______________________

The Government will not accept lots whose samples submitted for acceptance contain nonconformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD-1916, DOD Preferred Methods of Acceptance of Product. The

Verification Level (VL) shall be VL IV for major characteristics and VL II for minor characteristics. MIL-HDBK-1916 provides guidance on the use of MIL-STD 1916.

************ End of Narrative C.1 ************

C.5 Technical Data Package Information (FBO) Version____________________________________________________

The following Xd item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLINs Web-located TDP. To access the TDP, you will have to copy or type the links URL to your web browser address bar at the top of the screen.

Note: To copy a link from a .pdf file, click on the Text Select Tool, then highlight the URL, copy and paste it into your browser, and hit the Enter key.

CLIN: N/A

TDP Link (URL): N/A

[ X ] 3. The TDP for this solicitation resides within FedBizOpps (https://http://www.fbo.gov ), and is associated with this solicitation number and can be accessed via this URL:

https://www.fbo.gov/fedteds/SPRDL119Q0172

a. Log on to the FBO web site.

b. Enter your Marketing Partner Identification Number (MPIN).

c. Search for the solicitation number.

d. If solicitation is Export Controlled, select Verify MPIN.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec

2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data

Agreement on file with Defense Logistics Information Service (DLIS). If you are currently certified, your MPIN will be verified and you may proceed to the next step. To obtain certification, go to https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow you to access export controlled TDPs once certification is confirmed.

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the

Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the FBO

6 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

system administrator at DLA Warren with all the information needed for them to grant you access. FBO will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 3 working days to complete this FBO-TDP access/approval process through the FBO system.

f. If multiple individuals in your company need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in Federal Business Opportunities (FBO). Any individuals no longer with the company should be deleted.

Questions related to registration in FBO should be directed to https://www.fbo.gov/index The FBO helpdesk phone number is (866)

606-8220. Vendors are responsible for placing correct information in FBO.

g. It is strongly suggested that you submit the explicit access request and provide the contract specialist with the completed Use and

Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.

h. A user guide for FBO can be found at https://http://www.fbo.gov - on the right is User Guides - click on Vendor.

[ ] 4. The Government requires a Use and Non-Disclosure Agreement (NDA) to be signed by an authorized representative of your firm before you are granted access to the technical data. The appropriate Agreement is titled N/A, and is:

[ ] available by emailing the contract specialist listed on page 1 of this solicitation.

[ ] available as an attachment to this solicitation.

Follow the instructions on the Agreement, and email/fax it to the contract specialist at N/A. The contract specialist will notify the

FBO administrator upon receiving the NDA. The administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the TDP. If you have any questions/problems viewing the TDP contact the contract specialist

************ End of Narrative C.5 ************

C.11 Drawing Limitations________________________

(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are adequate to permit manufacture, and:

(1) depict the completed (item(s), and

(2) serve as the basis for inspection of the completed item(s).

(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.

(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.

(d) The Contractor is responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.

(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.

************ End of Narrative C.11 ************

C.13 Configuration Control Engineering Changes_______________________________________________

(a) The contractor may submit Engineering Change Proposal(s) (ECPs) and Request for Variance(s) (RFVs) for the requirements in the

Government provided Technical Data Package (TDP). If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.

7 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all NORs necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.

(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form 1695-1

Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.

(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.

(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.

(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.

(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).

(d) Forms If any of the above listed forms are not included with the solicitation or contract, the contractor may locate forms on the

DOD Forms Website (http://www.dtic.mil/whs/directives/forms/ ) or contact the contract specialist listed on page 1 of the solicitation or contract for copies of the forms.

************ End of Narrative C.13 ************

C.18 Use of Class 1 Ozone Depleting Substances (CIODS)______________________________________________________

(a) Definitions.

(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: http://www.epa.gov/ozone/science/ods/index.html .

(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.

(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.

(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing

************ End of Narrative C.18 ************

*** END OF NARRATIVE C0001 ***

8 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

PACKAGING AND MARKING

D.2 Packaging Requirements (Special Packaging Instructions)___________________________________________________________

(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of MIL-STD-2073-1, and the Special Packaging Instruction, see below.

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: B

(3) QUANTITY PER UNIT PACKAGE: 001

(4) SPECIAL PACKAGING INSTRUCTION NUMBER. SPI AK04047385

(a) REVISION F

(b) DATE OF REVISION 12/04/2017

(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL:

https://www.fbo.gov/fedteds/SPRDL119Q0172

(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging

Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the

"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")

(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(c) Marking:

(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R, including bar coding and

Military Shipment Label (MSL). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information

Guide. When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7006, refer to the DoD Guide to Uniquely Identifying Items for development of the UII and MIL-STD-129, Revision R for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.625-M and the requirements of the International Standards for Phytosanitary Measures 15

(ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood

Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.

(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency

9 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention

Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens.

Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

(e) Hazardous Materials (As applicable):

(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.

(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO

P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the

SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to

PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

(g) SUPPLEMENTAL INSTRUCTIONS: SPI AK04047385 is uploaded in FBO with Solicitation.

************ End of Narrative D.2 ************

*** END OF NARRATIVE D0001 ***

10 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

INSPECTION AND ACCEPTANCE

E.17 Inspection - Acceptance Criteria and Marking Requirement for Other Than New Material_________________________________________________________________________________________

(a) This clause applies only when recovered, reconditioned, remanufactured material or residual inventory is being offered for sale to the Government.

(b) Marking requirements. In addition to the packaging and marking requirements specified elsewhere in the contract, the supplier shall tag the following information on each item:

(1) The supplier's name, address, city and state.

(2) The supplier's Federal Supply Code for Manufacturers (FSCM).

(3) This contract or purchase order number.

(4) The National Stock Number (NSN) and nomenclature.

(5) The category the item falls into, either:

(i) "Recovered Material" means waste materials and by-products that have been recovered or diverted from solid waste including postconsumer material, but such term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(ii) "Reconditioned" means restored to the original normal operating condition by readjustments and material replacement.

(iii) "Remanufactured" means factory rebuilt to original specifications.

(iv) "Residual Inventory" means inventory from a transferred or terminated Government or Commercial contract.

(v) "New, Unused United States Government Surplus Property" means material that was produced under a United States

Government contract and sold through the Defense Property Disposal Service (DPDS) as new surplus property.

(c) Other than new material shall not be offered to the Government for inspection, acceptance or tests if it requires any work beyond that specified in paragraphs d.(2)(i) through d.(2)(v) and paragraph (f) of this clause in order to conform to the TDP, unless performance of such work is approved in advance in writing by the PCO.

(d) Inspection requirements.

(1) The Contractor shall conduct the tests described in paragraph (f). of this clause on all the items selected by the

Government Quality Assurance Representative (QAR), in accordance with the procedures established in paragraph (e) below.

(2) The Contractor shall perform sufficient examinations and tests on the material to ensure that the item(s) will comply with fit, form and functional characteristics. At a minimum, the contractor shall perform 100% inspection on all the items, to ensure:

(i) Completeness of assembly.

(ii) Freedom from rust, contamination or deterioration.

(iii) Proper identification.

(iv) Freedom from any obvious or suspected damage which may render the item or equipment unfit for issue, shipment or continued storage.

(v) The material meets the latest requirements of the TDPL listed in this solicitation/contract.

(3) The Contractor shall prepare a CERTIFICATE OF CONFORMING MATERIAL to certify that supplies comply with the requirements of paragraph d(2)(i) through d(2)(v) and paragraph f of this clause. At the time of inspection/acceptance, one copy of the Certificate shall be provided to the QAR and a copy shall also be attached to each copy of the DD Form 250. The certificate(s) may be for the entire or partial quantities, and shall be executed and furnished by the Contractor or by subcontractors (provided subcontractors' certificates are countersigned by a responsible official of the Contractor). Certificates of conforming material shall include the information below:

(i) This contract's (or purchase order's) number, which is: SPRDL1-19-P0315 _______________

(ii) The complete nomenclature of supplies, together with lot numbers or other identification, and the quantity in each lot or shipment;

11 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(iii) An inspection report of the results of the inspection and any tests performed, including the name of the company conducting the inspection and the date thereof;

(iv) The following certification, with the signature and title of the certifying official: The undersigned, individually and as the authorized representative of the Contractor, warrants and represents that:

(A) All of the information supplied above is true and accurate.

