DLA DISTRIBUTION
MIKE WATTERS
RECEIVING DEPT, CODE Z0S
667 SAFEGUARD ST, BLDG 167
JBPPH HI 96860-5033
TEL: 808-473-8000 X-4960 FAX: 808-471-1133
SEE SCHEDULE
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER)
PAGE OF PAGES
1 31
1. REQUEST NO. 2. DATE ISSUED RATING
SPMYM4-16-Q-0625 26-Jul-2016 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
DLA MARITIME PEARL HARBOR
NANETTE PHILLIPS
COMPETITIVE SOURCING DIV
667 SAFEGUARD ST, STE 100
JBPHH HI 96860-5033
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
02-Aug-2016(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
808-473-8000 X6396NANETTE G. PHILLIPS
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
SPMYM4-16-Q-0625
Section SF 30 - BLOCK 14 CONTINUATION PAGE
**IMPORTANT INFORMATION**
NANETTE PHILLIPS TEL: 808-473-8000 X6396
E-MAIL: Nanette.Phillips@dla.mil FAX: 808-471-1030
THE DOD AND NAVY REQUIRE PAPERLESS DISTRIBUTION OF PURCHASE ORDERS,
CONTRACTS, AND MODIFICATIONS. PLEASE PROVIDE YOUR E-MAIL ADDRESS BELOW:
PLEASE PROVIDE THE FOLLOWING INFORMATION SO YOUR COMPANY CAN BE ENTERED INTO
OUR COMPUTER SYSTEM
CAGE Code (Commercial & Government Entity No.) _____________ DUNS (Dun & Bradstreet) No. _________________________ SAM (System for Award Management) Yes No (circle one)
TAX ID NO. (TIN) _________________________
The Contractor shall be registered in the SAM database prior to submitting an invoice and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
The SAM registration shall be for the same name and address identified on the contract, with its associated CAGE code and DUNS or DUNS+4.
Contractors may obtain information on registration and annual confirmation requirements via the SAM accessed through https://www.acquisition.gov or by calling 866-606-8220, or 334-206-7828 for international calls.
SINGLE AWARD – The Government intends to award a single contract resulting from this solicitation.
Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specified otherwise in the offer.
THE FOLLOWING INFORMATION MUST BE PROVIDED OR YOUR QUOTE MAY NOT BE ACCEPTED.
Material is required to be delivered within 30 DAYS OR BEST DELIVERY after receipt of order (ARO)
If the required delivery cannot be met, an alternate delivery schedule may be considered. Provide your best delivery schedule:
Estimated delivery time ________________ days/months.
_________ FOB DESTINATION PREFERRED (Vendor pay to Destination)
_________ FOB ORIGIN (Government pay from shipping point) Estimated Cost $__________________ Origin City/State $_________________ Carrier Name ____________________________________________________
Business size (in accordance with Federal Government Standards) Small ____ Large ____Women-Owned____ Disadvantaged _____ Other_____
Prompt Payment Terms_______% _______Days NET ______
If on GSA Contract: [ ] GSA Contract #____________________Expiration Date: ______
VENDOR SHALL COMPLETE AND RETURN THE FOLLOWING PRICE INFORMATION:
PRICES ARE BASED ON (Check one or more)
(1) [ ] Commercial catalog/published price list number _______________ date_________page________.
ATTACH APPLICABLE CATALOG/PRICE LIST PAGE.
Note: If quoted prices exceeds catalog/published price, explain:
(2) Unpublished or internal Price List No. ______________
State means of verification: ______________________________________ Prices audited and approved by DCAA/DCASR ______________________ Last audit was on ________________________ (date).
(3) Sales history of this item for at least the last 12 months: _____________
Government Commercial Sales Dollar Volume: ___________________
Quantity of Units Sold: ____________________________________________________
Vendors are requested to furnish the following Information with their offers: (If Applicable)
UNIT COSTS
1. Purchase Part ___________
2. Raw Material ___________
3. Labor: _______hours, $_______/hour ___________
4. Manufacturing Overhead_______% ___________
5. Other Costs (packing, transportation, etc.) ___________
6. G&A Expense_______ % ___________
7. Profit_________% ___________
METHOD OF PAYMENT IS WIDE AREA WORK FLOW (WAWF)
DFAR 252.232-7003 (MAR 2008) ELECTRONIC SUBMISSION OF PAYMENT REQUEST AND RECEIVING REPORTS is applicable to this solicitation. Please note that the WAWF (Wide Area Work Flow) will be used as the method of payment for supplies and/or services procured under this solicitation. Information regarding WAWF is available on the internet at https://wawf.eb.mil. If you are not able to accept payment by WAWF, please provide the reason(s) below:
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CONDUIT FITTING
FFP
FIRST ARTICLE TESTING REQUIRED
FOB: Destination
MILSTRIP: N322536130A808
MFR PART NR: AX0685-4024-SP
PURCHASE REQUEST NUMBER: N322536130A808
PROJECT: 611
NET AMT
0001AA 12 Each
CONDUIT FITTING,
FFP
CONDUIT FITTING SWIVEL, STRAIGHT - CONFIG CODE 0, STFG TU SIZE
D - ADPTR SIZE CODE 40, 3/4" CND - SIZE CODE 24, 316L SST, MIL-PRF-
24758A(SH), ENTRACO SEA-FROST P/N: AX0685-4024-SP.
ORDERING DATA:
A) CONDUIT SYSTEMS, FLEXIBLE, WEATHERPROOF; MIL-PRF-
24758A(SH), DTD 24SEP04;
B) FIRST ARTICLE TESTING REQUIRED
C) & D) AS SPECIFIED;
E) COMMERCIAL;
NOTE: PER NAVSEA LTR 2450 SER 62/050 DTD 28 NOV 06, ENTRACO
MEETS THE PERFORMANCE REQUIREMENTS OF MIL-PRF-24758A AND
ARE CONSIDERED ACCEPTABLE
MFR PART NR: AX0685-4024-SP
0001AB 1 Lot
FIRST ARTICLE INSPECTION REQUIRED
FFP
FIRST ARTICLE TESTING REQUIRED - CONTRACTOR TESTING
MIL-PRF-24758A(SH) of 24 September 2004 First Article Inspection required in accordance with paragraph 4.2 and table II of specification.
Test reports shall be per DI-NDTI-80809B.
First article sample.
Sample size per paragraph 4.3.1of the specification (3 each)
Approval of first article test results by Pearl Harbor Naval Shipyard & IMF.
"The Government reserves the right to waive the requirements for samples for first article inspection to those bidders offering a product which has been previously acquired or tested by the Government, and that bidders offering such products, who wish to rely on such production or test, must furnish evidence with the bid that prior Govemment approval is presently appropriate for the pending contract.''
Disposition of first articles through commercially acceptable practices.
0002 8 Each
BACK SHELL
FFP
ENTRACO P/N: AX8765-54-1824-CT. BACK SHELL; CIRCULAR
CONNECTOR, ADAPTER W/OUT MISTY, CONFIG CODE - 8,
CONNECTION CODE - 54, CONNECT SHELL SIZE - 18, COND. TERM
CODE -24, ENTRACO P/N: AX8765-54-1824-CT.
FOB: Destination
MILSTRIP: N322536130A809
MFR PART NR: AX8765-54-1824-CT
PURCHASE REQUEST NUMBER: N322536130A809
0003 6 Each
BACK SHELL
FFP
ENTRACO P/N: AX8765-54-1416-CT. BACK SHELL; CIRCULAR
CONNECTOR, ADAPTER W/OUT MISTY, CONFIG CODE - 8,
CONNECTION CODE - 54, CONNECT SHELL SIZE - 14, COND. TERM
CODE -16,
FOB: Destination
MILSTRIP: N322536130A810
MFR PART NR: AX8765-54-1416-CT
PURCHASE REQUEST NUMBER: N322536130A810
EMP CONDUIT
FFP
FIRST ARTICLE TESTING REQUIRED
FOB: Destination
NSN: 5975
MILSTRIP: N3225361662701
MFR PART NR: CC261-16
PC NR: EM501
PURCHASE REQUEST NUMBER: N3225361662701
PROJECT: 6A3
0004AA 30 Foot
EMP CONDUIT
FFP
FIRST ARTICLE INSPECTION REQUIRED
CONDUIT, FLEX, 1/2" NOM I.D., MIL-PRF-24758A(SH), ENTRACO SEA-
FROST CC261-16 ID MIN: 0.485, OD MAX: 0.867 MIN INSIDE BEND
RADIUS: 2.250 MAX LENGTH IN FEET: 25-30
ACQ REQ:
A) CONDUIT SYSTEMS, FLEXIBLE, WEATHERPROOF MIL-PRF-
24758A(SH) 24SEP2004;
B) FIRST ARTICLE INSPECTION REQUIRED;
C) AND D) AS SPECIFIED;
E) COMMERCIAL PACKAGING IAW ASTM D3951.
