J A_SPRDL1-16-R-0340.pdf
PDF 224 KB Posted
- Attached to
- Infinity Federal contract opportunity
- Solicitation number
- SPRDL1-16-R-0340
About this file
J A posted
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEFENSE LOGISTICS AGENCY J&A: SPRDL1-16-R-0340
Prior procurements were competitive therefore no previous J&A is available.
CMO Control Number: N/A
SPRDL1-16-R-0340
DEFENSE LOGISTICS AGENCY
JUSTIFICATION FOR OTHER THAN
FULL AND OPEN COMPETITION
The Defense Logistics Agency (DLA Land – Warren) is the procuring activity for this action. The statutory authority permitting other than full and open competition is 10 U.S.C. 2304(c)(2), as implemented by FAR 6.302-2, "Unusual and Compelling Urgency."
PART I - Description of Item Required:
a. NOUN: Collimator, Infinity
b. QUANTITY: 146EA (see below for computation)
OPTION QUANTITY: 0EA
c. NSN: 1240-01-475-0276
d. MPN: 12960957-2, 1240014750276
e. VEHICLE SYSTEM: M1A1 and AIM
f. ESTIMATED UNIT PRICE: $ 2,359.30
g. ESTIMATED VALUE: $ 344,457.80
ESTIMATED OPTION VALUE: $ 0.00
ESTIMATED TOTAL VALUE: $ 344,457.80
h. PRON NUMBER: EH6T0053EH
i. TYPE OF FUNDS: Army Working Capital Fund (AWCF)
j. TYPE OF CONTRACT: Firm Fixed-Price
PART II - Statement of Urgency
1. TACOM has an urgent need for the items described above. They must be procured by the quickest means possible since full and open competition will not achieve the required delivery date. The rationale for citing urgency follows:
a. Describe the Urgent Requirement:
The urgent requirement quantity is 146 each, which was first known on 9 June 2016.
Urgent quantity is needed AS SOON AS POSSIBLE. Normal replenishment contract has been delayed due to problems acquiring needed down parts to complete the manufacturing process. Urgent quantity is required while these issues are being resolved.
b. Justify the proposed delivery schedule:
This item currently has 46 high priority backorders with 4EA stock available. Estimated high priority requirements have been identified for 104 each through the procurement and production lead-time. Repair cannot support all high priority requirements due to lack of necessary down parts and high washout rate.
c. Describe the extent and nature of the harm to the Government if the proposed delivery date is not met:
1. What is the serious injury (financial, harm to soldier, etc.) to the Government if the required delivery dates are not met?
Lack of this item may result in delay/hindering of the fielding of the Abrams FOV. Lack of this item will result in non-mission capable vehicles in the field and at training locations. This item is already in a critical stock position with multiple backorders awaiting fulfillment.
2. What impact would this have on the Army’s mission?
With ever increasing unrest in the world, it is ever more important that we have a tank fleet that would be able to protect American Interests around the world. Without serviceable tanks we would lose our Heavy Armor capability of our Armed and the units will not be able to complete the required tasks as part of their training cycle.
Delayed fielding of vehicles will reduce training capability and ulitmately reduced combat readiness/effectiveness. Unfilled requirements have a negative impact on FORSCOM mission as well. They are still required to complete their mission even if they are short on supply and/or weapon systems.
All Armored Brigade Combat Teams (ABCTs) in the Defense Department utilize the Abrams tank, and a lack of vehicles could have devastating results. Our main threats in the world today have Heavy Armor. The Abrams tank also functions as a deterrent, in addition to its offensive capabilities. Our ability as a fighting force to deploy ABCTs anywhere in the world makes it easier for the Army and the US Government to keep the peace in potentially hostile environments. Without that capability the Army would be at risk of mission failure.
3. What financial impact would this have on the Government and how was this dollar value assigned? Explain the basis for cost estimates.
Lack of this item may result in delay/hindrance of the fielding of the Abrams FOV. Lack of this item will result in non-mission capable vehicles in the field and at training locations. This item is already in a critical stock position with multiple backorders awaiting fulfillment.
4. (Only if Applicable) Consider and address whether any other items that we currently have in stock could fill this requirement and alleviate the immediate need.
d. Urgent circumstances requiring the inclusion of an option: No option required.
e. Net Requirement:
1. Number of existing high priority (1-3) backorders: 46
2. Number of anticipated high priority (1-3) demands from the current date through the anticipated award date if normal acquisition methods are used: 52
3. Number of anticipated high priority (1-3) demands expected from the end of the ALT through production lead time if normal acquisition methods are used: 52
TOTAL REQUIREMENT (sum of 1-3): 150
4. Current serviceable stock on hand: 4
5. Expected receipts from procurement from current date through the end of PLT: 0
6. Expected receipts from repair from current date through the end of PLT: 0
TOTAL AVAILABLE ASSETS (sum of 4-6): 4
7. If high priority requirements are greater than assets this figure represents current and anticipated high priority backorders:
NET REQUIREMENT (Total Requirements -Total Assets): 146
2. The POC for this action is Ryan Schmidt, 282- 7395
3. Requirements Certification - I certify that my supporting data included in this document are accurate and complete to the best of my knowledge and belief.
Signature: /s/ Shannon Fields
Name: Shannon Fields Title: Team Leader Office: AMSTA-LCG-AA Date: 13 June 2016
PART III - Contracting Information
1. Description of Action: Offers to provide the required item will be solicited under Request For Proposals SPRDL1-16-R-0030. DLA Land – Warren proposes to negotiate a firm-fixed-price contract with Optex Systems (Cage Code 1V513) for part number 12473351.
2. Extent of Competition: Due to issues with the technical data package, it is in the process of being reviewed and revised which will require a Government initiated Engineering Change Proposal. This process could take five (5) to six (6) months.
Optex is the only known successful producer of this item. Due to the urgency of this buy, no further action will be taken to increase competition on this buy. No market survey will be conducted. Further, the procurement will not be synopsized due to the urgency of the requirement.
3. The POC for this action is Morris Belleville, Office Symbol ZGAA, EXT. 282- 3221.
4. Fair and Reasonable Determination: I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable based on FAR 15.403-1(c)(1)(iii). Certified cost or pricing data will not be required, as this procurement is anticipated to be less than the $750,000 threshold stated in FAR
15.403-4. However, data other than certified cost or pricing data will be required in accordance with FAR 15.403-3. The appropriate forms of cost and/or price analysis will be utilized, and negotiations will be conducted if necessary.
5. Contracting Officer Certification: I certify that this J&A is accurate and complete to the best of my knowledge and belief.
Signature: /s/
Name: Marlene J. Scheele Title: Contracting Officer Office: DLA Land Warren ZGAA Date: 15 Jun 16
PART V - Legal Concurrence
Concur: // Darin R. Morency // Date: 06/16/2016
File details come from the government source that posted it. Updated .