(B) The material covered by this certificate conforms to all contract requirements (including, but not limited to, the drawing and specifications).

(C) The analysis appearing herein is a true and accurate analysis, and

(D) This certificate is made with knowledge that the information within this certification may be used as a basis for contract payment.

(v) Where supplies, which were accepted on the basis of a COC, are found not to conform to all contractual requirements, the Contractor agrees, if notice of the nonconformance is received from the Government within a reasonable time after discovery, to replace or correct supplies, at the Government's option, at no additional cost to the Government.

(e) Inspection/acceptance procedures.

(1) The Contractor shall notify the Administrative Contracting Officer (ACO) at least 20 days before the conduct of the inspections and tests prescribed in paragraph (f), so that the Government representatives will be present to witness such tests.

(2) At the time of Government inspection, the Contractor shall cooperate with the Government Quality Assurance Representative

(QAR) in the following inspection procedures:

(i) The entire quantity called for under this contract must be available at the place specified in the contract for inspection. The QAR will make his sample selection from the entire quantity, selecting at his discretion items for inspection.

(ii) The Contractor shall perform the tests described in paragraph (f). of this clause in the presence of the QAR, unless a waiver has been received in writing from the PCO.

(iii) The Government QAR will visually verify that the remaining material is in accordance with paragraph d(2)(i) through d(2)(v) above and review the Certificate of Conforming Material prepared per paragraph d(3) of this clause.

(iv) Any defective material found during inspection will be rejected by the QAR, who will notify the ACO and PCO of the rejection and the reasons thereof. Defective material will be isolated from the contract amount and the balance of the contract quantity shall be inspected for the defect.

(v) The QAR will also verify Contractor's records such as: year material was purchased, the agency from whom the material was purchased, and sale number. If there is any discrepancy between the Contractor records and the Contractor representation in its bid or proposal prior to award, the PCO will be notified of the discrepancy.

(3) If the supplies furnished under this contract are found not to conform to the contract requirements, the Government may, upon notice furnished within a reasonable time after discovery of such nonconformity, reject the supplies and require replacement thereof. The Contractor has the right to request that a reinspection or retest be performed at the Contractor's expense.

(4) The Contractor shall retain inspection records for each lot or shipment, listing results for each test or inspection specified by the contract, for a period of four years following issuance of final payment under the contract.

(5) In the event that this contract is terminated for default, the Government reserves the right to reprocure new material if acceptable used, reconditioned or surplus material is not available. The Contractor shall be liable for the excess cost of such reprocurement of new material in accordance with the terms of the DEFAULT clause of this contract.

(f) Inspection/acceptance criteria.

(1) NOTE: The inspection criteria specified below constitute acceptable tests for new, unused United States Government surplus sold through the Defense Property Disposal Service. If offered material is for used, reconditioned, recovered, remanufactured or surplus material, from terminated government contracts, additional test and inspection requirements may be directed by the PCO/QAR, as specified.

(2) The inspection/acceptance criteria, which apply under this paragraph, are attached as Special Inspection/Acceptance

12 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Criteria: N/A.

(g) Inspection report. The contractor shall prepare an inspection report of the results of the inspections, examinations, and tests specified in paragraphs d(2)(i) through d(2)(v) and paragraph (f) of this clause, including the date performed and the name of the contractor's inspector. One copy of the report shall be forwarded to the PCO.

************ End of Narrative E.17 ************

E.18 Inspection and Acceptance Points - Origin______________________________________________

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.

Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT:

Part Target 7BFD7_______________________

(Name) (CAGE)

19354 Londelius St., Suite 3, Northridge CA 91324_______________________________________________________________

(Address) (City) (State) (Zip)

ACCEPTANCE POINT:

Part Target 7BFD7__________________________

(Name) (CAGE)

19354 Londelius St., Suite 3, Northridge CA 91324_______________________________________________________________

Address) (City) (State) (Zip)

************ End of Narrative E.18 ************

E.26 Interchangeability of Components_____________________________________

(a) DESIGN CHANGES TO ITEMS NOT UNDER GOV'T DESIGN CONTROL. Once the Government accepts the first production test item, or accepts the first end item you deliver, (whichever comes first) you must not make design changes to any item or part that is not under

Government design control.

