Updated Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Computer Interface Module NSN: 7025-01-618-6736, newest first.
File Type Posted
SPRBL117R0031-0002.pdf PDF
SPRBL117R0031-0001.pdf PDF
SPRBL1-17-R-0031.pdf PDF
Attachment_0001_Packaging_Specifications.pdf PDF
Exhbit_A_Statement_of_Work.pdf PDF
Attachment_0002_Drawing_96-23754.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPRBL1-17-R-0031 Exhibit A 27 June 2017

For Official Use Only Source Selection Information-- See FAR 2.101 and 3.104

Statement of Work

1.0 Scope. This Statement of Work (SOW) defines the efforts required to produce the products required by this solicitation in accordance with the Documents listed below. The items being purchased are entitled “Color Computer Interface Module (CIM) used on 30 kW and 60 kW Tactical Quiet Generators (TQGs).”

2.0 Applicable Documents. The following documents are applicable to the extent cited.

2.1 Military and Federal Stds

Document No. Document Title Applicability MIL-STD- 129R Military Marking for Shipment and Storage Required

MIL-STD-

MIL-STD-

130N 2073-1E chg 1

Identification Marking of U.S. Military Property Standard Practice for Military Packaging

Required

2.2 Military and Federal Specs

None

2.3 Other DoD Documents

Drawing 96-23754 (6th Gen) Computer Interface Module (CIM) Required

2.4 Com’l Documents

ISPM

Packaging Specification Data Sheet Regulation of Wood Packaging Material in International Trade (2009)

3.0 Requirements. The contractor shall produce the Computer Interface Modules (CIMs) NSN 7025-01-618- 6736 in the quantity set forth in Section B of the schedule in accordance with Documents listed above and this SOW. In the event of a conflict between the requirements of this SOW and any drawings for the item on contract, the requirements of this SOW shall govern.

3.1. Requirements for Packaging. Preservation, packaging, and marking shall be in accordance with (IAW) Section ‘D’ of the Contract. Packaging shall be in accordance with MIL-STD-2073-1. Level of Preservation (LOP): Military, Level of Pack (LPK): B, Quantity Unit Pack (QUP): 001. Radio Frequency Identification (RFID) Requirements shall be IAW the Section ‘F’ clause, DFARS 252.211-7006, of the contract. MIL-STD- 129R with change 4 is applicable. Wood Packaging Material (WPM) shall meet the requirements below.

3.1.1. Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry. The Government reserves the right to recoup from the contractor any remediation costs incurred by the Government.

SPRBL1-17-R-0031 Exhibit A 27 June 2017

Source Selection Information-- See FAR 2.101 and 3.104

3.2 Requirements for Configuration Control.

3.2.1 Configuration Baseline. The applicable Configuration Baseline (CB) for the listed Configuration Item (CI)/Computer Software Configuration Item (CSCI) is as follows:

CI/CSCI CB Revision Computer Interface Module 96-23754 --

Note: New CIM drawing # 96-23754 equates to drawing # 96-23752 & ECP 09HE002400

3.2.2 Configuration. Each CI/CSCI, as developed/built and delivered, shall conform to the cited CB and (if applicable) all subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO). Configuration changes not directly effecting the configuration baseline do not require Government approval prior to incorporation, but must be documented by the contractor and shall be made available to the Government upon request.

3.2.3 Departures from CB. No changes or departures from the CB are acceptable except for changes or departures which are submitted in accordance with DI-MISC-80711A and are approved by the Government Configuration Manager (C Mgr.) or Configuration Management Officer (CMO) and which are made applicable to the contract by the PCO. Configuration Control shall be effected by the Configuration Control Documents (CCDs) as follows:

3.2.3.1 Engineering Change Proposal (ECP) includes both the engineering change and the supporting documentation by which the change is described and suggested. An ECP describes changes to the CI/CSCI and associated Government documents and data that are affected by the proposed engineering change.

3.2.3.1.1 A Notice of Revision (NOR) shows the detailed changes that must be made to technical documentation, except specifications, (one NOR per document) following approval of an ECP. The NOR is submitted as part of the ECP.

3.2.3.1.2 A Specification Change Notice (SCN) is used to delineate the exact change(s) in a specification that will be distributed to users when the ECP is approved. The SCN is submitted as part of the ECP. The SCN is not used for a military or federal document, only a Request for Waiver can be used for those documents.

3.2.3.1.3 Value Engineering Change Proposal (VECP) is the same as an ECP except there are proposed cost savings for the program. The contractor shall follow the guidance in Section I of this contract for VECPs.

3.2.3.2 Request for Waiver (RFW) describes a departure from configuration documentation for a specific number of units or period of time. Contractor shall identify the impact of the RFW on performance, operational readiness and logistics support of the affected CIs. The Government will require compensation for any RFW.

3.2.3.3 Contractor shall provide all supporting program or cost data with the CCD. The contractor shall uniquely and sequentially identify (including the use of the contract number) each ECP, VECP, NOR, SCN or RFW. The identification number should use less than 16 characters.

SPRBL1-17-R-0031 Exhibit A 27 June 2017

Source Selection Information-- See FAR 2.101 and 3.104

3.2.4 Identification of Authorized Personnel. The contractor shall identify to the PCO, Administrative Contracting Officer (ACO), and the technical office identified on the DD Form 1423 for DI-MISC-80711A, the name(s) of the official(s) of its organization who are authorized to submit CCDs 30 Days after Contract (DAC).

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TBD TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Color Computer Interface Module (CIM) used on 30 kW and 60 kW Tactical

Quiet Generators (TQGs)

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001 Scientific and Technical Reports Configuration Control

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80711A SOW Para 3.2.3 RDER-PRP-G INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

LT ASREQ SEE ITEM 16 b. COPIES

SECT. B

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

SEE ITEM 16

Reg

Repro

16. REMARKS:

Data Item Description DI-MISC-80711A: Delete Block 10 instructions entirely and follow instructions in SOW found at para 3.2.

The contractor shall prepare and submit Configuration Control Documents in accordance with the SOW section for Configuration Control (Para 3.2.) when a change to or departure from a contractual baseline document is deemed necessary.

All deliveries shall be in digital format. All digital files shall be provided both by electronic submission, e.g., e-mail, FTP, etc., as arranged with the requiring office, and also by CD ROM readable by computers running Microsoft Office 2000 and Office XP suite of applications (MS Word, MS Excel, MS PowerPoint, and MS Project, etc.).

Alternative delivery media may be discussed with the Contracting Officer prior to delivery.

RDER-PRP-G

PCO

ACO

QAR

AMSEL-LC-LEO-E-ET

AMSEL-LC-LEO-E-AV*

* 1 COPY VECP ONLY.

15. TOTAL 0 6 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

BRIAN KIM

RDER-PRP-G

Mechanical Engineer

03 / 24 / 17 MARK L. CARINGI

RDER-PRP-G

Chief, Generator Branch

03 / 24 / 17

DD Form 1423-1, 1 Jun 90

3.2.5 Documentation. The contractor shall document by serial number each products configuration, applicable documentation, maintenance support requirements and spares in relation to the contractor’s configuration baseline. The data in use shall be available for government review and use.

SPRBL1-17-R-0031 Exhibit A 27 June 2017

Source Selection Information-- See FAR 2.101 and 3.104

3.2.6 Use of CB Data. The contractor shall assure that all necessary contractor’s activities have access to and use of the contractually specified configuration baseline(s), approved changes and departures, and effectivity data. The data in use shall be available for government review and use.

3.3 Requirements for Item Marking (Commercial Off The Shelf Items). Part Number Marking. Each item delivered under contract, along with each assembly, sub assembly, and module, shall be legibly marked with the appropriate part number and manufacturer’s identification. Hardware such as screws, nuts, bolts, etc., need not be marked. This requirement should be entirely met by the contractor’s standard commercial marking.

However, if there is any question about marking it shall be directed to the Contracting Officer for resolution.

3.4 Requirements for Item Unique Identification (IUID). The contractor shall mark all contract deliverables In Accordance With (IAW) DFARS clause 252.211-7003 in Section F of this contract.

SPRBL1-17-R-0031 Exhibit A 27 June 2017

Source Selection Information-- See FAR 2.101 and 3.104

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TBD TDP TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Color Computer Interface Module (CIM) used on 30 kW and 60 kW Tactical

Quiet Generators (TQGs)

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 Scientific and Technical Reports IUID Marking Diagram/Instructions

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80711A SOW Para 3.4 RDER-PRP-G INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

LT ASREQ SEE ITEM 16 b. COPIES

SECT. B

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

N/A SEE ITEM 16

Reg

Repro

16. REMARKS:

Item 4: Delete Block 10.2 of Data Item Description (DID) and prepare in accordance with this CDRL & the Statement of Work.

Item 12: Delivery of draft shall be 30 DAC. Government has 30 days to review/comment.

Item 13 Delivery of final shall be 30 days after receipt of Government comments. Government has 60 days to determine acceptance.

Contractor to submit DD250 upon acceptance of UID Marking Diagram/Instructions.

Item 14: All digital files will be provided both by electronic submission, e.g., e-mail, FTP, etc., as arranged with the requiring office, and also by CD ROM, readable by computers running Microsoft Windows.

PCO 0

15. TOTAL 0 5 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

BRIAN KIM

RDER-PRP-G

Mechanical Engineer

03 / 24 / 17 MARK L. CARINGI

RDER-PRP-G

Chief, Generator Branch

03 / 24 / 17

DD Form 1423-1, 1 Jun 90

3.4.1 Per the Department of Defense, Item Unique Identification of Government Property Guidebook, Reporting Government Property In the Possession of the Contractor (PIPC), Guidance for: Defense Federal Acquisition Regulation (DFARS) 252.211-7007, Item Unique Identification of Government Property, Version 1.0, September 21, 2007

For new contracts issued after September 13, 2007, DoD will include an Interim Rule, DFARS 252.211-7007, Item Unique Identification of Government Property (DFARS Case 2005-D015), which permanently revises requirements for reporting of PIPC. The interim rule permanently replaces the DD Form 1662 reporting requirements with requirements for DoD contractors to electronically submit, to the IUID registry, the IUID data applicable to PIPC.

SPRBL1-17-R-0031 Exhibit A 27 June 2017

Source Selection Information-- See FAR 2.101 and 3.104

It should be understood that in accordance with DFARS 211.274-5, Contract clauses, the clause at DFARS 252.211-7003, Item Identification and Valuation, must be included in any contract that incorporates the clause at DFARS 252.211-7007, Item Unique Identification of Government Property. This is essential to assure there is no ambiguity in the requirements for assigning, registering, reporting and marking PIPC.

3.4.2 The contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the PCO or other Government representative at any time during the life of this contract. The contractor shall provide this list to the government at the end of the contract.

3.4.3 Correction of Noncompliant Equipment and Technical Data.

3.4.3.1 If this contract contains configuration control requirements, the contractor shall initiate the appropriate configuration control document to correct all affected drawings/specifications which conflict with or omit the marking requirements stipulated above.

3.4.3.2 If configuration control requirements do not apply and the equipment on order is defined by technical data which conflicts with or omits the marking requirements stated above, the contractor shall advise the PCO.

Such advice shall list the number of each deficient drawing/specification and a brief description of the deficiency.

3.4.3.3 If the item on order is defined by existing Government technical documentation and such documentation is in conflict with the requirements of this SOW, production of equipment with revised markings shall not proceed until Government approval is received.

3.4.4 Government Purchase of Product/Technical Data.

3.4.4.1 Specifications. If the Government is procuring any equipment specification(s) on this contract, such specification(s) shall include a requirement to mark the appropriate items with IUID.

3.4.4.2 Drawings. If the Government is procuring engineering drawings or drawing revisions on this contract, the contractor shall include IUID marking requirements on each applicable drawing. Location shall be depicted on the pictorial and other details presented in the notes.

3.4.5 Pricing of IUID Requirements. All efforts required by this SOW and contract, including, but not limited to, the preparation of ECPs or notification of marking deficiencies, PIPC reporting, serial number data reporting at end of contract and the actual marking of hardware, will be included in the base contract price.

3.5. Requirements for Quality Assurance System. The contractor shall implement and maintain a Quality Assurance System for commercial items that meets or exceeds commercial best practices. These established commercial quality requirements shall be commonly accepted practices employed by industry in both national and international manufacturing environments. The contractor shall comply with the following requirements in addition to their best practice commercial quality assurance system.

3.5.1 Quality System . The contractor shall establish/maintain a system for the final inspection and test of all

SPRBL1-17-R-0031 Exhibit A 27 June 2017

Source Selection Information-- See FAR 2.101 and 3.104 purchased items to comply with contract or order requirements.

3.5.2 Inspection and Testing . The contractor shall perform final Inspection and testing on all deliverables in accordance with the contractor's Inspection and Testing Procedures. The contractor shall assure that all necessary inspections and tests are performed on completed products, and this shall include all inspections and tests, which are normally performed for the equipment on order. The contractor shall as a minimum perform any inspections and tests (including visual/mechanical inspections and functional tests) required to satisfy the form, fit, and function requirements of the contract. The form, fit, and function requirements are defined by the contractor’s drawings and literature (specification sheets, brochures, technical manuals, etc).

3.5.3 Records . The contractor shall maintain adequate records of inspections and tests to demonstrate that the final product satisfies contract requirements. The Government has the right to review these records at any time.

3.5.4 Measuring, Testing, and Inspection Equipment . The contractor shall provide and maintain gages (including production tooling used for inspection purposes) and other measuring and testing equipment to assure that finished products conform to contract requirements. These devices shall be calibrated against certified measurement standards, which are traceable back to national/international standards.

3.5.5 Nonconforming Material . The contractor shall maintain controls for material, which does not satisfy contract or order requirements, including procedures for the identification, segregation, and disposition (rework/repair, scrap, etc.).

3.5.6 Corrective Action . The contractor shall promptly act to correct nonconforming materials and conditions to satisfy contract or order requirements and prevent the recurrence of this problem.

3.5.7 Handling, Storage, Preservation, Packaging, and Shipping shall be in accordance with MIL-STD-2073-1.

The Contractor shall establish, maintain, control and be responsible for the handling, storage, preservation, packaging and shipping to protect the quality of the materials and to prevent damage from loss, deterioration, degradation, or substitution of products.

3.5.8 Responsibility. The requirements of this SOW do not relieve the contractor of the responsibility to perform any additional tests or inspections required to assure product quality and compliance with drawings and specification requirements.

3.6. Requirements for Warranty. The contractor shall comply with the requirements for warrany IAW FAR 52.212-4.

3.4.1 Per the Department of Defense, Item Unique Identification of Government Property Guidebook, Reporting Government Property In the Possession of the Contractor (PIPC), Guidance for: Defense Federal Acquisition Regulation (DFARS) 252.211-7007, It...