UPDATED_STATEMENT_OF_WORK_CLIN_0001.pdf

PDF 294 KB Posted

Attached to
SKID MOUNTED VACUUM Federal contract opportunity
Solicitation number
SPMYM219Q1698
Issued by
Defense Logistics Agency Land and Maritime

View the file

Other files for this federal contract opportunity

Other files attached to SKID MOUNTED VACUUM, newest first.
File Type Posted
UPDATED_STATEMENT_OF_WORK_CLIN_0002.pdf PDF
STATEMENT_OF_WORK_CLIN0001.pdf PDF
19-Q-1698.pdf PDF
STATEMENT_OF_WORK_CLIN0002.pdf PDF
CDRL.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specification for TRF Shop 51R, Bldg. 7052 Portable - Skid Mounted 30 Horsepower Vacuum System

Project #894-833 17 Jan 2019

1 SCOPE

This specification reflects those characteristics that are essential to the minimum needs of the government for an outdoor rated, portable, skid mounted, self-contained 30 Horsepower VACUUM System which will be located outside Bldg. 7052, SE location, and will support Shop 51R Small Military Fiberglass Repair & Abrasive Sanding Booth vacuum requirements. The scope of work shall include the “Turn-Key” installation, operational start-up, operational testing, and equipment training as specified herein. It is the government’s intent that a single (primary) contractor be awarded this contract and be responsible for the accomplishment of all work detailed by this specification.

2 APPLICABLE DOCUMENTS

The following documents form a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on the date of an invitation for bids or a request for proposals shall apply.

2.1 SAFETY REQUIREMENTS

Safety Requirements for the Trident Refit Facility (TRF), Naval Base Kitsap (NBK) Bangor Site

A copy of this document is attached to this specification (See Enclosure 1).

2.2 ADDITIONAL SAFETY REQUIREMENTS In addition to the safety requirements specified in Paragraph 2.1, the following is requisite:

2.2.1 The equipment and its component parts shall be in compliance with applicable CFR 29, Part 1910 Regulation and Standards. By definition, any equipment will be deemed acceptable and approved by PSNS&IMF if it meets specific OSHA conditions outlined in OSHA Part 1910; Subparts "O" and "S". Specifically, equipment will be "Accepted" by PSNS&IMF if it has been inspected and found by a Nationally Recognized Testing Laboratory (NRTL) to conform to specified plans or procedures of applicable codes. The equipment (as a whole system) shall be Nationally Recognized Testing Laboratory (NRTL) inspected and certified (by an OSHA authorized third party).

An NRTL certification report shall be provided. If the equipment type/model has already been NRTL inspected and certified, a certification report or documentation mounted on the equipment (which acknowledges it is NRTL certified) shall be provided.

2.3 PADEYES REQUIREMENTS

Industrial Process Instruction (IPI) for “Padeyes: Temporary and Permanent; Installation, Use and Removal of Trident Refit Facility

A copy of this document can be provided upon request.

2.4 CRANE/WEIGHT HANDLING EQUIPMENT REQUIREMENTS

Management of Weight Handling Equipment (December 2009) – NAVFAC P-307.

A copy of this document is available on-line at:

https://portal.navfac.navy.mil/portal/page/portal/docs/doc_store_pub/p-307%20december%202009.pdf’

2.5 ENVIRONMENTAL COMPLIANCE REQUIREMENTS

Environmental Compliance Requirements for TRF as specified by NAVFAC NBK Bangor, PRB41 Environmental Division.

2.6 GENERAL ENVIRONMENTAL REQUIREMENTS

2.6.1 Hazardous Material Control shall include the following:

2.6.1 Estimated Contractors Hazardous Material Inventory (CHMI) Table provides quantities of each hazardous material to be used on this project. Copies of all SDS's will be submitted to the Base Environmental Office (BEO), NAVFAC PRB41 Environmental Division, which is located at Bldg. 7001. All processed and accepted SDS information must be kept on site where the work is being performed.

2.6.1.2 Contractor shall not use Hazardous Material (HM) composed of any of the following chemicals or substances: Leads, chromium, mercury, phenols, trichloroethylene, chlorofluorocarbons, halon, PCBs, asbestos, silica sand (for use as blasting agent), Class I ODS, radioactive materials or instruments capable of producing ionizing radiation, and chemicals listed in 40 CFR 355.50 Appendix B.

2.6.1.3 If additional HM is required for this project, an SDS shall be submitted to the BEO for approval before the HM is brought on board Naval Base Kitsap Bangor. The contractor shall not bring on board Naval Base Kitsap Bangor any HM until approved by the BEO. All containers of hazardous material shall be resealed, placed in a secure area while on base, and transported off base for reuse of material at other contractor projects. The Contractor shall not generate any unnecessary contractor generated hazardous or dangerous waste on this project.

2.6.2 If hazardous or dangerous waste is to be generated via the project, Waste Control measures must be implemented and at a minimum must include the following:

2.6.2.1 A trained individual from the shop or contractor with a current Waste Originator certification must be present for each shift that hazardous waste is produced.

2.6.2.2 The shop or contractor shall submit completed NBK Bangor Waste Information Specification (WIS) forms for all waste, hazardous and non-hazardous, expected to be encountered during the course of this project. The BEO will provide final waste designation along with WIS instructions. If additional wastes are produced after this plan is approved, waste is encountered not identified, or changes occur to waste streams that have already been assigned a WIS number, a new or updated WIS's for each waste stream must be submitted to the BEO for designation.

2.6.2.3 A hazardous waste label must be affixed to the appropriate container upon the first addition of waste. If more than 55 gallons of Dangerous Waste (DW) or 1 quart of Extremely Hazardous Waste (EHW) is produced, the date must be filled in on the label. All containers must be under the control of the shop and located in the same area the waste is generated.

3 REQUIREMENTS:

3.1 ENVIRONMENTAL PERMITTING REQUIRMENTS. The new portable, skid mounted, self-contained 30 Horsepower VACUUM System shall be procured and put into operation in accordance with applicable federal, Washington State and Puget Sound Clean Air Agency (PSCAA) air quality regulations, including but not limited to 40 CFR 1039 (see paragraph 3.5.2) and PSCAA Regulation I, Article 6 – New Source Review. The contractor shall provide to the Government all necessary documentation to determine whether the portable, skid mounted, self-contained 30 Horsepower VACUUM System will require an air permit from PSCAA or a formal notification of intent to operate to PSCAA.

3.1.1 Upon contract award, the contractor shall provide to the government all pertinent portable, skid mounted, self-contained 30 Horsepower VACUUM System technical data to include brochures of the make and model of equipment being supplied, assembly sketches of the overall project design with critical dimensions, sketches (with dimensions) of equipment to be provided, vendor data regarding intake and exhaust filtration systems and ventilation filter and pre-filter capture efficiencies, design system intake and exhaust airflow (in cfm), design system intake and exhaust airflow ducting, and other technical information related to the design as necessary, for submittal (if deemed necessary) of the PSCAA Notice of Construction (NOC) permit application in accordance with PSCAA Regulation I, Section 6.03.

3.1.2 If required, the government will prepare and forward the permit application package to PSCAA for approval based on the contractor’s equipment design information. The government shall be responsible for associated permit application fees. Final design approval and construction work in accordance with this contract may not commence until final permit approval is received. Final project and equipment design shall include features as necessary to comply with federal, state, and local environmental regulations and the conditions of the approved permit.

3.2 GENERAL DESCRIPTION OF SYSTEM - This specification covers the minimum government requirements for a “Turn-Key” Outdoor Rated, Portable, Skid Mounted 30 Horsepower Vacuum System.

3.3 WORK INCLUDED - The Contractor shall be responsible for the following:

Design, manufacture, test and groom all equipment required to provide a complete system and in accordance with the requirements specified herein.

All shipping, crating, and rigging costs associated with the transport, delivery, unloading, and set-up of said equipment specified herein.

Complete documentation and organization of all technical data which applies to the operation, maintenance, repair and testing of the specific equipment.

Equipment truck delivery, unloading, movement and installation at designated TRF facility of the specified equipment with the features identified in this specification. This includes connection of the equipment to required available utilities. Provide start-up and operational testing of all said equipment.

Provide training to personnel on the proper operation, and repair & maintenance of said installed equipment and its component parts.

3.4 WORK NOT INCLUDED - The government/receiving activity will provide:

Air, electrical and other utilities services (within 50 feet) as required for the proper operation of the equipment unless otherwise stated herein.

3.5 CONDITIONS OF SERVICE AND PERFORMANCE - The following service and operational conditions shall apply to the equipment delivered under this specification.

3.5.1 Environmental Conditions – The specified system will operate in a heavy-duty industrial environment.

The system shall operate continuously 24-hours per day, seven (7) days per week, for a four (4) month period with the only maintenance required being replacement of the dust collector filters. Additionally, the equipment will be operated in a salt and dust laden outdoor marine industrial environment, subject to high winds, driven rain, sleet and snow, and shall be capable of continuous operation over an extended period of time with and with minimal maintenance and upkeep.

3.5.2 Lifting and Handling - The specified equipment shall be equipped with four gross weight lifting pads, mounted on the top of the unit, correctly spaced for even and level lifting by a single crane hook. The base of the equipment shall also have continuous full length forklift slots/tubes (in both directions, front to back and side to side) for handling the unit with a forklift truck. The forklift slots/tubes shall be 4” tall x 12” wide (to allow a large forklift to transport the container/locker), and have a 3’ separation (between the forklift slots/tubes).

3.5.3 Electrical - The proposed system shall not require more than 60 AMPS (48 Amps computed FLA) of 480 VAC, 3-phase, 60 Hz electrical power, in its fully configured and operational state. Installation may require a step-down transform (to be provided and installed by the contractor)

3.5.4 Compressed Air - Compressed air available for air-actuated mechanisms is 90 pounds per square inch gage and 100 cubic feet per minute (nominal), and air source is available within 50 feet of new equipment installation location. If the proposed system requires more air than indicated above, the excess capacity shall be provided as part of the equipment. Any proposed compressed air system shall include a regulator(s) and a filter(s) with an automatic drain.

3.5.5 Emissions – If any emissions are projected to be generated by this equipment package, then the contractor and his subcontractors must submit all known and/or requested information to NAVFAC PRB41 Air Program

Manager who is located at NBK Bangor, Bldg. 7001, for regulatory evaluation, consideration, and action prior to initiating any equipment installation at NBK Bangor.

3.6 GENERAL EQUIPMENT REQUIREMENTS:

3.6.1 Standard, Off The Shelf Components - All materials and parts comprising the system shall be new, of current design and manufacture, and shall not have been in prior service except as required for factory testing.

Standard, off the shelf components with proven reliability shall be used wherever possible to increase performance reliability and reduce costs. The system components shall be one of the manufacturer’s current production models which, on the day this solicitation is issued, has been designed, engineered and sold, or is being offered for sale through advertisements or manufacturer’s published catalogs or brochures. System components such as a prototype unit, pre-production model, or experimental unit DO NOT qualify as meeting this requirement. The system shall be complete, so that when connected to the utilities identified herein, it can be used for the function for which it is designed and constructed.

3.6.2 Painting - All surfaces shall be painted in conformance with the manufacturer’s standard practices and good workmanship. Painting shall result in a highly wear-resistant finish, which guarantees continued protection to the surfaces covered against the specified environment under all service conditions. The manufacturer’s standard color shall be provided. Lead base or chromium base paints are prohibited.

3.6.2.1 Interior (excluding silencer interior) and exterior surfaces of all components shall be either hot dip galvanized or blasted and painted with federal standard green (14187) in accordance with the following requirements:

(A) Components shall be prepared and coated prior to final assembly.

(B) The exterior of all enclosures and components shall be primed and painted unless they are fabricated of stainless steel, fiberglass, plastic, or carbon steel hot dip galvanized per ASTM A 123.

(C) Coatings shall be applied in accordance with the manufacturer’s instructions.

3.6.2.2 Preparation:

(A) Prior to galvanizing or blasting, weld spatter and other surface imperfections shall be removed by grinding.

(B) Components to be coated shall be cleaned to SSPC-SP1 (solvent cleaning) prior to abrasive blasting. This step assures the removal of oil, salt, and other surface contamination which can prevent proper paint adhesion in spite of subsequent abrasive blasting.

(C) All sides of components shall be abrasive blasted to SSPC-SP10, (Steel Structures Painting Council-Surface Preparation Standard number 10, “Near White Blast”), with a surface profile of 1.5 to 2.5 mils.

3.6.2.3 External carbon steel components which conduct airflow, (for example ducts, hoppers, filter housing, plenums, transitions, silencers, and other air-moving components shall be prepared and either hot dip galvanized or primed with an inorganic zinc paint and top-coated High Solids Epoxy Coating (such as Devoe-Devran 224HS) with a dry film thickness of 5 to 8 mils.

3.6.2.4 Steel structure, (for example rigging structure, sub-foundation for the fan, deck plates, stiffeners & braces, equipment mounts & supports, access platforms, and other mechanical components). Either hot dip galvanized per ASTM A123 or primed with inorganic zinc paint and painted with a dry film thickness of 5 to 8 mils.

3.6.3 Caution - Warning Plates – Corrosion and UV resistant “Caution” or “Warning” plates shall be securely attached to system components in visible locations, with any safety precautions to be observed by the operator or maintenance personnel permanently marked on the plates.

3.6.4 Identification Plate - Corrosion and UV resistant identification plate shall be furnished with the system. A nameplate shall be affixed to each major component of the system showing the manufacturer’s name, equipment model, year of manufacture, and any other pertinent information for identifying the part as a unique component of the system.

3.6.5 Emergency Stop Button - The equipment specified herein shall each be provided with an emergency stop button at the operator’s station. Replace any existing emergency stop button. This emergency stop button shall be the mushroom type, shall be colored red, shall be labeled as such, and shall be located where it is logistically & easily accessible location inside the operator’s station. The emergency stop button will be enclosed in a clear dust-proof and impact-proof protective enclosure, and the operator will have easy emergency stop button assembly access for maintenance, repair, and/or replacement. When activated, the emergency stop button shall disconnect all electrical power to the equipment such that the all operations or functions will immediately stop or cease. If the machine utilizes a Programmable Logic Controller (PLC), a “pad lockable” emergency stop button shall be installed (instead of a regular emergency stop button).

3.6.6 All Electrical Components including motors, starters, relays, switches, and wiring shall conform to and be located in accordance with the applicable NFPA, NEMA, and ANSI standards for the intended application.

3.6.7 Motors - The electric fan motor shall be 100 HP (minimum) with soft start, Totally Enclosed Fan Cooled and UL approved, 1800 RPM, 480 VAC (±5%), 3 phase, 60 Hz with a service factor of 1.15. Severe Duty per IEEE 841-2009, IEEE Standard for Petroleum and Chemical Industry—Premium-Efficiency, Severe-Duty, Totally Enclosed Fan-Cooled (TEFC) Squirrel Cage Induction Motors—. Motor shall meet NEMA-MG 1.

3.6.8 Power Disconnect Box - A new lockable (that can be locked out) power disconnect box, shall be provided and installed on the equipment. The disconnect box (if applicable) shall have a proper sized (i.e. following the NEC, etc.) fused device, that shall protect the machine from a power surge, etc.). Disconnect box shall be within 50 feet and visible from the equipment.

3.6.9 Programmable Logic Controller - The unit shall be manually operated via selector switches located at the operator's work station, utilizing a Programmable Logic Controller (PLC). The system shall be designed to use push buttons and/or switches, touch screen or keyboard control is unacceptable. The PLC shall have memory retention to prevent loss of programming during power outages. A means to directly address the PLC to reassign functions to spare channels in case of a channel failure in a PLC shall be provided.

3.6.10 Audible Noise Level- During normal operation, the dust collector assembly shall not produce noise levels greater than 84 dB (A) as measured on the “A” scale and 84 dB(C) as measured on the “C’ scale, at any point three feet from the unit of standard sound level meter as slow response per 29 CFR 1910.95, Occupational Noise Exposure Standard, paragraph 4.1.1, for noise level testing.

3.6.11 Sanding Debris- All (99.9% +) sanding debris will be readily and thoroughly captured via said vacuum system.

3.7 EQUIPMENT TO BE PROVIDED – Install one (1) outdoor rated, portable, skid mounted, 30 HP Horsepower Vacuum System, such as the Industrial Vacuum Equipment Corp. Hurricane Model 300S-59-30HP-SP, or equal, to include the following minimum features:

3.7.1 Both, the power vacuum unit with sound attenuation package and the cyclone-baghouse-filter unit must be skid mounted as a single skid mounted portable outdoor unit which will have four (4) - way fork pockets for both the power unit (lower base location) and for the bag house assembly.

3.7.2 Since operation and installation space is very limited, the single skid with the power vacuum unit and the baghouse unit must not exceed 58 inch (W), 156 inch (L), and 136 inch (H).

3.7.3 Maximum weight shall not exceed the following: Vacuum system skid - 4,500lbs; as total system on a single skid.

3.7.4 Positive Displacement Blower - The blower shall be of the electric powered rotary positive displacement type (i.e. Belt driven “ROOTS 59 URAI Blower”, or equivalent, and have the following characteristics:

3.7.4.1 The blower shall operate at a free air capacity of 850 ACFM (minimum air volume).

3.7.4.2 The blower shall operate at 850 CFM (minimum) at 15 inches HG with 30 brake horsepower at this flow and pressure.

3.7.4.3 The blower shall be designed for continuous operation, and incorporate provisions to protect blower from overheating. The system shall not require water for cooling or for vacuum operation.

3.7.4.4 Shall operate under the negative pressure condition of 15" HG.

3.7.4.5 Blower shall not overheat when the unit is dead headed.

3.7.4.6 Safety Valve located at the vacuum pump to protect from surpassing 15” Hg.

3.7.4.7 Vacuum gage is required.

3.7.4.8 The vacuum blower shall operate at a minimum of 2,500 rpm and a maximum of 2,800 rpm.

3.7.4.9 The blower assembly/ power unit package/ sound attenuation skid mounted system will have a 4-inch hose connection, and a power unit cover with a vented ridge cap will be provide as part of this specific portable skid mounted unit

3.7.4.10 The electric motor-blower belt guard will have easy belt inspection access wither via a hinged door, or a sliding inspection door.

3.7.4.11 A outdoor rated sound attenuation package with four inspection doors shall be provided as part of the power-skid package.

3.7.5 Baghouse/Cyclone Separator - The baghouse/cyclone skid shall provide adequate bracing and support to permit placing the entire assembly on uneven surfaces without causing equipment damage, distortion or overstress.

The base and associated framework shall be gusseted and cross-braced as necessary to withstand the stresses, vibration and shock associated with rough handling and transport of the unit by overhead crane or flat-bed truck over rough surfaces. The dust collection system will be rated as a 100% outdoor unit and it shall be a 3stage system (cyclone separator, primary filtration and secondary filtration), which have the following characteristics:

3.7.5.1 The baghouse/cyclone separator shall be fabricated of minimum 11-gauge steel and lined with abrasion resistant easily removable steel wear plates and be capable of operating under the negative pressure condition of 15 inches HG (operating pressure).

3.7.5.2 Inlet flanged to the baghouse/cyclone separator connection shall be compatible with 4” I.D. vacuum recovery hose.

3.7.5.3 The inlet into the baghouse/cyclone separator shall have replaceable wear plates.

3.7.5.4 The baghouse/cyclone separator shall be fitted with a discharge. The material entering the cyclone spins out and decelerates and falls out of the air stream and is collected in the discharge cone.

3.7.5.5 The baghouse/cyclone separator hopper shall be equipped with gravity style dump door.

3.7.5.6 The baghouse/cyclone separator housing shall include an access door for easy cleanout. When the cone is full or when the operator wants to discharge the collected waste debris material, the operator must position a drum under the drum lid and under the slide gate discharge valve. The slide gate discharge valve and assembly is designed in such a manner as to it can be pulled open and the material falls into the drum. Afterwards, in order to initiate the waste debris collection process again, the operator must close the slide gate discharge valve in order to initiate waste debris collection. The waste debris collection process is repeated until the drum is full and is ready to be removed from underneath the cyclone separator hopper location.

3.7.5.7 The baghouse/cyclone separator shall have a removable lid for ease of access of filters. No forklift shall be required to open the lid.

3.7.5.8 The cyclone separator shall be designed to remove heavy particles from the airstream.

3.7.5.9 The primary filter system shall have a minimum of 12 - 5” outside diameter by 28” long Teflon coated filter bags - Bags should be snap-in style.

3.7.5.10 The primary filters shall be HEPA designated filters and remove 99.9% of the dust in the air stream.

3.7.5.11 The primary filters shall be cleaned with reverse pulse air cleaning system. Air supplied by the Navy will be available within 50 feet of the proposed equipment installation location.

3.7.5.11.1The air cleaning system shall include automatic, adjustable, solid state filter cleaning controls. Solenoid operated diaphragm valves shall sequentially introduce compressed air pulses into the filter bank. Cleaning air manifold, diaphragm valves, and pulse cleaning nozzle piping shall be factory assembled.

3.7.5.11.2 Pressure regulator to a single point connection shall be provided to operate the cleaning system.

3.7.5.12 A secondary pleated cartridge safety filter shall be installed with a high efficiency filter with a MERV rating of 13 or greater.

3.7.5.13 The filtration system shall provide an air-to-cloth ratio (ACR) at free air capacity of 2.50 to 1 actual cubic feet per minute (ACFM) air flow per square feet of filter media or greater ratio.

3.7.5.14 The primary filter and the secondary filter shall each have an aneroid gage (i.e. Magnehelic) to monitor differential pressure across the filter.

3.7.5.15 A locking valve must be provided on the bottom of the baghouse in order to prevent any spillage.

3.7.5.16 A 12 inch by 16-inch rectangular chute with a square flange will be located at the lower location of the baghouse unit.

3.7.5. 17 There will be minimum penetrations to Bldg. 7052 SE location, and any Bldg. 7052 penetration area shall be sealed to prevent rain water from entering either the sanding booth or the sanding booth exterior facility enclosure. All penetrations will be properly sealed to prevent sanding debris from escaping the Bldg. 7052 sanding area.

3.7.5.18 The vacuum system will have a minimum of two vacuum pick-up points inside the sanding area and as identified by TRF Shop 51R supervisor or his designee. Additionally, a minimum of one pick-up points exterior of the sanding area and facing to the adjacent work room. The vacuum system lines will consist of a minimum of 2 1/2-inch flexible vacuum lines and their respective 2 1/2-inch mechanical isolation valves at all split vacuum pick-up line location. At a minimum, 2 1/2-inch vacuum hard lines will be installed at all facility-sanding area penetration locations. A minimum of 20 feet of flexible 2 1/2-inch will be provided which can easily be moved throughout the inside the sanding area/room, and can reach inside the adjacent room for vacuum purposes.

3.7.6 30 HP Vacuum Motor:

3.7.6.1 Motor - The electric fan motor shall be 30 HP, Totally Enclosed Fan Cooled and UL approved, 1,800 RPM, 480 VAC (±5%), 3 phase, 60 Hz with a service factor of 1.15. Premium-Efficiency, Severe-Duty, Totally Enclosed Fan-Cooled (TEFC) Squirrel Cage Induction Motors—. Motor shall meet NEMA-MG 1. Motor and belt assemblies will have easy accessible inspection covers hinged or removable in order to routinely inspect belts and motor assembly.

3.7.6.2 Bearings shall be greasable without disassembly of fans or fan covers and shall contain a reservoir equipped with outlet plugs that extend beyond the fan cover for elimination of purged grease.

3.7.7 Main Control Soft Start Panel shall include:

3.7.7.1 A NEMA 4X, stainless steel, heavy duty soft start panel with lockable handle, dust and watertight and shall house all controls for the vacuum system.

3.7.7.2 The soft start control panel will come with its own stand and not be mounted to the power unit.

3.7.7.3 All push buttons and pilot lights for all components in the system.

3.7.7.4 An Emergency Vacuum System Stop interphase will be wired into the existing sanding booth emergency stop button circuit. The emergency stop button and electrical circuit is located on & inside, respectively, of the sanding booth and a primary control panel (main equipment control panel). The requested functional “Emergency Stop Button” is a mushroom type, is colored red, and is labeled as such, and shall be located where it is logistically & easily accessible location inside the operator’s station. The emergency stop button will be enclosed in a clear dust-proof and impact-proof protective enclosure, and the operator will have easy emergency stop button assembly access for maintenance, repair, and/or replacement of said system. When activated, the emergency stop button shall disconnect all electrical power to the equipment such that the all operations or functions will immediately stop or cease.

3.7.7.5 Operator controls, instrumentation and indicators shall be mounted on the control panel. Devices shall be clearly and legibly marked for function and identification. Controls shall be fitted with suitable handles, pushbuttons, or control knobs, as applicable.

3.7.7.6 A timer circuit for automatic reverse pulse cleaning of the dust collector filters.

3.7.7.7 An hour meter, displayed on the exterior of the panel, to indicate cumulative blower run time.

3.7.7.8 A single point, 3-phase connection of power supply to operate the system.

3.7.8 Vacuum Skid & Frame:

3.7.8.1 The Vacuum skid shall provide adequate bracing and support to permit placing the entire assembly on uneven surfaces without causing equipment damage, distortion or overstress. The base and associated framework shall be gusseted and cross-braced as necessary to withstand the stresses, vibration and shock associated with rough handling and transport of the unit by overhead crane or flat-bed truck over rough surfaces. When in use, the Vacuum skid system will be secured to the ground via ground fasteners in order to stabilize the fully assembled Vacuum system.

3.7.8.2 The Vacuum skid and baghouse assembly shall have four (4) way fork pockets.

3.7.8.3 The vacuum skid shall be lifted with four lifting attachments with an overhead crane without a spreader bar attachment.

3.7.8.4 Certified, gross weight lifting pad eyes for lifting with a crane.

3.7.9 Deteriorated sections (i.e. elbows) of the existing vacuum system internal hose piping shall be replaced.

3.8 CONTRACTOR INSTALLATION/ DEMOLITION AND SET-UP SERVICES TO BE PROVIDED

- The specified equipment and all associated equipment shall be assembled, installed, set-up and tested by the contractor in the area(s) designated as its functional work area by the Receiving Activity Point of Contact. The contractor shall provide all personnel, and supplies necessary for the complete installation and set-up of the proposed system (except as noted elsewhere in this specifications).

3.8.1 Demolition, removal and disposal of the existing remaining vacuum system. This includes disconnecting existing utilities (i.e. electrical and exhaust), and all other items required to remove the existing vacuum system.

The contractor shall properly dispose (via recycling, etc.) of the existing vacuum system (and non-hazardous) demolition materials.

3.8.2 Installation of the new vacuum system. This includes connecting available utilities (i.e. electrical and exhaust), other utilities work, and other work required to properly install the vacuum system. This includes running approximately 100 ft. +/- 10% of proper sized conduit and wiring, from an existing power panel (located on the exterior of the northeast side of the building), to the new equipment location. This also includes (if required) providing and installing new appropriate sized breaker(s), as well as removing an existing breaker(s)/spacer(s).

Utilities installation shall include the contractor requesting each necessary utility outage(s). The contractor shall complete and submit an outage request form (for each utility outage), and pay a nominal outage fee (for each outage) to the local base operating contractor (who will secure/re-energize the utility source). Installation also includes properly mounting the vacuum system to the existing concrete pad (with anchor bolts).

3.8.1 Coordination - The Contractor shall contact the Receiving Activity Point of Contact with a proposed installation schedule (at least one week before the installation starts). The installation schedule shall be subject to review and approval of the Receiving Activity Point of Contact. Approval of installation schedule shall not relieve the Contractor of any responsibility for performance in accordance with the contract. The Contractor shall coordinate the site preparation and the delivery of materials in a manner which causes minimum disruption/interference with the activity’s normal business routine.

3.8.2 Work Process - The Contractor shall provide a field supervisor to direct set up and testing. The field supervisor shall have full authority to implement his field decisions in an expeditious manner. No work shall be accomplished when the field supervisor is not in the immediate work area.

3.8.3 Methods and Schedules - The work shall be executed in a manner and at such times as to cause the least practicable disturbance to the occupants of the pier/dry-dock/buildings and normal activities of the activity. Before starting any work, the sequence of operations and methods of conducting the work shall have been reviewed and approved by the activity.

3.8.4 Lifting And Rigger Services - The contractor shall provide all material handling equipment necessary to unload the specified equipment, transport it to the installation site and any other equipment (such as forklifts, man-lifts, etc.) necessary for continuous support of the removal, transportation and installation of the specified equipment, and shall provide qualified personnel to operate it by the contractor. No cranes (if possible) shall be used (or forklifts used as a crane).

3.8.5 Contractor Site Visit - The contractor shall make a site visit to the facility prior to submitting a bid. This shall include viewing the existing facility, utilities, etc. The contractor shall have a complete understanding of the requirements for the installation of the specified equipment (prior to bidding on this project).

3.8.6 Exterior Vacuum System Component(s) Placement – The contractor shall mount the required exterior vacuum system component(s) between other existing equipment located on-site. The new exterior vacuum system component(s) can utilize the area currently painted with yellow caution lines.

3.9 INSTALLATION SUPPORT SERVICES PROVIDED BY THE GOVERNMENT - The activity will provide the following in support of the installation:

3.9.1 Receiving Activity Point Of Contact - Upon contract award, the receiving activity (Puget Sound Naval Shipyard & Intermediate Maintenance Facility, at Bangor) shall designate a Receiving Activity Point of Contact who shall be responsible for appropriate surveillance and coordination of all services to be performed under this contract. The Receiving Activity Point of Contact shall serve as the contractor’s primary contact for all interaction with Government activities.

3.9.2 Utilities - Reasonable amounts of water, shop air (80-90 psi) and electricity shall be made available adjacent (within 50 feet) to the assembly site at no cost to the contractor (for temporary use during the installation of the specified equipment). The Contractor shall be responsible for any costs incurred in connecting, converting and transferring the utilities to the work site.

3.9.3 Storage - Lay-down area will be provided within the vicinity of installation site for storage of Contractor materials and tools. The Government does not accept responsibility for security of Contractor’s materials or tools.

The area must be kept clean and orderly, free of rags, paper and other debris. Failure to maintain area in a clean condition may result in the loss of the area. The Contractor shall be responsible to restore the storage area to original condition after use.

3.9.5 Disposal Of Waste – Trident Refit Facility is the owner of all waste (hazardous or otherwise) generated within its facilities. This includes waste generated by contractor personnel while working at Puget Sound Naval Shipyard and Intermediate Maintenance Facility. All waste generated by this contract shall be turned over to the activity for disposal prior to the end of the work shift.

3.9.6 Start-Up Supplies – The contractor shall be required to furnish start-up/consumable supplies for the specified equipment.

3.10 ON-SITE PERSONNEL TRAINING SERVICES TO BE PROVIDED - Within five (5) working days after satisfactory completion of acceptance testing of the system, the services of a qualified representative(s) shall be provided for specialized training to familiarize receiving activity personnel with the equipment and to help ensure reliable performance and maximum service life, during normal usage. All training shall be provided by a factory authorized distributer. Training services shall be rendered at Puget Sound Naval Shipyard and Intermediate Maintenance, Bangor Site Facility. Training shall be scheduled by mutual agreement between the Contractor and the Receiving Activity Point of Contact. Two (2) weeks prior to the start of any training, the contractor shall provide a course outline for government review and comment. Training sessions shall be provided separately for each group/type of government personnel. The contractor shall provide all training manuals and guides. The government shall provide classroom space in close proximity to the equipment/shop (if needed). The entire contractor cost of providing the training (including travel, per diem, etc.) shall be covered by this contract. The training shall apply to personnel as follows:

3.10.1 Operator Personnel – Training shall be provided for personnel for a total period of 6 hours, two shifts, as a minimum. This training shall include preparation of equipment for operation and actual, safe operation of the equipment.

3.10.2 Maintenance Personnel (Mechanical/Pneumatic) - Training shall be provided for personnel at a journeyman mechanic level for a period of 3 hours minimum. This training shall include trouble-shooting and methods of correction if the equipment malfunctions, with particular emphasis on minimizing equipment down time.

3.10.3 Maintenance Personnel (Electrical/Electronic) - Training shall be provided for personnel at a journeyman mechanic level for a period of 2 hours minimum. This training, with respect to equipment/controls/drives/interface units and related components, shall include trouble-shooting and methods of correction should equipment malfunction, with emphasis on minimizing equipment down time

3.11 CONTRACTOR PROVIDED DESIGN - The designated equipment shall be “continuous outdoor rated” and shall be designed by a qualified engineer. It shall be designed to withstand salt and a dust laden outdoor marine industrial environment, subject to high winds, driven rain, sleet and snow. The design drawings shall have sufficient details for proper evaluation by the government. Allow for 14 calendar days for review by the government of the submittal. No fabrication or manufacturing shall commence until the design is approved and comments addressed.

3.12 LOAD TEST OF LIFTING PADS EYES AND NON-DESTRUCTIVE TEST OF LOAD BEARING

WELDS - The contractor shall perform these tests prior to shipping the equipment to the government. Each lifting pad eye, while attached to the top of the specified equipment shall undergo a load test for a minimum of 10 minutes without damage or deformation. The magnitude of the load test shall be based on a 200-210% increase above the “design load”. Acceptance shall be based on no visible damage or permanent distortion following the proof test.

Damage and permanent distortion is defined as cracks, tears, mushrooming of load-bearing areas, bent or twisted pads or structure etc. On each lifting pad eye (or immediately adjacent to it) the lifting pad design load, 200% test load and test date shall be stencil or labeled in 1-inch high letters. A Non-Destructive Test shall be made on each of the lifting pads (after the load test if each lifting pad is performed). This shall include magnetic particle or liquid penetrant examination of the load bearing welds and lifting pads. Welds and materials shall meet the acceptance criteria in Mil-Std-2035A Class 1. All “design load” calculations shall be based on the maximum weight including the specified equipment.

3.13 TECHNICAL DATA TO BE PROVIDED

3.13.1 Operator / Maintenance / Repair Manuals - The equipment shall be furnished with three (3) hard copies of the manufacturer’s standard Operation, Maintenance, and Repair Manual(s), bound in durable three ring binder(s). The manuals shall include all mechanical and electrical schematics showing discrete components/block diagrams/wiring diagrams with inputs and outputs identified/system electrical interface documents and drawings for the specific model of all machine equipment/drives/controls supplied. The information contained in the manual(s) shall reflect the unit and its components in the “as built” configuration. The information contained in the manual(s) shall be adequate to permit trouble shooting and repair of the equipment by journeymen level personnel. The information contained in the manual(s) shall be in the English language. The information contained in the manual(s) shall be in imperial units of measure.

3.13.2 NRTL Certification Report - As outlined in paragraph 2.2.1

3.13.3 Lifting Pad Certification and Non-Destructive (NDT) Report - Concurrent with delivery of the equipment, the contractor shall provide a signed, written certification of compliance to the lifting pad and NDT testing requirements as outlined in this specification. The Lifting Pad Certification statement shall include that all lifting pads have been designed in accordance with design criteria and that each lifting pad has successfully passed a 200-210% load test. The NDT report shall show the results of the magnetic particle or liquid penetrant examination of each load bearing weld and lifting pad (following the load test). Failure to provide this certification and NDT report could result in rejection of this equipment, because of failure to comply with the terms of the contract.

3.13.4 Recommended Consumable Spare Parts - The vender shall provide critical spare parts for emergency equipment repair, a one year supply of key consumable components, and a list of recommended consumable spare parts with reference to possible sources for spare parts procurement.

3.13.6 Programmable Logic Controller (PLC) - Documentation for the PLC shall include media and instructions for restoring/replacing the stored program in the event of battery backup failure. One (1) CD backup copy of the PLC automatic program shall be included. Appropriate software shall be provided in CD/DVD format to allow Government maintenance personnel to address, maintain, and adjust the PLC as needed for investigation of equipment malfunction.

3.14 WARRANTY - Supplies and services furnished shall be covered by a three (3) year warranty from defects in design, materials and workmanship. The warranty shall be the manufacturer’s standard commercial three (3) year warranty, which shall conform to all the requirements of the contract. Acceptance of the manufacturer’s standard commercial warranty shall not minimize the rights of the Government under clauses in the contract, and in any conflict that arises between the terms and conditions of the contract and manufacturer’s warranty, the terms and conditions of the contract shall take precedence. The warranty period shall be for a minimum of 3 years. The warranty period shall commence from the date of acceptance. All warranty work shall be provided by a factory authorized distributer.

4 QUALITY ASSURANCE PROVISIONS

4.1 RESPONSIBILITY FOR INSPECTION - The Contractor shall be responsible for the performance of all inspection requirements (examinations and tests) as specified herein. The Government reserves the right to perform any of the inspections set forth in this specification, where such inspections are deemed necessary to assure supplies and services conform to the prescribed requirements.

4.2 RESPONSIBILITY FOR COMPLIANCE - All items shall meet all requirements of this specification.

The inspection(s) set forth in this specification shall become part of the contractor’s overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling inspections, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements; however, this does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to accept defective material.

4.3 INSPECTION/TESTING AT ORIGIN - Basic performance tests (prior to shipment) shall be conducted by the manufacturer on the primary equipment and all associated equipment to the extent practicable, to demonstrate functionality, to ensure contract requirements are being met. The tests may be performed by the Contractor, either by personnel of their service organization directly, or by an independent testing agency. The contractor shall contact the government two (2) weeks before the completion of the manufacturing of the specified equipment. This shall allow the government the option of sending their technical representative(s) to witness the tests, and to ensure contract requirements are being met, prior to shipment of the unit to the government.

4.4 INSPECTION/TESTING AT DESTINATION

4.4.1 Initial Test and Grooming - The equipment delivered with the system shall be inspected by the Government for mechanical and electrical integrity as follows: All welds shall be inspected for integrity and appearance. Surfaces shall be examined for sharp edges and burrs. Fasteners shall be checked for tightness and if fixed to prevent loosening due to vibration. Paint will be checked for flaking and blistering. Electrical requirements shall be examined for compliance to the National Electrical Code, (NFPA 70/79). The fit of parts shall be observed, with particular reference to the interchangeability of those that are likely to require replacement. Faults will be duly recorded and presented to the contractor for rectification.

4.4.2 Operational Tests - Upon satisfactory completion of the tests above, the equipment shall be set up for an operational test and evaluation. The contractor shall demonstrate the ability of the equipment to perform as required in this specification. All equipment functions shall be exercised to the extent necessary to prove proper operation in accordance with specification requirements. The system shall function, without failure, for the duration of this test period. If a failure occurs during the test period, repairs shall be immediately affected by the Contractor, and the tests shall be restarted from the first test. Three failures without completion of the test period shall be considered cause for rejection of the system. For the purpose of this test, a “failure” is defined as any equipment malfunction, which requires remedial action to restore the system to full operation in accordance with contract specifications.

4.4.3 Load Test of Lifting Pads and Non-Destructive Tests of Load Bearing Welds - Each lifting pad while attached to the equipment shall undergo a load test for a minimum of 10 minutes without damage or deformation.

The magnitude of the load test shall be based on a 200-210% increase above the “design load”. Acceptance shall be based on no visible damage or permanent distortion following the proof test. Damage and permanent distortion is defined as cracks, tears, mushrooming of load-bearing areas, bent or twisted pads or structure etc. On each lifting pad (or immediately adjacent to it) the lifting pad design load, 200% test load and test date shall be stencil or labeled in 1-inch high letters. A Non-Destructive Test shall be made on each of the lifting pads (after the load test if each lifting pad is performed). This shall include magnetic particle or liquid penetrant examination of the load bearing welds and lifting pads. Welds and materials shall meet the acceptance criteria in Mil-Std-2035A Class 1.

4.5 PROVISIONS FOR REPAIR AND RETEST - In the event of a test failure, the contractor, at their discretion, may elect to correct the failed condition and request a retest of the system (vs. shipping the equipment back to the manufacturer for repairs).

4.6 FINAL ACCEPTANCE - Final acceptance shall be upon satisfactory completion of installation, inspection, start-up, testing, and training of said equipment system (as outlined in this specification).

5 DELIVERY

5.1 It is required that all goods and services provided by this solicitation be delivered prior to 120 days of contract award.

5.2 The Surveillance Officer shall be notified no less than 48 hours prior to the arrival at the site of the specified equipment and/or contractor personnel.

5.3 Material transportation from the manufacturer’s facility to the work site shall be the responsibility of the contractor. Limited secured storage areas at the facility will not permit the Government to store material for extended periods of time. Early shipment of materials, without the permission of the receiving activity shall be refused.

5.4 Packing Material - The use of shredded paper, whether newspaper, office scrap, computer sheets, or wax paper, in packing material for shipment to Navy activities, is prohibited.

5.5 It is the Government’s intent that the Contractor delivers a fully operational and functional system meeting the requirements stated herein prior to acceptance by the receiving activity and final payment by the government.

Delivery of this system shall occur when all deliverable items of this contract have been received, installed and made operational and the contractor has demonstrated and the receiving activity has confirmed that the system meets or exceeds the requirements set forth in this specification and is ready for Government use.

6 GENERAL NOTES

6.1 RESPONSE TO REQUEST - As a part of the response to this request, descriptive literature (in accordance with FAR 52.214-21) shall be furnished in sufficient detail to show that the proposed design will meet these specifications. Vendor submittals shall include brochures of the model being submitted, assembly sketches with critical dimensions, sketches (with dimensions) of all tooling provided, statements of compliance with specification, and performance statements with special attention to the key performance criteria stated herein.

6.2 ADMITTANCE TO THE WORK SITE:

6.2.1 Upon contract award, employees or representatives of the Contractor who require access to the Receiving Activity's facility at Naval Base Kitsap,…

This is the start of the file's text. The full file is on GovTribe.