SPRDL1-16-R-0365_0007.pdf

PDF 18 KB Posted

Attached to
Filter Unit, Gas-Par Federal contract opportunity
Solicitation number
SPRDL1-16-R-0365
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

Amendment 0007

View the file

Other files for this federal contract opportunity

Other files attached to Filter Unit, Gas-Par, newest first.
File Type Posted
SPRDL116R0365-0008.pdf PDF
SPRDL116R0365-0006.pdf PDF
SPRDL116R0365-0005.pdf PDF
SPRDL116R0365-0004.pdf PDF
SPRDL116R0365-0003.pdf PDF
SPRDL116R0365-0002.pdf PDF
SPRDL116R0365-0001.pdf PDF
SPRDL116R0365.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

SPRDL1

DLA LAND WARREN

WARREN, MI 48397-5000

GRETCHEN PERRY

EMAIL: GRETCHEN.E.PERRY.CIV@MAIL.MIL

SPRDL1-16-R-0365

2016JUL28

X

X

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 4

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: GRETCHEN PERRY

Buyer Office Symbol/Telephone Number: ZGA/(586)282-3216

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of Amendment 0007 to Solicitation SPRDL1-16-R-0365 is to revise Clause 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR

TESTING.

1. Clause 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING is revised to clarify the 100 CFM fan, PN 5-19-9431 submission.

2. All other terms and conditions are unchanged.

*** END OF NARRATIVE A0008 ***

2 4

SPRDL1-16-R-0365 0007

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION I - CONTRACT CLAUSES

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

I-1 CHANGED 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE SEP/1989

I (JAN 1997) AND ALTERNATE II (SEP 1989)

(a) The Contractor shall conduct a First Article Test (FAT) on part number (PN) 5-19-8892-20, Filter Unit, Gas-Particulate tank, 100

CFM, XM93. FAT shall consist of inspections and testing for eight (8) filter units, PN 5-19-8892-20, in accordance with (IAW) Para 4.2 and table I of EA-F-1456B.

In addition, the FAT shall consist of inspections and testing for select components, listed separately, IAW their QAPs, drawings, and specifications/standards. The contractor is responsible for all inspections and testing regardless of who conducts the actual testing.

For the following items, the FAT shall be;

For the control module, PN 5-19-9118, the FAT shall consist of a Certificate of Conformance (COC) with all inspections and____________________________________ testing on four (4) modules for all the requirements of drawing 5-19-9118 and Table III and IV of Para 4.2 of DTL-EA-C-1469B.

For PNs 5-19-9132, 5-19-9127, 5-19-9128, 5-19-9187, 5-19-9133, and 5-19-9482 the FAT shall consist of a COC with an attached____________________________________________________________________________ report for all inspections and testing on three (3) items for all the requirements IAW their applicable drawing and parts III-V of their respective Quality Assurance Provisions (QAP) documents.

For PN 5-19-9138, the FAT shall consist of a COC with all inspections and testing on three (3) items for all the requirements________________ of note 5 on the drawing.

For the 100 CFM fan, PN 5-19-9431, the contractor shall submit a Certificate of Conformance (COC) in accordance with the contract data requirements list (CDRL) and DID DI-MISC-81356A which states compliance with all requirements of drawing 5-19-9431 (minus notes 30, 33, 34, and 36) and specification EA-F-1473C per ECP Y21-0091-0014. In addition, a certified laboratory report will be submitted with the

COC as required by Paragraph 3.3 of specification EA-F-1473C per ECP Y21-0091-0014.

A COC is required for all other subcomponents not specifically listed. COC's must be submitted IAW the contract CDRL and DID DI-MISC-

81356A.

A packaging FAT is required and shall consist of three (3) packaged units and inspected IAW SPI P5-19-8892-20. A COC is required for all packaging materials to include heat treatment certification for the pallets. Pictures of the packaging and labels will help expedite approval.

A First Article Test Report shall be completed by the contractor documenting the results of all inspections and test (including suppliers and vendors inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic and drawing/specification characteristics.

The FAT report (FATR) shall be submitted through the local QAR to the Contracting Officer.

At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within 210 calendar days from the date of this contract to:

1. Gretchen Perry (Contract Specialist) at gretchen.perry@dla.mil

2. Grover Easterling (Contracting Officer) at grover.easterling@dla.mil

3. RDCB-DES-Q (QA) at USARMY.RIA.ECBC.MBX.DLA-TDP@MAIL.MIL marked First Article Test Report: Contract No. __________________, Lot/Item No. ______. Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the

Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this

3 4

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the

Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

(End of Clause)

4 4

SECTION A
SECTION I