(b) WHEN THE POLICY CAN BE WAIVED. The Procuring Contracting Officer (PCO) will consider waiving this policy at your request. If your request reaches the PCO after the first production item test has been performed, then we may conduct another first production test at your expense.

(c) PRODUCTION OR DELIVERY DELAYS. Any production or delivery delays caused by this retesting will not be the basis for:

(1) an "excusable delay" as defined in the DEFAULT clause of this contract.

(2) be the basis for an increase in contract price or delivery schedule extension.

************ End of Narrative E.26 ************

*** END OF NARRATIVE E0001 ***

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984

3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

13 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2015_____________

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

14 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DELIVERIES OR PERFORMANCE

F.1 Delivery Schedule_____________________

(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.

(b) DEFINITIONS:

(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.

(2) DELIVERY is defined as follows:

FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(4) by the time specified in the individual contract; or

FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.

(c) The Government requires delivery to be made according to the following schedule:

(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

N/A N/A N/A

(2) GOVERNMENT REQUIRED DELIVERY SCHEDULE IF THERE IS NO FIRST ARTICLE TEST (FAT), OR IF FAT IS WAIVED

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

0001AA 180 each 120 days

0002AA 180 each 120 days (Option Quantity)

(d) Accelerated delivery schedule IS acceptable. __

(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:

(1) OFFERORS PROPOSED ACCELERATED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

(2) OFFERORS PROPOSED ACCELERATED DELIVERY SCHEDULE WITHOUT FIRST ARTICLE TEST (FAT), or IF FAT IS WAIVED

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

0001AA 180 each 30 days

************ End of Narrative F.1 ************

15 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

F.5 DEPOT ADDRESS FOR THE APPLICABLE MODE OF SHIPMENTS: IN-THE-CLEAR ADDRESSES______________________________________________________________________________

Rail/ Motor SPLC*: 206721 and 209405

MILSTRIP Address Code: W2561U

Rail Ship to: Transportation Officer

Defense Dist. Depot

Susquehanna

New Cumberland, PA

Motor Ship to: Transportation Officer

Defense Dist. Depot

Susquehanna

New Cumberland, PA

Parcel Post Mail to: Transportation Officer

Defense Dist. Depot

Susquehanna

New Cumberland, PA 17070-5001

NOTE: All deliveries to New Cumberland MUST be scheduled at least 10 days prior to the delivery date. The carrier or contractor must call the New Cumberland DDSP customer service number, 800-307-8496 and provide the following information: contract number, item name, National Stock Number, total weight and cube, and vendor. All shipments to this MILSTRIP address code (W25G1U) are for mission stock and they will need to know that as well, but if you have instructions from the Contracting Officer to use MILSTRIP address code W25N14 instead, you must inform the appointment-taker that the delivery is for Consolidation and Containerization Point (CCP) stock.

Appointments for FOB Origin shipments should be coordinated with DCMA Transportation.

