Technical Requirements (11-29-21).pdf

PDF 296 KB Posted

Attached to
MX-11769 Image Intensifier Federal contract opportunity
Solicitation number
SPRBL1-22-R-0007
Issued by
Defense Logistics Agency Land and Maritime

About this file

This document outlines the technical requirements for a federal contract solicitation to procure MX-11769 Image Intensifier devices. The solicitation seeks firm-fixed-price quotes for National Stock Number 5855-01-504-4590, Part Numbers A3297310 or A3297320, to be used in AN/PVS-14 Monocular Night Vision Devices. The period of performance is from contract award until supplies shipment is complete. Offerors must have access to classified data and hold a SECRET security clearance, as the solicitation attachment conveys security requirements and classification guidance. Technical requirements include specialized testing, reliability testing, and quality assurance plans. The Defense Logistics Agency Land at Aberdeen is the procuring agency, with responses due by the closing date listed on SAM.gov where the solicitation and exhibits are posted.

View the file

Other files for this federal contract opportunity

Other files attached to MX-11769 Image Intensifier, newest first.
File Type Posted
SPRBL122R0007-0001.pdf PDF
DD0254 SIGNED_SPRBL122R0007_16MAR22.pdf PDF
SPRBL122R0007.pdf PDF
DD254 -Continuation Page_MX11769_17MAR22.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A SPRBL1-22-R-0007 Page 1 of 21 Issue: November 29, 2021

TECHNICAL REQUIREMENTS

MX-11769 Image Intensifier Spot Buy

Exhibit A SPRBL1-22-R-0007 Page 2 of 21

VERSION REVISIONS

Version Added/Deleted Reason November

Initial Revision

Exhibit A SPRBL1-22-R-0007 Page 3 of 21

TABLE OF CONTENTS

APPLICABLE DOCUMENTS

CONFIGURATION BASELINE

PACKAGING

Wood Packing Material

Military Packaging

SPECIALIZED TESTING

CONTRACT SECURITY REQUIREMENTS

CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1

CDRL List

Individual CDRLs

Exhibit A SPRBL1-22-R-0007 Page 4 of 21

APPLICABLE DOCUMENTS

Military and Federal Standards MIL-STD-129R Military Marking for Shipment and Storage MIL-STD-2073-1E Standard Practice for Military Packaging

Military and Federal Specifications

MIL-PRF-A3256363F Performance Specification, Image Intensifier Assembly, 18MM, Microchannel Wafer MX-11769/UV

Other Documents

Commercial Documents ISPM Number 15 Regulation of Wood Packaging in International Trade ANSI/ISO/ASQ(E) Q9001-2015 American National Standard, Quality Management Systems

Requirements EIA-649-1 Configuration Management Requirements For Defense Contracts ANSI/NCSL Z540.3-2006 Requirements for the Calibration of Measuring and Test Equipment ANSI/ASQ Q10012-2003 Measurement Management Systems – Requirements for

Measurement Processes and Measuring Equipment ANSI/ASQ Z1.4-2003 (R2013) Sampling Procedures and Tables For Inspection By Atrributes

Security Documents

CONFIGURATION BASELINE

The applicable Configuration Baselines (CB), for the listed Configuration Item (CI) and/or Computer Software Configuration Item (CSCI), are as listed in the table below.

NSN Nomenclature Part Numbers/Drawings 5855-01-504-4590 Image Intensifier A3297310 or A3297320

Each CI/CSCI, as developed/built and delivered, shall conform to the cited CB and (if applicable) all subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO). The Contractor shall establish a Configuration Management Program in accordance with EIA-649-1.

No changes or departures from the CB are acceptable except for changes or departures which are submitted in accordance with EIA-649-1, CDRL A001, CDRL B001, and CDRL C001, and are approved by the Government Configuration Manager (C Mgr.) or Configuration Management Officer (CMO) and which are made applicable to the contract by the PCO.

Exhibit A SPRBL1-22-R-0007 Page 5 of 21

An Engineering Change Proposal (ECP) describes the changes to be made to the CI/CSCI and all associated Government documents and data that are affected by the proposed engineering change. ECP should be prepared in accordance with EIA-649-1, CDRL A001, and DI-SESS-80639.

A Request For Variance (RFV) is a specific written authorization to depart from a particular requirement(s) of an item’s approved configuration documentation for a specific number of units or a specified period of time, either as an advance request or after the fact. The contractor shall identify the impact of the RFV on performance, operational readiness and logistics support of the affected CIs. The Government may require consideration for any RFV. RFV should be prepared in accordance with EIA-649-1, CDRL B001, and DI-

SESS-80640.

A Notice of Revision (NOR) shows the detailed changes that must be made to technical documentation, except specifications, following approval of an ECP. A NOR shall be submitted for each document affected by an ECP. NOR should be prepared in accordance with EIA-649-1, CDRL C001, and DI-SESS-80642.

Exhibit A SPRBL1-22-R-0007 Page 6 of 21

PACKAGING

Wood Packing Material Wood packing material includes pallets. See DLAD 52.247-9012 Requirements for Treatment of Wood Packaging Material (WPM).

Military Packaging DS7029 and/or DS7033 Preservation, Packing and Marking Instructions

DS7029 - DS7033 LEGEND

Qty Quantity Prot Req Protection Required PKG-REF Packaging Reference (Military/Federal Specification or Standard) SPI Special Packaging Instruction LPK Level of Packing QUP Quantity per Unit Pack ICQ Intermediate Container Quantity Pkg Reqmt Codes Packaging Requirement Codes when PKG-REF cites MIL-STD-2073 The below codes are for special markings:

PC Project Code WG Warranty/Guarantee SL Shelf Life BC Bar Code FMS Foreign Military Sales

Exhibit A SPRBL1-22-R-0007 Page 7 of 21

DS7029 - DS7033

NSN Prot Req PKG-REF or SPI LPK QUP ICQ Special Markings

Pkg J. J J J J J J J J J Reqmt I. II. III. IV. V. VI. VII. VII.a IX X Codes (MP) (CD) (PM) (WM) (CD) (CT) (UC) (IC) (PK) (SM) 5855-01-504-4590 Military MIL-STD-2073-1E B 001 10 1 00 00 GA D ED Military

Exhibit A SPRBL1-22-R-0007 Page 8 of 21

SPECIALIZED TESTING

The contractor shall perform First Article Testing, herein after referred to as Initial Production Testing (IPT), and Conformance Inspection (CI) IAW MIL-PRF-A3256363, and this document. Products delivered on this contract shall be qualified (also referred to as certified) by Product Manager Soldiers Manuever Sensors via performance of IPT. Test methods for the IPT and CI shall be in accordance with (IAW) the Government approved Quality Validation Plan (QVP) and Test Procedures.

The Government may require IPT be repeated over the life of this contract to requalify the product; should the contractor fail to deliver any of these items for a period of one year, make changes to products and/or processes, change a supplier of a component, or move the production line.

The Government reserves the right to waive IPT for contractors that have previously qualified by Product Manager Soldier Manuever Sensors and have completed Initial Production Testing. The contractor shall be required to provide evidence that their product has been previously qualified by Product Manager Soldier Manuever Sensors and have maintained production, with deliveries to the Government, prior to the Governemnt approving a waiver.

The Government reserves the right to conduct an operational test (OT), to include compatibility testing, to ensure the system is operationally effective and suitable, and interoperable with other Army equipment. If an OT is required, IPT approval is contingent on a successful OT.

As part of IPT, the contractor shall:

a) Develop the test procedures and plans necessary to demonstrate that these units conform to the requirements established by the applicable specification(s) and other technical data provided in this contract.

b) Notify the Government and test the IPT units.

c) Provide an Initial Production Test Report to the Government which documents the IPT results.

d) Ensure all equipment used to take performance readings for acceptance tests are kept within the performance parameters delineated by the manufacturer of that equipment and capable of satisfying the performance parameters of this contract. All equipment manufactured by the contractor shall be listed and the parameters established and maintained for this equipment also.

The number of samples to undergo IPT for each product shall be 20. All IPT samples shall be assembled at the same location at which production units will be assembled, using the same parts, materials, and manufacturing processes to be employed for subsequent production.

The contractor shall submit a Quality Validation Plan (QVP) in accordance with CDRL D001 and this document. IPT and Conformance Inspection shall be performed in accordance with the Government approved QVP. In addition to the information required by DI-NDTI-81307A, this submission shall contain:

a) The delineation and allocation of tests to be performed on each of the Initial Production units and the order of such tests.

b) The delineation and allocation of tests to be performed as Conformance Inspection on subsequent production lots, to include the order of tests and the sampling plan.

Exhibit A SPRBL1-22-R-0007 Page 9 of 21

c) Step-by-step test procedures for each test and the data sheets to be employed to document the results of testing. Test procedures may be submitted separate from the QVP, in accordance with CDRL E001.

d) Identification of required test facilities, equipment and personnel.

e) Test milestones schedules and the contractor's test readiness posture.

f) A table which cross references the paragraph number of the specification requirement (including a brief description of the requirement) and the associated paragraph number of the QVP.

The contractor shall submit an Initial Production Test Report in accordance with CDRL F001 and this document. Initial Production Test approval shall be contingent upon the submission of a complete and acceptable IPT Report to include verification of corrective action for reported IPT Failures to include adequacy of identified changes to the design/manufacturing process. IPT samples shall meet all contractual requirements or all variances shall be documented by Government approved waivers.

The IPT Report shall be complete, accurate, and readable and shall provide sufficient data to determine that the hardware item meets all the requirements delineated in the contract. The report will include the following:

a) Contractor's name and address.

b) Contract number.

c) Name and address of plant where Initial Production units were fabricated and assembled.

d) Place and date of performance of tests.

e) Identification of applicable test and inspection equipment used in performance of Initial

Production Test.

f) Sample size or quantity submitted for test or inspection.

g) A table which cross-references the paragraph numbers of the specification, the test procedures, and data sheet entry.

h) Complete test results showing actual or quantitative observations and all required calculations, allowable tolerances for each parameter, date the test was performed, the name and signature of tester, name and signature of the Government verifier/witness, and serial number of the equipment.

i) The final revision of the Government approved FIAR for each failure that occured.

The contractor shall report all IPT Failures and submit a Failed Item Analysis Report (FIAR) IAW CDRL G001 and this document. For any failure that occurs in a Government conducted Operational Test (OT), the contractor shall submit a FIAR and incorporate corrective actions.

The IPT samples shall NOT serve as a manufacturing standard. Upon successful completion of IPT, Items which are refurbishable and made fully compliant with contractual requirements shall be delivered as production items. The Government shall determine the acceptability of all IPT samples. Those items which are not refurbishable shall not be delivered as production items.

The contractor shall conduct Conformance Inspections for all product delivered in accordance with the Government approved Quality Validation Plan and the requirements of this document. Conformance Inspection procedures used to test production units shall be identical to those used to test IPT samples. After IPT is approved, any proposed changes to the QVP and/or production test procedures will be submitted per CDRL

Exhibit A SPRBL1-22-R-0007 Page 10 of 21

D001 and E001 for evaluation. Such submissions will provide complete justification for the change. Changes to the approved test procedures shall not be implemented without written Government approval.

Delivery of subsequent lots shall not be made prior to successful completion of Conformance Inspection.

The contractor shall notify the cognizant Government Quality Assurance Representative (QAR) in writing at least 2 days in advance, of the time and place for each Conformance Inspection. The contractor shall notify the QAR in writing within 2 working days of completion of Conformance Inspection for a specific production lot.

The contractor shall notify the PCO and Technical Activity in writing upon completion of Conformance Inspection. This notification will be submitted by email not later than 10 days after the test is completed, and will include:

- Contract Number.

- Item Identification (Nomenclature and/or Part Number)

- Date of Testing

- Lot Size, Number, and time frame represented

- Sample Size

- List of any associated failures

The contractor shall report each IPT Failure and each Conformance Inspection failure occurring in Test Groups B, C, and D, to the Government Quality Assurance Representative (QAR) and the Technical Activity (see Block 16 of DD Form 1423 for CDRL G001) within 48 hours of failure occurrence. Within 10 working days of failure occurrence, the contractor shall submit a Failed Item Analysis Report (FIAR) through the cognizant QAR to the Technical Activity as required by CDRL G001. In addition to the information required by DI- SESS-81315B, the report shall include:

a) Contractor's name, address and applicable contract number

b) Identification of failed item

c) Number of units in lot and sample size

d) Date and time of failure occurrence

e) Failure Mode

f) Summary of failure analysis

g) Root cause of failure

h) History of the failure

i) Proposed Corrective Action to eliminate root cause, contain the failure, and prevent re-occurrence

j) Re-inspection plan to validate the corrective action

k) Proposed disposition of failed item and lot

l) Verification that Corrective Action was effective.

The contractor shall implement the proposed corrective action on all units in the lot, select new samples and conduct re-inspection and other required re-testing in accordance with the re-inspection plan in the FIAR.

Results of the re-inspection and validation of the corrective action shall be included in the FIAR.

Exhibit A SPRBL1-22-R-0007 Page 11 of 21

Final acceptance and shipment approval will be withheld until results of the re-inspection substantiate that the corrective action was effective and the FIAR was accepted, as authorized by the PCO.

The contractor shall prepare and submit a Reliability Test Report, also referred to as a Production Reliability Acceptance Test (PRAT), for each production lot subjected to Reliability Testing. The Reliability Test Report shall be prepared in accordance with CDRL H001 and this document. Reliability Report shall include but not be limited to a test summary, test description, identification of item(s) under test, lot from which the test sample was taken, lots represented by the sample, test group number, performance requirements, measured values taken during the test, conclusions, and applicable failed item analysis reports (FIARs).

In the event of an Image Intensifier Reliability lot failure, the Government may, with Contractor concurrence, agree to accept consideration in lieu of correcting units that have already been delivered to the Government.

The following calculation shall be used to determine the amount of consideration.

Damages = [ ( MTTFREQ – MTTFDEM ) / ( MTTFREQ ) ] * # of units * cost per unit

MTTFREQ = Mean Time To Failure Required MTTFDEM = Mean Time To Failure Demonstrated

The number of units in the above calculation shall be all units delivered since the last production lot to successful complete Reliability test, or any other number of units as agreed to by the Government. The MTTF used in the equation is a cumulative total of all samples subjected to Reliability Testing in that particular lot.

When calculating the MTTFDEM for the lot, the MTTF demonstrated for an individual unit shall not exceed the required MTTF for that unit.

CONTRACT SECURITY REQUIREMENTS

The contractor shall adhere to the requirements of the signed DD-254 Contract Security Classification Specification and "Security Classification Guide (SCG) for Image Intensifier Devices". In the event of a discrepancy between the signed DD 254, included as an attachment to the solicitaition/contract, and the language in this section, the signed DD 254 information shall take precedence.

Access to Controlled Unclassified Information (CUI) is required in the performance of this contract.

Information designated as CUI, e.g., For Official Use Only (FOUO), generated or provided under this contract shall be controlled, handled, stored, marked, safeguarded, transmitted, and destroyed IAW DoDM 5200.01 Vol 4, DoDM 5400.0, AR 380-5, AR 25-55, AR 25-2, and the following guidance:

Electronically transmitted CUI shall be sent via:

1) Encrypted email

2) Password protected/encrypted document

3) DoD Safe Access File Exchange at https://safe.apps.mil

4) An accredited information system with proper security controls.

The contractor may disseminate FOUO information to their employees and subcontractors that have a need-to-know.

The contractor shall report the unauthorized disclosure of CUI to the COR.

Exhibit A SPRBL1-22-R-0007 Page 12 of 21

Contractor is authorized to receive, store, and generate classified material at the contractor’s facility. Contractor will reference the appropriate security classification guidance when generating or deriving classified material or hardware, reference item 10k. All classified information received or generated will be properly stored and handled according to the markings on the material. All classified information received or generated is the property of the U.S. Government. At the termination or expiration of this contract, the U.S. Government will be contacted for proper disposition instructions.

If performing on contractor site, the contractor shall develop an OPSEC Plan IAW AR 530-1 as listed in the TRD CDRL number I001. RA is responsible for providing to the contractor a current and valid program/command OPSEC Plan. The contractor will use the program/command OPSEC Plan to ensure the contractor developed OPSEC Plan includes the same Critical Information List (CIL) and OPSEC measures.

Contractor is authorized to receive, store, or generate CUI in the performance of this contract. Information designated as CUI, e.g., FOUO generated under this contract shall be controlled, handled, stored, marked, safeguarded, transmitted and destroyed IAW DoDM 5200.01, DoDM 5400.07, AR 380-5, AR 25-2, AR 25-55, and the following guidance:

Electronically transmitted CUI shall be sent via:

1) Encrypted email

2) Password protected/encrypted document

3) DoD Safe Access File Exchange at https://safe.apps.mil

4) An accredited information system with proper security controls.

The contractor may disseminate CUI to their employees and subcontractors that have a need-toknow.

Disposal/destruction shall be by means of shredding when no longer needed. If shredding capabilities are unavailable on contractor site – contractor may coordinate with government representative for shredding services.

The contractor shall report the unauthorized disclosure of CUI to the KO/COR, CM, or ISS.

CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1

CDRL List

CDRL

Data Line No. DID Identification Title

A001 DI-SESS- 80639 Engineering Change Proposal B001 DI-SESS- 80640 Request for Variance C001 DI-SESS- 80642 Notice of Revision D001 DI-NDTI- 81307A First Article Qualification Test Plan – Quality Validation Plan E001 DI-NDTI- 80603 Test Procedures F001 DI-NDTI- 80809B Test/Inspection Report – Initial Production Test Report G001 DI-RELI- 81315 Failure Analysis and Corrective Action Report H001 DI-TMSS- 81586A Reliability Test Reports I001 DI-MGMT- 80934C Operations Security (OPSEC) Plan

Exhibit A SPRBL1-22-R-0007 Page 13 of 21

Individual CDRLs

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Original Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A001 TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-11769

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

Engineering Change Proposal Configuration Management

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SESS-80639 AMSEL-LCE-INV

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

IN

LT

ASREQ SEE ITEM 16

b. COPIES

SECT. B

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

Reg Repro

16. REMARKS:

The contractor shall prepare and submit Engineering Change Proposal in accordance with EIA-649-1 and this DID when a change to a contractual baseline document is deemed necessary.

The Government will have 30 days to review, accept, and/or comment on the draft submission. The contractor shall incorporate changes into the electronic deliverable within 30 days after receipt of Government comments. The Government will have 30 days to review, accept, and/or comment on the final submission.

Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.

E-mail notification is required with any electronic submission.

AMSEL-LCE-INV

FCDD-ISP-AM

QAR

PCO

ACO

15. TOTAL 0 5 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Timothy Langan

FCDD-ISP-AM

Electronics Engineer

Daniel Webster

FCDD-ISP-AM

Branch Chief

Exhibit A SPRBL1-22-R-0007 Page 14 of 21

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B001 TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-11769

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

Request For Variance Configuration Management

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80640 AMSEL-LCE-INV

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

SUBMISSION

a. ADDRESSEE

16. REMARKS: The contractor shall prepare and submit Request For Variance in accordance with EIA-649-1 and this DID when a departure from a contractual baseline document is deemed necessary.

The Government will have 30 days to review, accept, and/or comment on the draft submission. The contractor shall incorporate changes into the electronic deliverable within 30 days after receipt of Government comments. The Government will have 30 days to review, accept, and/or comment on the final submission.

Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.

E-mail notification is required with any electronic submission.

AMSEL-LCE-INV

FCDD-ISP-AM

QAR

PCO

ACO

Timothy Langan

FCDD-ISP-AM

Electronics Engineer

Daniel Webster

Exhibit A SPRBL1-22-R-0007 Page 15 of 21

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

C001 TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-11769

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

Notice of Revision Configuration Management

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80642 AMSEL-LCE-INV

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

SUBMISSION

a. ADDRESSEE

16. REMARKS: The contractor shall prepare and submit Notice of Revision in accordance with EIA-649-1 and this DID when a change to a contractual baseline document is deemed necessary.

The Government will have 30 days to review, accept, and/or comment on the draft submission. The contractor shall incorporate changes into the electronic deliverable within 30 days after receipt of Government comments. The Government will have 30 days to review, accept, and/or comment on the final submission.

Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.

E-mail notification is required with any electronic submission.

AMSEL-LCE-INV

FCDD-ISP-AM

QAR

Timothy Langan

FCDD-ISP-AM

Electronics Engineer

Daniel Webster

Exhibit A SPRBL1-22-R-0007 Page 16 of 21

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

D001 TDP TM OTHER NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-11769

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

First Article Qualification Test Plan Quality Validation Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-81307A AMSEL-LCE-INV

INSER

T

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

DD

ONE/P 30 DAC

SECT.

B

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

A

16. REMARKS: Submit draft via LT. Government requires 30 days for review/comments. Submit final within 15 days of receipt of Government comments, via DD 250. The Government will require 15 days for review/comments for each subsequent submission.

Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.

E-mail notification is required with any electronic submission.

AMSEL-LCE-INV

FCDD-ISP-AM

15. TOTAL 3 3 0

Timothy Langan

FCDD-ISP-AM

Electronics Engineer

Daniel Webster

Exhibit A SPRBL1-22-R-0007 Page 17 of 21

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

E001 TDP TM OTHER NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-11769

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

Test Procedures

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80603 AMSEL-LCE-INV

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

OTIME 180 DAC

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

16. REMARKS: Submit draft via LT. Government requires 30 days for review/comments. Submit final within 30 days of receipt of Government comments, via DD 250.

Each draft and the final submissions shall be delivered in a format, compatible with Microsoft Office software delivered by e-mail.

Alternative delivery media may be discussed with the Contracting Officer prior to delivery. E-mail notification is required with any electronic submission.

AMSEL-LCE-INV

FCDD-ISP-AM

15. TOTAL 0 3 0

Timothy Langan

FCDD-ISP-AM

Electronics Engineer

Daniel Webster

Exhibit A SPRBL1-22-R-0007 Page 18 of 21

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

F001 TDP TM OTHER NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-11769

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

Test/Inspection Report Initial Production Test Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80809B AMSEL-LCE-INV

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

OTIME 180 DAC

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

16. REMARKS: Submit report of Initial Production Testing results via DD 250. Government requires 14 days to provide comments/approval.

Submit revised report within 7 days after receipt of government comments. Government requires 7 days to provide comments/approval.

Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.

E-mail notification is required with any electronic submission.

AMSEL-LCE-INV

FCDD-ISP-AM

15. TOTAL 0 3 0

Timothy Langan

FCDD-ISP-AM

Electronics Engineer

Daniel Webster

Exhibit A SPRBL1-22-R-0007 Page 19 of 21

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

G001 TDP TM OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-11769

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

Failure Analysis and Corrective Action Report

Failed Item Analysis Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81315B AMSEL-LCE-INV

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION IN

b. COPIES SECT. B

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Reg

Repro

16. REMARKS: Data Item Description (DID) reference to MIL specs/stds is for guidance only.

Failure reports shall be submitted within 10 days of failure occurrence.

Technical Activity Representative is Timothy Langan.

Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.

E-mail notification is required with any electronic submission.

AMSEL-LCE-INV

FCDD-ISP-AM

PCO

ACO

QAR

15. TOTAL 0 3 3

Timothy Langan

FCDD-ISP-AM

Electronics Engineer

Daniel Webster

Exhibit A SPRBL1-22-R-0007 Page 20 of 21

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

H001 TDP TM OTHER TMSS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-11769

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

Reliability Test Reports Production Reliability Acceptance Test (PRAT) Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-TMSS-81586A AMSEL-LCE-NVI

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

16. REMARKS: Report is to be submitted within 21 Days after completion of tests/inspections. Government requires 21 days for review and approval or comment. Contractor shall incorporate corrections and resubmit within 14 days of receipt of Government comments.

Frequency of reports shall be IAW frequency of Reliability Testing, identified in the Requirements for Conformance Inspection.

Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.

E-mail notification is required with any electronic submission.

AMSEL-LCE-NVI

15. TOTAL 0 4 4

Timothy Langan

FCDD-ISP-AM

Electronics Engineer

Daniel Webster

Exhibit A SPRBL1-22-R-0007 Page 21 of 21

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

I001 TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-11769

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

I001 Operations Security (OPSEC) Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-80934C AMSEL-LCE-INV

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

NO

ASREQ 90 DAC

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

A

16. REMARKS: Submit OPSEC Plan within 90 Days After Contract Award.

All deliveries shall be delivered in a format, compatible with Microsoft Office software delivered by e-mail. Alternative delivery media may be discussed with the Contracting Officer prior to delivery.

E-mail notification is required with any electronic submission.

AMSEL-LCE-I

15. TOTAL 0 3 3

Timothy Langan

RDER-PRA-CA

Electronics Engineer

Daniel Webster

RDER-PRA-CA

File details come from the government source that posted it. Updated .