FOB: Destination
NSN: 5975
MILSTRIP: N3225361662701
MFR PART NR: CC261-16
PC NR: EM501
0004AB 1 Lot
FIRST ARTICLE INSPECTION REQUIRED
FFP
FIRST ARTICLE TESTING REQUIRED - CONTRACTOR TESTING
MIL-PRF-24758A(SH) of 24 September 2004 First Article Inspection required in accordance with paragraph 4.2 and table II of specification.
Test reports shall be per DI-NDTI-80809B.
First article sample.
Sample size per paragraph 4.3.1of the specification (3 each)
Approval of first article test results by Pearl Harbor Naval Shipyard & IMF.
"The Government reserves the right to waive the requirements for samples for first article inspection to those bidders offering a product which has been previously acquired or tested by the Government, and that bidders offering such products, who wish to rely on such production or test, must furnish evidence with the bid that prior Govemment approval is presently appropriate for the pending contract.''
Disposition of first articles through commercially acceptable practices.
0005 2 Each
COUPLING
FFP
COUPLING, BOX HUB, STRAIGHT, ENTRACO SEA-FROST AX0737-2416-
CT ADAPTER SIZE CODE: 24, R.H. INTERNAL CLASS 2B THREAD: 0.750-
20 UNEF ADAPTER BODY WRENCH FLATS +/- 0.015: 0.625 COUPLING
NUT WRENCH FLATS +/- 0.015: 0.875
CONDUIT TERMINATION
CONDUIT NOMINAL SIZE: 0.5"
SIZE CODE: 16
WRENCH FLATS +/- 0.015: 1.375
MIN ID: 0.436
CT-MATERIAL: 6061-T6 SERIES ALUMINUM
FINISH: ENTRACO TTH PLATING
FOB: Destination
MILSTRIP: N3225361662702
MFR PART NR: AX0737-2416-CT
PC NR: EM580
PURCHASE REQUEST NUMBER: N3225361662702
Section C - Descriptions and Specifications
MERCURY EXCLUSION CLAUSE FOR MERCURY FREE PROCUREMENT ( LC-2, JAN 2013)
1. Mercury or mercury compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Supplier shall certify that all items furnished under this contract are free of mercury or mercury compounds.
Section D - Packaging and Marking
PROHIBITED PACKING MATERIALS
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use.
EUROPEAN UNION RESTRICTIONS REGARDING NONMANUFACTURED WOOD PACKAGING
AND PALLETS
All European shipments with wood pallets and wood containers produced of nonmanufactured wood shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) material and certified by an accredited agency recognized by the American Lumber Standards Committee (ALSC) in accordance with Nonmanufactured Wood Packing Policy and Nonmanufactured Wood Packing Enforcement Regulations dated May 30, 2001.
Reference:
http://www.aphis.usda.gov/ppq/swp/eunmwp.html for information and material sources
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0001AA Destination Government Destination Government 0001AB Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0004AA Destination Government Destination Government 0004AB Destination Government Destination Government 0005 Destination Government Destination Government
CLAUSES INCORPORATED BY FULL TEXT
SOURCE INSPECTION IS REQUIRED ( LC-2, JAN 2013)
SOURCE INSPECTION by the Defense Contract Management Agency (DCMA) is required. Delegate Source Inspection to DCMA-NSEO (DODAAC S4306A).
Inspection of the supplies to be furnished hereunder shall be made at ______________________
Acceptance shall be at destination by the receiving activity.
NOTIFICATION OF INSPECTION: The cognizant inspector shall be notified by the contractor (or his supplier) when the supplies are or will be ready for inspection. The place or places designated for such actions may not be changed without the authorization of the Contracting Officer.
The following clause is hereby incorporated by reference:
FAR 52.246-2 Inspection of Supplies--Fixed Price (AUG 1996)
MATERIAL INSPECTION AND RECEIVING REPORT (DFARS 252.246-7000) (MAR 2008):
(a) At the time of each delivery of supplies or services under this contract, the Contractor shall prepare and furnish to the Government a material inspection and receiving report in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense FAR Supplement.
