SPRDL1-20-R-0162 solicitation.pdf
PDF 170 KB Posted
- Attached to
- Wheel, Pneumatic Tire Federal contract opportunity
- Solicitation number
- SPRDL1-20-R-0162
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRDL1-20-R-0162 amendment 0001.pdf | ||
| SPRDL120-R-0162 amendment 0003.pdf | ||
| SPRDL1-20-R-0162 amendment 0002.pdf | ||
| FAT Waiver.pdf | ||
| NDA Use and Non-disclosure Agreement.pdf | ||
| SPI AK00000001 revD.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
SPRDL1-20-R-0162 2021SEP09
STEPHEN GRANCH (586)467-1244
STEPHEN.J.GRANCH.CIV@MAIL.MIL
2021OCT12 03:00pm
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
X
326211
X DOA4
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 82
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: STEPHEN GRANCH
Buyer Office Symbol/Telephone Number: ZGBB/(586)467-1244
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A.1 Acknowledgment of Amendments________________________________
Acknowledge all the amendments you've received from us by identifying the amendment number and its issue date below:
Amendment Number Date
A.2 Electronic Contracting Provision____________________________________
(a) Vendors should be aware that FedBizOpps (FBO) has moved to https://sam.gov and is now known as "Contracting Opportunities".
(b) All DLA Land Warren solicitations will be publicized on the Contract Opportunities website (https://sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or referenced with instructions in the solicitation.
(c) As directed in Section L of this solicitation, interested vendors shall submit a quote or proposal via email to the Contract
Specialist listed on the solicitation. The email shall include subject header: Proposal Submission SPRDL1-XX-X-XXXX (company name) on the solicitation.
(d) Requirements for tracking solicitations and submitting bid submissions:
1. Vendors must be registered for a https://sam.gov account through https://login.gov in order to manage searches and track solicitations. Using the Contract Opportunities search function in sam.gov, vendors will to be able to view the Solicitation and any modifications or amendments made by the Contract Specialist.
2. Vendors may Request Access to controlled documents such as the Technical Data Package (TDP). Interested vendors must request
TDPs via email to the Contracting Specialist as directed in Section C of this solicitation.
3. All bids and proposals must be submitted via email to the Contract Specialist on record.
(e) Note to offerors:
Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time (EST), for DLA Land Warren. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
It is Offeror's responsibility to ensure the proposal/quote is received by the Contract Specialist by the date and time specified on the
2 82
SPRDL1-20-R-0162
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late.
Proposal/quote is defined to mean that ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
Solicitations may remain posted on sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will need to send any late quotes, if applicable, directly to the Contract Specialist identified on the cover page of this solicitation.
(f) Any awards issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or
Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at https://www.sba.gov/tools/local-assistance/ptac to locate a regional center.
A.3 All or None Commercial Item Acquisition____________________________________________
This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS.
Paragraph (h) is modified to say that you must offer to provide the total quantity of the items in this solicitation. ONLY ONE AWARD
WILL BE MADE AS A RESULT OF THIS SOLICITATION. OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS
SOLICITATION WILL NOT BE CONSIDERED FOR AWARD.
*** END OF NARRATIVE A0001 ***
3 82
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
IN THE FOUR DIGIT ITEM NUMBERS (CLINS) THAT
FOLLOW, THE NUMBERING SYSTEM THAT IS USED IS AS
FOLLOWS:
THE FIRST THREE DIGITS SIGNIFY THE APPLICABLE
CONTRACT YEAR, i.e., CLIN 0011 IS FOR THE FIRST
ITEM - FIRST ORDERING YEAR, CLIN 0012 IS FOR THE
FIRST ITEM - SECOND ORDERING YEAR, CLIN 0013 IS
FOR THE FIRST ITEM - THIRD ORDERING YEAR, ETC.
THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE
SOLICITATION AND RESULTING CONTRACT:
FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE___________________
OF AWARD PLUS 364 DAYS.
SECOND ORDERING YEAR OF THE CONTRACT IS 365 DAYS____________________
THROUGH 729 DAYS AFTER CONTRACT AWARD.
THIRD ORDERING YEAR OF THE CONTRACT IS 730 DAYS___________________
THROUGH 1,094 DAYS AFTER CONTRACT AWARD.
NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL ORDER
IS THE PRICE FOR THE ORDERING YEAR IN WHICH THE
ORDER IS ISSUED. THE DELIVERY DATE DOES NOT
DETERMINE THE ORDERING YEAR.
