CONTRACT DATA REQUIREMENTS LIST
DD FORM 1423 (MECHANIZED)
CATEGORY: MISC
SYSTEM/ITEM: FEA PERSONALITY CABLE 2W470-E
TO CONTRACT/PR: EH8E1044EH
NSN: 6150-01-501-1047
1. SEQUENCE NUMBER
2. TITLE OF DATA ITEM
3. SUBTITLE
4. DATA ITEM NUMBER
5. CONTRACT REFERENCE
6. TECHNICAL OFFICE
7. DD 250
8. APP CODE
9. DIST STATEMENT REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF 1ST SUBMISSION
13. DATE OF SUBSEQUENT SUBMISSION
14. DRFT/REG/REPRO/DISTRIBUTION/COPIES
1. A001
2. ENGINEERING CHANGE PROPOSAL (ECP)
3. N/A
4. DI-SESS-80639
5. SECTION C
6. RDAR-EIS-PD
7. LT
8. N/A
9. SEE BLOCK 16
10. ASREQ
11. N/A
12. ASREQ
13. ASREQ
14. SEE BLOCK 16
15. TOTAL 0 / 2 / 0
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT
CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED
METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A002
2. REQUEST FOR VARIANCE (RFV)
3. N/A
4. DI-SESS-80640
5. SECTION C
6. RDAR-EIS-PD
7. LT
8. N/A
9. SEE BLOCK 16
10. ASREQ
11. N/A
12. ASREQ
13. ASREQ
14. SEE BLOCK 16
15. TOTAL 0 / 2 / 0
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT
CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED
METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A003
2. NOTICE OF REVISION (NOR)
3. N/A
4. DI-SESS-80642
5. SECTION C
6. RDAR-EIS-PD
7. LT
8. N/A
9. SEE BLOCK 16
10. ASREQ
11. N/A
12. ASREQ
13. ASREQ
14. SEE BLOCK 16
15. TOTAL 0 / 2 / 0
16. REMARKS
DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED
AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO
usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT
CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED
METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT
ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA
ELEMENTS ARE PROVIDED.
1. A004
2. TEST/INSPECTION REPORT
3. PERFORMANCE VERIFICATION TEST REPORT (PVTR) (CONTRACTOR FACILITY)
4. DI-NDTI-80809
5. SECTION E/DFP/END ITEM SPEC
6. RDAR-EIQ-P
7. XX
8. A*
9. A
10. ASREQ*
11. N/A
12. ASREQ
13. ASREQ*
14. THRU QAR 0 / 1 / 0 PCO 0 / 1 / 0 RDAR-EIQ-P 0 / 1 / 0
15. TOTAL 0 / 3 / 0
16. REMARKS
REQUIRED BY THE AUTHORITY IN BOX 4, PARA 10.2 AND ITS SUBPARAGRAPHS.
CONTRACTOR FORMAT IS ACCEPTABLE.
BOX 5: CONTRACT REFERENCE. THE CONTRACTOR SHALL PROVIDE TO THE PROCURING
CONTRACTING OFFICER, QAR, AND RDAR-EIQ-P AT LEAST 15 CALENDAR DAYS ADVANCE
NOTICE (IN WRITING) OF THE SCHEDULED DATE, TIME AND LOCATION OF START OF
PVTR, SO THAT THE GOVERNMENT MAY WITNESS THE TESTS. THE GOVERNMENT WILL
REVIEW THE PVTR AND PROVIDE FEEDBACK TO THE CONTRACTOR WITHIN 30 DAYS OF
RECEIPT OF PVTR.
BLOCK 13: SUBSEQUENT SUBMISSION ONLY IF INITIAL PVTR FAILS.
BLOCK 16: PVTR MAY BE SUBMITTED ELECTRONICALLY THROUGH THE QAR, CONTRACTING