EH8E1180EHCDRL_tacom.docx

DOCX document 18 KB Posted

Attached to
Nitro Charging Unit Federal contract opportunity
Solicitation number
SPRDL1-18-Q-0553
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

View the file

Other files for this federal contract opportunity

Other files attached to Nitro Charging Unit, newest first.
File Type Posted
SPRDL118Q0553.pdf PDF
EH8E1180EH-13006137_SHTS_1-2_DIST_CODE_A.PDF PDF
Instructions_to_open_TDPs.doc DOC document
EH8E1180EH_00_V1.zip ZIP file
EH8E1180EH_Contract_SectionC.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

DD FORM 1423 (MECHANIZED)

CATEGORY: MISC

SYSTEM/ITEM: GAS CHARGING UNIT

TO CONTRACT/PR: EH8E1180EH

NSN: 1025-01-535-6272

1. SEQUENCE NUMBER

2. TITLE OF DATA ITEM

3. SUBTITLE

4. DATA ITEM NUMBER

5. CONTRACT REFERENCE

6. TECHNICAL OFFICE

7. DD 250

8. APP CODE

9. DIST STATEMENT REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF 1ST SUBMISSION

13. DATE OF SUBSEQUENT SUBMISSION

14. DRFT/REG/REPRO/DISTRIBUTION/COPIES

1. A001

2. ENGINEERING CHANGE PROPOSAL (ECP)

3. N/A

4. DI-SESS-80639

5. SECTION C

6. RDAR-EIS-PD

7. LT

8. N/A

9. SEE BLOCK 16

10. ASREQ

11. N/A

12. ASREQ

13. ASREQ

14. SEE BLOCK 16

15. TOTAL 0 / 2 / 0

16. REMARKS

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED

AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO

usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT

CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED

METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT

http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT

ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA

ELEMENTS ARE PROVIDED.

1. A002

2. REQUEST FOR VARIANCE (RFV)

3. N/A

4. DI-SESS-80640

5. SECTION C

6. RDAR-EIS-PD

7. LT

8. N/A

9. SEE BLOCK 16

10. ASREQ

11. N/A

12. ASREQ

13. ASREQ

14. SEE BLOCK 16

15. TOTAL 0 / 2 / 0

16. REMARKS

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED

AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO

usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT

CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED

METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT

http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT

ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA

ELEMENTS ARE PROVIDED.

1. A003

2. NOTICE OF REVISION (NOR)

3. N/A

4. DI-SESS-80642

5. SECTION C

6. RDAR-EIS-PD

7. LT

8. N/A

9. SEE BLOCK 16

10. ASREQ

11. N/A

12. ASREQ

13. ASREQ

14. SEE BLOCK 16

15. TOTAL 0 / 2 / 0

16. REMARKS

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (e.g., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *DISTRIBUTION STATEMENT WILL BE ASSIGNED

AND IMPLEMENTED BY THE DOD CONFIGURATION MANAGER. **SUBMIT ELECTRONICALLY TO

usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil AND TO THE GOVERNMENT

CONTRACT SPECIALIST. ELECTRONIC FILES SHALL BE LESS THAN 7MB. THE PREFERRED

METHOD IS THE DD FORM 1692 WHICH IS LOCATED AT

http://www.dtic.mil/whs/directives/infomgt/forms/. CONTRACTOR FORMAT

ALTERNATIVE TO THE DD FORM IS ACCEPTABLE PROVIDED THE NECESSARY DATA

ELEMENTS ARE PROVIDED.

1. A004

2. TEST PROCEDURE - PHOSPHATE COATING

3. PRE-PRODUCTION PROCEDURE

4. DI-NDTI-80603A

5. MIL-DTL-16232G, PARA 3.1

6. RDAR-MEE-W(R)

7. XX

8. A

9. N/A

10. ONE/R

11. N/A

12. 60DAC

13. N/A

14. THRU CONTRACTING OFFICER / 1 /

15. TOTAL 0 / 1 / 0

16. REMARKS

BLOCK 8 CONT. - PRIOR TO PRODUCTION, APPROVAL THRU THE CONTRACTING OFFICER IS REQUIRED W/IN 60 DAYS AFTER CONTRACT AWARD. CONTRACTING OFFICER WILL ROUTE INTERNALLY TO THE APPROVING OFFICE (RDAR-MEE-W(R)). CONTRACTING OFFICER SHALL PROVIDE PROCEDURE REVIEW RESPONSE BACK TO CONTRACTOR. COATED PANELS PER PARA 3.2.2 SHALL INCLUDE THREE WITH PHOSPHATE ONLY, THREE WITH PHOSPHATE AND PRIMER, AND THREE WITH PHOSPHATE, PRIMER AND TOP COAT. A DD FORM 250 IS NOT REQUIRED FOR PHOSPHATE COATING PROCEDURE APPROVAL. CONTRACTOR FORMAT ACCEPTABLE.

1. A005

2. TEST/INSPECTION REPORT

3. FIRST ARTICLE TEST REPORT (FATR)CONTRACTOR FACILITY

4. DI-NDTI-80809

5. SECTION E

6. RDAR-EIQ-P

7. XX

8. A* 9.

10. ASREQ

11. N/A

12. ASREQ

13. ASREQ

14. THRU QAR 0 / 1 / 0 PCO 0 /1 / 0 RDAR-EIQ-P O / 1 / 0

15. TOTAL 0 / 3 / 0

16. REMARKS

REQUIRED BY THE AUTHORITY IN BOX 4, PARA 10.2 AND ITS SUBPARAGRAPHS.

CONTRACTOR FORMAT IS ACCEPTABLE.

BOX 5: CONTRACT REFERENCE. THE CONTRACTOR SHALL PROVIDE TO THE PROCURING

CONTRACTING OFFICER, QAR, AND RDAR-EIQ-P AT LEAST 15 CALENDAR DAYS ADVANCE

NOTICE (IN WRITING) OF THE SCHEDULED DATE, TIME AND LOCATION OF START OF

FAT, SO THAT THE GOVERNMENT MAY WITNESS THE TESTS. THE GOVERNMENT WILL

REVIEW THE FATR AND PROVIDE FEEDBACK TO THE CONTRACTOR WITHIN 30 DAYS OF

RECEIPT OF FATR.

BLOCK 13: SUBSEQUENT SUBMISSION ONLY IF INITIAL FAT FAILS.

BLOCK 16: FATR MAY BE SUBMITTED ELECTRONICALLY THROUGH THE QAR, CONTRACTING

OFFICER, AND QUALITY ASSURANCE. QUALITY ASSURANCE ELECTRONIC SUBMISSION:

USARMY.RIA.ARDEC.MBX.RDAR-QEP2@MAIL.MIL ----------------------------------------------------------------------------- DATE: 22 June 2018

File details come from the government source that posted it.