Rail/ Motor SPLC*: 875670 and 875675

MILSTRIP Address Code: W62G2T

Rail Ship to: Transportation Officer

XU Def Dist. Depot

San Joaquin

2600 S. Chrisman Rd.

Rec Whse 10

Tracy, CA 95376-5000

Motor Ship to: Transportation Officer

XU Def Dist. Depot

San Joaquin

2600 S. Chrisman Rd.

Rec Whse 10

Tracy, CA 95376-5000

Parcel Post Mail to: Transportation Officer

Dist. Depot San Joaquin

P.O. Box 96001

Stockton, CA 95296-0130

Rail/ Motor SPLC*: 471995 and 471996

MILSTRIP Address Code: W31G1Z

Rail Ship to: Transportation Officer

Anniston Army Depot

Bynum, AL

Motor Ship to: Transportation Officer

Anniston Army Depot

16 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Bynum, AL

Parcel Post Mail to: Transportation Officer

Anniston Army Depot

Bynum, AL 36201-5021

Rail/ Motor SPLC*: 209741 and 209770

MILSTRIP Address Code: W25G1R

Rail Ship to: Transportation Officer

Letterkenny Army Depot

Culbertson, PA

Motor Ship to: Transportation Officer

Letterkenny Army Depot

Chambersburg, PA

Parcel Post Mail to: Transportation Officer

Letterkenny Army Depot

Chambersburg, PA 17201-4150

Rail/ Motor SPLC*: 661136 and 661157

MILSTRIP Address Code: W45G19 and W562RM

Rail Ship to: Transportation Officer

Red River Army Depot

Defense, TX

Motor Ship to: Transportation Officer

Red River Army Depot

Texarkana, TX

Parcel Post Mail to: Transportation Officer

Red River Army Depot

Texarkana, TX 75507-5000

NOTE: Drivers must schedule an appointment for delivery at least 24 hours in advance. Deliveries will be scheduled for Monday-Friday, 0700-1300. E-mail or fax the PCO at CML (903)334-2208 or CML (903)334-2881. POC's are available Monday-Saturday, 0700-1730 with the exception of government holidays. For directions, please call CML (903)334-3060. Trucks enter through the commercial carrier route entrance and report to building 23 Truck Control 30 minutes prior to their scheduled appointment. Carriers that arrive at Truck Control without appointments will be placed at the end of the day's schedule unless there is an earlier opening and will be worked/unloaded as soon as possible.

POCs: ddrt-appt@dla.mil, Randy Cox, CML (903)334-2945, Randy.Cox@dla.mil

Angela Carr, CML (903)334-4950 Angela.Carr@dla.mil

Jane Haley, CML (903)334-4671 Jane.Haley@dla.mil

Darlene Phelps, CML (903)334-3818 Darlene.Phelps@dla.mil.

Rail/ Motor SPLC*: 764538 and 764535

MILSTRIP Address Code: W67G23

Rail Ship to: Transportation Officer

Tooele Army Depot

Warner, UT

Motor Ship to: Transportation Officer

17 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Tooele Army Depot

Warner, UT

Parcel Post Mail to: Transportation Officer

Tooele Army Depot

Warner, UT 84074-5003

*** SPLC indicates Standard Point Locator Code.

NOTE: The following is applicable only when so specified in an individual order or delivery increment:

This requirement is a depot replenishment buy, a portion of which is or may be required to fill Direct Support System (DSS) requisitions. Shipment shall be made, as specified, to one or more of:

New Cumberland Army Depot

Red River Army Depot

Sharpe Army Depot prior to shipments to any other depots as may be designated. When more than one depot is designated for DSS shipments, priority shipments will be made equally to each of the designated destinations.

************ End of Narrative F.5 ************

*** END OF NARRATIVE F0001 ***

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.242-15 STOP-WORK ORDER AUG/1989

2 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

3 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

18 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CONTRACT ADMINISTRATION DATA

PRON/ PRON/

AMS CD/ AMS CD/

LINE MIPR/ OBLG JO NO/ OBLIGATEDLINE MIPR/ OBLG JO NO/ OBLIGATED

ITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNTITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNT_____ _________ _____ ___________ ____ _______________ _________ _____ ___________ ____ __________

0001AA EH9C0750EH 2 AA $ 88,200.00

SM2B1100000

TOTAL $ 88,200.00

OBLIGATED OBLIGATED

ACRN ACCOUNTING CLASSIFICATION AMOUNTACRN ACCOUNTING CLASSIFICATION AMOUNT____ _________________________ ______________ _________________________ __________

AA 97 X4930AC9D 6D 26KB S20113 W56HZV $ 88,200.00 __________________

TOTAL $ 88,200.00

LINELINE

ITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATIONITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATION_____ ____ _______________________________________ ____ __________________________________

0001AA AA 97 0X0X4930AC9D S20113 6D0000SM2B110000026KB S20113 W56HZV

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS DEC/2018

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this

Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/ .

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

19 32

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(ii) For fixed price line items--

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

See Schedule____________

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.