EH8E0612EHCDRL_tacom.docx
DOCX document 19 KB Posted
- Attached to
- Grip Assembly, Contr Federal contract opportunity
- Solicitation number
- SPRDL1-18-R-0520
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRDL118R0520.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
DD FORM 1423 (MECHANIZED)
CATEGORY: MISC
SYSTEM/ITEM: GRIP ASSEMBLY SCWS
TO CONTRACT/PR: EH8E0612EH
NSN: 1290-01-612-0067
1. SEQUENCE NUMBER
2. TITLE OF DATA ITEM
3. SUBTITLE
4. DATA ITEM NUMBER
5. CONTRACT REFERENCE
6. TECHNICAL OFFICE
7. DD 250
8. APP CODE
9. DIST STATEMENT REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF 1ST SUBMISSION
13. DATE OF SUBSEQUENT SUBMISSION
14. DRFT/REG/REPRO/DISTRIBUTION/COPIES
1. A001
2. ENGINEERING CHANGE PROPOSAL (ECP)
3. N/A
4. DI-SESS-80639
5. SECTION C
6. RDAR-EIS-PD
7. LT
8. N/A
9. SEE BLOCK 16
10. ASREQ
11. N/A
12. ASREQ
13. ASREQ
14. SEE BLOCK 16
15. TOTAL 0 / 2 / 0
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT
CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED
METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A002
2. REQUEST FOR VARIANCE (RFV)
3. N/A
4. DI-SESS-80640
5. SECTION C
6. RDAR-EIS-PD
7. LT
8. N/A
9. SEE BLOCK 16
10. ASREQ
11. N/A
12. ASREQ
13. ASREQ
14. SEE BLOCK 16
15. TOTAL 0 / 2 / 0
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT
CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED
METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A003
2. NOTICE OF REVISION (NOR)
3. N/A
4. DI-SESS-80642
5. SECTION C
6. RDAR-EIS-PD
7. LT
8. N/A
9. SEE BLOCK 16
10. ASREQ
11. N/A
12. ASREQ
13. ASREQ
14. SEE BLOCK 16
15. TOTAL 0 / 2 / 0
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT
CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED
METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A004
2. SPECIAL INSPECTION EQUIPMENT DESCRIPTIVE DOCUMENTATION
3. ACCEPTANCE INSPECTION EQUIPMENT (AIE) DOCUMENTATION ACCEPTANCE
4. DI-MGMT-81979
5. SECTION E
6. RDAR-EIQ-P
7. XX
8. A
9. A
10. ASREQ
11. –
12. ASREQ*
13. ASREQ**
14. THRU QAR 0/1/0 PCO (LT ONLY) 0/1/0 RDAR-QEW 0/1/0 RDAR-EIQ-P 0/1/0
15. TOTAL 0/4/0
16. REMARKS
DD FORM 250 IS NOT REQUIRED.
BOX 12: SUFFICIENTLY PRIOR TO INITIATION OF PRODUCTION OR FIRST ARTICLE
TEST, IF CONTRACTUALLY REQUIRED (SEE NOTE 1).
BOX 13: WHENEVER ANY REVISION THERETO IS NEEDED FOR ANY REASON.
NOTE 1: THE GOVT WILL FURNISH DISPOSITION WITHIN 45 DAYS AFTER RECEIPT.
ELECTRONIC SUBMISSION:
1) ENGINEERING: USARMY.PICA.ARDEC.MBX.QESA-QEW-AIE@MAIL.MIL
2) QA: USARMY.RIA.ARDEC.MBX.RDAR-QEP2@MAIL.MIL
NOTE 2: MICROSOFT OFFICE 97 DRAWINGS: AUTOCAD-RELEASE 14 (EXPRESS MAILED
HARD COPIES WILL BE ACCEPTED) FILES MAY BE COMPRESSED USING ZIP PROGRAM.
WARNING: LARGE PACKAGES MAY CAUSE DELAYS IN DELIVERY USING M
USING MAIL INTERNET.
EMAIL SUBJECT LINE MUST CONTAIN END ITEM NOMENCLATURE.
1. A005
2. TEST/INSPECTION REPORT
3. FIRST ARTICLE TEST REPORT (FATR)CONTRACTOR FACILITY
4. DI-NDTI-80809
5. SECTION E
6. RDAR-EIQ-P
7. XX
8. A* 9.
10. ASREQ
11. N/A
12. ASREQ
13. ASREQ
14. THRU QAR 0 / 1 / 0 PCO 0 /1 / 0 RDAR-EIQ-P O / 1 / 0
15. TOTAL 0 / 3 / 0
16. REMARKS
REQUIRED BY THE AUTHORITY IN BOX 4, PARA 10.2 AND ITS SUBPARAGRAPHS.
CONTRACTOR FORMAT IS ACCEPTABLE.
BOX 5: CONTRACT REFERENCE. THE CONTRACTOR SHALL PROVIDE TO THE PROCURING
CONTRACTING OFFICER, QAR, AND RDAR-EIQ-P AT LEAST 15 CALENDAR DAYS ADVANCE
NOTICE (IN WRITING) OF THE SCHEDULED DATE, TIME AND LOCATION OF START OF
FAT, SO THAT THE GOVERNMENT MAY WITNESS THE TESTS. THE GOVERNMENT WILL
REVIEW THE FATR AND PROVIDE FEEDBACK TO THE CONTRACTOR WITHIN 30 DAYS OF
RECEIPT OF FATR.
BLOCK 13: SUBSEQUENT SUBMISSION ONLY IF INITIAL FAT FAILS.
BLOCK 16: FATR MAY BE SUBMITTED ELECTRONICALLY THROUGH THE QAR, CONTRACTING
OFFICER, AND QUALITY ASSURANCE. QUALITY ASSURANCE ELECTRONIC SUBMISSION:
USARMY.RIA.ARDEC.MBX.RDAR-QEP2@MAIL.MIL ----------------------------------------------------------------------------- DATE: 1 June 2018
File details come from the government source that posted it.