Attachment_0002_-_Technical_Requirements.pdf
PDF 117 KB Posted
- Attached to
- 01-207-1850 - Hydraulic Cylinder Federal contract opportunity
- Solicitation number
- SPRBL1-18-Q-0028
About this file
Attachment 0002 - Technical Requirements
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRBL118Q0028-0001.pdf | ||
| A19_Solicitation_-_SPRBL118Q0028.pdf | ||
| Attachment_0001_-_DLAD_Procurement_Notes.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
25 May 2018
TECHNICAL REQUIREMENTS
FOR
SPRBL1-18-Q-0028
CYLINDER ASSEMBLY, ACTUATING LINEAR-HYDRAULIC (NSN: 3040-01-207-1850)
SPOT BUY FOR THE
MAST GROUP, HYDRAULIC-PNEUMATIC OA-9054(V)4/G
TABLE OF CONTENTS
APPLICABLE DOCUMENTS
CONFIGURATION BASELINE
CHEMICAL AGENT RESISTANT COATING (CARC)
SPECIAL INSTRUCTIONS
PACKAGING
Wood Packaging Material
Military Packaging
CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1
CDRL List
Individual CDRLS
APPLICABLE DOCUMENTS
Military and Federal Standards
MIL-STD-130N w/ Change 1 Identification Marking of U.S. Military Property MIL-STD-129R Military Marking for Shipment and Storage MIL-STD-2073-1E w/ Change 1 Standard Practice for Military Packaging Military and Federal Specifications
N/A Other Documents Top Level Drawing 5035618 CYLINDER ASSEMBLY, ACTUATING LINEAR-HYDRAULIC SPI AG00000600 Rev C SPECIAL PACKAGING INSTRUCTION: Level C Packaging Drawing C5078346 Rev D FINISHES FOR GROUND ELECTRONIC EQUIPMENT SPRBL115D0001-P00002 Contract Modification P00002 to replace V-seals with new Poly Seals PQDR Corrective Action Report PQDR W25G1Q-17-350 Corrective Action Report for PN: 5035618-1 Commercial Documents ISPM Number 15 Regulation of Wood Packaging Material in International Trade ANSI/ISO/ASQ(E)Q 9001-2008 American National Standard, Quality Management Systems-Requirements Data Items DI-MISC-80711A Scientific and Technical Reports -- Configuration Control DI-MISC-80711A Scientific and Technical Reports – IUID Marking Diagram/Instructions
CONFIGURATION BASELINE
The applicable Configuration Baselines (CB), for the listed Configuration Item (CI) are as listed in the table below.
NSN Nomenclature Part Numbers/Drawings
3040-01-207-1850 CYLINDER ASSEMBLY, ACTUATING LINEAR-
HYDRAULIC
5035618 Rev E
Configuration. Each CI, as developed/built and delivered, shall conform to the cited CB and (if applicable) all subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO).
Configuration changes not directly effecting the configuration baseline do not require Government approval prior to incorporation, but must be documented by the contractor and shall be made available to the Government upon request.
Departures from CB. No changes or departures from the CB are acceptable except for changes or departures which are submitted in accordance with DI-MISC-80711A and are approved by the Government Configuration Manager (C Mgr.), Scott Mahoney (scott.h.mahoney4.civ@mail.mil), and which are made applicable to the contract by the PCO. Configuration Control shall be affected by the Configuration Control Documents (CCDs) as follows:
mailto:scott.h.mahoney4.civ@mail.mil
Engineering Change Proposal (ECP) includes both the engineering change and the supporting documentation by which the change is described and suggested. An ECP describes changes to the CI and associated Government documents and data that are affected by the proposed engineering change.
A Notice of Revision (NOR) shows the detailed changes that must be made to technical documentation, except specifications, (one NOR per document) following approval of an ECP. The NOR is submitted as part of the ECP and is used to determine any Technical Manual (TM) impacts. The Government must be notified of any part changes in order to update the proper TMs.
A Specification Change Notice (SCN) is used to delineate the exact change(s) in a specification that will be distributed to users when the ECP is approved. The SCN is submitted as part of the ECP. The SCN is not used for a military or federal document, only a Request for Variance can be used for those documents.
Value Engineering Change Proposal (VECP) is the same as an ECP except there are proposed cost savings for the program. The contractor shall follow the guidance in Section I of this contract for VECPs.
Request for Variance (RFV) describes a departure from configuration documentation for a specific number of units or period of time. Contractor shall identify the impact of the RFV on performance, operational readiness and logistics support of the affected CIs. The Government will require compensation for any RFV.
Contractor shall provide all supporting program or cost data with the CCD. The contractor shall uniquely and sequentially identify (including the use of the contract number) each ECP, VECP, NOR, SCN or RFV. The identification number should use less than 16 characters.
Identification of Authorized Personnel. The contractor shall identify to the PCO, Administrative Contracting Officer (ACO), and the technical office identified on the DD Form 1423 for DI-MISC-80711A, the name(s) of the official(s) of its organization who are authorized to submit CCDs 30 Days after Contract (DAC).
Documentation. The contractor shall document by serial number each products configuration, applicable documentation, maintenance support requirements and spares in relation to the contractor’s configuration baseline. The data in use shall be available for government review and use.
Use of CB Data. The contractor shall assure that all necessary contractor’s activities have access to and use of the contractually specified configuration baseline(s), approved changes and departures, and effectivity data.
The data in use shall be available for government review and use.
CHEMICAL AGENT RESISTANT COATING (CARC)
Requirements for Applying CARC. The contractor shall paint the equipment with CARC in accordance with the technical requirements below. The contractor shall prepare and submit Engineering Change Proposals (ECPs) to all documents that require changes due to the addition of the CARC finish in accordance with procedures identified in the provision for 'Configuration Control'. The contractor shall have available for CECOM inspection purchase orders for paint used on this work effort showing use of Qualified Product List (QPL) sources.
Technical Requirements for Chemical Agent Resistant Coating:
Paint Finishes. Exterior surfaces of the equipment and interior surfaces, which may be open to the environment during operation of the equipment (such as doors), shall be painted with lusterless green 383 CARC, Color No.
34094 in accordance with drawing 5035618 Paragraph 5 (FINISH) and drawing C5078346 unless specified otherwise by CECOM. All coatings shall be from a Qualified Product List (QPL) Source.
Touch-up. When piece parts have been finished with complete paint finishes, fixed assemblies shall be touched up in order to provide a continuous film across the interfaces. This requirement does not apply to hairline joints between mating parts, gasketed joints, or where moving parts such as hinges or catches are present. Touch-up paint used shall be identical to the final paint film and shall provide a reasonable color match with that of all other assembled parts.
Coating Thickness. The dry film thickness of each pretreatment, primer and final film coating shall be IAW 5035618 Paragraph 5 (FINISH).
Marking for CARC. The equipment shall be marked with the word 'CARC' stenciled in CARC paint in close proximity to the nameplate. A contrasting color shall be used for the marking (e.g. black marking on a green surface). The letters shall be one inch high or of appropriate size for small equipment. The marking shall be durable enough to withstand the full environmental conditions the surface will be exposed to during field use.
Plates or embossed lettering may be used. Embossed letters need not be highlighted as long as they are legible.
SPECIAL INSTRUCTIONS
Requirements for Item Marking (Commercial Off The Shelf Items). Part Number Marking. Each item delivered under contract, along with each assembly, sub assembly, and module, shall be legibly marked with the appropriate part number and manufacturer’s identification. Hardware such as screws, nuts, bolts, etc., need not be marked. This requirement should be entirely met by the contractor’s standard commercial marking.
However, if there is any question about marking it shall be directed to the Contracting Officer for resolution.
Requirements for Item Unique Identification (IUID). The contractor shall mark all contract deliverables In Accordance With (IAW) DFARS clause 252.211-7003 in Section F of this contract and the following requirements.
IUID Marking.
New items: The contractor shall provide IUID, or DoD recognized equivalent, for all items delivered with an acquisition cost of $5000 or more. For long term contracts, any items that have range quantity prices established, that will exceed the $5000 unit price shall have IUID markings from the beginning of the contract.
IUID markings shall be IAW MIL-STD-130N.
Commercial Markings. All other items shall have acceptable commercial markings that meet the guidelines in Department of Defense (DoD) Guide to Uniquely Identifying Items http://www.acq.osd.mil/dpap/pdi/uid/index.html.
http://www.acq.osd.mil/dpap/pdi/uid/index.html
Permanency and Legibility. The IUID marking and identification plates, tags, etching, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, groups, or kits shall be as permanent as the normal life expectancy of the item and be capable of withstanding the environment, test, cleaning, repair, and rebuild procedures specified for the item. Legibility shall be as required and verified for ready readability per MIL-
STD-130N.
Deleterious Effect. Marking of items shall be accomplished in a manner that will not adversely affect the life and utility of the item. Marking materials creating hazardous conditions shall not be used. Placement and choice of the marking shall not create hazardous conditions.
IUID Coding. IUID markings and readability requirements shall comply with MIL-STD-130N.
Symbology markings and the order of priority for marking the hardware shall be in accordance with MIL-STD 130N. First priority is the 2D data matrix symbol (machine readable) IUID is the minimum requirement when there are severe space limitations. The second priority is the human readable characters. The third priority is the Linear Bar Code.
If the technical data has not specified the marking location, markings shall be located such that they are visible during item use, provided that sufficient space is available, and does not interfere with equipment operations.
If items are not described by Government Product Technical Data (i.e. Commercial Items), the contractor shall submit diagrams showing placement and description of the IUID marking and applicable installation and processing instructions for government review and approval IAW with CDRL for DI-MISC-80711A and this
SOW.
Per the Department of Defense, Item Unique Identification of Government Property Guidebook, Reporting Government Property In the Possession of the Contractor (PIPC), Guidance for: Defense Federal Acquisition Regulation (DFARS) 252.211-7007, Item Unique Identification of Government Property, Version 1.0, September 21, 2007
For new contracts issued after September 13, 2007, DoD will include an Interim Rule, DFARS 252.211-7007, Item Unique Identification of Government Property (DFARS Case 2005-D015), which permanently revises requirements for reporting of PIPC. The interim rule permanently replaces the DD Form 1662 reporting requirements with requirements for DoD contractors to electronically submit, to the IUID registry, the IUID data applicable to PIPC.
It should be understood that in accordance with DFARS 211.274-5, Contract clauses, the clause at DFARS 252.211-7003, Item Identification and Valuation, must be included in any contract that incorporates the clause at DFARS 252.211-7007, Item Unique Identification of Government Property. This is essential to assure there is no ambiguity in the requirements for assigning, registering, reporting and marking PIPC.
The contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract.
Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the PCO or other Government representative at any time during the life of this contract. The contractor shall provide this list to the government at the end of the contract.
Pricing of IUID Requirements. All efforts required by this SOW and contract, including, but not limited to, the preparation of ECPs or notification of marking deficiencies, PIPC reporting, serial number data reporting at end of contract and the actual marking of hardware, will be included in the base unit price.
Requirements for Final Inspection and Test. The contractor shall implement and maintain a Final Inspection and Test System that meets or exceeds the requirements established below. These requirements are commonly accepted practices employed by industry. At a minimum, the contractor’s QAR require Government Source Inspection on all units delivered
Quality System. The contractor shall establish/maintain an effective inspection and test system for final inspection and test of completed products IAW ANSI/ISO/ASQ(E) Q9001-2008.
Inspection and Testing Procedures. The contractor shall utilize documented procedures for final inspection and testing of finished products to ensure that all contract requirements are satisfied.
Inspection and Testing. The quality system shall assure that all final inspections and tests required satisfying contract requirements are conducted.
Records. The contractor shall maintain adequate records of final inspections and tests to demonstrate that the product satisfies contract requirements.
Measuring, Testing, and Inspection Equipment. The contractor shall provide and maintain gages (including production tooling used for inspection purposes) and other measuring and testing equipment to assure that finished products conform to contract requirements. These devices shall be calibrated against certified measurement standards that are traceable back to national/international standards.
Inspection and Test Status. The contractor shall maintain a system for the identification of the final inspection and test status of all products.
Nonconforming Material. The contractor shall establish and maintain a system for controlling material that does not satisfy contract requirements, including procedures for its identification, segregation, and disposition (rework/repair, scrap, etc.).
Corrective Action. The contractor shall promptly act to correct nonconforming materials and processes to preclude the recurrence of the problem and to satisfy contract requirements. Prior production units using V-seals are not acceptable per Corrective Action Report for PQDR W25G1Q-17-0350 for the cylinder piston rod seals.
New poly seals per Drawing 5035618 Rev E are required.
Training Requirements. The contractor shall identify/provide for the training needs of their personnel performing inspections and tests.
Handling, Storage, Preservation, Packaging, and Shipping. The Contractor shall establish, maintain, control, and be responsible for the procedures for handling, storage, preservation, packaging, and shipping to protect the quality of materials and to prevent damage, loss, deterioration, degradation, or substitution of products.
PACKAGING
Requirements for Packaging. Requirements for Packaging. Preservation, packaging, and marking shall be in accordance with (IAW) Military Standard Practice for Military Packaging MIL-STD-2073-1E and Section ‘D’ of the contract. Level of Preservation (LOP): Military, Level of Pack (LPK): B, Quantity Unit Pack (QUP): 001.
Marking shall be in accordance with MIL-STD-129R. Wood Packaging Material (WPM) shall meet the requirements below.
Wood packaging material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. This requirement excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSB). Wood packing material includes pallets. See DLAD 52.247-9012 Requirements for Treatment of Wood Packaging Material
(WPM).
All WPM shall meet the requirements of International Standards for Phytosanitary Measures (ISPM) Number 15, “Regulation of Wood Packaging Material in International Trade”. DoD shipments inside and outside of the United States shall meet the requirements of ISPM 15 whenever WPM is used to ship DoD cargo.
All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) (IAW) American Lumber Standard Committee (ALSC), Incorporated, Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/).
All WPM shall include certification/quality markings IAW the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp.
Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry. The Government reserves the right to recoup from the contractor any remediation costs incurred by the Government.
http://www.alsc.org/
Military Packaging DS7029 and/or DS7033 Preservation, Packing and Marking Instructions
DS7029 - DS7033 LEGEND
Qty Quantity Prot Req Protection Required PKG-REF Packaging Reference (Military/Federal Specification or Standard) SPI Special Packaging Instruction LPK Level of Packing QUP Quantity per Unit Pack ICQ Intermediate Container Quantity Pkg Reqmt Codes Packaging Requirement Codes when PKG-REF cites MIL-STD-2073 The below codes are for special markings:
PC Project Code WG Warranty/Guarantee SL Shelf Life BC Bar Code FMS Foreign Military Sales
DS7029 - DS7033
NSN
Prot Req PKG-REF or SPI LPK QUP ICQ
Special Markings
Pkg J. J J J J J J J J J Reqmt I. II. III. IV. V. VI. VII. VII.a IX X Codes (MP) (CD) (PM) (WM) (CD) (CT) (UC) (IC) (PK) (SM)
3040-01-207-1850 Military MIL-STD-2073-1E B 1 - 10 1 00 00 NS X ED - - - BC
CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1
CDRL List
CDRL
Data Line No. DID Identification Title A001 DI-MISC- 80711A Scientific and Technical Reports – Configuration Control B001 DI-MISC- 80711A Scientific and Technical Reports – IUID Marking Diagram/Instructions
Individual CDRLs
DD Form 1423-1, 1 Jun 90
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TBD TDP X TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Cylinder, Assembly Linear- Hydraulic P/O Mast Group, Hydraulic-Pneumatic OA-
9054(V)4/G
TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Scientific and Technical Reports Configuration Control
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-80711A TBD RDER-PRP-G INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
DD ASREQ SEE ITEM 16 b. COPIES SECT. B
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A SEE ITEM 16
Reg
Repro
16. REMARKS:
Data Item Description DI-MISC-80711A: Delete Block 10 instructions entirely and follow instructions in Technical Requirements Document (AKA SOW). The contractor shall prepare and submit Configuration Control Documents in accordance with the SOW section for Configuration Control when a change to or departure from a contractual baseline document is deemed necessary. All deliveries shall be in digital format. All digital files shall be provided both by electronic submission, e.g., e-mail, FTP, etc., as arranged with the requiring office.
Alternative delivery media may be discussed with the Contracting Officer prior to delivery.
RDER-PRP-G
PCO
ACO
QAR
* 1 COPY VECP ONLY.
15. TOTAL 0 6 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Scott Mahoney
RDER-PRP-G
Product Realization Engineer
5/14/2018 Mark L. Caringi
RDER-PRP-G
Chief, Generator/ECU/Special Operations Branch
5/14/2018
DD Form 1423-1, 1 Jun 90
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TBD TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Cylinder, Assembly Linear- Hydraulic P/O Mast Group, Hydraulic-Pneumatic OA-
9054(V)4/G
TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B001 Scientific and Technical Reports IUID Marking Diagram/Instructions
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-80711A TBD RDER-PRP-G INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
DD ASREQ SEE ITEM 16 b. COPIES
SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A N/A SEE ITEM 16
Reg
Repro
16. REMARKS:
Item 4: Delete Block 10.2 of Data Item Description (DID) and prepare in accordance with the Statement of Work.
Item 12: Delivery of draft shall be 30 DAC. Government has 30 days to review/comment.
Item 13 Delivery of final shall be 30 days after receipt of Government comments. Government has 30 days to determine acceptance.
Contractor to submit DD250 upon acceptance of UID Marking Diagram/Instructions.
Item 14: All digital files will be provided both by electronic submission, e.g., e-mail, FTP, etc., as arranged with the requiring office.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the contractor to receive payment for the data deliverable (see section G of the Contract). CDRLs that are NSP shall not use WAWF to notify the government. E-mail notification is required with any electronic submission.
RDER-PRP-G
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Scott Mahoney
RDER-PRP-G
Product Realization Engineer
5/14/2018 Mark L. Caringi
RDER-PRP-G
Chief, Generator/ECU/Special Operations Branch
5/14/2018
| APPLICABLE DOCUMENTS |
| CONFIGURATION BASELINE |
| CHEMICAL AGENT RESISTANT COATING (CARC) |
| SPECIAL INSTRUCTIONS |
| Per the Department of Defense, Item Unique Identification of Government Property Guidebook, Reporting Government Property In the Possession of the Contractor (PIPC), Guidance for: Defense Federal Acquisition Regulation (DFARS) 252.211-7007, Item Uniqu... |
| PACKAGING |
| Military Packaging |
| CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1 |
| CDRL List |
| Individual CDRLs |