SPRDL116R0443-0004.pdf
PDF 15 KB Posted
- Attached to
- Grip Assembly, Controller Federal contract opportunity
- Solicitation number
- SPRDL1-16-R-0443
About this file
Amendment 04
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRDL116R0443-0006.pdf | ||
| SPRDL116R0443-0005.pdf | ||
| SPRDL116R0443-0003.pdf | ||
| SPRDL116R0443-0002.pdf | ||
| SPRDL1-16-R-0443_0001.pdf | ||
| SPRDL116R0443.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0004 2018JAN26
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
SABINE MCCORRY
EMAIL: SABINE.E.MCCORRY.CIV@MAIL.MIL
SPRDL1-16-R-0443
2016OCT19
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 3
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: SABINE MCCORRY
Buyer Office Symbol/Telephone Number: ZGA/(586)282-3174
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
SPRDL1-16-R-0443, Amendment 0004
1.The purpose of Amendment 0004 to Solicitation SPRDL1-16-R-0443 is to change the Point of Contact (POC) listed within clause 52.246-
4534 (b) PERFORMANCE VERIFICATION TESTING (CONTRACTOR FACILITY) DEC/1997 from gregory.kaminski@dla.mil to sabine.mccorry@dla.mil.
2.All other terms and conditions remain unchanged.
*** END OF NARRATIVE A0005 ***
2 3
SPRDL1-16-R-0443 0004
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
E-1 CHANGED 52.246-4534 PERFORMANCE VERIFICATION TESTING (CONTRACTOR FACILITY) DEC/1997
TACOM LCMC
(RI)
(a) Subsequent to completion of both contractor and Government inspection/verification actions, a test sample consisting of two each of the first ten produced from CLIN 0001AA shall be selected by the Government Quality Assurance Representative (QAR) for Initial
Production Test.
(b) The test shall be conducted at the contractor's facility. A copy of the contractor's inspection/test results shall be provided with the test sample. The contractor shall notify the Contracting Officer in writing at least 15 calendar days prior to initiation of the
(each) test. The contractor shall also provide a copy of such notification to sabine.mccorry@dla.mil, usarmy.RIA.ardec.mbx.rdarqep2@mail.mil, and to the QAR.
(c) The test sample shall be examined and/or tested in accordance with -Specification 10237-3113.
(d) Within 30 days after completion of the test, the Contracting Officer (or designated representative) shall provide notification to the Contractor as to the approval, disapproval, or conditional approval of the performance verification test. Unless authorized by the
Contracting Officer, the lot from which the test sample was taken shall not be shipped from the Contractor's facility, nor shall final acceptance of the lot be made, until such time as notification has been provided by the Contracting Officer that the Performance
Verification Test samples have been approved/conditionally approved.
(e) If the Contracting Officer does not provide notification of the approval, conditional approval, or disapproval of the performance
Verification Test sample within the time specified above, the Contracting Officer shall, if applicable, equitably adjust the delivery/performance dates and/or contract price (and any other contractual provision affected by such delay) in accordance with the procedures provided in the Changes clause of this contract.
(f) If any test sample fails to meet any applicable contractual requirement, the lot or batch from which the test sample was drawn shall be considered to be rejected. The contractor shall take immediate corrective action, both to correct the deficiency/nonconformance and to prevent recurrence of the deficiency/nonconformance. Such corrective action shall be taken by the contractor at no increase in contract price. Such corrective action shall apply to all items (to include basic issue items and/or repair parts) either in-process of final assembly, which have been produced or are in production since the last successful Performance Verification Test. In addition, the provisions of any warranty clause contained in the contract shall apply. Upon completion of the corrective action, the contractor shall resubmit a sample for Performance Verification testing. Any and all costs associated with testing the additional Performance
Verification Test sample shall be borne by the contractor. The Contracting Officer shall equitably adjust the contract price as applicable for the costs associated with the additional testing resulting from failure of the test sample to meet the applicable contractual requirements.
(g) If the contractor fails to deliver any Performance Verification test sample within the time specified, or if the test sample is disapproved and an acceptable replacement is not provided within the time specified, the contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(h) Unless otherwise specified, the initial production/confirmatory test units shall be considered to be destructively tested. At the
Contracting Officer's discretion, the initial production/confirmatory test units, and any unused repair parts, may be returned to the contractor for refurbishing, and may subsequently be shipped as deliverable items under the terms of the contract. Any refurbished test units shall meet all contract requirements; inspection and acceptance of any refurbished test units shall be conducted in accordance with contract requirements. Any costs to refurbish the test units shall be subject to negotiation between the contracting Officer and the contractor.
(ES6041) (End of Clause)
3 3
SPRDL1-16-R-0443 0004
| SECTION A |
| SECTION E |
File details come from the government source that posted it.