Attachment_0001_-_DLAD_Procurement_Notes.pdf

PDF 309 KB Posted

Attached to
WIN-T Multiple NSNs (SEPA) Federal contract opportunity
Solicitation number
SPRBL1-18-Q-0038
Issued by
Defense Logistics Agency Land and Maritime

About this file

DLAD Procurement

View the file

Other files for this federal contract opportunity

Other files attached to WIN-T Multiple NSNs (SEPA), newest first.
File Type Posted
SPRBL118Q0038.pdf PDF
Attachment_0002_-_DLA_Master_List_of_Technical_and_Quality_Requirements.pdf PDF
Attachment_0003_-_SEPA_CLAUSES_750K.pdf PDF
Attachment_0004_-_IDPO_CLAUSES-SEPA.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DLAD Procurement Notes – Effective February 7, 2018

C01 Prescription: 11.391(a) Solicitations and contracts shall include procurement note C01 when procuring part numbered items.

C01 Superseded Part Numbered Items (SEP 2016) If an item part number is superseded during the term of this contract, the contractor shall advise the contracting officer immediately upon determination. The notice shall include complete information on the superseding item form, fit, function, configuration, application, or physical nature. The contracting officer will determine whether the item is acceptable to the Government, advise the contractor within seven days, and modify the contract accordingly.

C02 Prescription: 11.9001(a) All solicitations and contracts shall include procurement note C02.

C02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components (DEC 2016) The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.

In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.

C03 Prescription: 4.703(a) Solicitations and awards shall include procurement note C03.

C03 Contractor Retention of Supply Chain Traceability Documentation (SEP 2016)

(1) By submitting a quotation or offer, the contractor agrees that, when the contractor is not the manufacturer of the item, it is confirming that it currently has or will obtain before delivery and shall retain documented evidence (supply chain traceability documentation) that the item is from the approved manufacturer and conforms to the technical requirements. The retention period is five years after final payment under this contract.

(2) At a minimum, the supply chain traceability documentation for the item shall include: basic item description, part number and/or national stock number, manufacturing source, manufacturing source’s Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, where available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.

(3) Examples of acceptable supply chain traceability documentation can be found at:

http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/

(4) The contractor shall immediately make available documentation upon request of the contracting officer. The contracting officer determines the acceptability and sufficiency of documentation. If the contractor fails to retain or provide the documentation or the contracting officer finds the documentation to be unacceptable, corrective action may be taken including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.

C04 Prescription: 11.390(a) Solicitations shall include procurement note C04 unless there is a documented restriction for unused former Government surplus property material. The procurement note is automatically included in automated solicitations.

http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/ http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/

C04 Unused Former Government Surplus Property (DEC 2016) To be considered for award, the offeror must complete and submit the following representation with their offer. Additional supporting documentation to demonstrate the surplus material offered was previously owned by the Government and meets solicitation requirements must be provided within 24 hours of request by the contracting officer.

(1) The material is new, unused, and not of such age or so deteriorated as to impair its usefulness or safety. Yes __ No __ The material conforms to the technical requirements cited in the solicitation (e.g., Commercial and Government Entity (CAGE) Code and part number, specification, etc.). Yes __ No __ The material conforms to the revision letter/number, if any is cited. Yes __ No __ Unknown __ If No, the revision does not affect form, fit, function, or interface. Yes__ No __ Unknown __ The material was manufactured by:

(Name): ______________________________________________________________________ (Address): _____________________________________________________________________

(2) The offeror currently possesses the material Yes __ No __ If yes, the offeror purchased the material from a Government selling agency or other source.

Yes __ No __ If yes, provide the following:

Government Selling Agency: ______________________________________________________ Contract Number: _______________________________________________________________ Contract Date: (Month, Year): _____________________________________________________ Other Source: __________________________________________________________________ Address: ______________________________________________________________________ Date Acquired: (Month/Year) _____________________________________________________

(3) The material has been altered or modified. Yes __ No __ If Yes, the offeror must provide the name of the company that performed the alteration or modification and attach or forward to the contracting officer a complete description of the alterations or modifications.

(4) The material has been reconditioned. Yes __ No __ If Yes, (i) the price offered includes the cost of reconditioning /refurbishment. Yes __ No __; and (ii) the offeror must provide information on the company that reconditioned the material with the certifications and attach or forward to the contracting officer a complete description of any work done or to be done, including the components to be replaced and the applicable rebuild standard. The material contains cure-dated components. Yes __ No __ If Yes, (i) the price includes replacement of cure-dated components. Yes __ No __; and (ii) provide cure date to the contracting officer.

(5) The material has data plates attached. Yes __ No __ If Yes, the offeror must state below all information contained thereon, or forward a copy or facsimile of the data plate to the contracting officer. ___________________________________________________

(6) The offered material is in its original package. Yes __ No __ If yes, the offeror has stated below all original markings and data cited on the package; or has attached or forwarded to the contracting officer a copy or facsimile of original package markings:

Contract Number ____________________________________________________________________

NSN____________________________________________________________________________

CAGE Code__________________________________________________________________________ Part Number ________________________________________________________________________ Other Markings/Data___________________________________________________________

(7) The offeror has supplied this same material (National Stock Number) to the Government before.

Yes __ No __

If Yes, (i) the material being offered is from the same original Government contract number as that provided previously. Yes __ No __; and (ii) state below the Government Agency and contract number under which the material was previously provided:

Agency _________________________________________________________________________ Contract Number_________________________________________________________________

(8) The material is manufactured in accordance with a specification or drawing. Yes __ No __ If Yes, (i) the specification/drawing is in the possession of the offeror. Yes __ No __; and (ii) the offeror has stated the applicable information below, or forwarded a copy or facsimile to the contracting officer.

Yes __ No __ Specification/Drawing Number _____________________________________________________ Revision (if any) _________________________________________________________________ Date___________________________________________________________________________

(9) The material has been inspected for correct part number and for absence of corrosion or any obvious defects. Yes __ No __ If Yes, (i) material has been re-preserved. Yes __ No __; (ii) material has been repackaged. Yes __ No __; (iii) percentage of material that has been inspected is ____%; and/or (iv) number of items inspected is _______; and (v) a written report was prepared. Yes __ No __; and if Yes, the offeror has attached the written report or forwarded it to the contracting officer. Yes__ No__ The offeror agrees that in the event of award and notwithstanding the provisions of the solicitation, Inspection and acceptance of the surplus material will be performed at source or destination subject to all applicable provisions for source or destination inspection.

The offeror has attached or forwarded to the contracting officer one of the following, to demonstrate that the material being offered was previously owned by the Government (offeror check which one applies):

___ For national or local sales, conducted by sealed bid, spot bid or auction methods, a solicitation/Invitation For Bid and corresponding DLA Disposition Services Form 1427, Notice of Award, Statement and Release Document.

___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment receipt/delivery pass document and invoices/receipts used by the original purchaser to resell the material.

___ When the above documents are not available, or if they do not identify the specific NSN being acquired, a copy or facsimile of all original package markings and data, including NSN, commercial and Government entity (CAGE) code and part number, and original contract number. (This information has already been provided in paragraph (c)(6) of this clause. Yes __ No __.)

___ When none of the above are available, other information to demonstrate that the offered material was previously owned by the Government. Describe and/or attach.

This only applies to offers of Government surplus material. Offers of commercial surplus, manufacturer’s overruns, residual inventory resulting from terminated Government contracts, and any other material that meets the technical requirements in the solicitation but was not previously owned by the Government will be evaluated in accordance with the DLAD procurement note L04, Offers for Part Numbered Items.

If requested by the contracting officer, the offeror shall furnish sample units, in the number specified, to the contracting officer or to another location specified by the contracting officer, within 10 days after the contracting officer's request. The samples will be furnished at no cost to the Government. All such samples not destroyed in evaluation will be returned at the offeror's expense. The samples will be evaluated for form, fit, and function with subassembly, assembly, or equipment with which the items are to be used. End items furnished under any contract award to the offeror furnishing the samples can include the returned samples, and all acceptable end items will have a configuration identical to the samples. If specific tests of the samples' performance are made by the Government, the offeror will be furnished the results of such tests prior to a contract being entered into. In addition to any other inspection examinations and tests required by the contract, the performance of the end items will be required to be as good as that of the samples submitted.

In the event of award, the contractor will be responsible for providing material that is in full compliance with all requirements in the contract or order. The surplus material to be furnished must meet the requirements of the current contract or order, whether or not the material met Government requirements in existence at the time the material was initially manufactured or sold to the Government. If higher-level contract quality requirements apply to the material being acquired, those requirements do not apply to surplus material furnished under this contract.

C05 Prescription: 37.103(S-90) Solicitations and contracts shall include procurement note C05 when the services to be provided require professional employees, and evaluation of proposed key managerial personnel is required to assess the probability of successful performance.

C05 Changes to Key Personnel (OCT 2016) Certain skilled, experienced, professional and/or technical personnel are essential for successful accomplishment of the work to be performed under this contract. These are defined as "key personnel" and are those persons whose resumes are submitted as part of the technical/business proposal for evaluation. The contractor shall use key personnel as identified in its proposal during the performance of this contract and will request contracting officer approval prior to any changes. Requests for approval of any changes shall be in writing with a detailed explanation of the circumstances necessitating the change.

The request must contain a complete resume for the new key personnel and any other pertinent information, such as degrees, certifications, and work history. New key personnel must have qualifications that are equal to or higher than those being replaced. The contracting officer will evaluate the request and notify the contractor whether the requested change is acceptable to the Government.

C06 Prescription: 17.9304(a) Solicitations and contracts must include procurement note C06 when MWR, D1-D6, or surge quantity option applies:

C06 Surge and Sustainment (S&S) Requirements (FEB 2017)

(1) Definitions.

“Surge and sustainment (S&S)” means increased quantities and accelerated delivery rates required to meet Military Service requisitions across a broad spectrum of contingencies. The increased quantity and accelerated delivery rate are above and beyond the normal peacetime requirements. S&S quantities are identified as MWR, D1-D6 schedule, or a surge quantity event.

“Capability Assessment Plan (CAP)” means the offeror’s plan for covering S&S requirements, identification of competing priorities for the same resources, and date when the S&S capability can be attained. The offeror must provide the CAP as an attachment to its proposal when S&S items are identified in the solicitation. If the offeror cannot meet S&S quantity and delivery needs, the CAP must identify the shortfall and provide best value solutions, to include a proposed Government investment strategy to help offset the shortfall if needed.

“Electronic CAP, or eCAP” means an electronic version of the CAP that the offeror can complete online.

The web address and instructions for completing the eCAP are provided in the solicitation.

(2) The contractor must maintain its S&S capability to produce and deliver the S&S quantity identified in Section C in accordance with the approved capability assessment plan (CAP) throughout the contract performance period. The contractor must participate in any S&S testing and verification requested by the Government. The contractor agrees to support S&S requirements to the maximum extent practical prior to achieving full S&S capability required in Section C and the CAP; and for requirements exceeding those required in Section C and the CAP but not exceeding any applicable contract maximum quantity or contract value required in FAR 52.216-19. Changes that negatively impact S&S capability must be reported in writing to the contracting officer within ten (10) working days after the contractor becomes aware of the impact. The notification must include a revised S&S CAP containing proposed corrective actions and date when the S&S capability will be attained.

(3) The Government reserves the right to verify and test the S&S capability described in the CAP at any time during contract performance. The Government will prepare a test and verification plan and upon request the contractor must demonstrate its S&S capability.

(4) If requested by the Government, the contractor must be prepared to provide a plan to participate in S&S validation and testing to verify the S&S capability described in the CAP. Participation in S&S validation and testing will be at no additional expense to the Government, and does not justify an equitable adjustment to the contract price. The plan must include methodology, rating criteria, labor, materials, and time required to conduct validation and testing. S&S validation generally entails verifying if the contractor and subcontractors have (a) sufficient equipment, facilities, personnel, stock, prepositioned raw materials, production capabilities, and base resources; (b) agreements, networks, and plans for distribution (receiving, storing, packaging, and issuing); (c) transportation services to accommodate the S&S requirements in the contract; (d) examination of any in-house work; (e) review of the stock rotation plan; and (f) other contracts that impact the production of added or accelerated delivery of contract quantities. The testing/verification plan is not required to be included in the offeror’s proposal.

Offerors are encouraged to consider the possibility of the Government requesting this participation when formulating the proposal.

C07 Prescription: 17.9305 Solicitations and long-term supply contracts must include procurement note C07 to notify suppliers that may be candidates to support industrial mobilization and/or material disruptions of the potential availability of key raw materials.

C07 Warstopper Program Material Buffer Availability (MAY 2017)

(1) The Warstopper program material buffer (Buffer) was created to decrease lead times for raw material to support defense contracts relating to military systems with a wartime requirement. The current material buffer suppliers and materials may be reviewed at https://www.jccs.gov/wicap. If the buffer material is not available or the material is inadequate to complete the requirement, the contractor must contact the contracting officer representative (COR) for guidance. When a buffer has been established, the following process must be used to submit requests for buffer material. A defense contractor (or sub-tier contractor supporting a prime contractor) with a current, active U.S. Government contract must submit a valid request to use a material buffer to the COR for the respective material buffer. The COR will review the submittal and approve or disapprove the request. The request should include the following information:

(i) Requestor’s name;

(ii) U.S. Government contract number;

(iii) Defense Priorities and Allocations System (DPAS) rating;

(iv) Material specification;

(v) Quantity required; and

(vi) Required delivery date.

(vii) Whether there is a pre-existing supply contract with the material buffer contractor.

(2) If no prior contractual relationship exists between the defense contractor requesting access to the material buffer and -the material buffer contractor, the material buffer contractor is authorized to enter into a contract – to provide material from the buffer – once a valid request has been approved by the COR. This action must be included in the monthly report submitted to the COR. When requests exceed the buffer’s maximum monthly material availability, the material supplier may negotiate phased delivery of material across the material monthly availability; or the Government COR may prioritize the release of the material at the Government’s discretion.

(3) Contractors accessing the material buffer will be charged the material price identified in any pre-existing contract with the material buffer contractor. For those defense contractors not having a preexisting contract with the material buffer contractor, they must be charged the standard (not spot https://www.jccs.gov/wicap market levels) pricing for the material. Contractors using the buffer are solely responsible for costs of using the buffer, and the Government has no liability either for these costs or for delays or other effects arising from the use of the buffer.

(4) The buffer material provided is not Government-furnished material, but is a normal vendor-to-vendor transaction with all applicable warranties and guarantees provided through the commercial transaction.

C08 Prescription: 17.9504(c) Solicitations and contracts must include procurement note C08 when a tailored logistics support contract relies on the contractor’s purchasing system to verify that the contractor competed the items or services or to justify that prices are fair and reasonable.

C08 Tailored Logistics Support Purchasing Reviews (FEB 2017)

(1) From the commencement of performance of this contract until 3 years after the final contract payment, the contractor must allow the contracting officer, ACO, Defense Contract Management Agency (DCMA), Defense Contract Audit Agency (DCAA), and any other duly authorized representative of the contracting officer access to all records and information pertaining to those items or services for which the Government is relying on the contractor’s purchasing system to determine that competition was obtained or to justify that prices are fair and reasonable. The contractor must maintain records subject to this clause for not less than 3 years after the contract final payment.

(2) The contracting officer may conduct reviews of purchased items or services provided under this contract regardless of dollar value that meet the criteria in paragraph (1) to ascertain whether the contractor has obtained the best value. The contractor must obtain competition to the maximum extent practicable for all purchases. Prior to purchasing any supplies or services, the contractor must solicit a competitive quotation from at least two independently-competing firms. For other than sole source items, the request for quotations must, to the maximum extent practical, solicit offers from different manufacturers or producers. If the contractor is unable to obtain quotes for competing items from two or more independently-competing firms, the contractor must retain documentation supporting its rationale for selection of the suppliers solicited and selected and its determination that the price was fair and reasonable. The contractor is responsible for maintaining this documentation for all sole source/noncompetitive actions. The following price reasonableness and documentation requirements are applicable to all purchases, regardless of dollar value:

(i) A price is reasonable if it does not exceed a price incurred by a prudent person in the conduct of competitive business. The contracting officer will examine the prices with particular care in connection with buys that may not be subject to effective competition restraints. The contractor’s price will not be presumed to be reasonable. If an initial review of the facts results in a challenge of a specific price by the contracting officer or the contracting officer’s representative, the burden of proof must be upon the contractor to establish that the price is reasonable under the standards in FAR Subpart 15.4 and FAR 31.201-3.

(ii) The contractor must keep the documentation to a minimum, but must retain data supporting the purchases either by paper or electronically. At a minimum, price quotations and invoices must be retained. Should the contractor receive an oral price quotation, the contractor must document who the supplier or subcontractor is by complete name, address, telephone number, price, terms and other conditions quoted by each vendor. Price quotes for supplies must be broken down by individual items, shipping costs, and any other included expenses. Price quotes for incidental services which are not pre-priced in the contract must include labor hours and costs or prices, as applicable, including the total price of the job, individual pricing for the portions of the work if applicable, materials, and all other elements of cost, overhead, and profit. This price breakdown documentation must be made for each subcontractor performing work on this contract.

(3) When applicable, if the contractor is purchasing from subcontractors or other sources and receives a discount or rebates, the contractor must immediately pass these savings to the Government in the contract price and invoice for payment. The contractor is required to use diligence in the selection of the most economical method of delivery of the product or services by selecting a best value method of delivery based on the urgency and nature of the work or product required. When labor hours are involved in the work to be accomplished and the contractor has not already pre-priced the effort to use its own labor force, the contractor must provide the labor at rates required by the contract (for example, Service Contract Act or Davis-Bacon Act rates) or at rates based on competition if mandatory rates are not required by the contract.

(4) If the contracting officer determines that the purchased product or service is unreasonably priced, the contractor must refund to the Government the amount the contracting officer determines is in excess of a reasonable price. The contracting officer must notify the contractor in writing in accordance with FAR

32.604 Demand for Payment, giving the basis for the determination and the amount to be refunded. The contractor must make the refund payment in accordance with directions from the contracting officer, and must provide proof of the refund payment to the contracting officer. The contracting officer may collect the amount due using all available means in accordance with FAR Subpart 32.6. FAR 52.232-17, Interest, is applicable to payments not made within 30 days of the demand for payment. Any disputes arising under this provision must be handled in accordance with the “Disputes” clause of this contract.

C09 Prescription: 16.290(d)(1) The contracting officer may use procurement note C09 in solicitations and contract awards when—

(i) Unpredictable increases or decreases in the cost of producing the items are expected or pricing uncertainties exist for a component or components of the end item, and the change in cost of production or component prices can be tracked via the Producers Price Index (PPI) published by the BLS; or unpredictable increases or decreases in the cost of producing the items are expected or pricing uncertainties exist for labor, and the change in cost of production can be tracked via the Employment Cost Index (ECI) published by the BLS;

(ii) The circumstances in FAR 16.203-4(d)(1) exist: (A) The contract involves an extended period of performance with significant costs to be incurred beyond 1 year after performance begins; (B) the contract amount subject to adjustment is substantial; and (C) the economic variables for labor and materials are too unstable to permit a reasonable division of risk between the Government and the contractor, without this type of clause;

(iii) The contracting officer considers the use of this procurement note appropriate; and

(iv) The requirements of FAR 16.203-3 are met: A fixed-price contract with economic price adjustment shall not be used unless the contracting officer determines that it is necessary either to protect the contractor and the Government against significant fluctuations in labor or material costs or to provide for contract price adjustment in the event of changes in the contractor’s established prices; and

(v) The requirements of DLAD Subpart 16.2 are met.

C09 Economic Price Adjustment – Department of Labor Index (AUG 2017)

(a) Warranties. The contractor warrants that--

(1) The base unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this clause; and

(2) The prices to be invoiced shall be computed in accordance with the provisions of this clause.

(b) Definitions. As used throughout this clause –

(1) "Index" for the purpose of price adjustment under this clause shall be the Producer Price Index(es) reported in the monthly publication entitled, “Producer Price Indexes”, published by the United States (U.S.) Department of Labor (DOL), Bureau of Labor Statistics (BLS) for the following code number(s) and title(s): ________________________( contracting officer fill-in)_________________________; or the Employment Cost Index(es) reported in the quarterly publication entitled, “Employment Cost Indexes,” published by the United States (U.S.) Department of Labor (DOL), Bureau of Labor Statistics

(BLS) for the following code number(s) and title(s): ________________________(contracting officer fill-in)_________________________.

(2) "Base index" is the arithmetic average of the final version of the indexes published for the ____ months, or ____ quarters for ECI, preceding the closing date for receipt of proposals or the date required for receipt of final proposal revisions, if discussions were held.

(3) "Adjusting index" shall be the ____ arithmetic average of the [ ] first published or [ ] final version of the index for the ____ months, or ____ quarters for ECI, prior to the month in which the adjusting contract modification is effective.

(4) "Base unit price" is the unit price applicable to a quantity of a contract line item established at contract award, exclusive of any price adjustment pursuant to this clause.

(5) “Adjustment period” is the period during which a particular adjustment to the unit price under this clause (calculated at the beginning of the adjustment period) will be applicable. The length of each adjustment period in months shall be calculated by dividing 12 by the number of adjustments allowed per year in (c)(1) below.

(c) Adjustments. Prior to the end of each adjustment period, the contracting officer shall calculate the adjusting index and any adjusted contract unit price(s) for the new adjustment period, and modify the contract accordingly. Price adjustments pursuant to this clause shall be made by contract modification, issued by the contracting officer and will show the base index, the adjusting index, the base unit price, the mathematical calculations, and the changed unit price(s). The price adjustment shall be applicable to orders issued after the effective date of the contract modification establishing the unit price for the adjustment period. The price adjustment(s) for each adjustment period will be based on the percentage change between the base index and the adjusting index for the adjustment period, as applied to the base unit price.

(1) The Government shall be entitled to a price decrease in any particular adjustment period if the adjusting index is less than the base index. There shall be _______ price adjustments per contract year.

(2) Example of adjustment calculation:

Base Index = 109.88* Adjusting index = 112.72* Less base index = 109.88 Change to index = 2.84 Divide change to index by base index = 2.84 / 109.88 = .02585 (2.585%)** Multiply by the base unit price =

$50.00 x .02585 = $1.29*** = Unit Price Adjustment

Adjusted unit price = $51.29

* In computing the base and adjusting indexes, the resulting figure shall be rounded to the second decimal place.

** This figure shall be rounded to the fifth decimal place.

*** All dollar figures shall be rounded to the nearest cent.

(d) Upward ceiling on economic price adjustment. No upward ceiling shall apply under this economic price adjustment clause, unless the BLS series is based on indices below the six-digit level (an index “below the six-digit level” in BLS usage means an index whose identifier exceeds six-digits). For any BLS series that is below the six-digit level, the following ceiling shall apply: The contractor agrees that the aggregate of the increases in any contract unit price under this clause shall not exceed ___% (percent) of the original base unit price, except as provided hereafter.

(1) If at any time the contractor has reason to believe that within the near future a price adjustment under the provisions of this clause will be required that will exceed the adjustment ceiling for any item, the contractor shall promptly notify the contracting officer in writing of the expected increase. The notification shall include a revised ceiling the contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the contracting officer.

(2) If an increase in the index would raise a contract unit price for an item above the current ceiling, the contracting officer may issue a contract modification to raise the ceiling. If the contract ceiling will not be raised, the contracting officer shall so promptly notify the contractor in writing.

(e) Invoices. The prices payable under this contract will be based on the latest adjusted unit price incorporated into the contract as of the date of order.

(f) Retroactive adjustment. Paragraph applies only if “first published index” is selected in paragraph (b)(3) above. The contractor may request a retroactive adjustment for orders that have been delivered during an adjustment period for which payment has already been made, based on the difference between a higher final revised index applicable to an adjustment period and the index values used in calculating the unit price for that adjustment period, and subject to the adjustment ceiling in (d) above and when the following conditions are met:

(1) The request for equitable adjustment clearly establishes that the unit price adjustment for the adjustment period would have been higher if the final revised index had been used, and identifies all invoices and payments to which it is applicable, cites the specific index differences relating to the requested adjustment, and provides a calculation of the total net price adjustment for items delivered during that adjustment period.

(2) No retroactive equitable adjustment shall be made under this clause unless the total dollar change for items delivered is $______ ($500.00 unless otherwise stated) or more for the applicable adjustment period(s).

(3) The contractor’s written request must be received by the contracting officer within 45 days following publication of the final revised index.

The Government shall be entitled to a downward adjustment based on the difference between a lower final revised index applicable to an adjustment period and the index values used in calculating the unit price for that adjustment period, subject to the limitation in paragraph (f)(2).

(g) Revision of index. In the event –

(1) Any applicable index is discontinued or its method of derivation is altered substantially; or

(2) The contracting officer determines that the index consistently and substantially fails to reflect market conditions, the parties shall mutually agree upon an appropriate and comparable substitute and the contract shall be modified to reflect such substitute effective on the date the index was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.

(h) Final invoice. The contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this clause.

(i) Disputes. Any dispute arising under this clause shall be determined in accordance with and subject to the “Disputes” clause of the contract.

C10 Prescription: 16.505(c) Contracting officers may use procurement note C10 to indicate delivery order procedures in multiple award indefinite delivery contracts pursuant to FAR 16.504.

C10 Placement of Task or Delivery Orders Against Multiple Indefinite Delivery Contracts (AUG 2017)

(1) In accordance with FAR 52.216-27, Single or Multiple Awards, the Government may elect to award multiple contracts under this solicitation. The Government will evaluate proposals in accordance with evaluation provisions in Section M of this solicitation. In the event of multiple awards, the Government will use the same evaluation criteria to determine which proposals represent the best value to the Government. The contracting officer has the discretion to determine the exact number of awards, considering the cost to the Government to administer multiple awards, the recurring nature of the requirement, the need to increase the active production base, and the benefits that may be achieved through continued competition.

(2) Task or delivery order placement procedure.

(a) In the event of multiple awards, the contracting officer will consider each awardee for placement of individual task or delivery orders unless an exception at FAR 16.505(b)(2) applies. However, awardees subject to testing and approval requirements (e.g., first article testing) are not eligible to receive orders until testing requirements are satisfactorily completed. Failure to successfully complete required testing will constitute grounds for contract termination for default by the Government.

(b) Unless stated otherwise in the contract or in the request for quotes for task or delivery orders under this contract, the following evaluation process will be used in awarding task or delivery orders. The criteria used for evaluating offers for task or delivery orders under this contract are price, past performance, and delivery. Price is of ______ importance than or to the other factors combined. Past performance will include performance on orders previously placed under the contract and may include performance under other contracts. In evaluating performance under previous orders, the contracting officer will consider delivery, quality of supplies or services furnished, and success in implementing any socioeconomic support programs that may be applicable to the contract.

(3) Task and delivery order ombudsman. In accordance with FAR 16.505(b)(8), the competition advocate will address complaints or questions regarding the placement of individual task or delivery orders. Address correspondence to the appropriate supply chain listed below:

For DLA Aviation:

DLA Aviation Competition Advocate, BPP 8000 Jefferson Davis Highway Richmond, Virginia 23297-5124 For DLA Troop Support’s construction and equipment, clothing and textile, subsistence, and medical supply chains:

DLA Troop Support Competition Advocate, BPA 700 Robbins Avenue Philadelphia, Pennsylvania 19111-5096 For DLA Land and Maritime:

DLA Land and Maritime Competition Advocate Post Office (P.O.) Box 3990 Columbus, Ohio 43218-3990 C12 Prescription: 16.590(b) Contracting officers shall use procurement note C12 in solicitations and contract awards for LTCs that provide for shipment to more than one location and include quantity range pricing; when transportation costs will be relatively small compared to the cost of the item; and when the contract price will be f.o.b. origin.

C12 Pricing of Delivery Orders with Quantity Increments (AUG 2017)

(a) In pricing delivery orders requiring delivery of one national stock number (NSN) to multiple destinations, the Government will determine the price for each destination as follows, depending on the box checked:

(1) The quantity range price based on the total quantity of the NSN being procured under each delivery order regardless of destination; or

(2) The total quantity being shipped to all destinations within each zone as defined elsewhere in this contract.

(b) If this solicitation or contract contains a provision for placement of orders through an electronic ordering system, the Government will determine unit prices for those orders as follows, depending on the box checked:

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/16.htm#P395_68844

(1) The total quantity of all requirements for each NSN issued via the electronic ordering system in a single day, regardless of the number of individual orders; or

(2) The quantity of each individual order.

(c) The minimum quantity to be ordered, per destination, will be the minimum ordering range quantity if specified in section B of the solicitation or contract for each item.

C13 Prescription: 16.290(a)(1) Contracting officers may use procurement note C13 in solicitations and contracts, when the contracting officer determines that the use of the clause at FAR 52.216-2 is inappropriate (reference FAR Deviation #2008-02).)

C13 Economic Price Adjustment – Standard Supplies (AUG 2017)

(a) The contractor warrants that the unit price stated in the schedule for _________ [offeror insert schedule line item number] is not in excess of the contractor’s applicable established price in effect on the contract date for like quantities of the same item. The term “unit price” excludes any part of the price directly resulting from requirements for preservation, packaging, or packing beyond standard commercial practice. The term “established price” means a price that --

(1) Is an established catalog or market price for a commercial item sold in substantial quantities to the general public; and

(2) Is the net price after applying any standard trade discounts offered by the contractor.

(b) The contractor shall promptly notify the contracting officer of the amount and effective date of each decrease in any applicable established price. Each corresponding contract unit price shall be decreased by the same percentage that the established price is decreased. The decrease shall apply to those items ordered on and after the effective date of the decrease in the contractor’s established price, and this contract shall be modified accordingly.

(c) If the contractor’s applicable established price is increased after the contract date, the corresponding contract unit price shall be increased, upon the contractor’s written request to the contracting officer, by the same percentage that the established price is increased, and the contract shall be modified accordingly, subject to the following limitations:

(1) The aggregate of the increases in any contract unit price under this procurement note shall not exceed 10 percent of the contract unit price [at the outset of each performance/ordering period].

(2) The increased contract unit price shall be effective --

(i) On the effective date of the increase in the applicable established price if the contracting officer receives the contractor’s written request within 10 days thereafter; or

(ii) If the written request is received later, on the date the contracting officer receives the request.

(3) The increased contract unit price shall not apply to quantities [ordered] under the contract before the effective date of the increased contract unit price.

(4) No modification increasing a contract unit price shall be executed under this paragraph (c) until the contracting officer verifies the increase in the applicable established price.

(5) Within 30 days after receipt of the contractor’s written request, the contracting officer may cancel, without liability to either party, any undelivered portion of the contract items affected by the requested increase.

(d) During the time allowed for the cancellation provided for in subparagraph (c)(5) of this procurement note, and thereafter if there is no cancellation, the contractor shall continue deliveries according to the contract delivery schedule, and the Government shall pay for such deliveries at the contract unit price, increased to the extent provided by paragraph (c) of this clause.

C14 Prescription: 46.407(b) Contracting officers shall include procurement note C14 in solicitations and awards.

C14 Repackaging or Relabeling to Correct Deficiencies (AUG 2017)

The Government may correct packaging or labeling deficiencies if the estimated costs of the corrections are $300 or less ($500 for C&T items). The contracting officer will advise the contractor of the discrepancy and that the Government has completed the repackaging or relabeling. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.

If the estimated costs of repackaging or relabeling are more than $300 ($500 for C&T), the contracting officer may advise the contractor of the discrepancy and have the material returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor’s expense. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.

C15 Prescription: 47.305-3-90(d) The contracting officer shall include procurement note C15 in solicitations and contracts issued by DLA Aviation, DLA Land and Maritime, and DLA Troop Support with f.o.b. origin and inspection/acceptance at destination, except (i) contracts with Classified, Controlled, or Sensitive Items; (ii) hazardous material (HAZMAT) contracts; (iii) Foreign Military Sales (FMS) contracts; or (iv) contracts being shipped to APO/FPO addresses.

C15 First Destination Transportation (FDT) Program, Government-Arranged Transportation for Automated Awards (AUG 2017)

(1) Definitions.

“Government-arranged transportation” means the Government is responsible for transportation costs, providing the carrier, and scheduling the shipment pickup contingent upon proper contractor notification in VSM (see procurement note C20).

(2) The contractor shall:

(a) Use the VSM to notify the Government that the materiel is ready to ship. The Government can take up to two (2) full business days to schedule the shipment. Pick-up should occur within five (5) business days of the contractor’s notification. The contractor shall plan for sufficient time for scheduling the shipment and standard ground transportation for its material to arrive at the destination by the Contract Delivery Date (CDD).

(b) Address the following special accommodations:

(i) If an order specifies carrier equipment when requested by the Government; or

(ii) If an order does not specify carrier equipment, the order appropriate carrier equipment should not be in excess of capacity to accommodate shipment;

(c) Deliver the shipment in good order and condition to the carrier, and load, stow, trim, block, and/or brace carload or truckload shipment (when loaded by the contractor) on or in the carrier’s conveyance as required by carrier rules and regulations

(3) The contractor is responsible for any loss and/or damage to the goods occurring before delivery to the carrier as a result of improper loading, stowing, trimming, blocking, and/or bracing of the shipment if loaded by the contractor on or in the carrier’s conveyance.

C16 Prescription: 47.305-3-90(e) The contracting officer shall include procurement note C16 in solicitations and contracts issued by DLA Aviation, DLA Land and Maritime, and DLA Troop Support with f.o.b. origin and inspection/acceptance at destination for manual solicitations, unless one of the exclusions in 47.305-3-90 (a)-(c) applies.

C16 First Destination Transportation (FDT) Program, Government-Arranged Transportation for Manual Awards (AUG 2017)

(1) Definitions.

“Government-arranged transportation” means the Government is responsible for transportation costs, providing the carrier, and scheduling the shipment pickup contingent upon proper contractor notification in VSM (see procurement note C20).

(2) The contractor determines its transportation processes, controls, or costs. The contractor may submit an offer based on f.o.b. destination if it offers a better value to the Government.

(3) The contractor shall:

(a) Use the VSM to notify the Government that the materiel is ready to ship. The Government can take up to two (2) full business days to schedule the shipment. Pick-up should occur within five (5) business days of the contractor’s notification. The contractor shall plan for sufficient time for scheduling the shipment and standard ground transportation for its material to arrive at the destination by the Contract Delivery Date (CDD).

(b) Address the following special accommodations:

(i) If an order specifies carrier equipment when requested by the Government; or

(ii) If an order does not specify carrier equipment, the order appropriate carrier equipment should not be in excess of capacity to accommodate shipment;

(c) Deliver the shipment in good order and condition to the carrier, and load, stow, trim, block, and/or brace carload or truckload shipment (when loaded by the contractor) on or in the carrier’s conveyance as required by carrier rules and regulations

(4) The contractor is responsible for any loss and/or damage to the goods occurring before delivery to the carrier as a result of improper loading, stowing, trimming, blocking, and/or bracing of the shipment if loaded by the contractor on or in the carrier’s conveyance.

C17 Prescription: 47.305-3-91 The contracting officer at DLA Aviation, DLA Land and Maritime, and DLA Troop Support, shall include procurement note C17 in solicitations and contracts when the material master indicates f.o.b. origin and inspection/acceptance at destination and the shipment originates from outside the contiguous United States with a contiguous United States location as the pick-up point in

VSM.

C17 First Destination Transportation (FDT) Program – Shipments Originating from Outside the Contiguous United States (AUG 2017)

(1) This acquisition is being conducted under the FDT Program. Delivery terms are f.o.b. origin.

Inspection and acceptance by the Government will occur at destination.

(2) For offerors whose shipments will originate from outside the contiguous United States, the offeror’s f.o.b.