Technical_Requirements_pack_REVIEWED.DOCX
DOCX document 91 KB Posted
- Attached to
- 10KW 400 HZ ENGINE, DIESEL Federal contract opportunity
- Solicitation number
- SPRBL118Q0064
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 10kW_400_Hz_Engine_Drawings.pdf | ||
| SPRBL118Q0064.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL REQUIREMENTS
ARMS: AMMPS Engines NSN 2815-01-597-5235 5kW Engine, Diesel NSN 2815-01-588-5596 10kW 50/60 Hz Engine, Diesel NSN 2815-01-588-4195 10kW 400 Hz Engine, Diesel NSN 2815-01-591-2200 15kW 50/60 Hz Engine, Diesel NSN 2815-01-596-5208 15kW 400 Hz Engine, Diesel NSN 2815-01-596-7562 30kW Engine, Diesel NSN 2815-01-590-8126 60kW Engine, Diesel
VERSION REVISIONS
| Version |
| Added/Deleted |
| Reason |
| 24 Jun 2015 |
| Added: Version Revision table for future use |
| 09 Mar 2016 |
| Add: Contract Security Requirements section |
| APG G-2 Army Security Office policy. |
TABLE OF CONTENTS
| APPLICABLE DOCUMENTS | 4 |
| CONFIGURATION BASELINE | 4 |
| Part Revisions | 5 |
| PACKAGING | 6 |
| Wood Packing Material | 6 |
| Military Packaging | 6 |
| CONTRACT SECURITY REQUIREMENTS | 8 |
APPLICABLE DOCUMENTS
Military and Federal Standards
| MIL-STD-129R |
| MILITARY MARKING FOR SHIPMENT AND STORAGE |
| MIL-STD-130N |
| IDENTIFICATION MARKING OF U.S. MILITARY PROPERTY |
| MIL-STD-2073-1E CHANGE 1 |
| STANDARD PRACTICE FOR MILITARY PACKAGING |
| MIL-STD-147E CHANGE 1 |
| STANDARD FOR PALLETIZED UNIT LOADS |
Military and Federal Specifications
Other Documents
| 04-20157 |
| 5 kW GOVERNMENT DRAWING |
| 04-20158-1 |
| 10 kW 50/60 Hz GOVERNMENT DRAWING |
| 04-20158-2 |
| 10 kW 400 Hz GOVERNMENT DRAWING |
| 04-20159-1 |
| 15 kW 50/60 Hz GOVERNMENT DRAWING |
| 04-20159-1 |
| 15 kW 400 Hz GOVERNMENT DRAWING |
| 04-20160 |
| 30 kW GOVERNMENT DRAWING |
| 04-20229 |
| 60 kW GOVERNMENT DRAWING |
| SPI AG00000605 |
| CECOM SPECIAL PACKAGING INSTRUCTION |
Commercial Documents
| ISPM NUMBER 15 |
| REGULATION OF WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE (2009) |
Security Documents
| AT-OPSEC |
| ANTI-TERRORISM/OPERATIONAL SECURITY |
CONFIGURATION BASELINE
The applicable Configuration Baselines (CB), for the listed Configuration Item (CI) and/or Computer Software Configuration Item (CSCI), are as listed in the table below.
| NSN |
| Nomenclature |
| Part Numbers/Drawings |
| 2815-01-597-5235 |
| 5kW Engine Assembly, Diesel |
| 04-20157 |
| 2815-01-588-5596 |
| 10kW 50/60 Hz Engine Assembly, Diesel |
| 04-20158-1 |
| 2815-01-588-4195 |
| 10kW 400 Hz Engine Assembly, Diesel |
| 04-20158-2 |
| 2815-01-591-2200 |
| 15kW 50/60 Hz Engine Assembly, Diesel |
| 04-20159-1 |
| 2815-01-596-5208 |
| 15kW 400 Hz Engine Assembly, Diesel |
| 04-20159-1 |
| 2815-01-596-7562 |
| 30kW Engine Assembly, Diesel |
| 04-20160 |
| 2815-01-590-8126 |
| 60kW Engine Assembly, Diesel |
| 04-20229 |
Obsolescence Reporting
3.6 Requirements for Configuration Management.
3.6.1 Product Definition Information. The Product Definition Information describes a product’s performance, functional and physical attributes, including the requirements and design information (specifications, drawings, design descriptions and software). Interfaces, including interfaces with other products, are also documented in the Product Definition Information. The Product Definition Information shall be specified by the Contractor’s Commercial Item Part Number (CIPN).
3.6.2 Configuration Change Process. The contractor shall establish a system for managing the configuration changes to the CIPN baseline.
3.6.3 CIPN Configuration Baseline. The Contractor’s Commercial Item Part Number (CIPN), as defined by the Contractor’s specifications, drawings, catalog page, etc, at the time of award of this contract, shall form the Configuration Baseline for this acquisition.
The applicable Configuration Baseline (CB) for the listed Configuration Item (CI)/Computer Software Configuration Item (CSCI) is as follows:
| CI/CSCI | CB | |
| 04-20136/A040N262 | 5kW Engine, Diesel | |
| 04-20136/A040N291 | 10kW Engine, Diesel | |
| 04-20136/A040N389 | 15kW Engine, Diesel | |
| 04-20136/A040N370 | 30kW Engine, Diesel | |
| 04-20136/A040N383 | 60kW Engine, Diesel |
3.6.4 Configuration. Each CI/CSCI, as developed/built and delivered, shall conform to the cited CB and (if applicable) and any subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO).
3.6.5 Application Management.
3.6.5.1 Application Management. In performing Application Management, the Government must assess the impact of design changes to the Configuration Item. The Government is the Configuration Management authority on application management for all external applications and for all Major changes that affect the Commercial Item Part Number (CIPN) specified in paragraph 3.6.1. A Major change is defined as any change that will impact any of the following conditions of the CIPN:
| (a) Overall performance and Form, Fit, Function and Interface (F3I) Characteristics. |
| (b) Reliability, Maintainability and Survivability |
| (c) Electromagnetic Interference (EMI), air worthiness certification, or other pertinent requirement. |
| (d) Safety |
| (e) Support, operational and training requirements |
| (f) Impact on Technical Manuals, Repair Parts and Special Tools Lists (RPSTLs), DMWRs, |
| Provisioning Parts List (PPL), etc. |
| (g) Impact on Cost and/or Schedule. |
| (h) Impact on test equipment, support equipment and associated software. |
| (i) Software. |
3.6.5.2 Application Activity. The Government is an Application Activity (AA) for changes that affect the Contractor’s CIPN. The Government does not possess document change authority over the changes affecting the CIPN. As part of the Government’s Application Management process, the Government as AA does have a right to review or be notified of changes made by the Contractor that will affect any of the conditions identified in paragraph 3.6.5.1. Any changes that affect these conditions shall be submitted for Government review or notification IAW the procedures outlined below (para 3.6.5.3). Configuration changes not directly affecting the configuration baseline conditions identified in paragraph 3.6.5.1 do not require Government review or notification.
3.6.5.3 Departures from CB. Changes that affect the CIPN conditions cited in paragraph 3.6.5.1 shall be submitted for Government review or notification in accordance with this SOW and the DD Form 1423 for DI-MISC-80711A. Upon receipt of notification, the Government will review the impact of the change.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Original Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP X TM OTHER
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
AMMPS Engines
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| Scientific and Technical Reports |
| Configuration Management |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80711A |
| Technical Requirements Configuration Baseline |
| RDER-PRP-G |
INSERT
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
IN
LT
| ASREQ |
| SEE ITEM 16 |
b. COPIES
SECT. B
| 8. APP CODE |
| N/A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
SEE ITEM 16
Reg
Repro
16. REMARKS: Data Item Description DI-MISC-80711A: Delete block 10 instructions entirely and follow instructions in SOW 3.6.5.3.1- (Request For Change documents (RFCs)).
The contractor shall prepare and submit Configuration Control Documents in accordance with the Technical Requirements section for Configuration Baseline when a change to or departure from a contractual baseline document is deemed necessary.
All deliveries shall be in digital format. All digital files shall be provided both by electronic submission, e.g., e-mail, FTP, etc., as arranged with the requiring office, and also by CD ROM readable by computers running Microsoft Office 2000 and Office XP suite of applications (MS Word, MS Excel, MS PowerPoint, and MS Project, etc.).
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the contractor to receive payment for the data deliverable (see section G of the Contract). E-mail notification is required with any electronic submission.
RDER-PRP-G
PCO
ACO
QAR
AMSEL-LC-LEO-E-ET
AMSEL-LC-LEO-E-AV*
* 1 COPY VECP ONLY.
| 15. TOTAL |
| 0 |
| 4 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
Brian Kim
RDER-PRP-G
Mechanical Engineer
Mark L. Caringi
RDER-PRP-G
Chief, Power Environmental Branch
3.6.5.3.1 Request For Change (RFC). The Request For Change (RFC) includes both the engineering change and the supporting documentation by which the change is described and suggested. An RFC describes changes to the CI/CSCI and associated Contractor documents and data (if applicable) that are affected by the proposed engineering change. The RFC also describes a full impact analysis of the effect of the change on the logistics, interface, design, cost and schedule requirements of the CIPN.
3.6.5.3.1 .1 RFCs could be generated as any of the following categories: Change Directive; Change Request; Engineering Change Package; Engineering Change Proposal; Engineering Change Request; Engineering Change Memo; Engineering Change Notice.
3.6.5.3.1.2 RFCs may contain some of the following elements:
| (a) A unique change identifier; identification of originating organization and responsible individual. |
| (b) Change classification, |
| (c) Identification of product(s) (including components and interfacing products) affected by the change. |
| (d) Change description and scope (including effects on performance, operation, maintenance, servicing, operation and maintenance training, repair parts, support and test equipment, cost, schedule, and any other effect on physical, functional, and logistics characteristics of the CIPN). |
| (e) Reason and justification for the change and consequences of not incorporating the change. |
| (f) Estimated cost increase or savings. |
| (g) Change implementation (and effectivity) and impact on delivery schedule. |
| (h) Criteria, if any, for retrofitting products. |
3.6.6 Contractor-approved changes that adversely impact any of the CIPN conditions listed in paragraph 3.6.5.1 may require re-evaluation by the Government of the CIPN. Re-evaluation may include operational testing re-assessment or re-assessment of the logistics impact of the proposed change. An approved change to the design of the CIPN must be verified to ascertain that the CIPN has achieved the functional attributes and requirements specified in the baselined Product Definition Information (CIPN) and that it is adequate for its intended purposes. The Government is not obligated to accept any CIPNs that no longer meet the Government’s requirements as established by the CIPN at the time of contract award.
Part Revisions See above statement, 3.6.5.3.1
PACKAGING
Wood Packing Material
Wood packaging material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. This requirement excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSB).
All WPM shall meet the requirements of International Standards for Phytosanitary Measures (ISPM) Number 15, “Guidelines for Regulating Wood Packaging Material in International Trade”. DoD shipments inside and outside of the United States shall meet the requirements of ISPM 15 whenever WPM is used to ship DoD cargo.
All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) (IAW) American Lumber Standard Committee (ALSC), Incorporated, Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/).
All WPM shall include certification/quality markings IAW the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp.
Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry. The Government reserves the right to recoup from the contractor any remediation costs incurred by the Government.
Wood packing material includes pallets. See DLAD 52.247-9012 Requirements for Treatment of Wood Packaging Material (WPM).
Military Packaging
Military Packaging in accordance with SPI AG00000605 is applicable.
Attachment 0001 SPRBL118-Q-0064 Page 2 of 16 Issue: 29 August 2018
DS7029 and/or DS7033 Preservation, Packing and Marking Instructions
DS7029 - DS7033 LEGEND
| Qty |
| Quantity |
| Prot Req |
| Protection Required |
| PKG-REF |
| Packaging Reference (Military/Federal Specification or Standard) |
| SPI |
| Special Packaging Instruction |
| LPK |
| Level of Packing |
| QUP |
| Quantity per Unit Pack |
| ICQ |
| Intermediate Container Quantity |
| Pkg Reqmt Codes |
| Packaging Requirement Codes when PKG-REF cites MIL-STD-2073 |
The below codes are for special markings:
| PC |
| Project Code |
| WG |
| Warranty/Guarantee |
| SL |
| Shelf Life |
| BC |
| Bar Code |
| FMS |
| Foreign Military Sales |
DS7029 - DS7033
| NSN |
| Prot Req |
| PKG-REF or SPI |
| LPK |
| QUP |
| ICQ |
Special Markings
| Pkg |
| J. |
| J |
| J |
| J |
| J |
| J |
| J |
| J |
| J |
| J |
| Reqmt |
| I. |
| II. |
| III. |
| IV. |
| V. |
| VI. |
| VII. |
| VII.a |
| IX |
| X |
| Codes |
| (MP) |
| (CD) |
| (PM) |
| (WM) |
| (CD) |
| (CT) |
| (UC) |
| (IC) |
| (PK) |
| (SM) |
| 2815-01-597-5235 |
| Military |
| AG00000605 |
| B |
| 1 |
| - |
| ZZ |
| Z |
| ZZ |
| ZZ |
| ZZ |
| Z |
| ZZ |
| ZZ |
| - |
| 03 |
| BC |
| 2815-01-588-5596 |
| Military |
| AG00000605 |
| B |
| 1 |
| - |
| ZZ |
| Z |
| ZZ |
| ZZ |
| ZZ |
| Z |
| ZZ |
| ZZ |
| - |
| 03 |
| BC |
| 2815-01-588-4195 |
| Military |
| AG00000605 |
| B |
| 1 |
| - |
| ZZ |
| Z |
| ZZ |
| ZZ |
| ZZ |
| Z |
| ZZ |
| ZZ |
| - |
| 03 |
| BC |
| 2815-01-591-2200 |
| Military |
| AG00000605 |
| B |
| 1 |
| - |
| ZZ |
| Z |
| ZZ |
| ZZ |
| ZZ |
| Z |
| ZZ |
| ZZ |
| - |
| 03 |
| BC |
| 2815-01-596-5208 |
| Military |
| AG00000605 |
| B |
| 1 |
| - |
| ZZ |
| Z |
| ZZ |
| ZZ |
| ZZ |
| Z |
| ZZ |
| ZZ |
| - |
| 03 |
| BC |
| 2815-01-596-7562 |
| Military |
| AG00000605 |
| B |
| 1 |
| - |
| ZZ |
| Z |
| ZZ |
| ZZ |
| ZZ |
| Z |
| ZZ |
| ZZ |
| - |
| 03 |
| BC |
| 2815-01-590-8126 |
| Military |
| AG00000605 |
| B |
| 1 |
| - |
| ZZ |
| Z |
| ZZ |
| ZZ |
| ZZ |
| Z |
| ZZ |
| ZZ |
| - |
| 03 |
| BC |
CONTRACT SECURITY REQUIREMENTS
AT/OPSEC FORM
In the event of a discrepancy between the signed DD 254 Contract Security Classification Specification, included as an attachment to the solicitaition/contract, and the language in this section, the signed DD 254 information shall take precedence.
CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1
CDRL List
| CDRL Data Line No. |
| DID Identification |
| Title |
| A001 |
| DI-MISC- |
| 80711A |
| Scientific and Technical Reports – Configuration Control |
| B001 |
| DI-MISC- |
| 80711A |
| IUID Marking Diagram/Instructions |
| C001 |
| DI-MISC- |
| 80711A |
| Packaging Data |
Individual CDRLs
3.3 Requirements for Item Unique Identification (IUID). The contractor shall mark all contract deliverables In Accordance With (IAW) DFARS clause 252.211-7003 in Section F of this contract and the following requirements.
3.3.1 IUID Marking.
3.3.1.1 New items: The contractor shall provide IUID, or DoD recognized equivalent, for all items delivered with an acquisition cost of $5000 or more. For long term contracts, any items that have range quantity prices established, that will exceed the $5000 unit price shall have IUID markings from the beginning of the contract. IUID markings shall be IAW MIL-STD-130N.
3.3.1.2. Repair items: The contractor shall mark those items as identified by the Government. Items received for repair shall be inspected for IUID markings. Those items where the marking is damaged or missing the contractor shall mark the equipment. When marking requirements are not clearly specified then the contractor shall advise the PCO. For previously acquired items where the IUID markings were not required the contractor shall follow the procedures as if the item was a new item.
3.3.1.3 Commercial Markings. All other items shall have acceptable commercial markings that meet the guidelines in Department of Defense (DoD) Guide to Uniquely Identifying Items http://www.acq.osd.mil/dpap/pdi/uid/index.html.
3.3.1.4 Permanency and Legibility. The IUID marking and identification plates, tags, etching, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, groups, or kits shall be as permanent as the normal life expectancy of the item and be capable of withstanding the environment, test, cleaning, repair, and rebuild procedures specified for the item. Legibility shall be as required and verified for ready readability per MIL-STD-130N.
3.3.1.5 Deleterious Effect. Marking of items shall be accomplished in a manner that will not adversely affect the life and utility of the item. Marking materials creating hazardous conditions shall not be used. Placement and choice of the marking shall not create hazardous conditions.
3.4.2 IUID Coding. IUID markings and readability requirements shall comply with MIL-STD-130N.
3.4.2.1 Symbology markings and the order of priority for marking the hardware shall be in accordance with MIL-STD 130N. First priority is the 2D data matrix symbol (machine readable) IUID is the minimum requirement when there are severe space limitations. The second priority is the human readable characters. The third priority is the Linear Bar Code.
3.4.2.2 If the technical data has not specified the marking location, markings shall be located such that they are visible during item use, provided that sufficient space is available, and does not interfere with equipment operations.
3.4.2.3 If items are not described by Government Product Technical Data (i.e. Commercial Items), the contractor shall submit diagrams showing placement and description of the IUID marking and applicable installation and processing instructions for government review and approval IAW with CDRL for DI-MISC-80711A and this TRD.
CDRL A001
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP TM OTHER MISC
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
AMMPS Engines
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| Scientific and Technical Reports |
| IUID Marking Diagram/Instructions |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80711A |
| Technical Requirements Configuration Baseline |
| RDER-PRP-G |
INSERT
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
IN
LT
| ASREQ |
| SEE ITEM 16 |
b. COPIES
SECT. B
| 8. APP CODE |
| N/A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Final
| N/A |
| SEE ITEM 16 |
16. REMARKS:
Item 4: Delete Block 10.2 of Data Item Description (DID) and prepare in accordance with this CDRL & the Technical Requirements.
Item 12: Delivery of draft shall be 120 DAC. Government has 30 days to review/comment.
Item 13 Delivery of final shall be 30 days after receipt of Government comments. Government has 60 days to determine acceptance. Contractor to submit DD250 upon acceptance of UID Marking Diagram/Instructions.
Item 14: All digital files will be provided both by electronic submission, e.g., e-mail, FTP, etc., as arranged with the requiring office, and also by CD ROM, readable by computers running Microsoft Windows.
RDER-PRP-G
PCO
ACO
QAR
AMSEL-LC-LEO-E-ET
AMSEL-LC-LEO-E-AV*
* 1 COPY VECP ONLY.
| 15. TOTAL |
| 0 |
| 5 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
BRIAN KIM
RDER-PRP-G
Mechanical Engineer
| 04 / 11 / 18 |
| MARK L. CARINGI |
RDER-PRP-G
Chief, Generator Branch 04 / 11 / 18
DD Form 1423-1, 1 Jun 90
3.4.2.4 Per the Department of Defense, Item Unique Identification of Government Property Guidebook, Reporting Government Property In the Possession of the Contractor (PIPC), Guidance for: Defense Federal Acquisition Regulation (DFARS) 252.211-7007, Item Unique Identification of Government Property, Version 1.0, September 21, 2007
For new contracts issued after September 13, 2007, DoD will include an Interim Rule, DFARS 252.211-7007, Item Unique Identification of Government Property (DFARS Case 2005-D015), which permanently revises requirements for reporting of PIPC. The interim rule permanently replaces the DD Form 1662 reporting requirements with requirements for DoD contractors to electronically submit, to the IUID registry, the IUID data applicable to PIPC.
It should be understood that in accordance with DFARS 211.274-5, Contract clauses, the clause at DFARS 252.211-7003, Item Identification and Valuation, must be included in any contract that incorporates the clause at DFARS 252.211-7007, Item Unique Identification of Government Property. This is essential to assure there is no ambiguity in the requirements for assigning, registering, reporting and marking PIPC.
3.4.2.5. The contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the PCO or other Government representative at any time during the life of this contract. The contractor shall provide this list to the government at the end of the contract.
3.5.11 Handling, Storage, Preservation, Packaging and Shipping. The Contractor shall establish, maintain, control, and be responsible for the handling, storage, preservation, packaging and shipping to protect the quality of the materials and to prevent damage from loss, deterioration, degradation, or substitution of products.
3.5.12 Packaging Data. The contractor shall provide accurate cubic dimensions and weights for the end item.
CONTRACT DATA REQUIREMENTS LIST
Original Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP X TM OTHER
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
AMMPS Engine
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| Scientific and Technical Reports |
| Packaging Data |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80711A |
| Para 3.5.12 |
| RDER-PRP-G |
INSERT
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
IN
LT
| ASREQ |
| SEE ITEM 16 |
b. COPIES
SECT. B
| 8. APP CODE |
| N/A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Final
SEE ITEM 16
16. REMARKS: Data Item Description DI-MISC-80711A: Delete block 10 instructions entirely and follow instructions in SOW 3.5.12 – Packaging Data
The contractor shall prepare and submit Cubic Dimensions and Weights (Wet & Dry when applicable) for AMMPS Diesel Engine Assemblies, for Government review in accordance with the Packaging Data (Para 3.5.12).
All Packaging Data shall be submitted for Government review or notification IAW para 3.5.12 within 5 working days of Contractor approval and prior to presentation for acceptance, but not later than 30 days, of any such product.
Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the contractor to receive payment for the data deliverable (see section G of the Contract). E-mail notification is required with any electronic submission.
RDER-PRP-G
PCO
ACO
QAR
AMSEL-LC-LEO-E-ET
AMSEL-LC-LEO-E-AV*
* 1 COPY VECP ONLY.
| 15. TOTAL |
| 0 |
| 4 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
Brian Kim
RDER-PRP-G
Mechanical Engineer
Mark L. Caringi
RDER-PRP-G
Chief, Power Environmental Branch image1.wmf image2.emf
AG00000605
SPECIAL PACKAGING INSTRUCTION
Form Approved
1. PART OR DRAWING NO.
ENGINE, DIESEL
2. CODE IDENT
80063
3. SPI NO.
4. NATIONAL STOCK NO
VARIOUS
5. DATE OF DRAWING
15203
6. REVISION
B
7. QUP
8. ICQ
NONE
9.UNIT PACK WEIGHT 10.UNIT PACK CUBE 11.UNIT PACK SIZE
12.
PRESERVATION
18.
STEPS
19.
REQD
20.
DESCRIPTION
MILITARY
MIL-STD-2073-1, Method 53
N/A N/A N/A
13. CLEANING
MIL-STD-2073-1
APPLICABLE DOCUMENTS
14. DRYING
MIL-STD-2073-1
MIL-STD-3010 AIA NAS 847
MIL-STD-129 AIA NAS 840
15. PACKING MIL-STD-2073-1 ASTM D4169
MIL-PRF-21260 ASTM D6256
a. LEVEL A MIL-STD-2073 and Note 6
TITLE 49 CFR ISPM-15
SAE-AMS-T-22085 SAE-AS26860
b. LEVEL B
GENERAL REQUIREMENTS
PRESERVATION: SEE NOTE 2 IN Block 17 Below
DESICCANT: MIL-D-3464
16. MARKING
MIL-STD-129 and Note 8
CONTAINER: ASTM D6256, TYPE 1, CLASS 2,
STYLE A, TREATMENT A
17. NOTES/DRAWING
1. PRESERVATION. In the event that any of the requirements contained in this special packaging instruction conflict with or would result in negating the warranty requirements for this engine, contact the U.S. Army Communications-Electronics Command, Logistics and Engineering Directorate, ATTN: AMSEL-LCL-EID, Aberdeen Proving Ground, MD 21005-1845.
1.1 General Packaging Requirement. Quantity per unit pack shall be one each.
1.2 In addition to item preservation required below, engine must be protected from rough handling, stacking, vibration, and other hazards associated with shipping, storage, and transportation.
1.3 Protection for physical damage and mechanical malfunction is required for the method of preservation in addition to the specific environment protection provided. All cushioning and dunnage materials shall be as clean and dry as practical to minimize item susceptibility to corrosion and contaminants. All knobs, sharp projections, greased slides, bearings and other protrusions shall be suitably wrapped or otherwise protected to prevent damage to either the item or the preservation.
DA FORM 2169, JUN 86 Page 1 of 5
(Continuation Sheet )
5. DATE
1.4 Only non-corrosive wrapping, cushioning, and dunnage shall be used in contact with bare metal and critical item surfaces. Non-corrosive is defined by test requirements of MIL-STD-3010, Test Method 3005.
1.5 Disassembly shall be confined to the minimum necessary to safeguard parts vulnerable to damage or that would otherwise increase cube if not removed. Disassembly shall also be confined to those parts that can be removed and reinstalled without special tools. Removed bolts, nuts, screws, washers, keys, and other fasteners shall be reinstalled in mating parts and secured to prevent loss. When not practical to reinstall hardware, items shall be preserved, packaged, and secured to the engine. Under no circumstances should ducting be disassembled or alterations made to the engine, which would allow dust or dirt to enter the engine.
1.6 The engine may be subject to the requirements of CFR Title 49. If so, it shall be certified by the contractor or his authorized representative and marked indicating that the engine does not contain fuel and that the fuel lines have been drained, sufficiently cleaned of residue, and purged of vapors to remove any potential hazard and the engine, when held in any orientation, will not release any liquid fuel. The contractor is responsible for any additional processing of the engine or changes in the preservation necessary to ensure the engine is purged of vapors prior to sealing in the watervaporproof barrier.
2. Engine preservation.
2.1 Crankcase. At the beginning of engine preservation, engine crankcase shall be filled to operating level with preservative lubricating oil conforming to Grade 10, 30, or 15-40 of MIL-PRF-21260.
2.2 Fuel system. A portable container or a supply line shall be positioned to provide preservative oil to the engine. The engine fuel supply line shall be disconnected at the most convenient point nearest the fuel tank, and a flexible line containing the preservative oil supply connected to the disconnected fuel supply line leading to the engine. Drain diesel fuel from the fuel filters and fill with preservative oil. The engine shall be started and operated at fast idle until running smoothly, but for not more than 4 minutes. Accelerate to ½ throttle and run for 3 minutes and then shutdown by conventional methods.
DA FORM 2169C, JUN 86 Page 2 of 5
2.3 Combustion chamber processing. The engine shall be cooled to 100 degrees F. Cooling will be accomplished by induced air currents, circulation of engine coolant (for liquid-cooled engines), or by waiting the period of time required to arrive at the 100 degrees F. When ambient temperature exceeds 100 degrees F, the engine should be cooled to a temperature equivalent to the ambient. After engine has been cooled to the required temperature, processing through combustion chamber will be started and completed with minimum delay.
Overall elapsed time for complete engine processing should not exceed 24 hours. After the engine has been cooled, an air restrictor plate shall be installed at the nearest and most convenient place to cut off the air supply to the engine. With the fuel system filled with preservative oil, MIL-PRF- 21260, Grade 10, the engine will be cranked for 10 seconds. Remove the preservative oil supply line and reconnect the fuel supply lines and open the fuel shut off valves. Drain filters, remove filter elements and replace with new element and gaskets. Level A engine processing requirements for each model may contain unique engine processing requirements. These should be reviewed prior to processing engines for outside storage.
CAUTION
SPECIAL PRECAUTIONS WILL BE TAKEN TO ENSURE THAT THE AMOUNT OF OIL DRAWN INTO
THE ENGINE WHILE COMPLETING 1.2.3 ABOVE WILL NOT RESULT IN A HYDROSTATIC
LOCK. PRIOR TO PROCESSING ADDITIONAL ENGINES, THE FIRST ENGINE WILL BE
PROCESSED AS SPECIFIED ABOVE AND ALLOWED TO STAND FOR 12 HOURS. THE ENGINE
WILL THEN BE MANUALLY ROTATED, OR ROTATED BY THE STARTER IF MANUAL TURNING IS
NOT POSSIBLE, TO ENSURE THAT THE AMOUNT OF OIL DRAWN INTO COMBUSTION CHAMBERS
ALLOWS FREE ROTATION OF THE ENGINE.
2.4 Drain crankcase. Install new filters. Reinstall drain plug.
2.5 Upon completion of engine preservation, all openings into the engine such as crankcase breathers, oil filter caps, valve cover breather holes, oil level dipstick/tube, and openings into accessories, shall be sealed with plastic caps or plugs conforming to AIA/NAS 840 and/or AIA/NAS 847, or with tape conforming to SAE-AMS—T-22085.
2.6 A warning tag shall be prepared and attached to the engine with the deprocessing instructions detailing how to deprocess the engine. Guidance is contained on DA Form 2258, “Depreservation Guide for Vehicles and Equipment”.
DA FORM 2169C, JUN 86 Page 3 of 5
DA FORM 2169C, JUN 86 Page 4 of 5
2.7 Engines, internal combustion are hazard for transport in accordance with CFR Title 49. The contractor is responsible for ensuring that all engines preserved are purged of all flammable vapors to remove any potential hazard. Alternate procedures may be used by the contractor for engine preservation. The procedure proposed by the contractor shall not cause excessive preservative lubricating oil to be left in combustion chambers and manifolds that could result in hydrostatic lockup of engine. The contractor shall furnish an engine for examination and test of his proposed procedure, prior to production preservation.
The proposed procedure shall be subject to prior approval of the contracting officer. Procedures previously approved for long term storage in excess of 60 months by the Government may be used to CO approval.
3. Quality Assurance Provisions.
3.1 Inspect the preservation and unit pack in accordance with MIL-STD- 2073-1.
3.2 Quality conformance shall be in accordance with MIL-STD-2073-1.
3.3 First Article Test and Inspection of the engine in the container is not required. However, the engine in the container must meet the mechanical handling requirements of ASTM D 4169, Distribution Cycle 18, Assurance Level II, Acceptance Criteria 3. Only mechanical handling testing is required.
4. Desiccant. Follow the guidance in MIL-STD-2073-1 for determining the quantity required in the barrier bag.
5. Container. Construct container using lag bolts or other reusable hardware. Base shall be full panel plywood with plywood panels on ends, sides and top. Skids will be beveled with rubbing strips. Corner straps are required. Blocking, bracing, and cushioning shall be designed to protect the engine and ensure successful rough handling testing without any damage to the engine, the watervaporproof barrier, or the container.
An inspection port is required to coincide with the location of the humidity indicator to view the humidity indicator installed in the bag.
Indicator shall comply with SAE AS26860, Type II.
6. Shipping container. The unit container will serve as the shipping container.
H
DA FORM 2169C, JUN 86 Page 5 of 5
7. Requirements For Wood Packaging Material. All CONUS and OCONUS shipments utilizing wood packaging material, such as pallets, dunnage, crating, packing blocks, drums, cases, load boards, pallet collars, and skids, shall meet the International Standards for Phytosanitary Measures, ISPM 15, entitled “Regulation of Wood Packaging Material in International Trade”.
8. Special marking. See ASTM D6256 for special container markings. All containers will additionally have the engine serial number marked on the container in accordance with the MIL-STD-129. Any required exercising representation of the engines during the storage period of 10 years shall be documented in the form of a shelf life (extendible) and the instruction provided to the Government Contracting Officer.
H image3.wmf
File details come from the government source that posted it.