This performance work statement outlines requirements for a non-personnel services contract to provide installation and training services for a new Agilent Technologies 8890 gas chromatograph with electron capture detector at Puget Sound Naval Shipyard in Bremerton, Washington. The contractor shall install one Agilent 8890 GC instrument according to the installation checklist, train analysts on its operation, and certify installation completion. Services shall be provided between award date and October 31, 2023. The contractor must furnish all required supplies, equipment, facilities and non-personal services except compressed gases which the government will provide.
Key deliverables include a completed installation checklist signed by the contractor and customer to certify satisfactory installation and training. Performance standards specify the checklist must be fully addressed with no deviations. Surveillance will verify contractor performance meets standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPMYM2-23-Q-1802 amendment 4.pdf | ||
| 23Q1802 Gas Chromatograph.pdf | ||
| Salient Characteristics for GC-ECD.doc | DOC document | |
| 23Q1802 Gas Chromatograph.pdf | ||
| CDRL MANUALS.pdf | ||
| CDRL WARRANTY.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACTIVITY: CODE 134
Place of Performance: PSNS & IMF Building 59
PERFORMANCE WORK STATEMENT (PWS)
PSNS & IMF LABORATORY DIVISION
NOTE TO OUR CUSTOMERS: THIS TEMPLATE MUST BE TAILORED FOR YOUR AGENCY
BY INCLUDING YOUR UNIQUE REQUIREMENTS, QUANTITIES FOR WORKLOAD,
SPECIFIC SURVEILLANCE TECHNIQUES, ETC. ANY QUESTIONS REGARDING THIS
TEMPLATE SHOULD BE ADDRESSED WITH YOUR ASSIGNED ACQUISITION TEAM.
GENERAL INFORMATION IS PRESENTED IN BLUE ITALICS WITH PARENTHESIS
BORDERS, WHILE FILL-IN GUIDANCE IS PRESENTED IN BLUE ITALICS WITH BRACKET
BORDERS. PLEASE DELETE ALL BLUE ITALICS WHEN FINALIZING THE PWS.
Part 1
General Information
1. GENERAL: This is a non-personnel services contract to provide installation of an Agilent Technologies 8890 gas chromatograph (GC-ECD) and equipment familiarization training to Code 134.1 personnel. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform 8890 GC-ECD installation and training as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: The laboratory division has purchased one 8890 GC-ECD from Agilent Technologies that requires installation and training.
1.3 Objectives:
Installation of one 8890 GC instrument, with ECD, and peripheral/support equipment.
Confirmation that the instrument functions per OEM criteria.
Train Code 134.1 analysts on features of the 8890 GC that have changed from the 7890 model.
1.4 Scope: The Agilent Technologies engineer will perform the installation and functionality checks identified on the attached “Agilent 8890 GC Installation Checklist.” The engineer will brief Code 134.1 analysts on the features of the 8890 GC that have been updated from the 7890 model. Attachment provided by Agilent Technologies - the revision may change between now and the installation/training date.
1.5 Period of Performance: The period of performance shall be from date of instrument purchase to
10/31/2023.
1.6 General Information
1.6.1 Quality Control: Not applicable.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day Juneteenth Day
1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0800 to 1600 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at Puget Sound Naval Shipyard, 1400 Farragut Ave, Building 59, Room 202, Bremerton, WA 98314.
1.6.6 Security Requirements: Contractor personnel performing work under this contract must have a [Insert the level of security required, if applicable] at time of the proposal submission, and must maintain the level of security required for the life of the contract.
1.6.6.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.6.2 Key Control. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.
1.6.6.2.1. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.
1.6.6.2.2. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked arey Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
1.6.7 Special Qualifications: Agilent engineer must be qualified to perform Agilent 8890 GC-ECD installation and training.
1.6.8 Post Award Conference/Periodic Progress Meetings: Not required.
1.6.9 Technical Point of Contact (TPOC):
Primary: Alternate:
Jacob Yeager Phillip Squier 360-476-8090 360-476-8090 Jacob.e.yeager@navy.mil phillip.squier@navy.mil
The TPOC(s) monitor all technical aspects of the contract and assists in contract administration. The TPOC is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance;
maintain written and oral communications with the Contractor concerning technical aspects of the contract;
issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel.
The TPOC(s) are NOT authorized to change any of the terms and conditions of this contract. If the contractor believes any Government Personnel has effectively issued a change resulting in a change in effort and price/cost of the contract, the Contractor shall immediately notify the Contracting Officer.
1.6.10 Key Personnel: The follow personnel are considered key personnel by the government: Dr.
Matthew Baehr – Code 134 Division Head, Jacob Yeager – Code 134.1 Branch Head and TPOC, Phillip Squier – Code 134.1 SME and alternate TPOC. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0720 to 1602, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
1.6.11 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor engineer will be required to obtain and wear a NAVSEA provided badge.
1.6.12 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.6.15 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: Not applicable.
3.2 Facilities: Not applicable.
3.3 Utilities: The Government will provide compressed gases for the installation of the Agilent 8890 GC- ECD. The Contractor shall instruct employees in utilities conservation practices.
3.4 Equipment: Not applicable.
3.5 Materials: Not applicable.
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
5. SPECIFIC TASKS:
5.1. Basic Services. The contractor shall perform the installation identified in the “Agilent 8890 GC Installation Checklist.” The contractor will familiarize Code 134.1 analysts with the new 8890 touchscreen interface and brief them on any other features that have been updated since the 7890 GC model.
5.2. Sequence of the installation and training will be per the attached “Agilent 8890 GC Installation Checklist.” Upon completion, the contractor engineer will complete the checklist certifying that installation and familiarization has been completed and sign for “Agilent Signature.” Laboratory personnel (either branch head or SME) will sign for “Customer Signature,” and a copy of the completed “Agilent 8890 GC Installation Checklist.” will be provided to the laboratory.
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS): Not applicable.
7. ATTACHMENT/TECHNICAL EXHIBIT LIST:
7.1. Technical Exhibit 1 – Performance Requirements Summary
7.2. Technical Exhibit 2 – Deliverables Schedule
7.3. Attachment 1 – Agilent 8890 GC Installation Checklist.
TECHNICAL EXHIBIT 1
Quality Assurance/Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required—usually a shall statement)
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
PRS # 1.
The contractor shall install one GC 8890 instrument with ECD, including support equipment, and train analysts on its use.
The contractor provided installation checklist must be followed.
All items on Analytical Installation Checklist must be addressed. “N/A” may apply to some items.
Completed “Agilent 8890 GC Installation Checklist.” for the installed 8890 GC- ECD.. The completed installation checklist will be signed off by either the SME, branch head, or COR.
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To
Agilent 8890 GC Installation Checklist.”
Once per instrument installation.
One total.
Once signed:
1 – Original provided to TPOC.
2 – Copies. One to vendor and one to
SME.
Printed or digital
PUGET SOUND NAVAL SHIPYARD
ATTN: JACOB YEAGER
1400 FARRAGUT AVE, BUILDING
59, CODE 134.1
BREMERTON, WA 98314