(End of narrative A001)
0011 PRODUCTION QUANTITY FIRST ORDERING YEAR EST 1,800 AY $ $ _______________________________________ ______________ __________________
NSN: 2530-01-563-8620
COMMODITY NAME: WHEEL, PNEUMATIC TIRE
CLIN CONTRACT TYPE:
Firm Fixed Price
A FIRST ARTICLE TEST REPORT IS REQUIRED IN ACCORDANCE
WITH THE CLAUSE ENTITLED "FIRST ARTICLE APPROVAL--
CONTRACTOR TESTING",
FAR 52.209-3.
First Article Test is required. Waiver may be authorized; see waiver provision in Section L.
The unit of issue for this NSN is "AY".
(End of narrative B001)
4 82
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: (19207) 12563651
DATE: 10-AUG-2021
The Technical Data Package (TDP) for this item contains purchased parts. Refer to the product drawing(s) for details.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS NARRATIVE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative E001)
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
5 82
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0012 PRODUCTION QUANTITY SECOND ORDERING YEAR EST 1,800 AY $ $ ________________________________________ ______________ __________________
NSN: 2530-01-563-8620
COMMODITY NAME: WHEEL, PNEUMATIC TIRE
CLIN CONTRACT TYPE:
Firm Fixed Price
The unit of issue for this NSN is "AY".
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: (19207) 12563651
DATE: 10-AUG-2021
The Technical Data Package (TDP) for this item contains purchased parts. Refer to the product drawing(s) for details.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS NARRATIVE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative E001)
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
6 82
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
7 82
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0013 PRODUCTION QUANTITY THIRD ORDERING YEAR EST 1,800 AY $ $ _______________________________________ ______________ __________________
NSN: 2530-01-563-8620
COMMODITY NAME: WHEEL, PNEUMATIC TIRE
CLIN CONTRACT TYPE:
Firm Fixed Price
The unit of issue for this NSN is "AY".
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: (19207) 12563651
DATE: 10-AUG-2021
The Technical Data Package (TDP) for this item contains purchased parts. Refer to the product drawing(s) for details.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS NARRATIVE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative E001)
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
8 82
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
9 82
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0014 FIRST ARTICLE TEST REPORT 1 EA $ $ _________________________ ______________ __________________
NSN: 2530-01-563-8620
COMMODITY NAME: WHEEL, PNEUMATIC TIRE
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19207
Mfr Part Number: 12563651
A FIRST ARTICLE TEST REPORT IS REQUIRED IN ACCORDANCE
WITH THE CLAUSE ENTITLED "FIRST ARTICLE APPROVAL--
CONTRACTOR TESTING",
FAR 52.209-3.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12563651
DATE: 10-AUG-2021
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Government Approval/Disapproval Days: 30
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00006) SEE FIRST ARTICLE TEST CLAUSE
FOR DISTRIBUTION
10 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 Technical Data Package Information (Contract Opportunities in https://sam.gov ) Version____________________________________________________________________________________________
The following "X-d" item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLINs Web-located TDP. To access the TDP, you will have to copy or type the links URL to your web browser address bar at the top of the screen.
Note: To copy a link from a .pdf file, click on the Text Select Tool, then highlight the URL, copy and paste it into your browser, and hit the Enter key.
CLIN: N/A
TDP Link (URL): N/A
[X] 3. The TDP for this solicitation resides within https://https://sam.gov under the Contract Opportunities search function
(https://https://sam.gov ), and is associated with this solicitation number and can be accessed via this URL:
https://sam.gov/opp/79c14ee1ed7f4d4fa8ac7ec67f9a28b8/view
a. Log on to the https://sam.gov website.
b. Enter your Marketing Partner Identification Number (MPIN).
c. Select Contract Opportunities in the search bar and search by solicitation number.
d. If solicitation is Export Controlled, select "Verify MPIN."
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq.
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you are currently certified, your MPIN will be verified and you may proceed to the next step. To obtain certification, login to the Joint Certification Program (JCP) https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx . Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. Contract Opportunities will allow you to access export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select "Pending Access" to controlled documents. This will generate an email to the
Contract Opportunities system administrator at DLA Warren with all the information needed for them to grant you access. Contract
Opportunities will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 to 3 working days to complete this Contract Opportunities-TDP access/approval process through https://https://sam.gov .
f. Only one individual in your company can request access to the Technical Data Package (TDP) for a solicitation. That individual must be registered as the Data Custodian, as identified in the JCP, and be granted approval to view the Technical Data Package (TDP) for a solicitation. The Data Custodian MUST be registered for a sam.gov account through https://login.gov . Any individual(s) no longer with the company should be deleted. Questions related to registration in https://login.gov should be directed to https://login.gov/help/ . Questions related to accounts in https://sam.gov should be directed to https://https://sam.gov/help/ .
Vendors are responsible for placing correct information in login.gov and https://sam.gov accounts.
g. It is strongly suggested that you submit an access request and provide the contract specialist with the completed "Use and Non-
Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.
[X] 4. The Government requires a "Use and Non-Disclosure Agreement" (NDA) to be signed by the Data Custodian of your firm, as identified in the JCP, before access is granted to the technical data. The appropriate Agreement is titled, "NDA ~ Use and Non-Disclosure Agreement for Government Technical Data," and is:
[X] available by emailing the contract specialist listed on page 1 of this solicitation.
[X] available as an attachment to this solicitation.
Follow the instructions on the Agreement, and email it to the contract specialist at Stephen.Granch@dla.mil. The contract specialist
11 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
will notify the Contract Opportunities administrator upon receiving the NDA. The administrator will grant approval to view/download the
TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the TDP. If you have any questions/problems viewing the TDP contact the contract specialist.
C.2 Drawing Limitations_______________________
(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor is responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
C.3 Configuration Control Engineering Changes______________________________________________
(a) The contractor may submit Engineering Change Proposal(s) (ECPs) and Request for Variance(s) (RFVs) for the requirements in the
Government provided Technical Data Package (TDP). If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all NORs necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form 1695-1
Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
12 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(d) Forms If any of the above listed forms are not included with the solicitation or contract, the contractor may locate forms on the
DOD Forms Website (http://www.dtic.mil/whs/directives/forms/ ) or contact the contract specialist listed on page 1 of the solicitation or contract for copies of the forms.
C.4 Acquisition of Manufacturers Part Number: Components________________________________________________________
One or more of the drawings for part of the contract item set forth in the Schedule and in the Technical Data Package specify manufacturer's part numbers. Since complete Government technical data for such part or parts are not available, it is understood that the Contractor, by accepting this contract, agrees to furnish only the listed manufacturer's part number(s) for those components of the contract item, except as provided in the provision entitled NOTICE REGARDING "SOURCE-CONTROLLED" COMPONENTS. (In Section L or near the end of this solicitation.) It is further understood and agreed that references to manufacturer's part numbers herein shall be deemed to include all changes or revisions thereto which the approved manufacturer has made effective as of the first date of delivery of any of the items under this contract; provided, that no change or revision that affects the interchangeability (ability to be interchanged with previous parts and to match with all mating parts when assembled) of the listed manufacturer's part shall be incorporated into the contract item without the prior written approval of the Procuring Contracting Officer.
C.5 Use of MIL-STD 1916_______________________
The Government will not accept lots whose samples submitted for acceptance contain nonconformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD-1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be VL IV for major characteristics and VL II for minor characteristics. MIL-HDBK-1916 provides guidance on the use of MIL-STD 1916.
C.6 Use of Class 1 Ozone Depleting Substances (CIODS)_____________________________________________________
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: http://www.epa.gov/ozone/science/ods/index.html .
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.
(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
C.7 Contractor Retention of Supply Chain Traceability Documentation____________________________________________________________________
1) By submitting a quotation or offer, the Contractor, if it is not the manufacturer of the item, is confirming it currently has, or will obtain before delivery, and shall retain documented evidence (supply chain traceability documentation), as described in paragraph
(2) below, demonstrating the item is from the approved manufacturer and conforms to the technical requirements.
(2) At a minimum, the supply chain traceability documentation for the item shall include: basic item description, part number and/or national stock number, manufacturing source, manufacturing sources Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.
(3) Contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance
13 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Program (CDAP) website http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/ .
(4) The contractor shall immediately make documentation available to the contracting officer upon request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for six years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
*** END OF NARRATIVE C0001 ***
14 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
PACKAGING AND MARKING
Packaging Requirements (Special Packaging Instructions)_______________________________________________________
(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of MIL-STD-2073-1, and the Special Packaging Instruction (SPI), see below.
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(4) SPI: AK00000001
(a) REVISION: D
(b) DATE OF REVISION: 11/13/2019
(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) MAY BE LOCATED WITHIN THE TECHNICAL DATA PACKAGE (TDP). IF IT IS
NOT LOCATED WITHIN THE TDP, THE SPI IS POSTED WITH THE SOLICITATION ON https://sam.gov .
(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging
Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the
"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(c) Marking:
(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R, including bar coding and
Military Shipment Label (MSL). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information
Guide. When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7006, refer to the DoD Guide to Uniquely Identifying Items for development of the UII and MIL-STD-129, Revision R for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.625-M and the requirements of the International Standards for Phytosanitary Measures 15
(ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials
15 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens.
Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
(e) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO
P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the
SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
(g) SUPPLEMENTAL INSTRUCTIONS: See SPI AK00000001, rev D
*** END OF NARRATIVE D0001 ***
16 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
E.1 Drawings for Inspection___________________________
(a) When requested, the Contractor shall make available to the Government Inspector the drawings and specifications to which the product was manufactured. Upon completion of product inspection and acceptance by the Government inspector, all drawings and specifications will be returned to the Contractor.
(b) If the Contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.), the Contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.
(c) The Government may rely on the Contractor's Certificate of Conformance, IAW FAR 52.246-15, that the item tendered for acceptance conforms to the contract requirements. However, conditions may warrant that the Contractor be required to make available to the
Government the drawings, specifications, or other technical data such that the Government can determine if the item meets the contract requirements. These conditions may include, but are not limited to, the following:
1) Complex items or items which have quality characteristics for which contractual conformance must be established through precise measurements and functional operation, either as an individual item or in conjunction with other items.
2) Items used in critical applications or items denoted as critical on technical data.
3) Items with known quality conformance issues.
4) Items with an unstable design history.
5) Contractor changes in technical requirements, technical data, and/or production processes which impact the fit, form, or function of the item.
E.2 Inspection and Acceptance Points - Origin_____________________________________________
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT:
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT:
(Name) (CAGE)
Address) (City) (State) (Zip)
E.3 Notice Regarding First Article__________________________________
(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
(b) When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not
17 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
E.4 Notice Regarding First Article Test Sample______________________________________________
(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of 0 that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of 3 that successfully pass all specified tests, less the destructive tests, if any, shall serve as a manufacturing standard for the remainder of the contract and be shipped as part of the last lot as a new part.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design. 2) as an aid in identifying any process changes, or 3) as the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
E.5 Inspection and Acceptance First Article Approval____________________________________________________
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
(1) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with drawing 12563651.
(2) The First Article Test Report (FATR) shall be compiled by the contractor to the contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated Government representative to determine that the First Article Test was successfully completed.
E.6 Requirements for Pre-treatment and CARC Painted Material_____________________________________________________________
(a) Scope
(1) This clause applies to contracts requiring Chemical Conversion Coatings and Pretreatments for Metallic Substrates, Chemical
Agent Resistant Coating (CARC), and their related materials. The requirements in this clause clarify and supplement those in the contract, unless nullified elsewhere in the contract or through an approved Request for Deviation.
(2) Coating qualification, spot paint repair, and MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base coatings are not within the scope of this clause.
(b) Definitions
(1) The "contracting agency," "appropriate agency," "procuring authority," "engineering authority," "procuring agency," and
"procuring activity" is the PCO or designee.
(2) The "prime contractor" is the company awarded this contract, and the "subcontractors" comprise all companies involved in providing coated parts to the prime contractor, including companies that apply the coatings.
(c) General Requirements Clarifications
(1) The government retains the right for onsite verification of the prime contractors and its subcontractors products, processes, procedures, and test reports.
18 82
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(2) The prime contractor shall be responsible for itself and its subcontractors to produce and maintain detailed process control plans, process control data, pre-production approval testing, ongoing quality control & quality control testing, and test reports. This information shall be available upon government request.
(3) The prime contractor shall immediately notify the PCO and the Defense Contract Management Agency (DCMA) of any failure to meet preproduction and production requirements.
(4) Each cleaning method shall be treated as a separate step in the process documentation.
(5) The Gage Repeatability and Reproducibility (Gage R&R) error shall be less than 30 percent for all process and product measurement systems.
(6) Products with hexavalent chromium, including but not limited to certain fastener finishes, shall not be used. Additionally, CARC topcoats containing siliceous additives to control gloss are prohibited.
(7) CARC primer and CARC topcoat shall not be applied directly to bare metal or plastic, except as provided for in MIL-DTL-53072.
(8) If the contract specifies application of CARC materials over a non-CARC coating, then both CARC primer and CARC topcoat are required. The complete coating system shall meet the requirements for CARC defined in TT-C-490.
(9) Neutral salt spray (NSS) testing shall not be used to validate compliance with materiel life cycle requirements; NSS is a production quality test and does not predict field performance.
(d) Pre-Production Approval Clarifications
(1) Pre-production testing shall include:
(i) Thickness of each layer of the coating system;
(ii) Coating system adhesion;
(iii) Salt spray performance; and
(iv) For phosphate pretreatments, the phosphate coating weight, crystal size and shape, and scanning electron microscope photos of the phosphate coatings at 500x and 1000x magnification.
(2)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .