EH8E0612EHCDRL_tacom.docx

DOCX document 19 KB Posted

Attached to
Grip Assembly, Contr Federal contract opportunity
Solicitation number
SPRDL1-18-R-0520
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

View the file

Other files for this federal contract opportunity

Other files attached to Grip Assembly, Contr, newest first.
File Type Posted
SPRDL118R0520.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

DD FORM 1423 (MECHANIZED)

CATEGORY: MISC

SYSTEM/ITEM: GRIP ASSEMBLY SCWS

TO CONTRACT/PR: EH8E0612EH

NSN: 1290-01-612-0067

1. SEQUENCE NUMBER

2. TITLE OF DATA ITEM

3. SUBTITLE

4. DATA ITEM NUMBER

5. CONTRACT REFERENCE

6. TECHNICAL OFFICE

7. DD 250

8. APP CODE

9. DIST STATEMENT REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF 1ST SUBMISSION

13. DATE OF SUBSEQUENT SUBMISSION

14. DRFT/REG/REPRO/DISTRIBUTION/COPIES

1. A001

2. ENGINEERING CHANGE PROPOSAL (ECP)

3. N/A

4. DI-SESS-80639

5. SECTION C

6. RDAR-EIS-PD

7. LT

8. N/A

9. SEE BLOCK 16

10. ASREQ

11. N/A

12. ASREQ

13. ASREQ

14. SEE BLOCK 16

15. TOTAL 0 / 2 / 0

16. REMARKS

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED

AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO

usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT

CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED

METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT

http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT

ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA

ELEMENTS ARE PROVIDED.

1. A002

2. REQUEST FOR VARIANCE (RFV)

3. N/A

4. DI-SESS-80640

5. SECTION C

6. RDAR-EIS-PD

7. LT

8. N/A

9. SEE BLOCK 16

10. ASREQ

11. N/A

12. ASREQ

13. ASREQ

14. SEE BLOCK 16

15. TOTAL 0 / 2 / 0

16. REMARKS

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED

AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO

usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT

CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED

METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT

http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT

ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA

ELEMENTS ARE PROVIDED.

1. A003

2. NOTICE OF REVISION (NOR)

3. N/A

4. DI-SESS-80642

5. SECTION C

6. RDAR-EIS-PD

7. LT

8. N/A

9. SEE BLOCK 16

10. ASREQ

11. N/A

12. ASREQ

13. ASREQ

14. SEE BLOCK 16

15. TOTAL 0 / 2 / 0

16. REMARKS

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED

AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO

usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT

CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED

METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT

http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT

ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA

ELEMENTS ARE PROVIDED.

1. A004

2. SPECIAL INSPECTION EQUIPMENT DESCRIPTIVE DOCUMENTATION

3. ACCEPTANCE INSPECTION EQUIPMENT (AIE) DOCUMENTATION ACCEPTANCE

4. DI-MGMT-81979

5. SECTION E

6. RDAR-EIQ-P

7. XX

8. A

9. A

10. ASREQ

11. –

12. ASREQ*

13. ASREQ**

14. THRU QAR 0/1/0 PCO (LT ONLY) 0/1/0 RDAR-QEW 0/1/0 RDAR-EIQ-P 0/1/0

15. TOTAL 0/4/0

16. REMARKS

DD FORM 250 IS NOT REQUIRED.

BOX 12: SUFFICIENTLY PRIOR TO INITIATION OF PRODUCTION OR FIRST ARTICLE

TEST, IF CONTRACTUALLY REQUIRED (SEE NOTE 1).

BOX 13: WHENEVER ANY REVISION THERETO IS NEEDED FOR ANY REASON.

NOTE 1: THE GOVT WILL FURNISH DISPOSITION WITHIN 45 DAYS AFTER RECEIPT.

ELECTRONIC SUBMISSION:

1) ENGINEERING: USARMY.PICA.ARDEC.MBX.QESA-QEW-AIE@MAIL.MIL

2) QA: USARMY.RIA.ARDEC.MBX.RDAR-QEP2@MAIL.MIL

NOTE 2: MICROSOFT OFFICE 97 DRAWINGS: AUTOCAD-RELEASE 14 (EXPRESS MAILED

HARD COPIES WILL BE ACCEPTED) FILES MAY BE COMPRESSED USING ZIP PROGRAM.

WARNING: LARGE PACKAGES MAY CAUSE DELAYS IN DELIVERY USING M

USING MAIL INTERNET.

EMAIL SUBJECT LINE MUST CONTAIN END ITEM NOMENCLATURE.

1. A005

2. TEST/INSPECTION REPORT

3. FIRST ARTICLE TEST REPORT (FATR)CONTRACTOR FACILITY

4. DI-NDTI-80809

5. SECTION E

6. RDAR-EIQ-P

7. XX

8. A* 9.

10. ASREQ

11. N/A

12. ASREQ

13. ASREQ

14. THRU QAR 0 / 1 / 0 PCO 0 /1 / 0 RDAR-EIQ-P O / 1 / 0

15. TOTAL 0 / 3 / 0

16. REMARKS

REQUIRED BY THE AUTHORITY IN BOX 4, PARA 10.2 AND ITS SUBPARAGRAPHS.

CONTRACTOR FORMAT IS ACCEPTABLE.

BOX 5: CONTRACT REFERENCE. THE CONTRACTOR SHALL PROVIDE TO THE PROCURING

CONTRACTING OFFICER, QAR, AND RDAR-EIQ-P AT LEAST 15 CALENDAR DAYS ADVANCE

NOTICE (IN WRITING) OF THE SCHEDULED DATE, TIME AND LOCATION OF START OF

FAT, SO THAT THE GOVERNMENT MAY WITNESS THE TESTS. THE GOVERNMENT WILL

REVIEW THE FATR AND PROVIDE FEEDBACK TO THE CONTRACTOR WITHIN 30 DAYS OF

RECEIPT OF FATR.

BLOCK 13: SUBSEQUENT SUBMISSION ONLY IF INITIAL FAT FAILS.

BLOCK 16: FATR MAY BE SUBMITTED ELECTRONICALLY THROUGH THE QAR, CONTRACTING

OFFICER, AND QUALITY ASSURANCE. QUALITY ASSURANCE ELECTRONIC SUBMISSION:

USARMY.RIA.ARDEC.MBX.RDAR-QEP2@MAIL.MIL ----------------------------------------------------------------------------- DATE: 1 June 2018

File details come from the government source that posted it.