Amendment 0002 which failed to post at the time of issue.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRDL117R0090-0005.pdf | ||
| SPRDL117R0090-0004.pdf | ||
| SPRDL117R0090-0003.pdf | ||
| SPRDL117R0090-0001.pdf | ||
| SPRDL117R0090.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0002 2018AUG13
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
SABINE MCCORRY
EMAIL: SABINE.E.MCCORRY.CIV@MAIL.MIL
SPRDL1-17-R-0090
2017JUN06
X
X 2018AUG31 03:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 22
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: SABINE MCCORRY
Buyer Office Symbol/Telephone Number: ZGAC/(586)467-1167
Type of Contract 1: Firm Fixed Price
Kind of Contract: System Acquisition Contracts
*** End of Narrative A0000 ***
SPRDL1-17-R-0090, Amendment 0002
1.The purpose of this Amendment 0002 is to request a revised offer for Contract Line Items (CLINs) 0001AA and 0006AA due to an increase in quantity. Refer to continuation pages.
2.Delivery Schedule (FAR 52.242-4022) has been changed on the following pages.
3.Several clauses have been deleted and updated. Refer to continuation pages.
4.Solicitation closing date has been extended from 07/21/2017 1:00 pm EST to 08/31/2018 3:00 pm EST.
5.All other terms and conditions remain unchanged.
*** END OF NARRATIVE A0002 ***
2 22
SPRDL1-17-R-0090
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
Notes Regarding Solicitation Requirements
1.CLINs 0001AA - 0003AA are the base CLINs
2.CLINS 0004AA - 0006AA are the option ClINs
3.IUID is required for CLINs 0002AA and 0005AA
(End of narrative A001)
0001 CIRCUIT CARD ASSEMB
NSN: 5998-01-600-3274
Mfr CAGE: 64547
Mfr Part Number: 4246351-1
0001AA PRODUCTION QUANTITY 97 EA $ $ ____________________ ______________ __________________
COMMODITY NAME: CIRCUIT CARD ASSEMB
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH7C0118EH PRON AMD: 05
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: SEE MFR PART NUMBER
Only the following Manufacturer's Part Number is approved for this procurement.
MFR: Honeywell International, Inc.
CAGE: 64547
Part Number: 4246351-2
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at origin means that you MUST
3 22
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV6294051Z W90454 J 2
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 97 0400
FOB POINT: Destination
SHIP TO:
(W90454) SU W4GG HQ US ARMY TACOM
TEAM ARMOR PARTNERSHIP FACILITY
WHSE BLDG 88037 LOGISTICS LANE
FORT HOOD,TX,76544-5060
4 22
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002 CIRCUIT CARD ASSEMB
NSN: 5998-01-600-3280
Mfr CAGE: 64547
Mfr Part Number: 4246213-2
0002AA Production Quantity 105 EA $ $ ____________________ ______________ __________________
COMMODITY NAME: CIRCUIT CARD ASSEMB
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH7C0119EH PRON AMD: 03
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: SEE MFR PART NUMBER
Only the following Manufacturer's Part Number is approved for this procurement.
MFR: Honeywell International, Inc.
CAGE: 64547
Part Number: 4246213-2
(End of narrative C001)
NOTE:
IUID is required.
Refer to Section F, Clause 252.211-7003 Item Unique
Identification and Valuation.
(End of narrative C002)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned
5 22
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
to you at your expense.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV6294052Z W90454 J 2
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 105 0400
FOB POINT: Destination
SHIP TO:
(W90454) SU W4GG HQ US ARMY TACOM
TEAM ARMOR PARTNERSHIP FACILITY
WHSE BLDG 88037 LOGISTICS LANE
FORT HOOD,TX,76544-5060
6 22
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0003 COVER,ELECTRICAL CO
NSN: 5935-01-604-3847
Mfr CAGE: 64547
Mfr Part Number: 4246223-2
0003AA PRODUCTION QUANTITY 91 EA $ $ ____________________ ______________ __________________
COMMODITY NAME: COVER,ELECTRICAL CO
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH7C0093EH PRON AMD: 03
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: SEE MFR PART NUMBER
Only the following Manufacturer's Part Number is approved for this procurement.
MFR: Honeywell International, Inc.
CAGE: 64547
Part Number: 4246223-2
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV6292051Z W90454 J 2
7 22
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 91 0400
FOB POINT: Destination
SHIP TO:
(W90454) SU W4GG HQ US ARMY TACOM
TEAM ARMOR PARTNERSHIP FACILITY
WHSE BLDG 88037 LOGISTICS LANE
FORT HOOD,TX,76544-5060
8 22
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0004 CIRCUIT CARD ASSEMB
NSN: 5998-01-600-3274
Mfr CAGE: 64547
Mfr Part Number: 4246351-2
0004AA UNEXERCISED OPTION QUANTITY 97 EA $ $ ___________________________ ______________ __________________
COMMODITY NAME: CIRCUIT CARD ASSEMB
CLIN CONTRACT TYPE:
Firm Fixed Price
OPTION QUANTITY,
PURSUANT TO THE CLAUSE ENTITLED OPTION FOR
INCREASED QUANTITY --- SEPARATELY PRICED LINE ITEM
(52.217-4001).
The quantity stated for the option CLIN DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated for award.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: SEE MFR PART NUMBER
Only the following Manufacturer's Part Number is approved for this procurement.
MFR: Honeywell International, Inc.
CAGE: 64547
Part Number: 4246351-2
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
9 22
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 97 0400
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
10 22
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0005 CIRCUIT CARD ASSEMB
NSN: 5998-01-600-3280
Mfr CAGE: 64547
Mfr Part Number: 4246213-2
0005AA UNEXERCISED OPTION QUANTITY 105 EA $ $ ___________________________ ______________ __________________
COMMODITY NAME: CIRCUIT CARD ASSEMB
CLIN CONTRACT TYPE:
Firm Fixed Price
OPTION QUANTITY,
PURSUANT TO THE CLAUSE ENTITLED OPTION FOR
INCREASED QUANTITY --- SEPARATELY PRICED LINE ITEM
(52.217-4001).
The quantity stated for the option CLIN DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated for award.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: SEE MFR PART NUMBER
Only the following Manufacturer's Part Number is approved for this procurement.
MFR: Honeywell International Inc.
CAGE: 64547
Part Number: 4246213-2
(End of narrative C001)
NOTE:
IUID is required.
Refer to Section F, Clause 252.211-7003 Item Unique
Identification and Valuation.
11 22
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative C002)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 105 0400
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
12 22
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0006 COVER, ELECTRICAL CO
NSN: 5935-01-604-3847
Mfr CAGE: 64547
Mfr Part Number: 4246223-2
0006AA UNEXERCISED OPTION QUANTITY 91 EA $ $ ___________________________ ______________ __________________
COMMODITY NAME: COVER, ELECTRICAL CO
CLIN CONTRACT TYPE:
Firm Fixed Price
OPTION QUANTITY,
PURSUANT TO THE CLAUSE ENTITLED OPTION FOR
INCREASED QUANTITY --- SEPARATELY PRICED LINE ITEM
(52.217-4001).
The quantity stated for the option CLIN DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated for award.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: SEE MFR PART NUMBER
Only the following Manufacturer's Part Number is approved for this procurement.
MFR: Honeywell International, Inc.
CAGE: 64547
Part Number: 4246223-2
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
13 22
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 91 0400
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
14 22
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
F-1 CHANGED 52.242-4022 DELIVERY SCHEDULE SEP/2008
(TACOM)
(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.
(b) DEFINITIONS:
(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.
(2) DELIVERY is defined as follows:
FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(4) by the time specified in the individual contract; or
FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.
(c) The Government requires delivery to be made according to the following schedule:
(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)
ITEM NO. QTY WITHIN DAYS AFTER DATE OF CONTRACT AWARD
(2) GOVERNMENT REQUIRED DELIVERY SCHEDULE IF THERE IS NO FIRST ARTICLE TEST (FAT), OR IF FAT IS WAIVED
ITEM NO. QTY WITHIN DAYS AFTER DATE OF CONTRACT AWARD
BASE CLINs
0001AA 97 400 Days after award
0002AA 105 400 Days after award
0003AA 91 400 Days after award
OPTION CLINs
0004AA 97 400 Days after option exercise
0005AA 105 400 Days after option exercise
0006AA 91 400 Days after option exercise
(d) Accelerated delivery schedule is acceptable.
(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:
(1) OFFERORS PROPOSED ACCELERATED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)
ITEM NO. QTY WITHIN DAYS AFTER DATE OF CONTRACT AWARD
(2) OFFERORS PROPOSED ACCELERATED DELIVERY SCHEDULE WITHOUT FIRST ARTICLE TEST (FAT), or IF FAT IS WAIVED
ITEM NO. QTY WITHIN DAYS AFTER DATE OF CONTRACT AWARD
15 22
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
[End of Clause]
16 22
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION G - CONTRACT ADMINISTRATION DATA
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
G-1 DELETED 252.204-0001 LINE ITEM SPECIFIC: SINGLE FUNDING SEP/2009
(DFARS PGI)
17 22
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
I-1 DELETED 52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA OCT/2010
I-2 DELETED 52.219-9 SMALL BUSINESS SUBCONRACTING PLAN JAN/2017
I-3 DELETED 52.222-60 PAYCHECK TRANSPARENCY (EXECUTIVE ORDER 13673) OCT/2016
I-4 DELETED 252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT FEB/2014
I-5 DELETED 252.215-7000 PRICING ADJUSTMENTS DEC/2012
I-6 ADDED 52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (DEVIATION 2018-O0015) MAY/2018
(DEV 2018-
O0015)
(a) Unless an exception under FAR 15.403-1 applies, the Contractor shall require the subcontractor to submit certified cost or pricing data (actually or by specific identification in writing), in accordance with FAR 15.408, Table 15-2 (to include any information reasonably required to explain the subcontractors estimating process such as the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data, and the nature and amount of any contingencies included in the price)--
(1) Before awarding any subcontract expected to exceed $750,000 prior to July 1, 2018, or modifying any subcontract that was awarded prior to July 1, 2018, involving a pricing adjustment expected to exceed $750,000, or
(2) Before awarding any subcontract expected to exceed $2 million on or after July 1, 2018, or modifying any subcontract that was awarded on or after July 1, 2018, involving a pricing adjustment expected to exceed $2 million.
(b) The Contractor shall require the subcontractor to certify in substantially the form prescribed in FAR 15.406-2 that, to the best of its knowledge and belief, the data submitted under paragraph (a) of this clause were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract or subcontract modification.
(c) In each subcontract that exceeds the threshold for submission of certified cost or pricing data at FAR 15.403-4, when entered into, the Contractor shall insert either--
(1) The substance of this clause, including this paragraph (c), if paragraph (a) of this clause requires submission of certified cost or pricing data for the subcontract; or
(2) The substance of the clause at FAR 52.215-13, Subcontractor Certified Cost or Pricing DataModifications (DEVIATION 2018-O0015).
(End of clause)
I-7 DELETED 52.230-2 COST ACCOUNTING STANDARDS OCT/2015
I-8 ADDED 52.230-2 (DEV COST ACCOUNTING STANDARDS (DEVIATION 2018-O0015) MAY/2018
2018-O0015)
(a) Unless the contract is exempt under 48 CFR 9903.201-1 and 9903.201-2, the provisions of 48 CFR Part 9903 are incorporated herein by reference and the Contractor, in connection with this contract, shall
(1) (CAS-covered Contracts Only) By submission of a Disclosure Statement, disclose in writing the Contractors cost accounting practices as required by 48 CFR 9903.202-1 through 9903.202-5, including methods of distinguishing direct costs from indirect costs and the basis used for allocating indirect costs. The practices disclosed for this contract shall be the same as the practices currently disclosed and applied on all other contracts and subcontracts being performed by the Contractor and which contain a Cost Accounting
Standards (CAS) clause. If the Contractor has notified the Contracting Officer that the Disclosure Statement contains trade secrets and commercial or financial information which is privileged and confidential, the Disclosure Statement shall be protected and shall not be released outside of the Government.
(2) Follow consistently the Contractors cost accounting practices in accumulating and reporting contract performance cost data concerning this contract. If any change in cost accounting practices is made for the purposes of any contract or subcontract subject to
CAS requirements, the change must be applied prospectively to this contract and the Disclosure Statement must be amended accordingly.
If the contract price or cost allowance of this contract is affected by such changes, adjustment shall be made in accordance with paragraph (a)(4) or (a)(5) of this clause, as appropriate.
(3) Comply with all CAS, including any modifications and interpretations indicated thereto contained in 48 CFR Part 9904, in effect on the date of award of this contract or, if the Contractor has submitted certified cost or pricing data, on the date of final agreement on price as shown on the Contractors signed certificate of current cost or pricing data. The Contractor shall also comply with any CAS
(or modifications to CAS) which hereafter become applicable to a contract or subcontract of the Contractor. Such compliance shall be
18 22
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
required prospectively from the date of applicability to such contract or subcontract.
(4)(i) (Agree to an equitable adjustment as provided in the Changes clause of this contract if the contract cost is affected by a change which, pursuant to paragraph (a)(3) of this clause, the Contractor is required to make to the Contractors established cost accounting practices.
(ii) Negotiate with the Contracting Officer to determine the terms and conditions under which a change may be made to a cost accounting practice, other than a change made under other provisions of paragraph (a)(4) of this clause; provided that no agreement may be made under this provision that will increase costs paid by the United States.
(iii) When the parties agree to a change to a cost accounting practice, other than a change under subdivision (a)(4)(i) of this clause, negotiate an equitable adjustment as provided in the Changes clause of this contract.
(5) Agree to an adjustment of the contract price or cost allowance, as appropriate, if the Contractor or a subcontractor fails to comply with an applicable Cost Accounting Standard, or to follow any cost accounting practice consistently and such failure results in any increased costs paid by the United States. Such adjustment shall provide for recovery of the increased costs to the United States, together with interest thereon computed at the annual rate established under section 6621(a)(2) of the Internal Revenue Code of 1986 (26
U.S.C. 6621(a)(2)) for such period, from the time the payment by the United States was made to the time the adjustment is effected. In no case shall the Government recover costs greater than the increased cost to the Government, in the aggregate, on the relevant contracts subject to the price adjustment, unless the Contractor made a change in its cost accounting practices of which it was aware or should have been aware at the time of price negotiations and which it failed to disclose to the Government.
(b) If the parties fail to agree whether the Contractor or a subcontractor has complied with an applicable CAS in 48 CFR 9904 or a CAS rule or regulation in 48 CFR 9903 and as to any cost adjustment demanded by the United States, such failure to agree will constitute a dispute under 41 U.S.C. chapter 71, Contract Disputes.
(c) The Contractor shall permit any authorized representatives of the Government to examine and make copies of any documents, papers, or records relating to compliance with the requirements of this clause.
(d) The Contractor shall include in all negotiated subcontracts which the Contractor enters into, the substance of this clause, except paragraph (b), and shall require such inclusion in all other subcontracts, of any tier, including the obligation to comply with all CAS in effect on the subcontractors award date or if the subcontractor has submitted certified cost or pricing data, on the date of final agreement on price as shown on the subcontractors signed Certificate of Current Cost or Pricing Data. If the subcontract is awarded to a business unit which pursuant to 48 CFR 9903.201-2 is subject to other types of CAS coverage, the substance of the applicable clause set forth in subsection 30.201-4 of the Federal Acquisition Regulation shall be inserted. This requirement shall apply only to negotiated subcontracts in excess of $2 million, except that the requirement shall not apply to negotiated subcontracts otherwise exempt from the requirement to include a CAS clause as specified in 48 CFR 9903.201-1.
(End of clause)
I-9 DELETED 252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)BASIC (DEVIATION AUG/2016
(DEV 2016- 2016-O0009)
O0009)
19 22
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
K-1 DELETED 52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION OCT/2015
K-2 ADDED 52.230-1 (DEV COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018- MAY/2018
2018-O0015) O0015)
NOTE: This notice does not apply to small businesses or foreign governments. This notice is in three parts, identified by Roman numerals I through III.
Offerors shall examine each part and provide the requested information in order to determine Cost Accounting Standards (CAS) requirements applicable to any resultant contract.
If the offeror is an educational institution, Part II does not apply unless the contemplated contract will be subject to full or modified CAS coverage pursuant to 48 CFR 9903.201-2(c)(5) or 9903.201-2(c)(6), respectively.
I. Disclosure StatementCost Accounting Practices and Certification
(a) Any contract in excess of $2 million resulting from this solicitation will be subject to the requirements of the Cost Accounting
Standards Board (48 CFR Chapter 99), except for those contracts which are exempt as specified in 48 CFR 9903.201-1.
(b) Any offeror submitting a proposal which, if accepted, will result in a contract subject to the requirements of 48 CFR Chapter 99 must, as a condition of contracting, submit a Disclosure Statement as required by 48 CFR 9903.202. When required, the Disclosure
Statement must be submitted as a part of the offerors proposal under this solicitation unless the offeror has already submitted a
Disclosure Statement disclosing the practices used in connection with the pricing of this proposal. If an applicable Disclosure
Statement has already been submitted, the offeror may satisfy the requirement for submission by providing the information requested in paragraph (c) of Part I of this provision.
CAUTION: In the absence of specific regulations or agreement, a practice disclosed in a Disclosure Statement shall not, by virtue of such disclosure, be deemed to be a proper, approved, or agreed-to practice for pricing proposals or accumulating and reporting contract performance cost data.
(c) Check the appropriate box below:
[ ] (1) Certificate of Concurrent Submission of Disclosure Statement. The offeror hereby certifies that, as a part of the offer, copies of the Disclosure Statement have been submitted as follows:
(i) original and one copy to the cognizant Administrative Contracting Officer (ACO) or cognizant Federal agency official authorized to act in that capacity (Federal official), as applicable; and
(ii) one copy to the cognizant Federal auditor.
(Disclosure must be on Form No. CASB DS-1 or CASB DS-2, as applicable. Forms may be obtained from the cognizant ACO or Federal official and/or from the loose-leaf version of the Federal Acquisition Regulation.)
Date of Disclosure Statement: _________________________
Name and Address of Cognizant ACO or Federal Official Where Filed:
The offeror further certifies that the practices used in estimating costs in pricing this proposal are consistent with the cost accounting practices disclosed in the Disclosure Statement.
[ ] (2) Certificate of Previously Submitted Disclosure Statement. The offeror hereby certifies that the required Disclosure Statement was filed as follows:
Date of Disclosure Statement: _________________________
Name and Address of Cognizant ACO or Federal Official Where Filed:
The offeror further certifies that the practices used in estimating costs in pricing this proposal are consistent with the cost accounting practices disclosed in the applicable Disclosure Statement.
[ ] (3) Certificate of Monetary Exemption. The offeror hereby certifies that the offeror, together with all divisions, subsidiaries, and affiliates under common control, did not receive net awards of negotiated prime contracts and subcontracts subject to CAS totaling
20 22
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
$50 million or more in the cost accounting period immediately preceding the period in which this proposal was submitted. The offeror further certifies that if such status changes before an award resulting from this proposal, the offeror will advise the Contracting
Officer immediately.
[ ] (4) Certificate of Interim Exemption. The offeror hereby certifies that
(i) the offeror first exceeded the monetary exemption for disclosure, as defined in (3) of this subsection, in the cost accounting period immediately preceding the period in which this offer was submitted and
(ii) in accordance with 48 CFR 9903.202-1, the offeror is not yet required to submit a Disclosure Statement. The offeror further certifies that if an award resulting from this proposal has not been made within 90 days after the end of that period, the offeror will immediately submit a revised certificate to the Contracting Officer, in the form specified under paragraph (c)(1) or (c)(2) of Part I of this provision, as appropriate, to verify submission of a completed Disclosure Statement.
CAUTION: Offerors currently required to disclose because they were awarded a CAS-covered prime contract or subcontract of $50 million or more in the current cost accounting period may not claim this exemption (4). Further, the exemption applies only in connection with proposals submitted before expiration of the 90-day period following the cost accounting period in which the monetary exemption was exceeded.
II. Cost Accounting StandardsEligibility for Modified Contract Coverage
If the offeror is eligible to use the modified provisions of 48 CFR 9903.201-2(b) and elects to do so, the offeror shall indicate by checking the box below. Checking the box below shall mean that the resultant contract is subject to the Disclosure and Consistency of
Cost Accounting Practices clause in lieu of the Cost Accounting Standards clause.
[ ] The offeror hereby claims an exemption from the Cost Accounting Standards clause under the provisions of 48 CFR 9903.201-2(b) and certifies that the offeror is eligible for use of the Disclosure and Consistency of Cost Accounting Practices clause because during the cost accounting period immediately preceding the period in which this proposal was submitted, the offeror received less than $50 million in awards of CAS-covered prime contracts and subcontracts. The offeror further certifies that if such status changes before an award resulting from this proposal, the offeror will advise the Contracting Officer immediately.
CAUTION: An offeror may not claim the above eligibility for modified contract coverage if this proposal is expected to result in the award of a CAS-covered contract of $50 million or more or if, during its current cost accounting period, the offeror has been awarded a single CAS-covered prime contract or subcontract of $50 million or more.
III. Additional Cost Accounting Standards Applicable to Existing Contracts. The offeror shall indicate below whether award of the contemplated contract would, in accordance with paragraph (a)(3) of the Cost Accounting Standards clause, require a change in established cost accounting practices affecting existing contracts and subcontracts.
[ ] Yes [ ] No
(End of provision)
21 22
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
L-1 DELETED 52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN OCT/2010
CERTIFIED COST OR PRICING DATA
22 22
| SECTION A |
| SECTION B |
| SECTION F |
| SECTION G |
| SECTION I |
| SECTION K |
| SECTION L |
File details come from the government source that posted it.