Attachment_0001_Special_Packing_Instructions_-_AG00000605.pdf

PDF 522 KB Posted

Attached to
5kW Engine Assembly; 2815-01-486-7691 Federal contract opportunity
Solicitation number
SPRBL117R0008
Issued by
Defense Logistics Agency Land and Maritime

About this file

Attachment 0001 Special Packing Instructions

View the file

Other files for this federal contract opportunity

Other files attached to 5kW Engine Assembly; 2815-01-486-7691, newest first.
File Type Posted
SPRBL117R0008.pdf PDF
Exhibit_A_SPRBL1-17-R-0008_-_Statement_of_Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PACKAGING INSTRUCTION Form Approved OMB No. 0704-0188

1. PART OR DRAWING NO.

ENGINE, DIESEL

2. CODE IDENT

80063

3. SPI NO.

AG00000605

4. NATIONAL STOCK NO

VARIOUS

5. DATE OF DRAWING

06206

6. REVISION

A

7. QUP

ICQ

NONE

9.UNIT PACK WEIGHT 10.UNIT PACK CUBE 11.UNIT PACK SIZE

12.

PRESERVATION

18.

STEPS

19.

REQD

20.

DESCRIPTION

MILITARY

MIL-STD-2073-1, METHOD 53

N/A N/A N/A

13. CLEANING

MIL-STD-2073-1

APPLICABLE DOCUMENTS

14. DRYING

MIL-STD-2073-1

MIL-STD-3010 AIA NAS 847

ASTM D 4169

MIL-PRF-21260 ASTM D 6256/D6256M

15. PACKING MIL-STD-129 SAE-AMS-T-22085

MIL-STD-2073-1 SAE-AS26860

AIA/NAS 840 TITLE 49 CFR

a. LEVEL A

MIL-STD-2073-1 AND NOTE 6 GENERAL REQUIREMENTS

b. LEVEL B

NOT APPLICABLE

PRESERVATION: SEE NOTE 2 IN BLOCK 17 BELOW

DESICCANT: MIL-D-3464

16. MARKING

MIL-STD-129 AND NOTE 7

CONTAINER: ASTM D 6256/D6256M, TYPE 1, CLASS 2,

STYLE A, TREATMENT A

17. NOTES/DRAWING

1. PRESERVATION: In the event that any of the requirements contained in this special packaging instruction conflict with or would result in negating the warranty requirements for this engine, contact the U.S. Army Communications-Electronics Command, ATTN: AMSEL-LC-LEO-D-SS-CC, Fort Monmouth, NJ 07703, for waiver of specification requirements.

1.1 General packaging requirement. Quantity per unit pack shall be one each.

1.2 In addition to item preservation required below, engine must be protected from rough handling, stacking, vibration, and other hazards associated with shipping, storage, and transportation.

1.3 Protection from physical damage and mechanical malfunction is required for the method of preservation in addition to the specific environment protection provided. All cushioning and dunnage materials shall be as clean and dry as practical to minimize item susceptibility to corrosion and contaminants. All knobs, sharp projections, greased slides, bearings and other protrusions shall be suitably wrapped or otherwise protected to prevent damage to either the item or the preservation.

DA FORM 2169, JUN 86 PAGE 1 OF 5

SPRBL117R0008 ATTACHMENT 0001 SPECIAL PACKING INST

SPECIAL PACKAGING INSTRUCTION

(Continuation Sheet )

Form Approved

1. PART OR DRAWING NO.

ENGINE, DIESEL

2. CODE IDENT

80063

3. SPI NO.

AG00000605

4. NATIONAL STOCK NO

. VARIOUS

5. DATE

06206

6. REVISION

A

1.4 Only non-corrosive wrapping, cushioning, and dunnage shall be used in contact with bare metal and critical item surfaces. Non-corrosive is defined by the test requirements of MIL-STD-3010, Test Method 3005.

1.5 Disassembly shall be confined to the minimum necessary to safeguard parts vulnerable to damage or that would otherwise increase cube if not removed. Disassembly shall also be confined to those parts that can be removed and reinstalled without special tools. Removed bolts, nuts, screws, washers, keys, and other fasteners shall be reinstalled in mating parts and secured to prevent loss. When not practical to reinstall hardware, items shall be preserved, packaged, and secured to the engine. Under no circumstances should the ducting be disassembled or alterations made to the engine, which would allow dust or dirt to enter the engine.

1.6 The engine may be subject to the requirements of CFR Title 49. If so, it shall be certified by the contractor or his authorized representative and marked indicating that the engine does not contain fuel and that the fuel lines have been drained, sufficiently cleaned of residue, and purged of vapors to remove any potential hazard and the engine, when held in any orientation, will not release any liquid fuel. The contractor is responsible for any additional processing of the engine or changes in the preservation necessary to ensure the engine is purged of vapors prior to sealing in the watervaporproof barrier.

2 Engine preservation.

2.1 Crankcase. At the beginning of engine preservation, engine crankcase shall be filled to operating level with preservative lubricating oil conforming to grade 10, 30, or 15-40 of MIL-PRF-21260.

2.2 Fuel system. A portable container or a supply line shall be positioned to provide preservative oil to the engine. The engine fuel supply line shall be disconnected at the most convenient point nearest the fuel tank, and a flexible line containing the preservative oil supply connected to the disconnected fuel supply line leading to the engine. Drain diesel fuel from the fuel filters and fill with preservative oil. The engine shall be started and operated at fast idle until running smoothly, but for not more than 4 minutes. Accelerate to 1/2 throttle and run for 3 minutes and then shutdown by conventional methods.

DA FORM 2169C, JUN 86 Page 2 of 5

2. CODE IDENT

80063

3. SPI NO.

AG0000605

4. NATIONAL STOCK NO

. VARIOUS

5. DATE

06206

6. REVISION

A

2.3 Combustion chamber processing. The engine shall be cooled to 100 degrees F. Cooling will be accomplished by induced air currents, circulation of engine coolant (for liquid-cooled engines), or by waiting the period of time required to arrive at the 100 degrees F. When ambient temperature exceeds 100 degrees F, the engine should be cooled to a temperature Equivalent to the ambient. After engine has been cooled to the required Temperature, processing through combusion chamber will be started and Completed within minimum delay. Overall elapsed time for complete engine processing should not exceed 24 hours. After the engine has been cooled, an air restrictor plate shall be installed at the nearest and most convenient place to cut off the air supply to the engine. With the fuel system filled with preservative oil, MIL-PRF-21260, Grade PE 10, the engine will be cranked for 10 seconds. Remove the preservative oil supply line and reconnect the fuel supply lines and open the fuel shut off valves. Drain filters, remove filter elements and replace with new elements and gaskets. Level A engine processing requirements for each model may contain unique engine processing requirements. These should be reviewed prior to processing engines for outside storage.

CAUTION

SPECIAL PRECAUTIONS WILL BE TAKEN TO ENSURE THAT THE AMOUNT OF OIL DRAWN

INTO THE ENGINE WHILE COMPLETING 1.2.3 ABOVE WILL NOT RESULT IN A

HYDROSTATIC LOCK. PRIOR TO PROCESSING ADDITIONAL ENGINES, THE FIRST ENGINE

WILL BE PROCESSED AS SPECIFIED ABOVE AND ALLOWED TO STAND FOR 12 HOURS. THE

ENGINE WILL THEN BE MANUALLY ROTATED, OR ROTATED BY THE STARTER IF MANUAL

TURNING IS NOT POSSIBLE, TO ENSURE THAT THE AMOUNT OF OIL DRAWN INTO

COMBUSTION CHAMBERS ALLOWS FREE ROTATION OF THE ENGINE.

2.4 Drain crankcase. Install new filters. Reinstall drain plug.

2.5 Upon completion of engine preservation, all openings into the engine such as crankcase breathers, oil filter caps, valve cover breather holes, oil level dipstick/tube, and openings into accessories, shall be sealed with plastic caps or plugs conforming to AIA/NAS 840 and/or AIA/NAS 847, or with tape conforming to SAE-AMS-T-22085.

2.6 A warning tag shall be prepared and attached to the engine with the deprocessing instructions detailing how to deprocess the engine. Guidance is contained on DA Form 2258, “Depreservation Guide for Vehicles and Equipment”.

DA FORM 2169C, JUN 86 Page 3 of 5

2. CODE IDENT

80063

3. SPI NO.

AG00000605

4. NATIONAL STOCK NO

. VARIOUS

5. DATE

06206

6. REVISION

A

2.7 Engines, internal combustion are a hazard for transport in accordance with CFR Title 49. The contractor is responsible for ensuring that all engines preserved are purged of all flammable vapors to remove any potential hazard. Alternate procedures may be used by the contractor for engine preservation. The procedure proposed by contractor shall not cause excessive preservative lubricating oil to be left in combustion chambers and manifolds that could result in hydrostatic lockup of engine. The contractor shall furnish an engine for examination and test of his proposed procedure prior to production preservation. The proposed procedure shall be subject to prior approval of the contracting officer. Procedures previously approved for long term storage in excess of 60 months by the Government may be used to CO approval.

3 Quality Assurance Provisions.

3.1 Inspect the preservation and unit pack in accordance with MIL-STD-2073- 1.

3.2 Quality conformance shall be in accordance with MIL-STD-2073-1.

3.3 First Article Test and Inspection of the engine in the container is not required. However, the engine in the container must meet the mechanical handling requirements of ASTM D 4169, Distribution Cycle 18, Assurance Level II, Acceptance Criteria 3. Only mechanical handling testing is required.

4 Desiccant. Follow the guidance in MIL-STD-2073-1 for determining the quantity required in the barrier bag.

5 Container. Construct container using lag bolts or other reusable hardware in the container construction. Base shall be full panel plywood with plywood panels on ends, sides, and top. Skids will be beveled with rubbing strips.

Corner straps are required. Blocking, bracing, and cushioning shall be designed to protect the engine and ensure successful rough handling testing without any damage to the engine, the watervaporproof barrier, or to the container. An inspection port is required to coincide with the location of the humidity indicator to view the humidity indicator installed in the bag.

Indicator shall comply with SAE AS26860, Type 11.

DA FORM 2169C, JUN 86 Page 4 of 5

2. CODE IDENT

80063

3. SPI NO.

AG00000605

4. NATIONAL STOCK NO

. VARIOUS

5. DATE

06206

6. REVISION

A.

6 Shipping container. The unit container will serve as the shipping container.

7 Special marking. See ASTM D 6256/D6256M for special container markings.

All containers will additionally have the engine serial number marked on the container in accordance with MIL-STD-129. Any required exercising/ represervation of the engines during the storage period of 10 years shall be documented in the form of a shelf life (extendible) and the instructions provided to the Government Contracting Officer.

DA FORM 2169C, JUN 86 Page 5 of 5

SPECIAL PACKAGING INSTRUCTION
MILITARY

File details come from the government source that posted it. Updated .