(b) Contractor submission of the material inspection and receiving information required by Appendix F of the Defense FAR Supplement by using the Wide Area Work Flow (WAWF) electronic form (see paragraph (b) of the clause at 252.232-7003) fulfills the requirement for a material inspection and receiving report (DD Form 250). Two copies of the receiving report (paper copies of either the DD Form 250 or the WAWF report) shall be distributed with the shipment, in accordance with Appendix F, Part 4, F-401, Table 1, of the Defense FAR Supplement.
CERTIFICATIONS REQUIRED WITH DELIVERY OF MATERIAL (CIM 2012-1)
All certifications are required to be delivered with the material. Payment on material for which certifications are not received will be withheld.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 09-DEC-2016 DLA DISTRIBUTION
MIKE WATTERS
RECEIVING DEPT, CODE Z0S
667 SAFEGUARD ST, BLDG 167
JBPPH HI 96860-5033
808-473-8000 X-4960
N32253
0001AA 09-DEC-2016 12 (SAME AS PREVIOUS LOCATION)
0001AB 09-DEC-2016 1 (SAME AS PREVIOUS LOCATION)
0002 09-DEC-2016 8 (SAME AS PREVIOUS LOCATION)
0003 09-DEC-2016 6 (SAME AS PREVIOUS LOCATION)
0004 09-DEC-2016 (SAME AS PREVIOUS LOCATION)
0004AA 09-DEC-2016 30 (SAME AS PREVIOUS LOCATION)
0004AB 09-DEC-2016 1 (SAME AS PREVIOUS LOCATION)
0005 09-DEC-2016 2 (SAME AS PREVIOUS LOCATION)
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management JUL 2013 52.204-13 System for Award Management Maintenance JUL 2013 52.204-16 Commercial and Government Entity Code Reporting JUL 2015 52.204-18 Commercial and Government Entity Code Maintenance JUL 2015 52.211-14 Notice Of Priority Rating For National Defense, Emergency
Preparedness, and Energy Program Use
APR 2008
52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.225-18 Place of Manufacture MAR 2015 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.243-1 Changes--Fixed Price AUG 1987 52.249-1 Termination For Convenience Of The Government (Fixed
Price) (Short Form)
APR 1984
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7007 Alternate A, Annual Representations and Certifications JAN 2015 252.211-7005 Substitutions for Military or Federal Specifications and
Standards
NOV 2005
252.225-7001 Buy American And Balance Of Payments Program-- Basic (Nov 2014)
NOV 2014
252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.246-7003 Notification of Potential Safety Issues JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2016)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 332710.
(2) The small business size standard is 500.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(v) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.
(vi) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(vii) 52.209-11, Representation by Corporations Regarding elinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(viii) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(ix) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(x) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(xi) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xiii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xiv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xvi) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.
(xvii) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xviii) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $77,533, the provision with its Alternate II applies.
(D) If the acquisition value is $77,533 or more but is less than $100,000, the provision with its Alternate III applies.
(xix) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xx) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xxi) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.
(xxii) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
(i) 52.204-17, Ownership or Control of Offeror.
(ii) 52.204-20, Predecessor of Offeror.
(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.
(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.
(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).
(vii) 52.227-6, Royalty Information.
(A) Basic.
(B) Alternate I.
(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
(End of provision)
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(a) The Contractor shall test 1 unit(s) of Lot/Item 0001AA and Lot/Item 0004AA as specified in this contract. At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within 30 calendar days from the date of this contract to nanette.phillips@dla.mil marked "FIRST ARTICLE TEST REPORT: Contract No. 0001AA and Lot/item 0004AA.” Within 15 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph
(b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
(End of clause)
52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
(a) Definitions.
As used in this clause--
New means composed of previously unused components, whether manufactured from virgin material, recovered material in the form of raw material, or materials and by-products generated from, and reused within, an original manufacturing process; provided that the supplies meet contract requirements, including but not limited to, performance, reliability, and life expectancy.
Reconditioned means restored to the original normal operating condition by readjustments and material replacement.
Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
Remanufactured means factory rebuilt to original specifications.
Virgin material means--
(1) Previously unused raw material, including previously unused copper, aluminum, lead, zinc, iron, other metal or metal ore; or
(2) Any undeveloped resource that is, or with new technology will become, a source of raw materials.
(b) Unless this contract otherwise requires virgin material or supplies composed of or manufactured from virgin material, the Contractor shall provide supplies that are new, reconditioned, or remanufactured, as defined in this clause.
(c) A proposal to provide unused former Government surplus property shall include a complete description of the material, the quantity, the name of the Government agency from which acquired, and the date of acquisition.
(d) A proposal to provide used, reconditioned, or remanufactured supplies shall include a detailed description of such supplies and shall be submitted to the Contracting Officer for approval.
(e) Used, reconditioned, or remanufactured supplies, or unused former Government surplus property, may be used in contract performance if the Contractor has proposed the use of such supplies, and the Contracting Officer has authorized their use.
52.215-5 FACSIMILE PROPOSALS (OCT 1997)
(a) Definition. Facsimile proposal, as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by the Government via facsimile machine.
(b) Offerors may submit facsimile proposals as responses to this solicitation. Facsimile proposals are subject to the same rules as paper proposals.
(c) The telephone number of receiving facsimile equipment is: 808.471.1030.
(d) If any portion of a facsimile proposal received by the Contracting Officer is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document--
(1) The Contracting Officer immediately shall notify the offeror and permit the offeror to resubmit the proposal;
(2) The method and time for resubmission shall be prescribed by the Contracting Officer after consultation with the offeror; and
(3) The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness, provided the offeror complies with the time and format requirements for resubmission prescribed by the Contracting Officer.
The Government reserves the right to make award solely on the facsimile proposal. However, if requested to do so by the Contracting Officer, the apparently successful offeror promptly shall submit the complete original signed proposal.
MANUFACTURING OR PRODUCTION INFORMATION
If offers are submitted which fail to provide the actual manufacturing/production source(s) for the item(s) offered, or, if such information is provided but restricted from disclosure (by the inclusion of the Federal Acquisition Regulation (FAR) clause 52.215-12 legend or any other proprietary or confidentiality restriction) such offers may be rejected as technically unacceptable. This provision does not apply to commercial items.
REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
(a) The Contractor shall remove or obliterate from a rejected end item and its packing and packaging, any marking, symbol, or other representation that the end item or any part of it has been produced or manufactured for the United States Government. Removal or obliteration shall be accomplished prior to any donation, sale, or disposal in commercial channels. The Contractor, in making disposition in commercial channels of rejected supplies, is responsible for compliance with requirements of the Federal Trade Commission Act (15 United States Code (U.S.C.) 45 et seq.) and the Federal Food, Drug and Cosmetic Act (21 U.S.C. 301 et seq.), as well as other Federal or State laws and regulations promulgated pursuant thereto.
(b) Unless otherwise authorized by the Contracting Officer, the Contractor is responsible for removal or obliteration of government identifications within 72 hours of rejection of nonconforming supplies including supplies manufactured for the Government but not offered or supplies transferred from the Government's account to the cold storage Contractor's account at origin or destination. (For product rejected at destination and returned to the Contractor's plant, the 72 hour period starts with the time of Contractor receipt of returned product). After removal or obliteration is accomplished and prior to disposition, the Contractor must notify the Government inspector.
REQUIREMENTS FOR TREATMENT OF WOOD PACKAGING MATERIAL (WPM)
(a) This clause only applies when wood packaging material (WPM) will be used to make shipments under this contract. and/or when WPM is being acquired under this contract.”
(b) Definition.
Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
(c) All wood packaging material (WPM) used to make shipments under Department of Defense (DOD) contracts and/or acquired by DOD must meet requirements of international standards for phytosanitary measures (ISPM) 15, “Guidelines for Regulating Wood Packaging Materials in International Trade.” DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, Incorporated (ALSC) wood packaging material program and WPM enforcement regulations (see http://www.alsc.org/).
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard.
Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved dunnage stamp.
(d) Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government."
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
FAR Clauses: http://acquisition.gov/far/ DFARS Clauses: http://www.acq.osd.mil/dpap/dars/dfarspgi/current/
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR Clauses: http://acquisition.gov/far/ DFARS Clauses: http://www.acq.osd.mil/dpap/dars/dfarspgi/current/
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
(a) Any data required to be submitted on a Standard or Optional Form prescribed by the Federal Acquisition Regulation (FAR) may be submitted on a computer generated version of the form, provided there is no change to the name, content, or sequence of the data elements on the form, and provided the form carries the Standard or Optional Form number and edition date.
(b) Unless prohibited by agency regulations, any data required to be submitted on an agency unique form prescribed by an agency supplement to the FAR may be submitted on a computer generated version of the form provided there is no change to the name, content, or sequence of the data elements on the form and provided the form carries the agency form number and edition date.
(b) If the Contractor submits a computer generated version of a form that is different than the required form, then the rights and obligations of the parties will be determined based on the content of the required form.
252.204-7002 PAYMENT FOR SUBLINE ITEMS NOT SEPARATELY PRICED (DEC 1991)
(a) If the schedule in this contract contains any contract subline items or exhibit subline items identified as not separately priced (NSP), it means that the unit price for that subline item is included in the unit price of another, related line or subline item.
(b) The Contractor shall not invoice the Government for any portion of a contract line item or exhibit line item which contains an NSP until --
(1) The Contractor has delivered the total quantity of all related contract subline items or exhibit subline items; and
(2) The Government has accepted them.
(c) This clause does not apply to technical data.
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
(a) 26 U.S.C. 6331(h) authorizes the Internal Revenue Service (IRS) to continuously levy up to 100 percent of contract payments, up to the amount of tax debt.
(b) When a levy is imposed on a payment under this contract and the Contractor believes that the levy may result in an inability to perform the contract, the Contractor shall promptly notify the Procuring Contracting Officer in writing, with a copy to the Administrative Contracting Officer, and shall provide--
(1) The total dollar amount of the levy;
(2) A statement that the Contractor believes that the levy may result in an inability to perform the contract, including rationale and adequate supporting documentation; and
(3) Advice as to whether the inability to perform may adversely affect national security, including rationale and adequate supporting documentation.
(c) DoD shall promptly review the Contractor's assessment, and the Procuring Contracting Officer shall provide a written notification to the Contractor including--
(1) A statement as to whether DoD agrees that the levy may result in an inability to perform the contract; and
(2)(i) If the levy may result in an inability to perform the contract and the lack of performance will adversely affect national security, the total amount of the monies collected that should be returned to the Contractor; or
(ii) If the levy may result in an inability to perform the contract but will not impact national security, a recommendation that the Contractor promptly notify the IRS to attempt to resolve the tax situation.
(d) Any DoD determination under this clause is not subject to appeal under the Contract Disputes Act.
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)
(a) At the time of each delivery of supplies or services under this contract, the Contractor shall prepare and furnish to the Government a material inspection and receiving report in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense FAR Supplement.
(b) Contractor submission of the material inspection and receiving information required by Appendix F of the Defense FAR Supplement by using the Wide Area WorkFlow (WAWF) electronic form (see paragraph (b) of the clause at 252.232-7003) fulfills the requirement for a material inspection and receiving report (DD Form 250). Two copies of the receiving report (paper copies of either the DD Form 250 or the WAWF report) shall be distributed with the shipment, in accordance with Appendix F, Part 4, F-401, Table 1, of the Defense FAR Supplement.
5252.215-9401 Evaluation Of First Article Testing (June 2003)
(d) Offerors are advised that the contract awarded as a result of this soliciation will require first article testing.
This requirement may be waived by the Contracting Officer when supplies identical or similar to those called for have previously been delivered by the offeror and accepted by the Government. Therefore, offerors can submit alternative offers, one including testing and approval and the other excluding testing and approval. If the Government waives the requirement for first article unit(s), test plans, testing and test report(s) for eligible offerors, the prices set forth in paragraph (g) will be used in evaluating offers. In addition, all provisions relating to first article testing will be deleted from the resulting contract.
(e) Offerors shall identify these identical or similar supplies by the contract number, agency, national stock number, contract award date, and contract delivery date.
CONTRACT AGENCY NSN CONTRACT CONTRACT
NUMBER AWARD DATE DELIVERY DATE
(c) ** The Government is responsible for first article testing under this contract. The cost to the Government of this testing will be a factor in the evaluation of offers, as it will be added to the offers requiring first article testing. The estimated cost of this testing is ** .
(d) The approved first article **** serves as a manufacturing standard.
(e) Earlier delivery, if required in case of waiver of first article, shall not e a factor in the evaluation for award.
(f) The prices for first articles and first article tests in relation to production quantities shall not be materially unbalanced, if first article test items or tests are to be separately priced.
(g) Unit price offered if First Article is waived: $___________
(End of Provision)
UNIT PRICES (JULY 2016)
Contractor’s unit prices, when incorporated into a Government contract, will be released under the Freedom of Information Act (FOIA) without further notice to the Contractor that submitted the prices. If the Contractor does not want his unit prices released, then he shall submit his proposal with the appropriate legends regarding the data, and explain in detail why such data cannot be released as a public record under FOIA.
REVIEW OF AGENCY PROTESTS
(a) The contracting activity, will process agency protests in accordance with the requirements set forth in FAR 33.103(d).
(b) Pursuant to FAR 33.103(d)(4), agency protests may be filed directly with the appropriate Reviewing Authority or a protester may appeal a decision rendered by a Contracting Officer to the Reviewing Authority.
(c) Agency procurement protests should clearly identify the initial adjudicating official, i.e., the “Contracting Officer” or “Reviewing Official”.
(d) Offerors should note this review of the Contracting Officer’s decision will not extend GAO’s timeliness requirements. Therefore, any subsequent protest to GAO must be filed within 10 days of knowledge of initial adverse agency action.
USE OF PAST PERFORMANCE INFORMATION RETRIEVAL SYSTEM – STATISTICAL
REPORTING (PPIRS-SR) IN PAST PERFORMANCE EVALUATION
(1) The offeror’s past performance shall be evaluated in accordance with FAR 13.106-2 or 15.305(a)(2), as applicable. This procurement is subject to Past Performance Information Retrieval System – Statistical Reporting (PPIRS-SR), authorized by the Department of Defense for use by participating activities during the acquisition of supplies and services.
(2) The purpose of the PPIRS-SR is to provide contracting personnel with quantifiable past performance information regarding delivery and quality, as collected from existing DoD reporting systems. PPIRS-SR uses the past performance data collected to classify each supplier’s performance by Federal Supply Class(es) or Service Code(s).
(3) Quality: The method used in PPIRS-SR to classify the quality of a supplier’s past performance is a comparison of quality records among all suppliers who have provided goods or services to the Federal Government which are categorized in the same Federal Supply Class or Service Class (FSC). Based on the comparison among suppliers in a specific FSC group, suppliers are classified by PPIRS-SR into a color rating that represents the supplier’s overall quality performance for that specific Federal Supply Class or Service Class. The following is a summarization of the PPIRS-SR classification colors:
1. Dark Blue: Top 5% of suppliers in FSC group*
2. Purple: Next 10% of suppliers in FSC group*
3. Green: Next 70% of suppliers in FSC group*
4. Yellow: Next 10% of suppliers in FSC group*
5. Red: Bottom 5% of suppliers in FSC group*
* If all supplier performance ratings for an entire FSC group are equal, all suppliers in that group will be classified Green.
(4) Delivery: Supplier delivery past performance is classified in PPIRS-SR by the supplier’s percentage of on time deliveries. On time deliveries are calculated using the number of line items delivered and a weighting factor which reflects the length of time a delivery was overdue.
(5) PPIRS-SR classifications are established monthly for each supplier and can be reviewed at http://www.ppirs.gov/. Suppliers are granted access to PPIRS-SR for their own classifications. Offerors are encouraged to review their own classifications as well as the PPIRS-SR reporting procedures and methodology detailed in the PPIRS-SR Procedures Manual and the PPIRS-SR User Guide available at http://www.ppirs.gov. The method to challenge a rating is also found on the identified website.
(6) Suppliers with no history in PPIRS-SR will be considered to have a neutral PPIRS-SR rating.
Section K - Representations, Certifications and Other Statements of Offerors
52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL
ITEMS) (JUN 2016).
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are ncorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
(ii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(iii) 52.222-26, Equal Opportunity (APR 2015) (E.O. 11246).
(iv) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(v) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(vi) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78 (19 U.S.C. 3805 note).
(2) Listed below are additional clauses that apply:
(i) 52.232-1, Payments (APR 1984).
(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).
(iii) 52.232-11, Extras (APR 1984).
(iv) 52.232-25, Prompt Payment (JUL 2013).
(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).
(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013).
(vii) 52.233-1, Disputes (MAY 2014).
(viii) 52.244-6, Subcontracts for Commercial Items (JUN 2016).
(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (MAR 2016) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia)).
(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:
(1) The clauses listed below implement provisions of law or Executive order:
(i)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .