SPRDL1-15-R-0116.pdf
PDF 187 KB Posted
- Attached to
- GUNS, THROUGH 30MM Federal contract opportunity
- Solicitation number
- SPRDL115R0116
About this file
SOLICITATION
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRDL115R0116-0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
SPRDL1-15-R-0116
X
2015MAR25
2015APR2404:00pm
DOA4
2015MAR25 SEE SCHEDULE
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
HTTP://CONTRACTING.TACOM.ARMY.MIL
ROBERT HARRISON
(586)282-3200
ZGA
ROBERT.W.HARRISON30.CIV@MAIL.MIL
1 75
X 1
X 5 X 12
X 15 X 17 X 21
X 30
X 32
X 37
X 51
X 52
X 67
X 74
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: ROBERT HARRISON
Buyer Office Symbol/Telephone Number: ZGA/(586)282-3200
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
** THIS IS A TOTAL SMALL BUSINESS SET-ASIDE **
NOTE:
52.246-15 'CERTIFICATE OF CONFORMANCE' Applies only to CLIN 0002AA & 0002AB
*** END OF NARRATIVE A0001 ***
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
A-1 52.204-4016 TACOM-WARREN ELECTRONIC CONTRACTING SEP/2008
(TACOM)
(a) All DLA Land Warren solicitations and awards are distributed on the TACOM-Warren Procurement Network (ProcNet) Business
Opportunities website (http://contracting.tacom.army.mil/opportunity.htm) and are no longer available in hard copy. The Technical Data
Packages (TDPs) and other documents, when available electronically, will be attachments or links to the solicitation package on ProcNet.
(b) You may need to use special software to view documents that we post on ProcNet. This viewing software is freeware, available for download at no cost from commercial websites like Microsoft and Adobe. In cases where such software is required, we provide a link from
ProcNet to the commercial site where the software is available. Once you arrive at the software developer's site, follow its instructions to download the free viewer. You can then return to the ProcNet.
(c) Unless otherwise authorized in this solicitation, you are required to submit your offer, bid, or quote electronically, via the Army
Single Face to Industry (ASFI) Online Bid Response System (BRS). For detailed information about submitting your offer electronically, please see http://contracting.tacom.army.mil/acqinfo/ebidnotice.htm.
(d) Requirements for online bid submission:
(1) You must be registered in the System for Award Management (SAM) and have a Marketing Partner Identification Number (MPIN) and CAGE Code.
(2) If you found the solicitation on ProcNet, use the following link to the Start Bid Page on the ASFI BRS website for this solicitation:
https://acquisition.army.mil/asfi/solicitation_view.cfm?psolicitationnbr=SPRDL115R0116
(3) If you found the solicitation by searching on ASFI, you can start the online bidding process by using the Start Bid button on the ASFI Solicitation View page. You may also access the ASFI BRS by going to https://acquisition.army.mil/asfi/ and clicking on the
Contracting Opportunities Search to find the solicitation.
(4) Once in the ASFI BRS, you will be asked to enter basic information and will then be directed to upload one or more files containing your offer and information required by the solicitation.
(5) You will receive a confirmation of your bid upon completion of the bid submission process. You can find detailed BRS user instructions on the ASFI website at https://acquisition.army.mil/asfi/BRS_guide.doc.
(e) Note to offerors:
Your attention is called to the solicitation closing date and time as stated on the cover page of this solicitation, local time for the
DLA Land - Warren, (DTA), Michigan. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
2 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
It is the offeror's responsibility to ensure its proposal is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if your proposal was not received at the initial point of entry to the Government infrastructure (in this case, received through ASFI) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal, as the term is used here, means ALL volumes and/or parts of the proposal.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned to submit their proposals allowing adequate time for submission.
Solicitations may remain posted on the AFSI Open Solicitation Web page after the solicitation closes. Even though the system will allow you to submit a proposal after the closing date/time, your proposal will be considered late and may not be considered for award.
If you are responding to a Request for Proposal, your offer will not be considered if it is submitted after the closing date and time unless one of the exceptions is met at FAR 15.208(b). If you are responding to a Request for Quotation, your quote may be considered if it is received after the closing date, and it will not unduly delay award.
(f) Any award issued as a result of this solicitation will be distributed electronically. Awards posted on ProcNet represent complete
OFFICIAL copies of contract awards and will include the awarded unit price. This is the notice required by Executive Order 12600 (June
23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552.
Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If you object to such release, and you intend to submit an offer, notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(g) If you have questions or need help using ProcNet, call our Electronic Contracting Help Desk at (586) 282-7059, or send an email to usarmy.detroit.acc.mbx.wrn-web-page-request@mail.mil. If you have questions about the content of any specific item posted on the
ProcNet, please call the contract specialist or point of contact listed for the item. For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center website at http://www.dla.mil/SmallBusiness/Pages/ptap.aspx to find a location near you.
A-2 52.210-4901 RESTRICTED TDP MAR/2011
This solicitation contains a Restricted Technical Data Package (TDP). Please refer to Section C - 52.211-4072 - 'TECHNICAL DATA PACKAGE
INFORMATION' for instructions on how to get access to restricted TDPs.
Furthermore, Review 52.210-4501 - 'DRAWINGS/SPECIFICATIONS'; "Vendors to access this information with the technical data posted on
FedBizOpps." Exceptions to the Drawings and Specifications in accordance with Technical Data Package may be uploaded to FEDBIZOPS as a
STAND ALONE DOCUMENT. Please review all files and documents prior to providing your proposal.
A-3 52.214-4000 ACKNOWLEDGMENT OF AMENDMENTS OCT/1993
Acknowledge all the amendments you've received from us by identifying the amendment number and its issue date below:
Amendment Number Date
(End of Provision)
3 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A-4 52.214-4003 ALL OR NONE MAR/1998
(TACOM)
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.
[End of clause]
A-5 52.215-4801 NOTICE OF REVERSE AUCTION PROVISION JAN/2014
(DLA LAND-
WARREN)
This solicitation contains standard DLAD provision 52.215-9023, Reverse Auction. After receipt of proposals, the contracting officer will determine if a reverse auction will be conducted. However, the use of a reverse auction does not preclude additional methods of price and/or cost analysis.
If a reverse auction is held, Contractors must be registered in the reverse auction system in order to participate in the auction.
Additionally, the Contractor representative participating in the auction must have taken the on-line reverse auction training prior to the reverse auction. Registration, on-line training, and other information regarding the reverse auction can be found at https://dla.procurexinc.com. If a reverse auction is held and a Contractor that provided a proposal to the solicitation does not participate in the auction, the initially proposed price(s) will be considered and evaluated.
[End of Provision]
A-6 52.227-4500 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE APR/2008
TACOM (RI) (RI)
This solicitation may contain technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.
seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
To be eligible to gain access to export controlled TDP whether it is via CD you must have a current DD 2345, Militarily Critical
Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, go to http://www.dlis.dla.mil/jcp/, click on documents, and follow instructions provided. Processing time is estimated at three days after receipt. Upon receipt of certification, you may request the TDP in accordance with the instructions stated in the solicitation's
Section C (52.210-4501 Drawings/Specifications).
Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
[End of clause]
4 75
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 CROSS BAR ASSEMBLY,
NSN: 2840-01-615-9279
Mfr CAGE: 19200
Mfr Part Number: 13036411
0001AA PRODUCTION QUANTITY 10 EA $ $ ____________________ ______________ __________________
COMMODITY NAME: CROSS BAR ASSEMBLY,
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH5V5228EH PRON AMD: 02
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 13036411
DATE: 10-OCT-2014
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
THERE IS A REQUIREMENT FOR FIRST
ARTICLE TESTING.
Your proposed price for this Production __________
SubCLIN 0001AA must include the cost___________________________ of the First Article Testing.
See Data Item SubCLIN 0001AC: First
Article Test Report.
The Data Item SubCLIN 0001AC is
"Not Separately Priced", which is _____________________ why the cost of testing must be included in this Production
SubCLIN 0001AA.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV5030V353 W562RP J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 10 0390
5 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE
ANNISTON,AL,36201-4199
0001AB UNEXERCISED OPTION QUANTITY 10 EA $ $ ___________________________ ______________ __________________
COMMODITY NAME: CROSS BAR ASSEMBLY, RIGHT
OPTION QUANTITY: PURSUANT TO SECTION H OR I
CLAUSE ENTITLED OPTION FOR INCREASED QUANTITY--
SEPARATELY PRICED LINE ITEM
The quantity stated for the Option CLIN DOES NOT
Form a part of the basic contractual quantity.
