9197-3G53_cdrls.pdf
PDF 501 KB Posted
- Attached to
- SPMYM2-19-Q-2426 Federal contract opportunity
- Solicitation number
- SPMYM2-19-Q-2426
About this file
CDRLS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19-Q-2426_AMENDMENT_2.pdf | ||
| 19-Q-2426_AMENDMENT.pdf | ||
| 19-Q-2426.pdf | ||
| 9197-3G53_SPECIFICATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
C001
0005AC
CONTRACT DATA REQUIREMENTS LIST Form Approved
(1 Data Item) 0MB No. 0704-0188
Public reporting burden for this collection of Information is estimated to average 110 hours per response, including the time for reviewing Instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, inch.iding suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send comr.leted form to the Government issuing Contractlna Officer for the Contract/PR No. listed In Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY TBD
,op TM OTHER
D. SYSTEM/ITEM
I
E. CONTRACT/PR NO. F. CONTRACTOR
High Precision Wire EDM System (Project #955-322) TBD TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
N RTL Certification OSHA Safety Certification
4. AUTHORITY (Data Acquisition Document No.} I
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
TBD N/A PSNS & IMF. Banaor- C830E
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION
NO REQUIRED SUBMISSION See Block 16 SEE BLOCK 16 SEE BLOCK 16 b. COPIES
8. A.PPCODE N/R 11. AS OF DATE 13. DATE OF SUBSEQUENT A. ADDRESSEE Final
N/A SUBMISSION
N/A N/A Draft Rog Repr
16. REMARKS See Block 16
Block 3: The NRTL {Nationally Recognized Testing Laboratory) certification report 3 shall be in an appropriate format, but shall include all required items Included in content section (paragraph 2.2) on page two of this document. NRTL stickers shall be mounted on the High Precision Wire EDM System.
Blocks 10 & 12 & 14: The Contractor shall provide three copies of the certification report and one NRTL Sticker {mounted on the unit), prior to final acceptance.
TOTAL 3
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Carl Jaeckel 11 Jul 2019 Carl Jaeckel 11 Jul 2019
DD Form 1423-1, FEB 2001 previous edition may be used. Page _1 _ of _2_ Pages
17. Pl
18. E!
T(
0005AB
B
B001
CONTRACT DATA REQUIREMENTS LIST Form Approved
(1 Data Item) 0MB No. 0704-0188
Public reporting burden for this collection of information Is estimated to average 11D hours per response, including the time for reviewing ins tructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collectlon of lnfonnation, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN vour form to either of these address. Send comnleted form to the Government issuinn Contracting Officer for the Contract/PR No. Usted in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY TSO
TOP TM OTHER
D. SYSTEM/ITEM
I
E. CONTRACT/PR NO. F. CONTRACTOR
High Precision Wire EDM System (Project #955-322) TBD TBD
1, DATA ITEM NO.
2, TITLE OF DATA ITEM 3. SUBTITLE
Commercial Off-The-Shelf (COTS) Manuals Operator & Maintenance Manuals
4. AUTHORITY (Data Acquisition Document NoJ I
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
TBD NIA PSNS & IMF. Banaor - C830E
7. DD250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION
NO REQUIRED SUBMISSION See Block 16 SEE BLOCK 16 SEE BLOCK 16 b. COPIES
8. APP CODE NIR 11. AS OF DATE 13. DATE OF SUBSEQUENT A. ADDRESSEE
Final
NIA SUBMISSION
NIA NIA
Draft Rog Repr
16. REMARKS See Block 16
Block 3: The operator and maintenance manuals shall be in the Contractor's 3 format, but shall include all required items Included in content section {paragraph 2.2) on page two of this document.
Blocks 10 & 12 & 14: The Contractor shall provide three copies of the manuals, prior to final acceptance.
TOTAL 3
G. PREPARED BY H. DATE I. APPROVED BY J, DATE
Carl Jaeckel 11 Jul 2019 Carl Jaeckel 11 Jul 2019
DD Form 1423-1, FEB 2001 previous edition may be used. Page _1 _ of _2_ Pages
17. Pl
18. E:
T<
0005AA A
A001
File details come from the government source that posted it.