Part or all of it may, however be added to the contract by exercise of the option clause, at the discretion of the Government.
The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government at the basic contract unit price and the offer will be evaluated for award accordingly.
The Government may unilaterally exercise this Option in part or in whole, at any time between award and 240 days thereafter.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 13036411
DATE: 10-OCT-2014
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
6 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 10 0240
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0001AC DATA ITEM: FIRST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** ____________________________________ ______________ __________________
COMMODITY NAME: FIRST ARTICLE TEST REPORT
1 EA = 1 Each Test____
Report on Contractor
Performed First
Article Test (FAT)
NSP = Not Separately___
Priced.
(End of narrative B001)
FIRST ARTICLE TEST REPORT, PURSUANT TO THE
REQUIREMENTS OF THE CLAUSE ENTITLED "FIRST
ARTICLE APPROVAL - CONTRACTOR TESTING."
(SEE SECTION I OF THIS DOCUMENT.)
NOTE TO OFFEROR:
Please fill in the dollar amount you have
INCLUDED in Production CLIN 0001AA to cover the cost of performing FAT (First Article
Testing) and writing the FAT Report:
WE ARE REQUESTING OFFERORS TO FILL IN
THE DOLLAR AMOUNT IN THE PARAGRAPH ABOVE
SO WE WILL KNOW HOW MUCH TO SUBTRACT
FROM THE PRODUCTION CLIN IF WE WAIVE
FIRST ARTICLE TEST.
(End of narrative C001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
7 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Government Approval/Disapproval Days: 30
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0120
FOB POINT: Destination
SHIP TO:
8 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002 ARM,MOUNT,GUN
NSN: 1005-01-616-2308
Mfr CAGE: 19200
Mfr Part Number: 13036417
0002AA PRODUCTION QUANTITY 10 EA $ $ ___________________ ______________ __________________
COMMODITY NAME: ARM,MOUNT,GUN
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH5V5229EH PRON AMD: 02
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 13036417
DATE: 26-SEP-2014
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV5030V354 W562RP J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 10 0240
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE
ANNISTON,AL,36201-4199
9 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002AB UNEXERCISED OPTION QUANTITY 10 EA $ $ ___________________________ ______________ __________________
COMMODITY NAME: ARM, MOUNT, GUN
OPTION QUANTITY: PURSUANT TO SECTION H OR I
CLAUSE ENTITLED OPTION FOR INCREASED QUANTITY--
SEPARATELY PRICED LINE ITEM
The quantity stated for the Option CLIN DOES NOT
Form a part of the basic contractual quantity.
Part or all of it may, however be added to the contract by exercise of the option clause, at the discretion of the Government.
The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government at the basic contract unit price and the offer will be evaluated for award accordingly.
The Government may unilaterally exercise this Option in part or in whole, at any time between award and 240 days thereafter.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 13036417
DATE: 26-SEP-2014
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 10 0240
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
10 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
ITEMS REQUIRED UNDER THIS
REQUISITION.
11 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
C-1 52.210-4501 DRAWINGS/SPECIFICATIONS MAR/2010
TACOM (RI)
In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to
Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.
** THE FOLLOWING APPLIES TO CLINs 0001AA-0001AB**
Drawings and Specifications in accordance with Technical Data Package/Technical Data Package Listing 13036411, with revisions in effect as of 10/10/2014, are applicable to this procurement.
**THE FOLLOWING APPLIES TO CLINs 0002AA-0002AB**
Drawings and Specifications in accordance with Technical Data Package/Technical Data Package Listing 13036417, with revisions in effect as of 9/26/2014, are applicable to this procurement with the following exceptions: - Vendors to access this information with the technical data posted on FedBizOpps.
(CS6100) (End of Clause)
C-2 52.211-4072 TECHNICAL DATA PACKAGE INFORMATION JUN/2013
(TACOM)
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLINs Web-located TDP. To access the TDP, you will have to copy or type the links URL to your web browser address bar at the top of the screen.
Note: To copy a link from a .pdf file, click on the Text Select Tool, then highlight the URL, copy and paste it into your browser, and hit the Enter key.
[ X ] 3. The TDP for this solicitation resides within FedBizOpps (https://http://www.fbo.gov), and is associated with this solicitation number and can be accessed via this URL:
https://www.fbo.gov/fedteds/SPRDL115R0116
a. Log on to the FBO web site.
b. Enter your Marketing Partner Identification Number (MPIN).
c. Search for the solicitation number.
d. If solicitation is Export Controlled, select Verify MPIN.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data
Agreement on file with Defense Logistics Information Service (DLIS).\~ If you are currently certified, your MPIN will be verified and you may proceed to the next step.\~ To obtain certification, go to http://www.dlis.dla.mil/jcp/ click on documents and follow instructions provided.\~ Processing time is estimated at six (6) to ten (10) weeks after receipt.
12 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
FBO will allow you to access export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the FBO system administrator at TACOM Warren with all the information needed for them to grant you access. FBO will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 3 working days to complete this FBO-TDP access/approval process through the FBO system.
f. If multiple individuals in your company need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in Federal Business Opportunities (FBO). Any individuals no longer with the company should be deleted. Questions related to registration in FBO should be directed to https://www.fbo.gov/index The FBO helpdesk phone number is
(866) 606-8220. Vendors are responsible for placing correct information in FBO.
g. It is strongly suggested that you submit the explicit access request and provide the buyer with the completed Use and Non-
Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
h. A user guide for FBO can be found at https://http://www.fbo.gov - on the right is User Guides - click on Vendor.
[ ] 4. The Government requires a Use and Non-Disclosure Agreement (NDA) to be signed by an authorized representative of your firm before you are granted access to the technical data. The appropriate Agreement is:
[ ] available at http://contracting.tacom.army.mil/acqinfo/contractorforms.htm titled: -4-
[ ] available as an attachment to this solicitation.
Follow the instructions on the Agreement, and email/fax it to the buyer at -5-, or fax -6-. The buyer will notify the FBO administrator upon receiving the NDA. The administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the TDP. If you have any questions/problems viewing the TDP contact the buyer.
[End of Clause]
C-3 52.211-4008 DRAWING LIMITATIONS NOV/2005
(TACOM)
(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are ___ adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.
(c) YOU ARE RESPONSIBLE for producing the shop or process drawings needed to cover intermediate steps in the manufacturing ___________________
13 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
process.
(d) You, the contractor, are responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
[End of clause]
C-4 52.211-4074 CERTIFICATE OF DESTRUCTION OF TECHNICAL DATA REQUIREMENT OCT/2010
If this acquisition is for a component or end item associated with the M240 Machine Gun, M16 Rifle or M4 Carbine, the terms of the license agreement with the original equipment manufacturer requires that you and your vendors certify your destruction of the technical data. After selection of the successful offeror, or after performance of the contract, you must provide the necessary certification to the buyer. . The Certificate of Technical Data Destruction is available at:
http://contracting.tacom.army.mil/acqinfo/contractorforms.htm
(End of Clause)
C-5 52.248-4502 CONFIGURATION MANAGEMENT DOCUMENTATION JUL/2001
TACOM (RI)
The contractor may submit Engineering Change Proposals (ECPs), Value Engineering change Proposals (VECPs), (Code V shall be assigned to an engineering change that will effect a net life cycle cost), including Notice of Revisions (NORs), and Request for Deviations (RFDs), for the documents in the Technical Data Package (TDP). The contractor shall prepare these documents in accordance with the Data Item
Descriptions cited in block 04 on the enclosed DD Form 1423, Contract Data Requirements List.
Contractor ECPs/VECPs shall describe and justify all proposed changes and shall included NORs completely defining the change to be made.
Contractors may also submit RFD, which define a temporary departure from the Technical Data package or other baseline documentation under Government control. The contractor shall not deliver any units incorporating any change/deviation to Government documentation until notified by the Government that the change/deviation has been approved and the change/deviation has been incorporated in the contract.
If the Government receives the same or substantially the same VECPs from two or more contractors, the contracts whose VECP is received first will be entitled to share with the Government in all instant, concurrent, future, and collateral savings under the terms of the VE clause in the contract.
Duplicate VECPs, which are received subsequently, will be returned to the contractor(s) without formal evaluation, regardless of whether or not the first VECP has been approved and accepted by the Government.
(CS7110) (End of Clause)
14 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
D-1 52.211-4501 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS) DEC/2007
TACOM (RI)
A. Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, Revision D, Date 15 Dec 99 including Notice 1, dated
10 May 02 and the Special Packaging Instruction (SPI) contained in the TDP.
PRESERVATION: MILITARY
LEVEL OF PACKING: B
QUANTITY PER UNIT PACKAGE: 001
SPI NUMBER: 13036411 DATED 07 APR 14 ** APPLIES TO CLINs 0001AA-0001AB** _____________________________
PRESERVATION: MILITARY
LEVEL OF PACKING: B
QUANTITY PER UNIT PACKAGE: 001
SPI NUMBER: 13036417 DATED 07 APR 14** APPLIES TO CLINs 0002AA-0002AB** ____________________________
B. Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
C. Marking: In addition to any special markings called out on the SPI;
C.1. All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision P, Change Notice 4, dated 19 Sep 2007 including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/rfid/index.htm for the current DoD Suppliers Passive
RFID Information Guide and Supplier Implementation Plan. If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.
D. Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organizations compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
E. This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the
SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
F. Hazardous Materials (as applicable):
F.1..Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
15 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
F.2. Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:
--International Air Transport Association (IATA) Dangerous Goods Regulations
--International Maritime Dangerous Goods Code (IMDG)
--Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
--Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO
P4030.19/DLAM 4145.3 (for military air shipments).
F.3. If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United
Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
F.4. When applicable, a Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
G. SUPPLEMENTAL INSTRUCTIONS: N/A
(DS6419) (End of Clause)
16 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
** APPLIES TO CLINs 0001AA-0001AB**
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
Quality Management System - Requirements: ISO 9001:2008 (15 Nov 2008) Tailored by excluding paragraph 7.3
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E-5 52.209-4512 FIRST ARTICLE TEST (CONTRACTOR TESTING) MAR/2008
TACOM (RI)
** APPLIES TO CLINs 0001AA-0001AB**
a. The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance
Provisions (QAPs) and all drawings listed in the Technical Data Package.
b. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
c. The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the
First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the
First Article Test Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
d. Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
e. A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to the following:
17 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Contracting Officer - Michael Bissig, (Michael.bissig@dla.mil)
Contract Specialist - Robert Harrison robert.harrison@dla.mil and
ARDEC Engineering (usarmy.RIA.ardec.mbx.rdar-qep2@mail.mil)
f. Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the
Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the
Government shall be borne by the Contractor.
(ES6026) (End of Clause)
E-6 52.209-4012 NOTICE REGARDING FIRST ARTICLE APR/2000
(TACOM)
(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
(b) When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
[End of Clause]
E-7 52.211-4029 INTERCHANGEABILITY OF COMPONENTS MAY/1994
(TACOM)
(a) DESIGN CHANGES TO ITEMS NOT UNDER GOV'T DESIGN CONTROL. Once the Government accepts the first production test item, or ______________________________________________________ accepts the first end item you deliver, (whichever comes first) you must not make design changes to any item or part that is not under
Government design control.
(b) WHEN THE POLICY CAN BE WAIVED. The Procuring Contracting Officer (PCO) will consider waiving this policy at your request. If _____________________________ your request reaches the CO after the first production item test has been performed, then we may conduct another first production test at your expense.
(c) PRODUCTION OR DELIVERY DELAYS. Any production or delivery delays caused by this retesting will not be the basis for: _____________________________
(1) an "excusable delay" as defined in the DEFAULT clause of this contract.
(2) be the basis for an increase in contract price or delivery schedule extension.
[End of clause]
E-8 52.246-4028 INSPECTION AND ACCEPTANCE POINTS: ORIGIN NOV/2005
(TACOM)
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
18 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION POINT: ___________________________________________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: ____________________________________________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
[End of Clause]
E-9 52.246-4528 REWORK AND REPAIR OF NONCONFORMING MATERIAL MAY/1994
TACOM RI
** APPLIES TO CLINs 0001AA-0001AB**
a. Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
b. Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
c. Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting Officer for review and written approval prior to implementation.
d. Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
e. The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
(ES7012) (End of Clause)
E-10 52.246-4531 ACCEPTANCE INSPECTION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .